Attachment 2.1 Replace EMCS and Smart Meters Drawings May 2023.pdf
PDF 11 MB Posted
- Solicitation number
- W50S9E23B0003
- Issued by
-
Department of the Army National Guard
About this file
This attachment provides drawings related to a federal contract opportunity issued by the Department of the Army National Guard. The solicitation seeks proposals to repair the existing Energy and Resource Tracking Database system and smart meters at Camp Murray in Washington. Offerors should reference solicitation number W50S9E23B0003 and must submit proposals by the date specified in the solicitation to be considered for award of a firm fixed price contract to provide the required repairs and maintenance services. The opportunity is set aside for small businesses only.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:55:59 PM
T H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134321\1056590_1\G-001.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
D
R
E P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
MAY 2023
G-001.dgn
G-001
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
C O
V E
R S
H E
E T
G E
N E
R A
L
CONTRACT DRAWINGS FOR
CAMP MURRAY AIR NATIONAL GUARD STATION, WASHINGTON
REPLACE EMCS AND SMART METERS
D3250107
1 17 1
R
E V
IE
W
DATE: MAY 12, 2023
CAMP MURRAY, WA.
PROJECT NUMBER: ETRD202324
B3 100% DELIVERABLE
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:47:33 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134321\1056590_2\G-002.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
R
E V
IE
W
D3250107
G-002.dgn
G-002
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
G E
N E
R A
L
A N
D E
Q U
IP
M E
N T I
N D
E X
IN
S
T A
L L
A T
IO
N M
A P
DRAWING INDEX
SHEET TITLE SHEET TITLE
DRAWING INDEX - CONTINUED
DRAWING DRAWING
D R
A W
IN
G I
N D
E X
M-503
M-502
M-501
M-105
M-104
M-103
M-102
M-101
G-002
G-001
ETRD-109
ETRD-102, 103, 105, 106, 107
ETRD-101
EMCS ARCHITECTURE
EMCS ARCHITECTURE
EMCS ARCHITECTURE
EMCS ARCHITECTURE
EMCS ARCHITECTURE
INSTALLATION MAP AND EQUIPMENT INDEX, DRAWING INDEX
COVER SHEET
M-704
M-703
M-702
M-701
M-506
M-505
M-504
CONTROL DIAGRAMS SHEET 4
CONTROL DIAGRAMS SHEET 3
CONTROL DIAGRAMS SHEET 2
CONTROL DIAGRAMS SHEET 1
ETRD-120, 126, 127, 137
ETRD-117, 118
ETRD-112, 113
2 17
CONTROLLER EXPLANATION
MAY NOT BE MUCH DIFFERENT THAN A FLEXIBLE AAC.
TRENDING, ALARMING) OR MAY MERELY ACT AS AN INFORMATION ROUTER. BC'S WITH POINT CAPACITY
POINT CAPACITY, AND PROVIDE "SUPERVISORY" CONTROL OF THE ASC'S/AAC'S (E.G., SCHEDULING, OPERATOR INTERFACE). OTHERWISE, THEIR OTHER CAPABILITIES CAN VARY GREATLY: SOME HAVE NO
ROUTING INFORMATION BETWEEN CONTROLLERS AND USERS (I.E., VIA IP COMMUNICATIONS TO AN
BACNET BUILDING CONTROLLER (BC): ARE THE TOP-LEVEL CONTROLLER CATEGORY AND IS USED FOR
BOTH APPROACHES TO AN AAC.
FLEXIBILITY (I.E., FOR CUSTOM AHU'S). SOME MANUFACTURERS MAY EVEN OFFER MODELS THAT COVER
FACTORY-PROGRAMMED SEQUENCE CHOICES (I.E., FOR RTU'S), WHILE OTHER AAC'S PROVIDE MORE
BOTH AVAILABLE. SOME AAC'S MIGHT BE BETTER CLASSIFIED AS ASC'S DUE TO THE USE OF
SCHEDULING, TRENDING AND ALARMING CAPABILITIES. MS/TP AND IP COMMUNICATIONS ARE OFTEN
RANGE OF POINT COUNTS/TYPES ALONG WITH POINT EXPANSION CAPABILITIES. THEY SHOULD SUPPORT
BACNET ADVANCE APPLICATION CONTROLLER (AAC): NETWORK BACNET MS/TP. MEANT FOR A WIDER
ALARMS.
CLOCKS FOR START/STOP SCHEDULING, CAPACITY FOR TRENDING AND/OR THE ABILITY TO GENERATE
THEY ALSO VARY IN THE DEGREE THAT THEY CAN OPERATE AUTONOMOUSLY. SOME HAVE TIME
THAT PURPOSE. THEY MAY COME WITH A FIXED SET OF FACTORY-PROGRAMMED SEQUENCE CHOICES.
APPLICATION (VAV BOXES, FAN COIL'S ETC.) AND THEREFORE HAVE A POINT COUNT/TYPE SPECIFIC FOR
BACNET ADVANCED SPECIFIC CONTROLLER (ASC): NETWORK BACNET MS/TP. MEANT FOR A SPECIFIC
IT SWITCHGEAR - REFER TO UFC 4-010-06 FOR LEVEL OF CYBER SECURITY.
REFER TO ASHRAE STANDARD 135-2020 FOR DEFINITIONS AND MINIMUM CAPABILITIES OF CONTROLLERS.
R
E V
IE
W
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:42:46 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_11\M-101.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
R
E V
IE
W
M-101.dgn
M-101
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
GENERAL SHEET NOTES
SHEET KEYNOTES
E M
C S A
R C
H
IT
E C
T U
R E
ETHERNET
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTINGGYM 130
SENSOR
TEMPERATURE
EXISTING
EXISTING
BUILDING 101
1 TYPICAL
2 TYPICAL
ETHERNET
SWITCH
NETWORK
BUILDING 102
PARTITION 1
SENSOR
TEMPERATURE
BUILDING 103
EXISTING
KITCHEN MAIN
EXF
STARTER
EXISTING
RESTROOMS
EXF
STARTER
EXISTING
EXISTING
DISHWASH
EXF
STARTER
KITCHEN LINE
EXF
STARTER
SERVER 172
SENSOR
TEMPERATURE
BUILDING 103
CONTRACTOR FURNISHED AND INSTALLED
NETWORK SERVER
BASE FIBER NETWORK
B A
S E F
IB
E R N
E T
W O
R K
B A
S E F
IB
E R N
E T
W O
R K
E T
H E
R N
E T
PARTITION 2
SENSOR
TEMPERATURE
PARTITION 3
SENSOR
TEMPERATURE
BAY 4
SENSOR
TEMPERATURE
ROOM 103
SENSOR
TEMPERATURE
BAY 3
SENSOR
TEMPERATURE
BAY 2
SENSOR
TEMPERATURE
BAY 1
SENSOR
TEMPERATURE
OFFICE
SENSOR
TEMPERATURE
6CONTROLLER
BUILDING
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 3.
TO THE NEW DDC.
APPLICATION CONTROLLERS AND FIELD DEVICES
REQUIRED TO CONNECT THE EXISTING
PROVIDE NEW SYSTEM CONTROLLERS AS 2.
NETWORK IS NOT INDICATED.
AND DETAILED CONFIGURATION OF EXISTING
QUANTITY OF EXISTING SYSTEM CONTROLLERS
CONTROL SYSTEM ARCHITECTURE. ACTUAL
REPRESENTATION OF NEW AND EXISTING DDC
DRAWING IS A DIAGRAMMATIC ONLY 1.
PARTITION 4
SENSOR
TEMPERATURE
MONITOR
POWER
ELECTRIC
BUILDING 112
MONITOR
POWER
ELECTRIC
MONITOR
POWER
ELECTRICAL
10WATER
DOMESTIC
METER
(EXISTING)
NATURAL GAS
METER MODULE
(EXISTING)
DOMESTIC WATER
METER
(EXISTING)
NATURAL GAS
METER
(EXISTING)
MONITOR
POWER
ELECTRICAL
(EXISTING)
DOWN SWITCH
HVAC SHUT
PROVIDE WITH PRINTER
LOCATED IN BUILDING B117
UTILITY MONITORING AND CONTROL SYSTEM
3 17
102. SEE DETAIL ON M-703.
THE POWER SERVING BUILDING 112 IN BUILDING
WIRING ASSOCIATED WITH THE MONITORING OF
INSTALL NEW POWER MONITOR INCLUDING ALL
BUILDING 112 IS POWERED FROM BUILDING 102. 11.
REQUIRED.
DEMOLISH ANY EXISTING POWER MONITOR AS
AND INCLUDE ALL WIRING. SEE DETAIL ON M-703.
COORDINATE THE LOCATION TO MONITOR POWER
NEW POWER MONITOR FOR INCOMING POWER. 10.
BUILDING 102. SEE DETAIL ON M-703.
THE POWER SERVING BUILDING 103 INSIDE OF
WIRING ASSOCIATED WITH THE MONITORING OF
INSTALL NEW POWER MONITOR INCLUDING ALL
BUILDING 103 IS POWERED FROM BUILDING 102. 9.
UPGRADED.
UNTIL REMAINDER OF BUILDING HVAC IS
REMAINING BUILDING CONTROLLERS TO REMAIN 8.
BUILDING UTILIZING EXISTING I/O.
AREA IN B101 WITH NEW OPEN ARCHITECTURE
REPLACE EXISTING BUILDING CONTROLLING SCIF 7.
BUILDING UTILIZING EXISTING I/O.
BUILDING WITH NEW OPEN ARCHITECTURE
REPLACE EXISTING BUILDING CONTROLLING 6.
EXISTING MONITOR. SEE DETAIL ON SHEET M-703.
INCLUDING ALL WIRING ASSOCIATED WITH THE
REMOVE AND REPLACE EXISTING MONITOR
EXISTING POWER MONITOR TO BE REPLACED. 5.
PROVIDE ALARM OUTPUT TO DDC.4.
IN ADJACENT BUILDING 102.
BUILDING 103 TO CONNECT TO NETWORK SWITCH 3.
CONFIGURATION IS ACCEPTABLE.
WIRING TO ACCOMMODATE NEW NETWORK
REPLACEMENT AND REROUTING OF CONTROL
SENSORS TO REMAIN. AT CONTRACTOR'S OPTION,
CONTROL WIRING TO EXISTING CONTROLLERS AND 2.
CONTROLLERS WITH EXISTING CONDITIONS.
QUANTITY AND CONFIGURATION OF FIELD
NETWORK CONFIGURATION AND COORDINATE
DIAGRAMMATICALLY. FIELD VERIFY EXISTING
NEW SYSTEM CONTROLLERS ARE INDICATED 1.
DOWN SWITCH
HVAC SHUT
FPOC - LEVEL 3
IT SWITCH
CONTROLLER
DDC BUILDING
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED
TYPICAL 2
PRIMARY CWP
STARTER
ASC
TWINNED ACH
AAC
TYPICAL 2
SECONDARY CWP
VFD
ASC
14-ZONE AHU
AAC TYPICAL 2
SECONDARY HWP
VFD
ASC
HWB
ASCBC
DX AHU
AAC
TYPICAL 2
SPLIT DX AHU
ASC
8-ZONE MZU
AAC
TYPICAL 14
VAV CONTROLLER
CHILLED BEAM
ASC
BC
BC
ETHERNET CAT6E
ARRANGEMENT
SERVING SECURED AREAS. FIELD VERIFY FINAL
LAYOUT IS SHOWN BASED ON CONTROLLER
SWITCH - LEVEL 2
DDC IT ETHERNET
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:56:44 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_12\M-102.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-102.dgn
M-102
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
GENERAL SHEET NOTES
SHEET KEYNOTES
E M
C S A
R C
H
IT
E C
T U
R E
ETHERNET
SWITCH
NETWORK
CONTROLLER
BUILDING
BUILDING 105
GLOBAL
SENSOR
TEMPERATURE
ETHERNET
SWITCH
NETWORK
BUILDING 106
AHU-1
SENSOR
TEMPERATURE
AHU-2
SENSOR
TEMPERATURE
ETHERNET
SWITCH
NETWORK
CONTROLLER
BUILDING
EXISTING
1 TYPICAL
BUILDING 107
EXISTING
TYPICAL
EXISTING
TYPICAL 2
EXF
STARTER
ROOM 115
SENSOR
TEMPERATURE
ROOM 109
SENSOR
TEMPERATURE
COMM ROOM 111
SENSOR
TEMPERATURE
NATURAL GAS
METER MODULE
SWITCH
SHUTDOWN
EMERGENCY
SWITCH
SHUTDOWN
EMERGENCY
DOMESTIC WATER
METER
CONTRACTOR FURNISHED AND INSTALLED
NETWORK SERVER
BASE FIBER NETWORK
B A
S E F
IB
E R N
E T
W O
R K
B A
S E F
IB
E R N
E T
W O
R K
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 3.
TO THE NEW DDC.
APPLICATION CONTROLLERS AND FIELD DEVICES
REQUIRED TO CONNECT THE EXISTING
PROVIDE NEW SYSTEM CONTROLLERS AS 2.
NETWORK IS NOT INDICATED.
AND DETAILED CONFIGURATION OF EXISTING
QUANTITY OF EXISTING SYSTEM CONTROLLERS
CONTROL SYSTEM ARCHITECTURE. ACTUAL
REPRESENTATION OF NEW AND EXISTING DDC
DRAWING IS A DIAGRAMMATIC ONLY 1.
MONITOR
POWER
ELECTRIC
MONITOR
POWER
ELECTRIC
MONITOR
POWER
ELECTRIC
PROVIDE WITH PRINTER
LOCATED IN BUILDING 117
UTILITY MONITORING AND CONTROL SYSTEM
4 17
DOWN SWITCH
HVAC SHUT
THE EXISTING OPERATOR WORKSTATION.
CONTRACTING OFFICER FOR THE REMOVAL OF
BASE DDC SYSTEM. COORDINATE WITH THE
DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE
PROVIDE A LAPTOP AND A CONNECTION TO THE 8.
AND INCLUDE ALL WIRING. SEE DETAIL ON M-703.
COORDINATE THE LOCATION TO MONITOR POWER
NEW POWER MONITOR FOR INCOMING POWER. 7.
TO THE DDC SYSTEM.
TO PROVIDE A PULSE OUTPUT TO BE CONNECTED
EXISTING GAS METER TO BE UPDATED/CHANGED 6.
ARCHITECTURE BUILDING UTILIZING EXISTING I/O.
CONTROLLING BUILDING WITH NEW OPEN
REPLACE EXISTING SIEMENS BUILDING5.
SYSTEM.
OUTPUT FROM EXISTING WATER METER TO DDC
PROVIDE NEW WIRING AS REQUIRED TO CONNECT 4.
PROVIDE ALARM OUTPUT TO DDC.3.
CONFIGURATION IS ACCEPTABLE.
WIRING TO ACCOMMODATE NEW NETWORK
REPLACEMENT AND REROUTING OF CONTROL
SENSORS TO REMAIN. AT CONTRACTOR'S OPTION,
CONTROL WIRING TO EXISTING CONTROLLERS AND 2.
CONTROLLERS WITH EXISTING CONDITIONS.
QUANTITY AND CONFIGURATION OF FIELD
NETWORK CONFIGURATION AND COORDINATE
DIAGRAMMATICALLY. FIELD VERIFY EXISTING
NEW SYSTEM CONTROLLERS ARE INDICATED 1.
DOWN SWITCH
HVAC SHUT
LEVEL 3
IT SWITCH FPOC -
COMM NETWORK
COORDINATE WITH EXISTING
GOVERNMENT-FURNISHED
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED
PACKAGED AHU
AAC
TYPICAL 11
VAV CONTROLLER
FAN POWERED
ASC
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED BC
SWITCH - LEVEL 2
DDC IT ETHERNET
ETHERNET CAT6E
ETHERNET CAT6E
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:47:24 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_13\M-103.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-103.dgn
M-103
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
E M
C S A
R C
H
IT
E C
T U
GENERAL SHEET NOTES
SHEET KEYNOTES
ETHERNET
SWITCH
NETWORK
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
BUILDING 109
EXISTING
EXISTING
EXISTING
EXF
STARTER
REF
STARTER
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
SPLIT DX AHU
CONTROLLER
APPLICATION
EXISTING
MECH ATTIC
SENSOR
TEMPERATURE
MECH ROOM 378
SUPPLY FAN
COLD WEATHER
EXISTING
MECH ATTIC
EF
STARTER
EXISTING
MECH ATTIC
EF
STARTER
EXISTING
MECH ATTIC
EF
STARTER
MECH ATTIC
EF
STARTER
MECH ATTIC
EF
STARTER
1 TYPICAL
2 TYPICAL
MECH ATTIC
EF
STARTER
EXISTING
TELECOMM 135A
SENSOR
TEMPERATURE
ELECTRICAL 135
SENSOR
TEMPERATURE
SERVER 305
SENSOR
TEMPERATURE
ETHERNET
SWITCH
NETWORK
ETHERNET
SWITCH
NETWORK
RECEIVING
SHIPPING /
SENSOR
TEMPERATURE
ADMIN
SENSOR
TEMPERATURE
OFFICE 100
SENSOR
TEMPERATURE
NCC 101
SENSOR
TEMPERATURE
CLASSROOM 200
SENSOR
TEMPERATURE
BUILDING 112
BUILDING 113
EXISTING
EXISTING
NATURAL GAS
METER
NATURAL GAS
METER MODULE
BASE FIBER NETWORK
B A
S E F
IB
E R N
E T
W O
R K
B A
S E F
IB
E R N
E T
W O
R K
CONTRACTOR FURNISHED AND INSTALLED
NETWORK SERVER
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 3.
TO THE NEW DDC.
APPLICATION CONTROLLERS AND FIELD DEVICES
REQUIRED TO CONNECT THE EXISTING
PROVIDE NEW SYSTEM CONTROLLERS AS 2.
NETWORK IS NOT INDICATED.
AND DETAILED CONFIGURATION OF EXISTING
QUANTITY OF EXISTING SYSTEM CONTROLLERS
CONTROL SYSTEM ARCHITECTURE. ACTUAL
REPRESENTATION OF NEW AND EXISTING DDC
DRAWING IS A DIAGRAMMATIC ONLY 1.
MONITOR
POWER
ELECTRIC
SHEET M-101
SEE NOTE 11 ON
MONITOR
POWER
ELECTRIC
(EXISTING)
NATURAL GAS
METER MODULE
(EXISTING)
WATER
METER DOMESTIC
(EXISTING)
MONITOR
POWER
ELECTRIC
DOMESTIC WATER
METER
(EXISTING)
METER
NEW WATER
METER
NEW WATER
ON M-503
SEE PHOTO 1
ON M-503
SEE PHOTO 1
PROVIDE WITH PRINTER
LOCATED IN BUILDING B117
UTILITY MONITORING AND CONTROL SYSTEM
5 17
DOWN SWITCH
(3) HVAC SHUT
THE EXISTING WORKSTATION.
CONTRACTING OFFICER FOR THE REMOVAL OF
BASE DDC SYSTEM. COORDINATE WITH THE
DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE
PROVIDE A LAPTOP AND A CONNECTION TO THE 7.
SYSTEM.
REPLACED TO ALLOW CONNECTION TO THE DDC
EXISTING GAS METER TO BE REPAIRED OR 6.
EXISTING MONITOR. SEE DETAIL ON M-703.
INCLUDING ALL WIRING ASSOCIATED WITH THE
REMOVE AND REPLACE EXISTING MONITOR
EXISTING POWER MONITOR TO BE REPLACED. 5.
ARCHITECTURE BUILDING UTILIZING EXISTING I/O.
CONTROLLING BUILDING WITH NEW OPEN
REPLACE EXISTING SIEMENS BUILDING 4.
DDC METER.
PULSE OUTPUT FROM EXISTING WATER METER TO
PROVIDE NEW WIRING AS REQUIRED TO CONNECT 3.
CONFIGURATION IS ACCEPTABLE.
WIRING TO ACCOMMODATE NEW NETWORK
REPLACEMENT AND REROUTING OF CONTROL
SENSORS TO REMAIN. AT CONTRACTOR'S OPTION,
CONTROL WIRING TO EXISTING CONTROLLERS AND 2.
CONTROLLERS WITH EXISTING CONDITIONS.
QUANTITY AND CONFIGURATION OF FIELD
NETWORK CONFIGURATION AND COORDINATE
DIAGRAMMATICALLY. FIELD VERIFY EXISTING
NEW SYSTEM CONTROLLERS ARE INDICATED 1.
LEVEL 3
IT SWITCH FPOC -
FIBER COMMUNICATION NETWORK
GOVERNMENT-FURNISHED
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED BC
BC
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED BC
ETHERNET CAT6E
THIRD FLOOR
BC
ARRANGEMENT
SERVING SECURED AREAS. FIELD VERIFY FINAL
LAYOUT IS SHOWN BASED ON CONTROLLER
2ND FLOOR
BC
MECH ATTIC
BC
MECH ATTIC
BC
ETHERNET CAT6E
7-ZONE AHU
AAC
TYPICAL 7
VAV CONTROLLER
ASC
REF
VFD
ASC
TYPICAL 2
SECONDARY HWP
VFD
ASC
TYPICAL 2
SECONDARY CWP
VFD
ASC
TYPICAL 2
HWB
AAC
ACH
AAC
SPLIT DX AHU
AAC
DWH
AAC
MECH ROOM 246
AAC
8-ZONE MZU
AAC
REF
VFD
ASC
REF
STARTER
ASC
11-ZONE MZU
AAC
SPLIT DX AHU
AAC
REF
VFD
ASC
SWITCH - LEVEL 2
DDC IT ETHERNET
ETHERNET CAT6E
SWITCH - LEVEL 2
DDC IT ETHERNET
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:51:27 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_16\M-104.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
R
E V
IE
W
M-104.dgn
M-104
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
GENERAL SHEET NOTES
SHEET KEYNOTES
E M
C S A
R C
H
IT
E C
T U
R E
ETHERNET
SWITCH
NETWORK
BUILDING 117
OFFICE 101
SENSOR
TEMPERATURE
NATURAL GAS
METER MODULE
STORAGE 100
SENSOR
TEMPERATURE
TOOL ROOM 106
SENSOR
TEMPERATURE
ETHERNET
SWITCH
NETWORK
CONTROLLER
BUILDING
FIRST FLOOR
SENSOR
TEMPERATURE
SECOND FLOOR
SENSOR
TEMPERATURE
THIRD FLOOR
SENSOR
TEMPERATURE
OFFICE 111
SENSOR
TEMPERATURE
BUILDING 118
CONTRACTOR FURNISHED AND INSTALLED
NETWORK SERVER
BASE FIBER NETWORK
B A
S E F
IB
E R N
E T
W O
R K
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 3.
TO THE NEW DDC.
APPLICATION CONTROLLERS AND FIELD DEVICES
REQUIRED TO CONNECT THE EXISTING
PROVIDE NEW SYSTEM CONTROLLERS AS 2.
NETWORK IS NOT INDICATED.
AND DETAILED CONFIGURATION OF EXISTING
QUANTITY OF EXISTING SYSTEM CONTROLLERS
CONTROL SYSTEM ARCHITECTURE. ACTUAL
REPRESENTATION OF NEW AND EXISTING DDC
DRAWING IS A DIAGRAMMATIC ONLY 1.
MONITOR
POWER
ELECTRIC
DOMESTIC WATER
METER
(EXISTING)
NATURAL GAS
METER
(EXISTING)
MONITOR
POWER
ELECTRIC
PROVIDE WITH PRINTER
LOCATED IN BUILDING B117
UTILITY MONITORING AND CONTROL SYSTEM
6 17
AND INCLUDE ALL WIRING. SEE DETAIL ON M-703.
COORDINATE THE LOCATION TO MONITOR POWER
NEW POWER MONITOR FOR INCOMING POWER. 8.
BASE DDC SYSTEM.
DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE
PROVIDE A LAPTOP AND A CONNECTION TO THE 7.
ARCHITECTURE BUILDING UTILIZING EXISTING I/O.
CONTROLLING BUILDING WITH NEW OPEN
REPLACE EXISTING ALERTON BUILDING 6.
VERIFY.
EXISTING METER TO PULSED OUTPUT. FIELD
PROVIDE POWER SUPPLY AS REQUIRED TO ADAPT 5.
DETAIL ON M-703.
PROVIDE WITH WEATHERPROOF ENCLOSURE. SEE
NEW POWER MONITOR LOCATED OUTDOORS. 4.
FROM EXISTING TERMINAL PANEL IN BUILDING 137.
GOVERNMENT-FURNISHED NETWORK PATHWAY 3.
METER AS INDICATED TO ELECTRIC METER.
PULSE OUTPUT FROM EXISTING WATER OR GAS
PROVIDE NEW WIRING AS REQUIRED TO CONNECT 2.
CONTROLLERS WITH EXISTING CONDITIONS.
QUANTITY AND CONFIGURATION OF FIELD
NETWORK CONFIGURATION AND COORDINATE
DIAGRAMMATICALLY. FIELD VERIFY EXISTING
NEW SYSTEM CONTROLLERS ARE INDICATED 1.
DOWN SWITCH
(3) HVAC SHUT
BC
LEVEL 3
IT SWITCH FPOC
GOVERNMENT-FURNISHED
ETHERNET CAT6E
SWITCH - LEVEL 2
DDC IT ETHERNET
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:41:45 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_17\M-105.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-105.dgn
M-105
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
GENERAL SHEET NOTES
SHEET KEYNOTES
E M
C S A
R C
H
IT
E C
T U
R E
BUILDING 120
ETHERNET
SWITCH
NETWORK
CONTROLLER
BUILDING
OFFICE 101
SENSOR
TEMPERATURE
SERVER 103
SENSOR
TEMPERATURE
CONF 106B
SENSOR
TEMPERATURE
SIMULATOR 105
SENSOR
TEMPERATURE
CONF 106A
SENSOR
TEMPERATURE
TRAINING 107
SENSOR
TEMPERATURE
CONTROLLER
BUILDING
BUILDING 126
OFFICE 101
SENSOR
TEMPERATURE
MAINTENANCE 102
SENSOR
TEMPERATURE
OPERATIONS 103
SENSOR
TEMPERATURE
ETHERNET
SWITCH
NETWORK
CONTROLLER
BUILDING
BUILDING 127
OPEN AREA 100
SENSOR
TEMPERATURE
OPEN AREA 200
SENSOR
TEMPERATURE
EXISTING
EXISTING
EXISTING
ROOM 109
EXF
STARTER
RESTROOM 106
EXF
STARTER
RESTROOM 107
EXF
STARTER
CONTROLLER
BUILDING
BUILDING 137
1ST FLOOR
SENSOR
TEMPERATURE
BREAK ROOM 108
SENSOR
TEMPERATURE
TELECOMM 111
SENSOR
TEMPERATURE
BRIEFING 102A
SENSOR
TEMPERATURE
BRIEFING 102B
SENSOR
TEMPERATURE
TYPICAL 2
OFFICE 101B
SENSOR
TEMPERATURE
TYPICAL 2
OFFICE 205
SENSOR
TEMPERATURE
TYPICAL 2
OPEN BAY 110
SENSOR
TEMPERATURE
CONTRACTOR FURNISHED AND INSTALLED
NETWORK SERVER
BASE FIBER NETWORK
B A
S E F
IB
E R N
E T
W O
R K
B A
S E F
IB
E R N
E T
W O
R K
TO DDC
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 3.
TO THE NEW DDC.
APPLICATION CONTROLLERS AND FIELD DEVICES
REQUIRED TO CONNECT THE EXISTING
PROVIDE NEW SYSTEM CONTROLLERS AS 2.
NETWORK IS NOT INDICATED.
AND DETAILED CONFIGURATION OF EXISTING
QUANTITY OF EXISTING SYSTEM CONTROLLERS
CONTROL SYSTEM ARCHITECTURE. ACTUAL
REPRESENTATION OF NEW AND EXISTING DDC
DRAWING IS A DIAGRAMMATIC ONLY 1.
MONITOR
POWER
ELECTRIC
(EXISTING)
DOMESTIC WATER
METER
(EXISTING)
NATURAL GAS
METER MODULE
(EXISTING)
DOMESTIC WATER
METER
(EXISTING)
NATURAL GAS
METER MODULE
(EXISTING)
MONITOR
POWER
ELECTRIC
(EXISTING)
DOMESTIC WATER
METER
ON M-506
SEE PHOTO 2
NATURAL GAS
METER MODULE
(EXISTING)
MONITOR
POWER
ELECTRIC
PROVIDE WITH PRINTER
LOCATED IN BUILDING B117
UTILITY MONITORING AND CONTROL SYSTEM
7 17
OFFICER.
COORDINATE INSTALL WITH THE CONTRACTING
AN EXISTING MODEM IN THE BUILDING.
CONTRACTORS OPTION UTILIZE A WIFI SENSOR OR
MONITOR ROOM TEMPERATURE. AT
PROVIDE NEW TEMPERATURE SENSOR TO 11.
OFFICER.
REQUIRED. COORDINATE WITH CONTRACTING
CORRECTLY. REPAIR OR REPLACE METER AS
EXISTING GAS METER IS NOT READING 10.
AND INCLUDE ALL WIRING. SEE DETAIL ON M-703.
COORDINATE THE LOCATION TO MONITOR POWER
NEW POWER MONITOR FOR INCOMING POWER, 9.
FROM BUILDING 127. SEE DETAIL ON M-703.
EXISTING MONITOR. BUILDING IS FEED POWER
INCLUDING ALL WIRING ASSOCIATED WITH THE
REMOVE AND REPLACE EXISTING MONITOR
EXISTING POWER MONITOR TO BE REPLACED. 8.
CONNECT TO THE DDC SYSTEM.
EXISTING GAS METER IS NOT IN USE. DO NOT 7.
STATUS TO DDC NETWORK.
CONTROLLER TO COMMUNICATE THERMISTOR 6.
ARCHITECTURE BUILDING UTILIZING EXISTING I/O.
CONTROLLING BUILDING WITH NEW OPEN
REPLACE EXISTING SIEMENS BUILDING 5.
TELEPHONE LINE.
GOVERNMENT-FURNISHED PATHWAY VIA 4.
NOT USED3.
CONFIGURATION IS ACCEPTABLE.
WIRING TO ACCOMMODATE NEW NETWORK
REPLACEMENT AND REROUTING OF CONTROL
SENSORS TO REMAIN. AT CONTRACTOR'S OPTION,
CONTROL WIRING TO EXISTING CONTROLLERS AND 2.
CONTROLLERS WITH EXISTING CONDITIONS.
QUANTITY AND CONFIGURATION OF FIELD
NETWORK CONFIGURATION AND COORDINATE
DIAGRAMMATICALLY. FIELD VERIFY EXISTING
NEW SYSTEM CONTROLLERS ARE INDICATED 1.
DOWN SWITCH
HVAC SHUT
DOWN SWITCH
(2) HVAC SHUT
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED
LEVEL 3
IT SWITCH FPOC -
GOVERNMENT-FURNISHED
BC
ETHERNET CAT6E
SWITCH - LEVEL 2
DDC IT ETHERNET
ETHERNET CAT6E
ETHERNET CAT6E
SWITCH - LEVEL 2
DDC IT ETHERNET
ARRANGEMENT
SERVING SECURED AREAS. FIELD VERIFY FINAL
LAYOUT IS SHOWN BASED ON CONTROLLER
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:22:51 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_1\M-501.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-501.dgn
M-501
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
BUILDING ETRD-101
E T
R D -1
GENERAL SHEET NOTES
SHEET KEYNOTES
CWP
CWP
CWP
HWP
HWB
AHU
ACH
VAV
14 ZONES
TYPICAL
1EXF
EXF
DSW
TYPICAL 5
AHU 4
AHU 12
DSW AOU
AOU AOU
MZU 3
8 ZONES
EXF
EXF
NTS
T
T
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 4.
TO EMCS ARCHITECTURE DRAWINGS.
OWNER-PROVIDED NETWORK SWITCHES. REFER
CONNECT NEW BUILDING CONTROLLERS TO 3.
CONTROL DIAGRAMS.
120% OF THE TOTAL POINTS COUNT. REFER TO
REPLACED IN KIND AND PROVIDE CAPACITY FOR
PURPOSES, ASSUME EQUIPMENT WILL BE
OF ALL ASSOCIATED POINTS. FOR BIDDING
CONTROLLERS, AND MONITORING AND CONTROL
SUITABLE FOR CONNECTION OF APPLICATION
CONTROLLERS AND NETWORK ARCHITECTURE
DIAGRAMS. PROVIDE NEW BUILDING
CONTROLLER. REFER TO EMCS ARCHITECTURE
AND NOT CONNECTED TO THE NEW BUILDING
APPLICATION CONTROLLERS ARE TO BE RETAINED
APPLICATION CONTROLLER. EXISTING
ON AND IS EXECUTED BY THE EXISTING
FOR EQUIPMENT SERVING THESE SPACES RESIDES
PROGRAMMING OF THE SEQUENCE OF OPERATION
TEMPERATURE SENSORS. IT IS ASSUMED THAT
CONTROLLERS AND PROVIDE SPACE
WHERE INDICATED, RETAIN EXISTING APPLICATION 2.
CONTROL SYSTEM.
APPLICATION CONTROLLERS INTO NEW BUILDING
AS NECESSARY TO INTEGRATE EXISTING
CONFIGURATION. PROVIDE SYSTEM CONTROLLERS
FIELD-VERIFY EXISTING NETWORK 1.
8 17
CONTRACTING OFFICER.
SWITCH. COORDINATE LOCATION WITH
PROVIDE NEW HVAC EMERGENCY SHUTDOWN 19.
EXISTING BUILDING CONTROLLER PANEL.18.
INSTALL NEW ELECTRIC METER IN SWBD A.17.
TEMPERATURE SENSOR.
LOCATED AT GRADE. PROVIDE SPACE
ASSOCIATED AIR-SOURCE OUTDOOR UNIT 16.
REPLACED.
COMPLETED IN THE FUTURE WHEN HVAC UNIT IS
CONTROLLER. HVAC UNIT INTEGRATION WILL BE
EXECUTED BY THE EXISTING APPLICATION
SEQUENCE OF OPERATION RESIDES ON AND IS
LIFE. IT IS ASSUMED THAT PROGRAMMING OF THE
EXISTING EQUIPMENT IS NEAR END OF USEFUL 15.
EXISTING VAV AND CHILLED BEAM CONTROLLERS.
AND ACTIVE CHILLED BEAM EACH ZONE. RETAIN
PASSIVE VAV TERMINAL UNIT WITH HW REHEAT 14.
SERVED.
TEMPERATURE SENSOR FOR EACH SPACE
LOCATED ON ROOF. PROVIDE SPACE
ASSOCIATED AIR-SOURCE OUTDOOR UNITS 13.
LOCATED ON ROOF.
ASSOCIATED AIR-SOURCE OUTDOOR UNIT
DX AIR HANDLING UNIT LOCATED IN ATTIC. 12.
SYSTEM. RETAIN EXISTING VFDS.
VARIABLE SPEED DRIVES SERVING CHILLED BEAM
DUPLEX CHILLED WATER SECONDARY PUMPS ON 11.
HANDLER. RETAIN EXISTING VFDS.
VARIABLE SPEED DRIVES SERVING VAV AIR
DUPLEX CHILLED WATER SECONDARY PUMPS ON 10.
CONTROLLER.
PIPED IN PARALLEL WITH COMMON APPLICATION
TWINNED AIR-COOLED CHILLERS, TWO UNITS 9.
EXISTING STARTERS.
DUPLEX CHILLED WATER PRIMARY PUMPS. RETAIN 8.
VARIABLE SPEED DRIVES. RETAIN EXISTING VFDS.
DUPLEX HEATING WATER SECONDARY PUMPS ON 7.
CONTROLLER.
CIRCULATOR. RETAIN EXISTING APPLICATION
HEATING WATER BOILER WITH PRIMARY 6.
EXISTING APPLICATION CONTROLLER.
CHW/HW VAV AIR HANDLING UNIT. RETAIN 5.
AIR-SOURCE OUTDOOR UNITS LOCATED AT GRADE.
BURNER LOCATED IN ATTIC. ASSOCIATED
SPLIT DX AIR HANDLING UNIT WITH OUTBOARD NG 4.
EXISTING APPLICATION CONTROLLER.
ASSOCIATED ZONES AS INDICATED. RETAIN
PACKAGED DX/NG AIR HANDLING UNIT, NUMBER OF 3.
THE EXISTING METER.
DDC SYSTEM. COORDINATE THE REQUIRMENTS OF
EXISTING GAS METER TO BE CONNECTED TO THE 2.
ELECTRIC METER.
EXISTING DOMESTIC WATER METER. CONNECT TO 1.
ES
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:42:06 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_2\M-502.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-502.dgn
M-502
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
BUILDING ETRD-102
GENERAL SHEET NOTES
SHEET KEYNOTES
BUILDING ETRD-105
BUILDING ETRD-106 BUILDING ETRD-107
GRH
GRH
GRH
GRH
GRH
GRH
DSC
DSC DSC DSC DSC
DSW
T
T
T
T
T T
AHU
AHU
AOU
AOU
GRH
GRH
GRH
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
AHU
DSC
DSCAOU
EF
DSW 3
ERV
7 7
GRH
GRH
T
BUILDING ETRD-103
EUH
T
T
ERV11
TT
T T
T
EUH EUH EUH
TTT
T
T
T
NTS
NTS NTS
NTS
NTS
E T
R D -1
ES
SWBD B
13PANEL A
ES
13 PANEL A
ES
EF
13MDP
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 4.
TO EMCS ARCHITECTURE DRAWINGS.
OWNER-PROVIDED NETWORK SWITCHES. REFER
CONNECT NEW BUILDING CONTROLLERS TO 3.
CONTROL DIAGRAMS.
120% OF THE TOTAL POINTS COUNT. REFER TO
REPLACED IN KIND AND PROVIDE CAPACITY FOR
PURPOSES, ASSUME EQUIPMENT WILL BE
OF ALL ASSOCIATED POINTS. FOR BIDDING
CONTROLLERS, AND MONITORING AND CONTROL
SUITABLE FOR CONNECTION OF APPLICATION
CONTROLLERS AND NETWORK ARCHITECTURE
DIAGRAMS. PROVIDE NEW BUILDING
CONTROLLER. REFER TO EMCS ARCHITECTURE
AND NOT CONNECTED TO THE NEW BUILDING
APPLICATION CONTROLLERS ARE TO BE RETAINED
APPLICATION CONTROLLER. EXISTING
ON AND IS EXECUTED BY THE EXISTING
FOR EQUIPMENT SERVING THESE SPACES RESIDES
PROGRAMMING OF THE SEQUENCE OF OPERATION
TEMPERATURE SENSORS. IT IS ASSUMED THAT
CONTROLLERS AND PROVIDE SPACE
WHERE INDICATED, RETAIN EXISTING APPLICATION 2.
CONTROL SYSTEM.
APPLICATION CONTROLLERS INTO NEW BUILDING
AS NECESSARY TO INTEGRATE EXISTING
CONFIGURATION. PROVIDE SYSTEM CONTROLLERS
FIELD-VERIFY EXISTING NETWORK 1.
WITH EXISTING CONDITIONS.
BUILDING 112. COORDINATE THE FINAL LOCATION
PROVIDE POWER METER FOR POWER SERVING 18.
WITH EXISTING CONDITIONS.
BUILDING 103. COORDINATE THE FINAL LOCATION
PROVIDE POWER METER FOR POWER SERVING 17.
BASE DDC SYSTEM.
DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE
PROVIDE A LAPTOP AND A CONNECTION TO THE 16.
CONTRACTING OFFICER.
SWITCH. COORDINATE LOCATION WITH
PROVIDE NEW HVAC EMERGENCY SHUTDOWN 15.
AT DISTRIBUTION PANEL IN BUILDING 103.
PROVIDE NEW CURRENT TRANSMITTER MODULE 14.
PROVIDE NEW POWER MONITOR.13.
PARTITION.
102. PROVIDE TEMPERATURE SENSOR FOR EACH
CONNECT TO NEC SWITCH IN ADJACENT BUILDING
STORAGE FACILITY BUILDING 103 CONTROLS WILL 12.
CONNECTION TO DDC NOT REQUIRED.
ROOFTOP ERV CONTROLLED BY MANUAL SWITCH. 11.
CONNECT TO DDC SYSTEM.
EXISTING DOMESTIC WATER RISER AND METER. 10.
COORDINATE WITH ASSOCIATED OUTDOOR UNIT.
NEW THERMOSTAT FOR INDOOR UNIT. 9.
CONTROLLER.
A DISCRETE INPUT, TO THE NEW BUILDING
CONTROLLER. PROVIDE ALARM STATUS ONLY, AS
EXECUTED BY THE EXISTING APPLICATION
SEQUENCE OF OPERATION RESIDES ON AND IS
LIFE. IT IS ASSUMED THAT PROGRAMMING OF THE
EXISTING EQUIPMENT IS NEAR END OF USEFUL 8.
BY GAS RADIANT HEATER.
TEMPERATURE SENSOR FOR EACH SPACE SERVED
GAS RADIANT HEATERS. PROVIDE SPACE
RETAIN EXISTING LOCAL CONTROL SYSTEMS FOR 7.
EXISTING VAV CONTROLLERS.
FAN-POWERED VAV TERMINAL UNITS. RETAIN 6.
LOCATED ON ROOF.
PACKAGED ROOFTOP VAV AIR HANDLING UNIT 5.
BY INDOOR UNIT.
TEMPERATURE SENSOR FOR EACH SPACE SERVED
LOCATED ON ROOF. PROVIDE SPACE
MULTI-SPLIT SYSTEM. COMMON OUTDOOR UNIT 4.
PROVIDE SPACE TEMPERATURE SENSOR.
ASSOCIATED OUTDOOR UNIT LOCATED ON ROOF. 3.
TO THE DDC SYSTEM.
TO PROVIDE A PULSE OUTPUT TO BE CONNECTED
EXISTING GAS METER TO BE UPDATED/CHANGED 2.
AND CONNECT TO ELECTRIC METER.
DOMESTIC WATER RISER. PROVIDE NEW METER 1.
13VERIFY PANEL LOCATION
17 18
9 17 1
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:21:00 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_3\M-503.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
R
E V
IE
W
M-503.dgn
M-503
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
E T
R D -1
SHEET KEYNOTES
BUILDING ETRD-109 1st FLOOR BUILDING ETRD-109 3rd FLOOR
BUILDING ETRD-109 2nd FLOOR
DSW
ACH
AOU
AHU4
AOU
AOU
AOU AOU
AOU
AOU
AOU
AOU
REF
AHU
T
EXF
CWP
VAV
HWB
HWP
DSW5
BUILDING ETRD-109 MECHANICAL ATTIC
EXF
EXF
MZU
MZU
8 ZONES
11 ZONES
REF
REF 6
REF 6
AHU 13
EXF
EXF
EXF
EXF
GENERAL SHEET NOTES
REF
ABOVE
AHU3
T
4 UNITS
7 ZONES
TYPICAL
HWB
T T
NTS
NTS
NTS NTS
ES
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFYEXISTING GAS, AND 4.
TO EMCS ARCHITECTURE DRAWINGS.
OWNER-PROVIDED NETWORK SWITCHES. REFER
CONNECT NEW BUILDING CONTROLLERS TO 3.
CONTROL DIAGRAMS.
120% OF THE TOTAL POINTS COUNT. REFER TO
REPLACED IN KIND AND PROVIDE CAPACITY FOR
PURPOSES, ASSUME EQUIPMENT WILL BE
OF ALL ASSOCIATED POINTS. FOR BIDDING
CONTROLLERS, AND MONITORING AND CONTROL
SUITABLE FOR CONNECTION OF APPLICATION
CONTROLLERS AND NETWORK ARCHITECTURE
DIAGRAMS. PROVIDE NEW BUILDING
CONTROLLER. REFER TO EMCS ARCHITECTURE
AND NOT CONNECTED TO THE NEW BUILDING
APPLICATION CONTROLLERS ARE TO BE RETAINED
APPLICATION CONTROLLER. EXISTING
ON AND IS EXECUTED BY THE EXISTING
FOR EQUIPMENT SERVING THESE SPACES RESIDES
PROGRAMMING OF THE SEQUENCE OF OPERATION
TEMPERATURE SENSORS. IT IS ASSUMED THAT
CONTROLLERS AND PROVIDE SPACE
WHERE INDICATED, RETAIN EXISTING APPLICATION 2.
CONTROL SYSTEM.
APPLICATION CONTROLLERS INTO NEW BUILDING
AS NECESSARY TO INTEGRATE EXISTING
CONFIGURATION. PROVIDE SYSTEM CONTROLLERS
FIELD-VERIFY EXISTING NETWORK 1.
ES
NOTES 18,19
SEE PHOTO THIS PAGE AND
PHOTO 1 EXISTING WATER METER
19 18
10 17
UNIT.
NEW POWER MONITOR TO REPLACE EXISTING 21.
CONTRACTING OFFICER.
SWITCH. COORDINATE LOCATION WITH
PROVIDE NEW HVAC EMERGENCY SHUTDOWN 20.
OWNER.
COORDINATE THE FINAL LOCATION WITH THE
INSTALL WATER METER ON IRRIGATION LINE. 19.
THE OWNER.
BOILER. COORDINATE THE FINAL LOCATION WITH
INSTALL WATER METER ON LINE SERVING THE 18.
EACH ZONE. RETAIN EXISTING VAV CONTROLLERS.
PASSIVE VAV TERMINAL UNIT WITH HW REHEAT 17.
PROVIDE SPACE TEMPERATURE SENSOR.16.
EXISTING VFD.
ASSOCIATED WITH AIR HANDLING UNIT. RETAIN
RELIEF FAN ON VARIABLE SPEED DRIVE 15.
LOCATED AT GRADE.
ASSOCIATED AIR-SOURCE OUTDOOR UNIT 14.
CONTROLLER.
BURNER. RETAIN EXISTING APPLICATION
SPLIT DX AIR HANDLING UNIT WITH OUTBOARD NG 13.
FLOOR.
MECHANICAL ATTIC LOCATED ABOVE SECOND 12.
CONTROLLERS.
CIRCULATORS. RETAIN EXISTING APPLICATION
HEATING WATER BOILERS WITH PRIMARY 11.
VARIABLE SPEED DRIVES. RETAIN EXISTING VFDS.
DUPLEX HEATING WATER SECONDARY PUMPS ON 10.
VARIABLE SPEED DRIVES. RETAIN EXISTING VFDS.
DUPLEX CHILLED WATER SECONDARY PUMPS ON 9.
EXISTING DDC PANEL8.
ACTUATORS.
STARTER, TEMPERATURE SENSORS, AND
COLD WEATHER SUPPLY FAN. RETAIN EXISTING 7.
EXISTING VFD.
REFER TO EMCS ARCHITECTURE DRAWING. RETAIN
RELIEF FAN ASSOCIATED WITH AIR HANDLING UNIT. 6.
SENSOR.
OUTDOOR UNIT. PROVIDE SPACE TEMPERATURE
MULTI-SPLIT INDOOR UNITS PAIRED WITH COMMON 5.
APPLICATION CONTROLLER.
SPLIT DX/NG AIR HANDLING UNIT. RETAIN EXISTING 4.
EXISTING APPLICATION CONTROLLER.
CHW/HW VAV AIR HANDLING UNIT. RETAIN 3.
TO CONNECT TO DDC.
NATURAL GAS METER. PROVIDE OUTPUT MODULE 2.
DDC. SEE PHOTO 1 THIS PAGE.
EXISTING DOMESTIC WATER METER. CONNECT TO 1.
ES
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:21:32 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_4\M-504.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-504.dgn
M-504
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
BUILDING ETRD-112
GENERAL SHEET NOTES
SHEET KEYNOTES
BUILDING ETRD-113 1st FLOOR
BUILDING ETRD-113 2nd FLOOR
GRH
DSC
EXF
AOU
AOU
DSC3
DSW
DSW
DSW DSW
SERVICE
ELECTRICAL
T
DSWDSWDSWDSWDSWDSW DSWDSW
T
T
T
T
NTS
NTS
NTS
TYP 7
E T
R D -1
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 4.
TO EMCS ARCHITECTURE DRAWINGS.
OWNER-PROVIDED NETWORK SWITCHES. REFER
CONNECT NEW BUILDING CONTROLLERS TO 3.
CONTROL DIAGRAMS.
120% OF THE TOTAL POINTS COUNT. REFER TO
REPLACED IN KIND AND PROVIDE CAPACITY FOR
PURPOSES, ASSUME EQUIPMENT WILL BE
OF ALL ASSOCIATED POINTS. FOR BIDDING
CONTROLLERS, AND MONITORING AND CONTROL
SUITABLE FOR CONNECTION OF APPLICATION
CONTROLLERS AND NETWORK ARCHITECTURE
DIAGRAMS. PROVIDE NEW BUILDING
CONTROLLER. REFER TO EMCS ARCHITECTURE
AND NOT CONNECTED TO THE NEW BUILDING
APPLICATION CONTROLLERS ARE TO BE RETAINED
APPLICATION CONTROLLER. EXISTING
ON AND IS EXECUTED BY THE EXISTING
FOR EQUIPMENT SERVING THESE SPACES RESIDES
PROGRAMMING OF THE SEQUENCE OF OPERATION
TEMPERATURE SENSORS. IT IS ASSUMED THAT
CONTROLLERS AND PROVIDE SPACE
WHERE INDICATED, RETAIN EXISTING APPLICATION 2.
CONTROL SYSTEM.
APPLICATION CONTROLLERS INTO NEW BUILDING
AS NECESSARY TO INTEGRATE EXISTING
CONFIGURATION. PROVIDE SYSTEM CONTROLLERS
FIELD-VERIFY EXISTING NETWORK 1.
CONTRACTOR.
METER LOCATION WILL NEED TO BE VERIFIED BY
SYSTEM. THE LOCATION WAS NOT VERIFIED.
CONNECT EXISTING WATER METER TO DDC 11.
SERVES BUILDING.
REPLACE EXISTING POWER MONITOR THAT 10.
IN BUILDING 102.
COORDINATE POWER MONITOR THAT IS LOCATED 9.
SWITCH. CONNECTION TO DDC IS NOT REQUIRED.
EXISTING EXHAUST FAN IS CONTROLLED BY LOCAL 8.
BY GAS RADIANT HEATER
TEMPERATURE SENSOR FOR EACH SPACE SERVED
GAS RADIANT HEATERS. PROVIDE SPACE
RETAIN EXISTING LOCAL CONTROL SYSTEMS FOR 7.
AIR-SOURCE OUTDOOR UNITS LOCATED AT GRADE.6.
PROVIDE SPACE TEMPERATURE SENSOR.5.
SPLIT DX/NG FAN COIL4.
EXISTING DDC PANEL3.
TO CONNECT TO DDC.
NATURAL GAS METER. PROVIDE OUTPUT MODULE 2.
AND CONNECT TO DDC.
DOMESTIC WATER RISER. PROVIDE NEW METER 1.
R
E V
11 17
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:22:09 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_5\M-505.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-505.dgn
M-505
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
GENERAL SHEET NOTES
SHEET KEYNOTES
BUILDING ETRD-117 1st FLOOR
BUILDING ETRD-117 2nd FLOOR
BUILDING ETRD-118 1st FLOOR
BUILDING ETRD-118 2nd FLOOR
BUILDING ETRD-118 3rd FLOOR
AOU
DSW
GRH GRH
ELECTRICAL SERVICE
NGF
RFC4
DSW
AOU
AOU
TYP 3
RFC4
RFC 4
ELECTRICAL SERVICE
NTS
NTS
NTS
NTST
T
T
NGF
ON MEZZ ABOVE
GAS FURNACE
8 8
T
T
T
T
BELOW
IN MECH ROOM
DX/NG FAN COIL
BELOW
IN MECH ROOM
DX/NG FAN COIL
NTS
E T
R D -1
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 4.
TO EMCS ARCHITECTURE DRAWINGS.
OWNER-PROVIDED NETWORK SWITCHES. REFER
CONNECT NEW BUILDING CONTROLLERS TO 3.
CONTROL DIAGRAMS.
120% OF THE TOTAL POINTS COUNT. REFER TO
REPLACED IN KIND AND PROVIDE CAPACITY FOR
PURPOSES, ASSUME EQUIPMENT WILL BE
OF ALL ASSOCIATED POINTS. FOR BIDDING
CONTROLLERS, AND MONITORING AND CONTROL
SUITABLE FOR CONNECTION OF APPLICATION
CONTROLLERS AND NETWORK ARCHITECTURE
DIAGRAMS. PROVIDE NEW BUILDING
CONTROLLER. REFER TO EMCS ARCHITECTURE
AND NOT CONNECTED TO THE NEW BUILDING
APPLICATION CONTROLLERS ARE TO BE RETAINED
APPLICATION CONTROLLER. EXISTING
ON AND IS EXECUTED BY THE EXISTING
FOR EQUIPMENT SERVING THESE SPACES RESIDES
PROGRAMMING OF THE SEQUENCE OF OPERATION
TEMPERATURE SENSORS. IT IS ASSUMED THAT
CONTROLLERS AND PROVIDE SPACE
WHERE INDICATED, RETAIN EXISTING APPLICATION 2.
CONTROL SYSTEM.
APPLICATION CONTROLLERS INTO NEW BUILDING
AS NECESSARY TO INTEGRATE EXISTING
CONFIGURATION. PROVIDE SYSTEM CONTROLLERS
FIELD-VERIFY EXISTING NETWORK 1.
12 17
CONTRACTING OFFICER.
SWITCH. COORDINATE LOCATION WITH
PROVIDE NEW HVAC EMERGENCY SHUTDOWN 15.
SYSTEM.
REPLACE EXISTING POWER MONITOR WITH NEW 14.
BASE DDC SYSTEM.
DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE
PROVIDE A LAPTOP AND A CONNECTION TO THE 13.
TEMPERATURE SENSOR.
DUCTLESS SPLIT SYSTEM. PROVIDE SPACE 12.
TO DDC.
SWITCH. PROVIDE NEW STARTER AND CONNECT
EXISTING EXHAUST FAN IS CONTROLLED BY LOCAL 11.
TEMPERATURE SENSOR.
NATURAL GAS FURNACE. PROVIDE SPACE 10.
SWITCH. CONNECTION TO DDC IS NOT REQUIRED.
EXISTING EXHAUST FAN IS CONTROLLED BY LOCAL 9.
BY GAS RADIANT HEATER.
TEMPERATURE SENSOR FOR EACH SPACE SERVED
GAS RADIANT HEATERS. PROVIDE SPACE
RETAIN EXISTING LOCAL CONTROL SYSTEMS FOR 8.
TEMPERATURE SENSOR.
APPLICATION CONTROLLER AND PROVIDE SPACE
SPLIT DX AIR HANDLING UNIT. RETAIN EXISTING 7.
SENSOR.
CONTROLLER AND PROVIDE SPACE TEMPERATURE
FLOOR. RETAIN EXISTING APPLICATION
HORIZONTAL GAS-FIRED FURNACE SERVES FIRST 6.
LADDER IN JANITOR CLOSET BELOW.
EQUIPMENT LOCATED ON MECHANICAL PLATFORM. 5.
TEMPERATURE SENSOR.
APPLICATION CONTROLLER AND PROVIDE SPACE
SPLIT DX/NG FAN COIL. RETAIN EXISTING 4.
EXISTING DDC PANEL.3.
TO CONNECT TO DDC.
NATURAL GAS METER. PROVIDE OUTPUT MODULE 2.
AND CONNECT TO DDC.
DOMESTIC WATER RISER. PROVIDE NEW METER 1.
ES
ES
ES
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:41:18 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_6\M-506.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-506.dgn
M-506
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
BUILDING ETRD-120
GENERAL SHEET NOTES
SHEET KEYNOTES
BUILDING ETRD-126
BUILDING ETRD-127 - 1st FLOOR
BUILDING ETRD-127 - 2nd FLOOR
BUILDING ETRD-137 - 1st FLOOR BUILDING ETRD-137 - MEZZANINE
E T
R D -1
HFC5
AOU
AOU
AOU
HFC5
HFC6
TYP 6
AOU AOU
AOU
AOU
AOU
NGF 3
EXF
EXF
EXF
GRH
GRH
RFC7
DSW9
ELECTRICAL SERVICE
AOU
DSW
ELECTRICAL SERVICE
ELECTRICAL SERVICE
T
9DSW
TRFC7
T
T
T
T
T
T
T
T
T
T
T
T
5 5
T
T
T
DSW
RFC7
3 DSW
T
T T
T
13 13
MEZZ ABOVE
FAN COIL ON
NTS NTS
NTS
NTS
NTS
NTS
T
REPAIR METER.
WORKING CORRECTLY, CONTRACTOR TO REPLACE
WATER METER FUNCTIONALITY. IF METER IS NOT
CONTRACTOR TO VERIFY EXISTING GAS, AND 4.
TO EMCS ARCHITECTURE DRAWINGS.
OWNER-PROVIDED NETWORK SWITCHES. REFER
CONNECT NEW BUILDING CONTROLLERS TO 3.
CONTROL DIAGRAMS.
120% OF THE TOTAL POINTS COUNT. REFER TO
REPLACED IN KIND AND PROVIDE CAPACITY FOR
PURPOSES, ASSUME EQUIPMENT WILL BE
OF ALL ASSOCIATED POINTS. FOR BIDDING
CONTROLLERS, AND MONITORING AND CONTROL
SUITABLE FOR CONNECTION OF APPLICATION
CONTROLLERS AND NETWORK ARCHITECTURE
DIAGRAMS. PROVIDE NEW BUILDING
CONTROLLER. REFER TO EMCS ARCHITECTURE
AND NOT CONNECTED TO THE NEW BUILDING
APPLICATION CONTROLLERS ARE TO BE RETAINED
APPLICATION CONTROLLER. EXISTING
ON AND IS EXECUTED BY THE EXISTING
FOR EQUIPMENT SERVING THESE SPACES RESIDES
PROGRAMMING OF THE SEQUENCE OF OPERATION
TEMPERATURE SENSORS. IT IS ASSUMED THAT
CONTROLLERS AND PROVIDE SPACE
WHERE INDICATED, RETAIN EXISTING APPLICATION 2.
CONTROL SYSTEM.
APPLICATION CONTROLLERS INTO NEW BUILDING
AS NECESSARY TO INTEGRATE EXISTING
CONFIGURATION. PROVIDE SYSTEM CONTROLLERS
FIELD-VERIFY EXISTING NETWORK 1.
WATER METER
SEE PHOTO 2 THIS SHEET
NEW WATER METER.
PHOTO 2
NEW WATER METER
13 17
CONTRACTING OFFICER.
SWITCH. COORDINATE LOCATION WITH
PROVIDE NEW HVAC EMERGENCY SHUTDOWN 17.
CONDITIONS.
OF NEW MONITOR TO BE VERIFIED WITH EXISTING
PROVIDE NEW POWER MONITOR. EXACT LOCATION 16.
PROVIDE NEW POWER MONITOR.15.
CONNECT TO THE DDC SYSTEM.
EXISTING GAS METER IS NOT IN USE DO NOT 14.
BY GAS RADIANT HEATER.
TEMPERATURE SENSOR FOR EACH SPACE SERVED
GAS RADIANT HEATERS. PROVIDE SPACE
RETAIN EXISTING LOCAL CONTROL SYSTEMS FOR 13.
TEMPERATURE SENSOR.
DUCTLESS SPLIT SYSTEM. PROVIDE SPACE 12.
UNIT HEATERS.
COMMON THERMOSTAT FOR SUSPENDED GAS 11.
CONNECTION TO DDC IS NOT REQUIRED.
CONTROLLED TO RUN ON CALL FOR HEAT.
RECIRCULATING DESTRATIFICATION FAN 10.
SENSOR FOR EACH SPACE SERVED.
OUTDOOR UNIT. PROVIDE SPACE TEMPERATURE
MULTI-SPLIT INDOOR UNITS PAIRED WITH COMMON 9.
SENSOR.
CONTROLLER AND PROVIDE SPACE TEMPERATURE
CEILING. RETAIN EXISTING APPLICATION
NG FAN COIL LOCATED ABOVE BREAK ROOM 8.
TEMPERATURE SENSOR.
APPLICATION CONTROLLER AND PROVIDE SPACE
SPLIT DX/NG FAN COIL. RETAIN EXISTING 7.
SERVED.
TEMPERATURE SENSOR FOR EACH SPACE
COMMON OUTDOOR UNIT. PROVIDE SPACE
MULTI-SPLIT HEAT PUMP FAN COILS PIPED TO 6.
TEMPERATURE SENSOR.
SPLIT HEAT PUMP FAN COIL. PROVIDE SPACE 5.
POWER MONITOR.
THE INCOMING POWER LOCATION AND ADD NEW
THE MEZZANINE ABOVE THE OFFICE. COORDINATE
EXISTING ELECTRICAL EQUIPMENT LOCATION ON 4
EXISTING DDC PANEL.3.
TO CONNECT TO DDC.
NATURAL GAS METER. PROVIDE OUTPUT MODULE 2.
AND CONNECT TO DDC.
DOMESTIC WATER RISER. PROVIDE NEW METER 1.
ES
ES
ES
R
E V
FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:42:57 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
\\USLAS0-APP385\ICS_workdir\134320\1056621_10\M-701.dgn$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
J A
C O
B S
A
L L R
IG
H T S R
E S
E R
V E
P
L A
C E E
M C
S A
N D S
M A
R T M
E T
E R
S
C A
M P M
U R
R A
Y
W A
S H
IN
G T
O N
W A
S H
IN
G T
O N A
IR
N
A T
IO
N A
L G
U A
R D
C A
M P M
U R
R A
Y
W A
S H
IN
G T
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
C H
M H
IL
L H
D R J
V S
O U
T H J
A M
A
IC
A S
T R
E E
T
E N
G L E
W O
O D
C O
T E
L E (3
-0
F
A X (7
-9
M-701.dgn
M-701
T P
R
IC
E J P
IG
M A
N J M
C M
U R
R E
N
B U
IL
D
IN
G
M E
C H
A N
IC
A L
C O
N T
R O
L D
IA
G R
A M
S
NTS
CWP - CHILLED WATER PUMP
C O
N N
E C
T
IO
N
N E
T W
O R
K
DP
AI
D
IF
F E
R E
N T
IA
L P
R E
S S
U R
E
C H
IL
L E
D W
A T
E R L
O O
P
DI
R U
N S
T A
T U
S
SEQUENCE OF OPERATION
C O
N N
E C
T
IO
N
N E
T W
O R
K
DI
R U
N S
T A
T U
S
LEAD LAG
AS REQUIRED TO MAINTAIN LOOP DIFFERENTIAL PRESSURE AT SETPOINT.
THE DDC AND THE REMAINING PUMP SHALL START AND MODULATE SPEED
UPON FAILURE OF EITHER PUMP TO RUN, AN ALARM SHALL BE ISSUED AT
SPEED AS REQUIRED TO MAINTAIN LOOP DIFFERENTIAL AT SETPOINT.
AND BOTH PUMPS SHALL RUN AT THE SAME SPEED. DDC SHALL MODULATE
OPERATING AT 90% SPEED (ADJUSTABLE), THE LAG PUMP SHALL START
UPON A CALL FOR INCREASED PUMP SPEED WITH THE LEAD PUMP
(ADJUSTABLE, FIELD VERIFY).
REQUIRED TO MAINTAIN LOOP DIFFERENTIAL PRESSURE AT SETPOINT
DISTRIBUTION LOOP AND SHALL MODULATE LEAD PUMP SPEED AS
DDC SHALL MONITOR DIFFERENTIAL PRESSURE IN THE CHILLED WATER
START AND RUN AT MINIMUM SPEED (ADJUSTABLE, FIELD VERIFY).
UPON A CALL FOR COOLING AT ANY ZONE DEMAND, THE LEAD PUMP SHALL
IN THE DISTRIBUTION LOOP.
AS A LEAD/LAG PAIR CONTROLLED TO MAINTAIN DIFFERENTIAL PRESSURE
CHILLED WATER SECONDARY LOOP DISTRIBUTION PUMP SHALL OPERATE
NTS
HWP - HEATING WATER PUMP
C O
N N
E C
T
IO
N
N E
T W
O R
K
DP
AI
D
IF
F E
R E
N T
IA
L P
R E
S S
U R
E
H E
A T
IN
G W
A T
E R L
O O
P
DI
R U
N S
T A
T U
S
SEQUENCE OF OPERATION
C O
N N
E C
T
IO
N
N E
T W
O R
K
DI
R U
N S
T A
T U
S
LEAD LAG
AS REQUIRED TO MAINTAIN LOOP DIFFERENTIAL PRESSURE AT SETPOINT.
THE DDC AND THE REMAINING PUMP SHALL START AND MODULATE SPEED
UPON FAILURE OF EITHER PUMP TO RUN, AN ALARM SHALL BE ISSUED AT
SPEED AS REQUIRED TO MAINTAIN LOOP DIFFERENTIAL AT SETPOINT.
AND BOTH PUMPS SHALL RUN AT THE SAME SPEED. DDC SHALL MODULATE
OPERATING AT 90% SPEED (ADJUSTABLE), THE LAG PUMP SHALL START
UPON A CALL FOR INCREASED PUMP SPEED WITH THE LEAD PUMP
(ADJUSTABLE, FIELD VERIFY).
REQUIRED TO MAINTAIN LOOP DIFFERENTIAL PRESSURE AT SETPOINT
DISTRIBUTION LOOP AND SHALL MODULATE LEAD PUMP SPEED AS
DDC SHALL MONITOR DIFFERENTIAL PRESSURE IN THE HEATING WATER
START AND RUN AT MINIMUM SPEED (ADJUSTABLE, FIELD VERIFY).
UPON A CALL FOR HEAT AT ANY ZONE DEMAND, THE…