This document is a Draft Request for Proposal (RFP) for Small Caliber Second Source ammunition production. The U.S. Army is seeking a supplier to produce 5.56mm, 7.62mm, and Caliber .50 ammunition, with a requirement that the supplier be geographically separate from the Lake City Army Ammunition Plant. The procurement is restricted to suppliers in the United States, its outlying areas, or Canada, and will result in a five-year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract awarded to a single contractor.
The contract involves producing 17 different Department of Defense Identification Codes (DODICs) of ammunition, with a guaranteed minimum quantity of 10,000,000 each for 5.56mm and 7.62mm cartridges, and a maximum total contract quantity of 715,000,000 cartridges. The contract will use a combination of Firm-Fixed Prices and Fixed Prices with Economic Price Adjustment, with an Economic Price Adjustment for Copper applicable to Ordering Periods 2-5. Proposals are due by the date specified in Block 9 of the SF33, and the final RFP is scheduled for release in August 2025, with comments on the draft RFP due by July 18, 2025.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W519TC-25-R-0034
X
DOA6
SEE SCHEDULE
W519TC
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
MARK D. STEVENS
(309)782-2082
CCRI-AB
MARK.D.STEVENS.CIV@ARMY.MIL
X 3 25
1 126
X 1
X 7 X 9
X 13 X 30 X 49
X 57
X 59
X 89
X 90
X 107
X 118
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MARK D. STEVENS
Buyer Office Symbol/Telephone Number: CCRI-AB/(309)782-2082
Type of Contract 1: Firm Fixed Price
Type of Contract 2: Fixed Price with EPA - Established Prices
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
NOTICE
(a) This is a Draft Request for Proposal (RFP). The purpose of this document is to provide industry with a general understanding of the requirements of this acquisition and to obtain industry feedback on its contents prior to the release of the Final RFP. The Government is not utilizing this document to negotiate or solicit proposals, and the issuance of this Draft RFP does not serve to bind the
Government in any way. Portions of this Draft RFP are subject to change. Please note the terms RFP and solicitation will be used interchangeably throughout this document. Unless specified, the number of days for all submissions required by the resulting contract shall be in calendar days.
(b) Comments and questions regarding this Draft RFP are due to the below individuals, via e-mail, no later than July 18, 2025 using the
Comment/Question and Answer Template (Section J, RFP Attachment 0019).
Lana Graw, Contracting Officer, lana.r.graw.civ@army.mil
Mark Stevens, Contract Specialist, mark.d.stevens.civ@army.mil
EXECUTIVE SUMMARY
(a) RFP W519TC-25-R-0034 is for a Small Caliber Second Source supplier to produce 5.56 millimeter (mm), 7.62mm, and Caliber .50 ammunition. The Second Source supplier is required to be geographically separate from the Lake City Army Ammunition Plant (LCAAP) in
Independence, MO.
(b) This acquisition is a restricted competition to the United States (U.S.), its outlying areas, or Canada (hereinafter referred to
U.S./Canada) in accordance with Federal Acquisition Regulation (FAR) 6.302-3, Industrial Mobilization; Engineering, Developmental, or
Research Capability; or Expert Services.
(c) Award will result in a five-year Indefinite-Delivery Indefinite-Quantity (IDIQ) contract to a single successful Offeror. A combination of Firm-Fixed Prices and Fixed Prices with Economic Price Adjustment (EPA) will be utilized. An EPA for Copper will be included and will be applicable to Ordering Periods 2 through 5. See below for Ordering Period timeframes.
(d) Manufacture of all the following 17 Department of Defense Identification Codes (DODICs) will be required for this acquisition.
5.56mm
Contract Line Item Number (CLIN): X001
DODIC: A059
National Stock Number (NSN): 1305-01-155-5459
Description: Cartridge, 5.56mm, Ball, M855
CLIN: X002
DODIC: A062
NSN: 1305-01-258-8692
Description: Cartridge, 5.56mm, Ball, M855, Linked
CLIN: X003
DODIC: A080
NSN: 1305-00-182-3217
Description: Cartridge, 5.56mm, Blank, M200
CLIN: X004
DODIC: AB56
NSN: 1305-01-559-3332
Description: Cartridge, 5.56mm, Ball, M855A1, Linked
2 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CLIN: X005
DODIC: AB57
NSN: 1305-01-559-3333
Description: Cartridge, 5.56mm, Ball, M855A1
CLIN: X006
DODIC: AB77
NSN: 1305-01-598-0155
Description: Cartridge, 5.56mm, Ball, M855A1
7.62mm
CLIN: X007
DODIC: A131
NSN: 1305-01-569-2912
Description: Cartridges, 7.62mm, Ball, M80 and Tracer, M62, Linked
CLIN: X008
DODIC: A151
NSN: 1305-00-889-2169
Description: Cartridge, 7.62mm, Ball M80 OHF* and Tracer, M62 OHF*, Linked
* Overhead Fire (OHF)
CLIN: X009
DODIC: A143
NSN: 1305-01-569-2917
Description: Cartridges, 7.62mm, Ball, M80, Linked
CLIN: X010
DODIC: AB79
NSN: 1305-01-598-5913
Description: Cartridges, 7.62mm, Ball, M80A1, Linked
CLIN: X011
DODIC: AB86
NSN: 1305-01-606-7003
Description: Cartridges, 7.62mm, Ball, M80A1 and Tracer, M62A1, Linked
CLIN: X012
DODIC: AB82
NSN: 1305-01-598-8201
Description: Cartridges, 7.62mm, Ball, M80A1, Carton Packed
Caliber .50
CLIN: X013
DODIC: A552
NSN: 1305-01-662-6430
Description: Cartridge, Caliber .50, Ball, M33
CLIN: X014
DODIC: A555
NSN: 1305-01-658-2714
Description: Cartridges, Caliber .50, Ball, M33, Linked
CLIN: X015
DODIC: A557
NSN: 1305-01-658-2580
Description: Cartridges, Caliber .50, Ball, M33 and Tracer, M17, Linked
CLIN: X016
DODIC: A576
NSN: 1305-01-659-2421
Description: Cartridges, Caliber .50, 4 M8 API**/1 M20 API-T***, Linked
3 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
** Armor Piercing Incendiary (API)
*** Armor Piercing Incendiary-Trace (API-T)
CLIN: X017
DODIC: A598
NSN: 1305-01-078-4879
Description: Cartridges, Caliber .50, M1A1 Blank, Linked
(e) The resulting five-year IDIQ contract will consist of the following Ordering Periods.
Ordering Period 1: Date of Award - September 30, 2027
Ordering Period 2: October 1, 2027 - September 30, 2028
Ordering Period 3: October 1, 2028 - September 30, 2029
Ordering Period 4: October 1, 2029 - September 30, 2030
Ordering Period 5: October 1, 2030 - Five Years from Date of Award
A unique Delivery Order number will be assigned to each Ordering Period upon the initial quantity award within that Ordering Period timeframe. The Delivery Order format will be W519TC-XX-F-XXXX. Any contractual actions associated with a specific Delivery Order after the establishment of that Delivery Order will be accomplished through Modifications (W519TC-XX-F-XXXX, Modification PXXXXX).
The unit prices contained in the Small Caliber Second Source Price Matrix (Section J, RFP Attachment 0001) will be the unit prices used as the basis for all quantity awards. Awards will reflect the current cumulative quantity of the caliber family total (5.56mm, 7.62mm, and Caliber .50 respectively) for each Ordering Period. If a new award within an Ordering Period changes the Price Matrix quantity range of a caliber family, the unit price of all previously awarded quantities within that Ordering Period will be adjusted accordingly
(downward adjustment only).
The following example is provided for illustrative purposes only.
In Ordering Period 1, DODIC A059 (5.56mm) has a Price Matrix unit price of $0.50 each (EA) for the quantity range of 1-50 and $0.45 EA for the quantity range of 51-100. DODIC A062 (5.56mm) has a Price Matrix unit price of $0.40 EA for the quantity range of 1-50 and $0.35
EA for the quantity range of 51-100.
Under the initial quantity award in Ordering Period 1, the Government awards a quantity of 45 A059 cartridges at $0.50 EA. Later in
Ordering Period 1, the Government issues a Delivery Order Modification to award a quantity of 40 A062 cartridges. Since both awards are within the same Ordering Period and both DODICs are in the same caliber family, both of their awarded quantities count towards the cumulative caliber family total. This results in a 5.56mm caliber family total of 85 cartridges in Ordering Period 1. The 40 A062 cartridges are awarded at a unit price of $0.35 EA and the unit price of the 45 A059 cartridges is adjusted from $0.50 each to $0.45 EA.
(f) The guaranteed minimum quantity for the resulting contract is 10,000,000 EA 5.56mm cartridges in any combination of the 5.56mm
DODICs and 10,000,000 EA 7.62mm cartridges in any combination of the 7.62mm DODICs. These guaranteed minimum quantities shall be awarded by the initial Delivery Order in Ordering Period 1 at the same time that the Base IDIQ Contract is awarded. After the minimum guaranteed quantities have been awarded by the Government, the Government will no longer have any obligation to purchase additional quantities under the contract.
(g) During the life of the resulting contract, the Government is entitled to order a maximum of 715,000,000 cartridges in any combination of the 17 DODICs.
(h) Offerors cannot use LCAAP as a place of performance and/or obtain components or cartridges from LCAAP. However, any proposed use of an Armament Retooling Manufacturing Support (ARMS) tenant at LCAAP requires the proper and appropriate ARMS approvals, granted by the
Government, consistent with the purposes of ARMS and this RFP.
(i) In accordance with the Section C Narrative C0007, Restriction of Critical Items and Components, finished components are restricted to the U.S./Canada with the exception of Tracer and Incendiary Projectiles and their components. This acquisition will allow Tracer and
Incendiary Projectiles and their components to be obtained from Outside of the Continental U.S. (OCONUS) suppliers. Those items would then be required to be assembled into cartridges by the U.S./Canada Contractor. Levels below finished components are not required to be obtained from the U.S./Canada.
Any components/supplies obtained OCONUS shall be shipped using U.S. Flag Vessels per Defense Federal Acquisition Regulation Supplement
(DFARS) Clause 252.247-7023, Transportation of Supplies by Sea. The process to obtain a U.S. Flag Vessel for transportation may result in delays and U.S. Flag Vessels are typically more expensive. The U.S. Flag Vessel requirement is normally not waived and, therefore, an
Offeror's proposal must not be based upon an expected waiver of the U.S. Flag Vessel requirement.
(j) As outlined in Sections L and M of this RFP, a best value tradeoff approach will be used to evaluate proposals submitted in response to this RFP. The Government reserves the right to make an award to other than the lowest total evaluated price Offeror for non-price evaluation factors. The Government anticipates receiving adequate price competition under this RFP; therefore, cost or pricing data is
4 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
not required to be submitted with the proposal. However, in the event the Contracting Officer determines that adequate competition does not exist, the Government reserves the right to require certified cost or pricing data to be submitted. Additionally, the Government reserves the right to request other than certified cost or pricing data in the event such data is necessary to establish a fair and reasonable price.
(k) The Government intends to award without discussions; therefore, each proposal should contain the Offeror's best terms for award of a contract as a result of this RFP. The Contracting Officer may contact the Offeror(s) for clarifications, as described in FAR 15.306(a) and FAR Clause 52.215-1, Instructions to Offerors--Competitive, without opening discussions. However, the Government does reserve the right to open and conduct discussions and to permit Offerors to revise their proposals if determined necessary by the Contracting
Officer.
(l) Offerors shall propose all pricing using the Small Caliber Second Source Price Matrix (Section J, RFP Attachment 0001) as outlined in Section L of this RFP. Prices entered anywhere other than this Price Matrix will not be considered. The pricing/quantity ranges in the Price Matrix are provided for the purpose of establishing reasonable quantities against which to provide unit prices. The weights established in the Price Matrix are for evaluation purposes only. The weights are not a guarantee of quantities to be awarded.
(m) Offerors are to submit proposed unit prices on a Free on Board (FOB) Origin basis. The Government is only responsible for the costs associated with the shipment of the deliverable end item/DODIC. The Awardee/Contractor will be responsible for all other shipping.
(n) Deliveries of end items/DODICs shall be in accordance with the schedules set forth in Section F Narrative F0001, Required Delivery
Schedule.
(o) Controlled documents included in this RFP contain sensitive information and require special handling. Access to these documents is restricted to entities certified by the Joint Certification Program (JCP) at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/.
To request access, you must be logged into your System for Award Management (SAM) account at https://sam.gov/entity-information, and your user profile must be linked to the active registration for your entity, such as your Data Universal Numbering System (DUNS) number or Commercial and Government Entity (CAGE) Code. Access to controlled documents on SAM.gov will be granted only after the Government
Contracting Opportunities Point of Contact confirms the JCP certification for your entity is active. Additionally, only the registered
Data Custodian for your entity, listed in Block 3A of the DD Form 2345, and their alternate Block 3.1A, are eligible for approval. Your entity is responsible for managing its SAM.gov and JCP accounts and registrations, as well as handling controlled documents in compliance with all prescribed directives.
(p) Program Reviews/Program Management Reviews (PMRs) and Integrated Product Team (IPT) meetings are a requirement of the resulting contract. See Section C Narrative C0001, Program Reviews and Teleconferences, for details.
(q) All contractual provisions specified are obligatory for the Prime Contractor. The Prime Contractor is responsible for enforcing contractual provisions upon any subcontractors/suppliers/vendors.
(r) The items/DODICs to be procured as part of this acquisition are classified as sensitive ammunition/explosives that require a Pre-
Award Survey, which at a minimum, shall address safety and security considerations, to be completed at the applicable place(s) of performance.
(s) For Other Than Small Businesses ONLY. Separate from the Small Business Participation Commitment Document (Section J, Attachment
0015), Other Than Small Business Offerors shall also submit a Small Business Subcontracting Plan as required by FAR 19.7 (FAR Clause
52.219-9, Small Business Subcontracting Plan).
(t) Offerors must ensure proposals are fully complete, including all fill-ins within the RFP. Proposals shall be submitted no later than the due date specified in Block 9 of the Standard Form (SF) 33 and shall remain valid for 240 calendar days from the closing date of this RFP. Please ensure Page 1, Block 12 is completed with 240 calendar days. Receipt of an Offeror's proposal in response to this RFP is an affirmation that the Offeror has had access to and received adequate information to prepare a proposal.
Offerors must also have an active registration in SAM to be considered for award. Offerors are required to be registered in SAM at the time of proposal submission. In addition, pursuant to FAR 9.103, a contract will only be awarded to a Contractor that the Contracting
Officer determines to be responsible. Offerors must be able to demonstrate that they meet the standards of responsibility set forth by
FAR 9.104.
(u) Submission of representative production samples is a requirement of this acquisition. See Section C Narrative C0005, North Atlantic
Treaty Organization (NATO) Production Testing.
(v) The successful Offeror's proposal in response to this RFP may be incorporated in whole or in part as a material term of the resultant contract and failure to implement it may result in termination. No revisions or changes to the Offeror's proposal may be made after the award without prior approval from the Contracting Officer. The contract requirements take precedence over the incorporated proposal should a conflict exist.
(w) In the event a configuration change should materialize after the award of the resultant contract, it will be negotiated in
5 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
accordance with FAR 52.243-1, Changes-Fixed Price.
(x) Government-Furnished Test Equipment/Material will be supplied for performance of the resultant contract. See Section E Narrative
E0006, Government-Furnished Test Support Equipment, for further details. Reference rounds/cartridges will also be provided by the
Government. See Section E Narrative E0007, Government-Furnished Ammunition, for further details.
(y) The cognizant Army Contracting Command-Rock Island (ACC-RI) Contracting Officer is the only individual authorized to issue awards, modifications, and changes under the resultant contract.
(z) This RFP should not be discussed with any Government employee except the Contracting Officer, Ms. Lana Graw, or her representative, Mr. Mark Stevens. Ms. Graw can be contacted by e-mail at lana.r.graw.civ@army.mil and Mr. Stevens at mark.d.stevens.civ@army.mil.
Failure to adhere to this restriction may be grounds to declare an Offeror ineligible for consideration of the contract award resulting from this RFP.
*** END OF NARRATIVE A0001 ***
6 126
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PRODUCTION QUANTITY ___________________
All proposed unit prices for production quantities shall be entered into the Section J, RFP Attachment
0001, Small Caliber Second Source Price Matrix
Production Quantities:
Inspection at Origin/Source
Acceptance at Origin/Source
F.O.B Origin
(End of narrative A001)
7 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
FIRST ARTICLE
All proposed prices for First Article Tests (FATs) shall be entered into Section J, RFP Attachment 0001, Small Caliber Second Source
Price Matrix.
See Section E Narrative E0008, First Article Test (Contractor Testing), for FAT requirements.
FAT Report:
Inspection at Origin
Acceptance at Destination
*** END OF NARRATIVE B0001 ***
CONTRACT DATA REQUIREMENTS LIST (CDRLs)
Information required by each individual CDRL shall be delivered to the Government as specified in Section J, RFP Exhibit A, Contract
Data Requirements List (CDRLs).
CDRLs shall not be separately priced.
*** END OF NARRATIVE B0002 ***
DELIVERY SCHEDULE
See Section F Narrative F0001, Required Delivery Schedule, for details.
*** END OF NARRATIVE B0003 ***
ORDERING
See Section I Clauses 52.216-19, Order Limitations; 52.216-22, Indefinite Quantity; and 52.216-18, Ordering, for details.
*** END OF NARRATIVE B0004 ***
8 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PROGRAM REVIEWS AND TELECONFERENCES
(a) Program Reviews/PMRs: The Prime Contractor shall hold Program Reviews, generally two times per calendar year, at a location and time to be established by the Government. Responsible and cognizant Contractor personnel shall attend these reviews to provide cognizant
Government personnel with a contract status update, accomplishments during the previous period, and a review of any technical and/or administrative issues associated with the program. Program review briefing charts shall be submitted to the Contracting Officer, the
Project Manager Maneuver Ammunition Systems Program Lead, and the Joint Munitions Command (JMC) Production Leads at least five working days in advance of the scheduled Program Review.
(b) Teleconferences/Virtual Meetings: Teleconferences/Virtual Meetings shall be conducted by the Small Caliber Second Source IPT, consisting of Government and Prime Contractor personnel. These meetings will be held at a mutually agreed to time on a weekly basis or at the discretion of the Contracting Officer. The purpose is to ensure that pertinent program issues are addressed in a timely manner.
The Contractor shall provide an action item list for these meetings at least one working day in advance. The Government reserves the right to require separate IPTs for each individual caliber and/or an overarching contract IPT.
*** END OF NARRATIVE C0001 ***
CONTRACTUAL BASELINE REPORT
The Technical Data Packages (TDPs) issued through "Contract Opportunities" on the SAM.gov website (see Section A for how to obtain TDPs) in conjunction with this RFP W519TC-25-R-0034 will serve as the TDP baseline at the time of contract award. After contract award, Engineering Change Proposals (ECPs) and/or Requests for Variance (RFVs) may be incorporated via contract modification. Reference Section
J, Contract Exhibit A, CDRL A018 regarding the requirement for a Contractual Baseline Report that annotates the baseline TDP for each
DODIC supplemented with any ECPs and/or RFVs subsequently incorporated. The TDP baseline shall be for information purposes only. The contract and any modifications shall take precedence.
*** END OF NARRATIVE C0002 ***
SALE/DE-MILITARIZTION OF ENHANCED PERFORMANCE ROUNDS (EPR)
(a) The Contractor is not authorized to sell or otherwise distribute conforming or non-conforming EPR, nor specific components
(including, but not limited to, M855A1 and M80A1) without the express written approval of the Contracting Officer.
(b) The Contractor must de-militarize the EPR projectiles for any and all rounds found to be non-conforming material. The Contractor can choose any de-militarization process, so long as the bullets are not usable as bullets after the process has been completed.
(c) The Government may permit direct sales of specific EPR cartridges and/or components to other Government agencies and Department of
Defense (DoD)-approved contractors. The Contractor must request and obtain Contracting Officer written approval as outlined herein and include the following information for each qualified request.
(1) A Statement of Purpose for the sale, identifying a Government sponsor, a proposed test plan/matrix, and the quantity required.
(2) A Alcohol, Tobacco, Firearms, and Explosives license.
(3) A U.S. Government Agency/DoD-Approved Contractor DD Form 2345 (see Section A regarding JCP guidance for DD Form 2345).
(4) Completed and signed Non-Disclosure Agreements (samples will be provided after contract award).
(d) Additional comments/requirements.
(1) Sale to foreign countries is restricted. Exportation of EPR ammunition is not allowed.
(2) All cartridges/components delivered to other Government agencies and DoD-approved contractors must be in compliance with all
Government TDPs and requirements.
9 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) For all approved EPR sales, the Contractor must include the following verbiage in the purchase agreement:
"The Purchaser is not authorized to sell or otherwise distribute conforming or non-conforming Enhanced Performance Rounds (EPR), nor specific components (including, but not limited to, M855A1 and M80A1) without the express written approval of the Contracting Officer.
The Purchaser must de-militarize any and all EPR projectiles left over or found to be non-conforming material. The Purchaser can choose any de-militarization process, so long as the bullets are not usable as bullets after the process is completed. Penetrators may remain intact".
(4) The Contractor shall not proceed with any EPR direct sale until Contracting Officer approval is obtained.
*** END OF NARRATIVE C0003 ***
ENGINEERING SUPPORT
Throughout the life of the resulting contract, the Contractor may be required to provide additional engineering support necessary for small caliber ammunition, above and beyond what is already required by the terms and conditions contained in this RFP. As engineering support is needed, the Government will provide the Contractor with a Statement of Work (SOW) and will request a supporting cost/price proposal. Efforts will be negotiated and incorporated via contract modification. Engineering support means Government-initiated complementary small caliber ammunition engineering analyses/efforts. Requirements may include, but are not limited to, the building of prototype tooling, components, and/or cartridges; industrial base and facilities studies, analysis, and conceptual designs; and manufacturing engineering support.
*** END OF NARRATIVE C0004 ***
NATO PRODUCTION TESTING
The Contractor shall be responsible for the delivery of a representative sample(s) of ammunition to the NATO North American Regional
Test Center located at LCAAP in Independence, MO, for NATO production testing. This is required to determine if the U.S. ammunition designs, that are currently qualified to be used by NATO Member Forces, continue to meet the NATO standards for battlefield interchangeability, and merit the application of the NATO Symbol of Interchangeability. Reference Section J, RFP Attachment 0006, NATO
Production Test SOW.
*** END OF NARRATIVE C0005 ***
CONTRACT PRODUCTION, DELIVERY, AND GOVERNMENT-FURNISHED EQUIPMENT/MATERIAL REPORTING
The Contractor will be required to submit recurring reports of varying frequency pertaining to production and delivery progress/status and Government-Furnished Equipment/Material status. The Contractor is responsible for execution of Section J, RFP Attachment 0007, Contract Production, Delivery, and Government-Furnished Equipment/Material Reporting SOW. The applicable report templates are included in Section J, RFP Attachments 0008 through 0012. Reports will be submitted for all items required under the resultant contract unless specifically excluded by the Contracting Officer.
*** END OF NARRATIVE C0006 ***
RESTRICTION OF CRITICAL ITEMS AND COMPONENTS
(a) The items and components listed in paragraphs (b) and (c) are critical to the support of national defense items. As such, it is necessary to create and/or maintain a domestic capability to produce these items and components by limiting production and procurement to the U.S/Canada industrial base.
(b) All finished components (to include but not limited to Explosives, Nitrocellulose, Propellants, and Ammunition Containers) must be obtained from sources within the U.S./Canada but not from LCAAP. The U.S./Canada requirement does not apply to Tracer and Incendiary
10 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Projectiles and their components.
(c) Load, Assemble, and Pack of all cartridges shall occur at a facility other than LCAAP that is within the U.S./Canada.
(d) The failure of the Contractor or any subcontractors to comply with this requirement shall be a material breach of the contract.
(e) The Contractor will insert the substance of this narrative, including this paragraph (e), in every subcontract for items or components identified above to ensure flow-down to, but not including, raw materials.
*** END OF NARRATIVE C0007 ***
OPERATIONS SECURITY (OPSEC) REQUIREMENTS
(a) As defined in Army Regulation (AR) 530-1, OPSEC, sensitive information is information requiring special protection from disclosure that could cause compromise or threat to our national security, an Army organization, activity, family member, DA civilian or DoD
Contractor. Critical Information is defined as information important to the successful achievement of U.S. objectives and missions, or which may be of use to an adversary of the United States. It consists of specific facts about friendly capabilities, activities, limitations (includes vulnerabilities), and intentions needed by adversaries for them to plan and act effectively so as to degrade friendly mission accomplishment. All critical information is sensitive, but not all sensitive information is critical.
(b) The Contractor shall not release sensitive information to the general public without prior written approval from the Contracting
Officer. All Contractor requests to release sensitive information shall be in writing and clearly explain the necessity for the release of the information and consequences if approval is not granted. Contractor employees who are U.S. citizens shall be provided access to sensitive information on a "need to know" basis required to fulfill the terms and conditions of the contract. Foreign National (FN) employees' access to information will be limited to non-sensitive information. FN access to sensitive information will be approved in writing by the Contracting Officer on a case-by-case basis and will be strictly limited to the information that the employee must know in order to fulfill the terms and conditions of the contract.
(c) The Contracting Officer will provide the Contractor with a list of known Critical Information (CI) pertinent to contract requirements as soon as possible after contract award. Critical Information shall be used by the Contractor's appointed OPSEC Manager to prepare an OPSEC Plan.
(d) The Contractor shall be responsible for establishing and maintaining an OPSEC program to adequately manage, protect and control sensitive information that has been provided or generated under the contract. The Contractor shall prepare and submit a written OPSEC
Plan to the Contracting Officer for approval in accordance with CDRL A004 and DI-MGMT-80934C within 30 calendar days after receipt of the CI information addressed in paragraph (c) above to be reviewed and approved by the responsible Government OPSEC officer. See Section
J, RFP Attachment 0004 for an OPSEC Plan sample. The Contractor shall implement OPSEC measures as ordered by the Government. In addition, the Contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The
Contractor shall implement OPSEC measures as ordered by the commander. The Contracting Officer will coordinate with the Government OPSEC
Officer and advise the Contractor in writing of the approval, conditional approval or disapproval of the plan within 20 calendar days of receipt.
(e) The Contractor shall conduct annual self-assessments of their OPSEC program and submit annual written assessments to the Contracting
Officer in the anniversary month of contract award. OPSEC Assessment checklists and sample assessment responses will be provided in advance by the Government as tools to aid the Contractor in assessing their OPSEC program.
(f) The Contractor's Level II certified OPSEC Officer / coordinator shall provide OPSEC training to all employees regarding the safeguarding of sensitive information prior to employees being allowed access to such information, and annually thereafter.
(g) The Contractor shall destroy all sensitive program material at the completion of the contract so as to ensure the information cannot be accessed or utilized for any purpose and notify the Contracting Officer in writing of its destruction.
(h) These same requirements will flow down to all subcontractors working on or provided any sensitive information related to the contract.
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
(a) Contractor employees that will require access to CUI will follow all DoD (DoDI 5200.48) and Army policies regarding access to CUI, and the handling, storage, transmission, and destruction of CUI. Contractor employees are required to complete initial CUI training
(available at https://securityawareness.usalearning.gov/cui/index.html) within 30 calendar days of start of performance on the contract, and then annually thereafter. All CUI must be transmitted via encrypted channels such as the DoD Safe Access File Exchange (SAFE) website (https://safe.apps.mil/).
11 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) Contractor shall safeguard CUI and perform Cyber Incident Reporting in accordance with DFARS Clause 252.204-7012.
(c) Adequate security. The Contractor shall provide adequate security on all covered contractor information systems. The covered
Contractor information system shall be subject to the security requirements in National Institute of Standards and Technology (NIST)
Special Publication (SP) 800-171.
(d) Cyber incident reporting requirement. When the Contractor discovers a cyber incident that affects a covered Contractor information system or the covered defense information residing therein, the Contractor shall:
(1) Conduct a review for evidence of compromise of covered defense information, including, but not limited to, identifying compromised computers, servers, specific data, and user accounts. This review shall also include analyzing covered Contractor information system(s) that were part of the cyber incident, as well as other information systems on the Contractor's network(s), that may have been accessed as a result of the incident in order to identify compromised covered defense information, or that affect the
Contractor's ability to provide operationally critical support; and
(2) Rapidly report cyber incidents to DoD at https://dibnet.dod.mil.
*** END OF NARRATIVE C0008 ***
SUPPLY CHAIN RISK MANAGEMENT
(a) Manufacture Bill of Materials (MBOM)
(1) The Contractor shall utilize the "AS BUILT"/USG's Item(s) "BUILD TO PRINT" TDPs / Technical Data Package Listing(s) which is part of this procurement, as a guide to provide the Materiel Sourcing List.
(2) The Contractor shall submit an MBOM for each item on contract. The primary top-tiered level parts are aligned with each part number dependency and each subcomponent for that part number by following CDRL A027 as an itemized list. The Contractor's data shall be treated as proprietary or confidential as designated by the Contractor.
(3) The Contractor shall include breakdown of raw material, precursor level, element, and constituents. Applies to the prime and their suppliers, subcontractors, associated integrators, and vendor spanning down to and limited to the 8th tier level, where feasible, of the supply chain, from raw material stage to delivery of a finished product and/or service.
(4) The Contractor shall trace down the indentured MBOM for all military items used for this procurement to the lowest tier possible or until a proprietary roadblock is encountered.
(5) The Contractor shall further supplement the indentured MBOM with all commercially available product items. The Commercial-Off-
The-Shelf items shall continue down to the 4th tier level, where feasible.
(b) Supply Risk Management Plan and Risks & Mitigations Strategy
(1) The Contractor shall identify, assess, and plan strategies for actual or potential threats, vulnerabilities, and disruptions to the Supply Chain, throughout the contract lifecycle to ensure contract requirements are met. The Contractor shall maintain strategy documentation about subcontractors/vendors for all parts that will be used for this contract, in accordance with CDRL A027 and DI-MGMT-
82256A (Supply Chain Risk Management Plan). The information shall be the basis for a dialogue between the Government and the Contractor throughout the performance of the contract.
(2) The Contractor shall utilize a Government-directed electronic format or the Supply Chain Risk Register template to identify
Supply Chain Risk Information in accordance with DI-MGMT-82255A paragraph 3.2. Additionally, the Contractor shall detail the Supply
Chain Risk Handling procedures in accordance with DI-MGMT-82256A paragraph 3.4.g. The Contractor shall share their Supply Chain Risks and Mitigations Summary with the Government at Program Reviews. A collaborative approach shall be established between the Contractor and the Government to identify, mitigate, and monitor supply chain risks (as appropriate). Any documents that are shared with the Government that are Contractor proprietary information shall be labeled "Proprietary" or "Confidential" as appropriate.
*** END OF NARRATIVE C0009 ***
12 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
PACKAGING REQUIREMENTS
CLIN: X001
DODIC: A059
NSN: 1305-01-155-5459
NOMENCLATURE: Cartridge, 5.56mm, Ball, M855; Packed 10-Ctgs/10 Round
Clip; 3-Clips/Carton; 4-Cartons/Bandoleer, M8 with Magazine Filler; 7-
Bandoleers/Box, Ammunition M2A2; 2-Box, M2A2/Box, Wirebound (Total 1680
Ctgs/Box, Wirebound)
(a) Packaging shall be in accordance with 12551963, revision BD, dated 28 MARCH 2019.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with 12551963, revision BD, dated 28 MARCH 2019. 2-D barcodes are require in accordance with
12999545, rev J, dated 26 JAN 2018.
(d) The following shall apply to drawing 12551963, revision BD, dated 28 MARCH 2019:
(e) PERFORMANCE ORIENTED PACKAGING (POP)
(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented
Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multiyear contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.
(f) EXCEPTION TO POP MARKINGS
(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.
(g) POP VERIFICATION
(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.
(h) HEAT TREAT WOOD QUALITY MARKING
(1) In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All
WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations
(http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(i) MARKING
(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.
(j) Palletization shall be in accordance with 19-48-4116/5, revision 20, dated 01 MARCH 2019. 19-48-4116, Revision 13, dated 01 JAN
2017, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with
ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are required.
13 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CLIN: X002
DODIC: A062
NSN: 1305-01-258-8692
NOMENCLATURE: Cartridge, 5.56mm, Ball, M855, Linked; Packed 200-
Ctgs/Belt, Link, Cartridge, M27; 1-Belt/Magazine, Ammo, M249 SAW; 1-
Magazine, Ammo, M249 SAW/Bandoleer 200 Rd Mag, (M249 M.G.); 4-
Bandoleers/Container, Ammo, PA108; 2-Container, PA108/Box, Wirebound
(Total 1600 Ctgs/Box, Wirebound)
(a) Packaging shall be in accordance with 12590217 revision AR, dated 28 MAR 2019.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with 12590217 revision AR, dated 28 MAR 2019. 2-D barcodes are require in accordance with 12999545, rev J, dated 26 JAN 2018.
(d) The following shall apply to drawing 12590217 revision AR, dated 28 MAR 2019:
(e) PERFORMANCE ORIENTED PACKAGING (POP)
(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented
Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multiyear contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.
(f) EXCEPTION TO POP MARKINGS
(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.
(g) POP VERIFICATION
(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.
(h) HEAT TREAT WOOD QUALITY MARKING
(1) In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All
WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations
(http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(i) MARKING
(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.
(j) Palletization shall be in accordance with 19-48-4116/5C, revision 9, dated 01 AUG 2017. 19-48-4116, Revision 13, dated JAN 2017, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are
14 126
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
required.
CLIN: X003
DODIC: A080
NSN: 1305-00-182-3217
NOMENCLATURE: Cartridge, 5.56mm, Blank, M200; Packed 20-Ctgs/Carton;
57-Cartons/Box, Ammunition, M2A2; 2-Box, M2A2/Box, Wirebound (Total 2280
Ctgs/Box, Wirebound)
(a) Packaging shall be in accordance with 12551963 revision BD, dated 28 MAR 2019.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with 12551963, revision BD, dated 28 MAR 2019. 2-D barcodes are require in accordance with 12999545, rev J, dated 26 JAN 2018.
(d) The following shall apply to drawing 12551963, revision BD, dated 28 MAR 2019:
(e) PERFORMANCE ORIENTED PACKAGING (POP)
(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented
Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multiyear contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.
(f) EXCEPTION TO POP MARKINGS
(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.
(g) POP VERIFICATION
(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.
(h) HEAT TREAT WOOD QUALITY MARKING
(1) In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .