This document is a Contract Data Requirements List (CDRL) for RFP W519TC-25-R-0034, detailing the Small Caliber Second Source 5.56mm, 7.62mm, and Caliber .50 Ammunition contract. The CDRL outlines 27 different data submission requirements (A001-A027) that the contractor must fulfill throughout the contract lifecycle, including technical, quality, production, and packaging reports.
Key submission requirements include Engineering Change Proposals, Operations Security Plans, Quality Program Plans, First Article Test Reports, Ammunition Data Cards, Production Status Reports, and Material Sourcing Lists. Most submissions are electronic via email or DoD SAFE, with specific timelines ranging from 30 to 270 calendar days after contract award. The requiring offices are primarily AMJM-QA, AMJM-SPS, and FCDD-ACE, with distribution typically including the Procuring Contracting Officer (PCO), Production Quality Manager (PQM), and various Joint Munitions Command (JMC) personnel. Each requirement specifies frequency (weekly, monthly, annually, or as required), distribution statement, and detailed submission instructions.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A Contract Data Requirements List
RFP W519TC-25-R-0034 / Small Caliber Second Source 5.56mm, 7.62mm, Caliber .50 Ammunition
A001
Title: Engineering Change Proposal (ECP) App Code: N/A
Subtitle: N/A Dist Statement Required: *
Data Item Number: DI-SESS-80639D Frequency: ASREQ
Contract Reference: Section C As of Date: N/A
Requiring Office: FCDD-ACE-SP Date of 1st Submission: ASREQ
DD 250: LT Date of Subsequent Submission: ASREQ
Distribution Draft Reg Repro
SEE ADDRESS CODE 0 0 0
DISTRIBUTION 0 0 0
REMARKS
Data must be in Government compatible software (i.e., Microsoft Office or Portable Document Format (pdf)). *Distribution Statement will be assigned and implemented by the DoD Configuration Control Authority. Distribution Statement should be at the highest level of the applicable drawings. For example, if the document has Distribution Statement A and D drawings, then the whole submittal shall be labeled Distribution Statement D.
The preferred method for submittal is DD FORM 1692 located at http://www.dtic.mil/whs/directives/infomgt/forms/. Submit electronically to usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; copy furnish this submittal to the Government Contracting Office (ACC-RI).
A002
Title: Request for Variance (RFV) App Code: N/A
Subtitle: N/A Dist Statement Required: *
Data Item Number: DI-SESS-80640D Frequency: ASREQ
Contract Reference: Section C As of Date: N/A
Requiring Office: FCDD-ACE-SP Date of 1st Submission: ASREQ
DD 250: LT Date of Subsequent Submission: ASREQ
Distribution Draft Reg Repro
SEE ADDRESS CODE 0 0 0
DISTRIBUTION 0 0 0
REMARKS
Data must be in Government compatible software (i.e., Microsoft Office or Portable Document Format (pdf)). *Distribution Statement will be assigned and implemented by the DoD Configuration Control Authority. Distribution Statement should be at the highest level of the applicable drawings. For example, if the document has Distribution Statement A and D drawings, then the whole submittal shall be labeled Distribution Statement D.
The preferred method for submittal is DD FORM 1692 located at http://www.dtic.mil/whs/directives/infomgt/forms/. Submit electronically to usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; copy furnish this submittal to the Government Contracting Office (ACC-RI).
mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil
A003
Title: Notice of Revision (NOR) App Code: N/A
Subtitle: N/A Dist Statement Required: *
Data Item Number: DI-SESS-80642D Frequency: ASREQ
Contract Reference: Section C As of Date: N/A
Requiring Office: FCDD-ACE-SP Date of 1st Submission: ASREQ
DD 250: LT Date of Subsequent Submission: ASREQ
Distribution Draft Reg Repro
SEE ADDRESS CODE 0 0 0
DISTRIBUTION 0 0 0
REMARKS
Data must be in Government compatible software (i.e., Microsoft Office or Portable Document Format (pdf)). *Distribution Statement will be assigned and implemented by the DoD Configuration Control Authority. Distribution Statement should be at the highest level of the applicable drawings. For example, if the document has Distribution Statement A and D drawings, then the whole submittal shall be labeled Distribution Statement D.
The preferred method for submittal is DD FORM 1692 located at http://www.dtic.mil/whs/directives/infomgt/forms/. Submit electronically to usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; copy furnish this submittal to the Government Contracting Office (ACC-RI).
A004
Title: Operations Security (OPSEC) Plan App Code: A
Subtitle: N/A Dist Statement Required: D
Data Item Number: DI-MGMT-80934C Frequency: ONE/R
Contract Reference: Section C As of Date: ASREQ
Requiring Office: AMSJM-FP/G2 Date of 1st Submission: ASREQ
DD 250: XX Date of Subsequent Submission: ASREQ
JMC OPSEC 0 1 0
PCO 0 1 0
Delete reference “Applying OPSEC to U.S. Government Contracts”. Replace with reference “Sample Acquisitions OPSEC Plan”. 10 calendar days required for Government review and approval. *30 calendar days after the Contracting Officer provides the list of known Critical Information (CI)/Threat Information. ** Resubmit 10 calendar days after Government review. Submit electronically to usarmy.ria.jmc.mbx.opsec-fd@army.mil.
mailto:usarmy.ria.jmc.mbx.opsec-fd@army.mil
A005
Title: Quality Program Plan (QPP) App Code: A
Subtitle: N/A Dist Statement Required: B
Data Item Number: DI-QCIC-81722 (Current Revision) Frequency: ONE/R
Contract Reference: Section E As of Date: N/A
Requiring Office: AMJM-QA Date of 1st Submission: 150DAC
PQM 0 1 0
Date of 1st Submission: Quality Program Plan (QPP) shall be submitted no later than 150 calendar days after contract award. The Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions, and the Government shall provide response within 15 calendar days. Approval is required prior to First Article Test (FAT), if FAT is required, or prior to the initiation of production. Disposition will be provided by the Contracting Officer.
Date of Subsequent Submission: Submit updates/revisions for review and approval prior to implementation.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be provided after contract award.
A006
Title: Critical Characteristics Control Plan (CCCP) App Code: A
Subtitle: N/A Dist Statement Required: B
Data Item Number: DI-MGMT-81986 (Current Revision) Frequency: ANNLY
Contract Reference: Section E As of Date: N/A
Requiring Office: AMJM-QA Date of 1st Submission: 120DAC
Date of 1st Submission: Critical Characteristics Control Plan (CCCP) shall be submitted no later than 120 calendar days after contract award. Government shall provide response within 45 calendar days of initial submission. Disposition of the CCCP will be provided by the Contracting Officer. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions, and the Government shall provide a response within 15 calendar days. The CCCP shall be approved prior to First Article Test (FAT), if FAT is required, or the initiation of production.
Date of Subsequent Submission: Submit updates/revisions for review and approval prior to implementation. Government shall provide a response within 15 calendar days of receipt and Contractor shall response to any comments within 15 calendar days.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be provided after contract award.
A CCCP Review Guide is available to assist Contractors on the DEVCOM/CCDC Public Website (https://ac.ccdc.army.mil/organizations/QESA/) in the application of the CCCP requirement. The CCCP Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the CCCP Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the CCCP requirement itself nor into the terms and conditions of any underlying contract which contains the CCCP requirement.
https://safe.apps.mil/
A007
Title: Critical Plan of Action (CPOA) App Code: A
Subtitle: N/A Dist Statement Required: B
Data Item Number: DI-MGMT-81996 (Current Revision) Frequency: ASREQ
Contract Reference: Section E As of Date: N/A
Requiring Office: AMJM-QA Date of 1st Submission: ASREQ
Frequency: Contractor may voluntarily submit a Critical Plan of Action (CPOA) for all critical characteristics as specified in the critical characteristic requirement. If the Contractor chooses to utilize the CPOA, it shall be updated and resubmitted on an annual basis from the date that the CPOA is approved.
Date of 1st Submission: Contractor shall submit the CPOA for approval prior to use. The Government requires 45 calendar days for review. Disposition of the CPOA will be provided through the Contracting Officer. CPOA shall be approved prior to implementation. If further revisions are necessary, the Contractor shall provide revision within 15 calendar days and the Government will provide disposition within 15 calendar days of receipt.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be provided after contract award.
A CPOA Review Guide is available to assist Contractors on the ARDEC Public Website (https://ac.ccdc.army.mil/organizations/QESA/) in the application of the CPOA requirement. The CPOA Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the CPOA Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the CPOA requirement itself nor into the terms and conditions of any underlying contract which contains the CPOA requirement.
A008
Title: Statistical Process Control (SPC) App Code: A
Subtitle: N/A Dist Statement Required: B
Data Item Number: DI-MGMT-81987 (Current Revision) Frequency: ONE/R
Contract Reference: Section E As of Date: N/A
Requiring Office: AMJM-QA Date of 1st Submission: 150DAC
Date of 1st Submission: The General Plan shall be submitted no later than 150 calendar days after contract award. The final Detailed Plan shall be submitted 200 calendar days after contract award. Approval is required prior to a First Article Test (FAT), or initiation of production if FAT is not required. The Government requires 30 days for review. Disposition of the General and Detailed sections will be provided through the Contracting Officer.
Date of Subsequent Submission: If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall review and provide disposition within 15 calendar days of receipt.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be
A009
Title:
Critical Safety Item, Characteristic, and Critical Defect Report
App Code: A
Subtitle: CICL, Notification, Investigation, and Restart Dist Statement Required: B
Data Item Number: DI-SAFT-80970(Current Revision) Frequency: ASREQ
Contract Reference: Section E As of Date: N/A
Date of 1st Submission: CICL - If applicable, shall be submitted no later than 120 calendar days after contract award. The Government shall provide a response within 45 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions, and the Government shall provide response within 15 calendar days. If applicable, the CICL shall be approved prior to First Article Test (FAT), if FAT is required, or prior to initiation of production.
Disposition will be provided by the Contracting Officer.
Date of 1st Submission: Critical Defect – Notification of a critical defect shall be made to the Contracting Officer, Contract Specialist, PQM, and QAR within 24 hours of the event. Root cause investigation and corrective action and segregated suspect material use shall be submitted to the Government for approval. Government will respond within 15 calendar days of receipt of original and any required revisions. Disposition will be provided by the Contracting Officer.
Date of 1st Submission: Restart Request – Contractor shall submit request to restart to the Government for approval. The Government will respond within 3 business days of receipt. Disposition will be provided by the Contracting Officer.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be provided after contract award.
A CCCP/CPOA Review Guide is available to assist contractors on the ARDEC Public Website (https://ac.ccdc.army.mil/organizations/QESA/ in the application of the CICL requirement. The CCCP/CPOA Review Guide’s content, in its entirety, is provided solely for REFERNCE and GUIDANCE PURPOSES ONLY – it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the CCCP/CPOA Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the CICL requirement itself nor into the terms and conditions of any underlying contract which contains the CICL requirement.
A010
Title:
Measurement System Evaluation (MSE) – Measurement and Inspection Equipment System Design Documentation for Acceptance
App Code: A
Subtitle:
Measurement System Evaluation/Acceptance Inspection Equipment
(MSE/AIE)
Dist Statement Required: B
Data Item Number: DI-QCIC-81960 (Current Revision) Frequency: ONE/R
Contract Reference: Section E As of Date: N/A
DD 250: DD Date of Subsequent Submission: ASREQ
Date of 1st Submission: The Contractor shall submit a completed Acceptance Inspection Equipment (AIE) package no later than 120 calendar days after contract award. The AIE shall be approved prior to First Article Testing (if First Article Testing is required)), production, and/or all acceptance of product under the contract. The Contracting Officer will provide disposition within 45 calendar days of final AIE package receipt.
Date of Subsequent Submission: If further revisions are necessary, the Contractor shall have 30 calendar days to generate them and the Government shall have 30 calendar days to review and respond to them. The approved AIE shall be available for First Article Testing (FAT (if FAT is required), production, and/or all acceptance of product under the contract.
If the Contractor revises a previously Government accepted AIE for this contract, the revised AIE must be submitted to the Government for review and approval. Approval must be granted before AIE is used for acceptance of product. The Government will respond within 30 calendar days.
The Contractor shall notify the responsible Government technical agency a minimum of 30 calendar days prior to acceptance (prove-out) testing for Automated Acceptance Inspection Equipment.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be provided after contract award.
An MSE Review Guide is available to assist contractors on the ARDEC Public Website (https://ac.ccdc.army.mil/organizations/QESA/) in the application of the MSE Clause. The Measurement System Evaluation (MSE) Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the MSE Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the MSE clause itself nor into the terms and conditions of any underlying contract which contains the MSE clause.
https://ac.ccdc.army.mil/organizations/QESA/
A011
Title: First Article Qualification Test Plan and Procedure App Code: A
Subtitle: N/A Dist Statement Required: B
Data Item Number: DI-NDTI-81307 (Current Revision) Frequency: ASREQ
Contract Reference: Section E As of Date: N/A
Date of 1st Submission: First Article Test (FAT) Plans shall be submitted no later than 120 calendar days after contract award. The Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions, and the Government shall provide response within 15 calendar days. Disposition will be provided by the Contracting Officer. Contracting Officer approval of the plan shall be obtained prior to FAT.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be
A012
Title: Test/Inspection Reports App Code: A
Subtitle: First Article Test Report (FATR) Dist Statement Required: B
Data Item Number: DI-NDTI-80809 (Current Revision) Frequency: ASREQ
Contract Reference: Section E As of Date: N/A
Requiring Office: AMJM-QA Date of 1st Submission: 270DAC
Date of 1st Submission: The First Article Test Report (FATR) shall be submitted with Quality Assurance Representative findings on DD Form 1222. The FATR shall be submitted 270 calendar days after contract award and no later than 30 calendar days after completion of the First Article Test (FAT). The Government requires 30 calendar days for review.
Disposition of the FAT report will be provided through the Contracting Officer. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days. Contracting Officer approval of the FATR shall be obtained prior to start of production.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be
A013
Title: Ammunition Data Card (ADC) App Code: A
Subtitle: Data Input Dist Statement Required: B
Data Item Number: DI-MISC-80043 (Current Revision) Frequency: ASREQ
Contract Reference: Section C, MIL-STD- 1168 As of Date: N/A
WARP 0 1 0
Lot Shipment 0 2 0 Mail to Dest 0 2 0
Date of 1st Submission: Sample Ammunition Data Card (ADC) shall be submitted into the Munitions History Program (MHP) system and approved prior to First Article Testing (FAT) or initiation of production if FAT is not required. ADCs shall be prepared in accordance with MIL-STD-1168 by accessing the Worldwide Ammunition-Data Repository Program (WARP) on the Munitions History Program website at https://mhp.redstone.army.mil.
Frequency/ Date of Subsequent Submission: An ADC shall be submitted with each lot.
Hard copy ADC provided with lot shipments shall be generated from the WARP and signed/dated by the Government Agent Responsible for Acceptance (GARA).
When ballistic tests are required, one hard copy ADC generated from the WARP and signed/dated by the GARA shall be sent to the Proving Ground with sample shipment, plus an additional signed/dated, hard copy provided to the Proving Ground by mail.
If the critical characteristic requirement is in the contract, the critical characteristic information fields in WARP for the ADC shall be completed for each lot.
A014
Title: Test/Inspection Reports App Code: N/A
Subtitle: Lot Acceptance Test Reports Dist Statement Required: B
Data Item Number: DI-NDTI-80809 (Current Revision) Frequency: Each Lot
Contract Reference: Section E As of Date: N/A
Requiring Office: AMJM-QA Date of 1st Submission: 30DATC
DD 250: NO Date of Subsequent Submission: ASREQ
WARP 0 1 0
QAR 0 1 0
Frequency/Date of 1st Submission: Lot Acceptance Test Reports (LATRs) shall be submitted for each lot and contain conformance testing results in accordance with the item specification MIL-STD-1916.
LATRs shall be submitted 30 calendar days after completion of the Lot Acceptance Test.
Distribution: LATRs shall be submitted by accessing the Worldwide Ammunition-Data Repository Program which is located on the Munitions History Program website at https://mhp.redstone.army.mil.
https://mhp.redstone.army.mil/
A015
Title: Acceptance Description Sheets App Code: A
Subtitle: Loading Authorization and Description Sheets Dist Statement Required: B
Data Item Number: DI-MGMT-81978 (Current Revision) Frequency: ASREQ
Contract Reference: Section E As of Date: N/A
WARP 1
Date of 1st Submission: Loading authorizations, propellant description sheets and/or description sheets for chemicals and explosives shall be submitted for each lot or batch processed and shall be loaded into WARP at the time of acceptance.
Distribution: Electronic submissions are made using the Worldwide Ammunition Data Card Repository Program (WARP) housing the Description Sheets and Loading Authorization modules which are located on the Munitions History Program (MHP) website at https://mhp.redstone.army.mil.
This requirement is in addition to the distribution requirements called out in the specification and contract.
ADVISORY NOTE: The first energetic description sheets submitted in the WARP system will undergo a Government review.
A016
Title: Quality Audit Site Visit Schedule App Code: A
Subtitle: N/A Dist Statement Required: N/A
Data Item Number: DI-SESS-81925 (Current Revision) Frequency: ASREQ
Contract Reference: Section E As of Date: N/A
Requiring Office: AMJM-QA Date of 1st Submission: 30DAC
Frequency/ Date of 1st Submission/Date of Subsequent Submission: The Contractor shall provide a schedule of all supplier/vendor audits within 30 calendar days after contract award. The Contractor shall notify the Government 15 days prior to a scheduled audit and the Government will advise whether or not it plans to witness the audit.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be https://mhp.redstone.army.mil/
A017
Title: Failure Summary and Analysis Report App Code: A
Subtitle: N/A Dist Statement Required: B
Data Item Number: DI-SESS-80255 (Current Revision) Frequency: ASREQ
Contract Reference: Section E As of Date: N/A
Frequency/ Date of 1st Submission/Date of Subsequent Submission: The Contractor shall notify the addressee list in Block 14 via e-mail within 24 hours after the occurrence of a failure during acceptance testing, including but not limited to, any failures during First Article Test/Lot Acceptance Test and any destructive/nondestructive test failures. Formal submittal shall be no later than 10 calendar days after reported failure. Final report shall be submitted no later than 30 calendar days after determining/conducting root cause/failure analysis.
The Government will provide a response within 15 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions. Disposition will be provided by the Contracting Officer.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be
A018
Title: Contractual Baseline Report App Code: A
Subtitle: Baseline Summary Report Dist Statement Required: D
Data Item Number: DI-SESS-81856 (Current Revision) Frequency: ASREQ
Contract Reference: Section E As of Date: N/A
Requiring Office: AMJM-QA Date of 1st Submission: 180DAC
Contractor format acceptable. Each report shall be annotated with calendar date for revision control. Submit electronically in Portable Document Format (pdf) 6 months after contract award and every 6 months (semi-annually) thereafter.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be
A019
Title:
Product Engineering Design Data and Associated Lists
App Code: A
Subtitle: Technical Data Package Dist Statement Required: N/A
Data Item Number: DI-SESS-81000 (Current Revision) Frequency: ASREQ
Contract Reference: MIL-STD-31000 As of Date: N/A
Distribution Statement Required: The Technical Data Packages (TDPs) shall be furnished for use internal to the Government and shall not be furnished outside the U.S. Government without the written permission of the Contractor. The TDPs will be used by the Government for quality control, configuration management, interface control, logistics, and engineering analysis (see TDP option selection worksheet MIL-STD-31000).
Date of 1st Submission: TDP shall be submitted no later than 120 days after contract award. The Contracting Officer will provide disposition within 30 calendar days after receipt.
Distribution: Submit via e-mail or DoD SAFE (https://safe.apps.mil). Specific e-mail addresses for the distribution list will be
A020
Title: Production Status Report App Code: N/A
Subtitle: Contract Delivery Schedule Dist Statement Required: N/A
Data Item Number: N/A Frequency: ASREQ
Contract Reference: Section C As of Date: N/A
Requiring Office: AMJM-SPS Date of 1st Submission ASREQ
JMC, Production Leads 0 1 0 JMC, Production Managers 0 1 0
REMARKS
Include data identified in Section J RFP Attachment 0008. Submit by close of business on the 2nd business day of October and April each year along with each contract award.
A021
Title: Production Status Report App Code: N/A
Subtitle:
Production Status Report for Family of Items
Dist Statement Required: N/A
Data Item Number: N/A Frequency: ASREQ
Contract Reference: Section C As of Date: N/A
Requiring Office: AMJM-SPS Date of 1st Submission ASREQ
JMC, Production Leads 0 1 0 JMC, Production Managers 0 1 0 PM MAS, Deputy Small Caliber 0 1 0
REMARKS
Include all data identified in the Section J RFP Attachments 0010, 0011, and 0012. The Contractor shall electronically submit three separate workbooks (one workbook for each family; 5.56mm, 7.62mm, and Cal .50) biweekly and update the tabs as follows:
• Receiving Report Status – Update and submit biweekly and by the 3rd business day of each month for previous month’s data. The Contractor shall keep a running total throughout the month. First submission is due upon initial production.
• Weekly Production Status – Update tab by close of business Monday of each week and the 3rd business day of each month for previous month’s data. The Contractor shall keep a running total throughout the month. First submission is due upon initial production.
A022
Title: Inventory Report App Code: N/A
Subtitle: GFM and GFE Physical Inventory Dist Statement Required: N/A
Data Item Number: N/A Frequency: ASREQ
Contract Reference: Section C As of Date: N/A
Requiring Office: AMJM-SPS Date of 1st Submission 180DAC
JMC, Production Leads 0 1 0
REMARKS
Contractor format is acceptable. The Contractor shall submit electronically 6 months after contract award and every 6 months (semi-annually) thereafter.
A023
Title: Ammunition Shipment Report App Code: N/A
Subtitle: Shipment Lot Detail Dist Statement Required: N/A
Data Item Number: N/A Frequency: WKLY
Contract Reference: Section C As of Date: N/A
Requiring Office: AMJM-SPS Date of 1st Submission UPON INITIAL
PRODUCTION
JMC, Production Leads 0 1 0 JMC, Production Managers 0 1 0
REMARKS
Contractor format is acceptable. The Contractor shall submit a weekly report electronically every Monday in Microsoft Excel listing the shipments of Government-owned materiel that occurred the prior week. Data fields required include Shipment Number, Lot Number, Document Number, NSN, Quantity, TCN, DODIC, Ship Date, and Destination.
A024
Title: GFE Status Report App Code: N/A
Subtitle: GFE Critical Items Dist Statement Required: N/A
Data Item Number: N/A Frequency: BIWKLY
Contract Reference: Section C As of Date: N/A
Requiring Office: AMJM-SPS Date of 1st Submission 30DAC
JMC, Weapons Manager 0 1 0
REMARKS
Contractor format is acceptable. Submit electronically on a biweekly basis. Report should include, at a minimum, the following data fields: Part Number, NSN, Item Description, Quantity on Hand, Quantity on Order, and Purchase Order Number(s). Items will be classified by color code as No Issue, Watch item, or Critical.
A025
Title: Transactional Details App Code: N/A
Subtitle: GFE Transactions Dist Statement Required: N/A
Data Item Number: N/A Frequency: MTHLY
Contract Reference: Section C As of Date: N/A
Requiring Office: AMJM-SPS Date of 1st Submission 30DAC
ACO 0 1 0
JMC, Weapons Manager 0 1 0
REMARKS
Contractor format is acceptable. The Contractor shall submit a monthly report electronically in Microsoft Excel tracking receipts and issues that occurred for the month. First submission will be 30 days after contract award. Data fields may include, but are not limited to, Item Description, Quantity, Date, and Transaction Type.
A026
Title: Performance Oriented Packaging Test Report App Code: N/A
Subtitle: N/A Dist Statement Required: N/A
Data Item Number: DI-PACK-81059A (Current Revision) Frequency: ASREQ
Contract Reference: Section D As of Date: N/A
Requiring Office: FCDD-ACE-LTP (RI) Date of 1st Submission ASREQ
CCDC ARM CTR PACKAGING 0 1 0
FCDD-ACE-LTP 0 1 0
REMARKS
30 days prior to First Article Test (FAT). The report title shall include item name and model number of the ammunition that goes into the package. If item is a component of ammunition, the ammunition system that the item is used on shall also be included. Report shall be submitted electronically via e-mail to TBD saved in rich text format (rft), ASCII, or pdf format.
Submit every two (2) years.
mailto:TBD
A027
Title: Material Sourcing List App Code: N/A
Subtitle: Supply Chain Mapping Data Dist Statement Required: N/A
Data Item Number: N/A Frequency: AS REQ
Contract Reference: Section C As of Date: N/A
Requiring Office: PM MAS Date of 1st Submission ASREQ
DD 250: NO Date of Subsequent Submission: ASREQ
Distribution Draft Reg Repro
PCO 0 1 0
PQM 0 1 0
PM MAS, Project Officer 0 1 0
REMARKS
Within 90 days after contract award. Use Attachment 0018, Supply Chain Mapping Data. The Contractor shall provide notification via an updated submission whenever there is a supplier/vendor change. The Contractor shall respond within 15 business days of receipt of Government responses.
June 11, 2025
File details come from the government source that posted it. Updated .