Attachment 2.1 Replace EMCS and Smart Meters Drawings May 2023.pdf

PDF 11 MB Posted

Attached to
ERTD202324 Repair EMCS and Smart Meters, Camp Murray, WA
Solicitation number
W50S9E23B0003
Issued by

About this file

This attachment provides drawings related to a federal contract opportunity issued by the Department of the Army National Guard. The solicitation seeks proposals to repair the existing Energy and Resource Tracking Database system and smart meters at Camp Murray in Washington. Offerors should reference solicitation number W50S9E23B0003 and must submit proposals by the date specified in the solicitation to be considered for award of a firm fixed price contract to provide the required repairs and maintenance services. The opportunity is set aside for small businesses only.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:55:59 PM

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134321\1056590_1\G-001.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

D

R

E P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

MAY 2023

G-001.dgn

G-001

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

C O

V E

R S

H E

E T

G E

N E

R A

L

CONTRACT DRAWINGS FOR

CAMP MURRAY AIR NATIONAL GUARD STATION, WASHINGTON

REPLACE EMCS AND SMART METERS

D3250107

1 17 1

R

E V

IE

W

DATE: MAY 12, 2023

CAMP MURRAY, WA.

PROJECT NUMBER: ETRD202324

B3 100% DELIVERABLE

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:47:33 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134321\1056590_2\G-002.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

R

E V

IE

W

D3250107

G-002.dgn

G-002

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

G E

N E

R A

L

A N

D E

Q U

IP

M E

N T I

N D

E X

IN

S

T A

L L

A T

IO

N M

A P

DRAWING INDEX

SHEET TITLE SHEET TITLE

DRAWING INDEX - CONTINUED

DRAWING DRAWING

D R

A W

IN

G I

N D

E X

M-503

M-502

M-501

M-105

M-104

M-103

M-102

M-101

G-002

G-001

ETRD-109

ETRD-102, 103, 105, 106, 107

ETRD-101

EMCS ARCHITECTURE

EMCS ARCHITECTURE

EMCS ARCHITECTURE

EMCS ARCHITECTURE

EMCS ARCHITECTURE

INSTALLATION MAP AND EQUIPMENT INDEX, DRAWING INDEX

COVER SHEET

M-704

M-703

M-702

M-701

M-506

M-505

M-504

CONTROL DIAGRAMS SHEET 4

CONTROL DIAGRAMS SHEET 3

CONTROL DIAGRAMS SHEET 2

CONTROL DIAGRAMS SHEET 1

ETRD-120, 126, 127, 137

ETRD-117, 118

ETRD-112, 113

2 17

CONTROLLER EXPLANATION

MAY NOT BE MUCH DIFFERENT THAN A FLEXIBLE AAC.

TRENDING, ALARMING) OR MAY MERELY ACT AS AN INFORMATION ROUTER. BC'S WITH POINT CAPACITY

POINT CAPACITY, AND PROVIDE "SUPERVISORY" CONTROL OF THE ASC'S/AAC'S (E.G., SCHEDULING, OPERATOR INTERFACE). OTHERWISE, THEIR OTHER CAPABILITIES CAN VARY GREATLY: SOME HAVE NO

ROUTING INFORMATION BETWEEN CONTROLLERS AND USERS (I.E., VIA IP COMMUNICATIONS TO AN

BACNET BUILDING CONTROLLER (BC): ARE THE TOP-LEVEL CONTROLLER CATEGORY AND IS USED FOR

BOTH APPROACHES TO AN AAC.

FLEXIBILITY (I.E., FOR CUSTOM AHU'S). SOME MANUFACTURERS MAY EVEN OFFER MODELS THAT COVER

FACTORY-PROGRAMMED SEQUENCE CHOICES (I.E., FOR RTU'S), WHILE OTHER AAC'S PROVIDE MORE

BOTH AVAILABLE. SOME AAC'S MIGHT BE BETTER CLASSIFIED AS ASC'S DUE TO THE USE OF

SCHEDULING, TRENDING AND ALARMING CAPABILITIES. MS/TP AND IP COMMUNICATIONS ARE OFTEN

RANGE OF POINT COUNTS/TYPES ALONG WITH POINT EXPANSION CAPABILITIES. THEY SHOULD SUPPORT

BACNET ADVANCE APPLICATION CONTROLLER (AAC): NETWORK BACNET MS/TP. MEANT FOR A WIDER

ALARMS.

CLOCKS FOR START/STOP SCHEDULING, CAPACITY FOR TRENDING AND/OR THE ABILITY TO GENERATE

THEY ALSO VARY IN THE DEGREE THAT THEY CAN OPERATE AUTONOMOUSLY. SOME HAVE TIME

THAT PURPOSE. THEY MAY COME WITH A FIXED SET OF FACTORY-PROGRAMMED SEQUENCE CHOICES.

APPLICATION (VAV BOXES, FAN COIL'S ETC.) AND THEREFORE HAVE A POINT COUNT/TYPE SPECIFIC FOR

BACNET ADVANCED SPECIFIC CONTROLLER (ASC): NETWORK BACNET MS/TP. MEANT FOR A SPECIFIC

IT SWITCHGEAR - REFER TO UFC 4-010-06 FOR LEVEL OF CYBER SECURITY.

REFER TO ASHRAE STANDARD 135-2020 FOR DEFINITIONS AND MINIMUM CAPABILITIES OF CONTROLLERS.

R

E V

IE

W

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:42:46 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_11\M-101.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

R

E V

IE

W

M-101.dgn

M-101

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

GENERAL SHEET NOTES

SHEET KEYNOTES

E M

C S A

R C

H

IT

E C

T U

R E

ETHERNET

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTINGGYM 130

SENSOR

TEMPERATURE

EXISTING

EXISTING

BUILDING 101

1 TYPICAL

2 TYPICAL

ETHERNET

SWITCH

NETWORK

BUILDING 102

PARTITION 1

SENSOR

TEMPERATURE

BUILDING 103

EXISTING

KITCHEN MAIN

EXF

STARTER

EXISTING

RESTROOMS

EXF

STARTER

EXISTING

EXISTING

DISHWASH

EXF

STARTER

KITCHEN LINE

EXF

STARTER

SERVER 172

SENSOR

TEMPERATURE

BUILDING 103

CONTRACTOR FURNISHED AND INSTALLED

NETWORK SERVER

BASE FIBER NETWORK

B A

S E F

IB

E R N

E T

W O

R K

B A

S E F

IB

E R N

E T

W O

R K

E T

H E

R N

E T

PARTITION 2

SENSOR

TEMPERATURE

PARTITION 3

SENSOR

TEMPERATURE

BAY 4

SENSOR

TEMPERATURE

ROOM 103

SENSOR

TEMPERATURE

BAY 3

SENSOR

TEMPERATURE

BAY 2

SENSOR

TEMPERATURE

BAY 1

SENSOR

TEMPERATURE

OFFICE

SENSOR

TEMPERATURE

6CONTROLLER

BUILDING

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 3.

TO THE NEW DDC.

APPLICATION CONTROLLERS AND FIELD DEVICES

REQUIRED TO CONNECT THE EXISTING

PROVIDE NEW SYSTEM CONTROLLERS AS 2.

NETWORK IS NOT INDICATED.

AND DETAILED CONFIGURATION OF EXISTING

QUANTITY OF EXISTING SYSTEM CONTROLLERS

CONTROL SYSTEM ARCHITECTURE. ACTUAL

REPRESENTATION OF NEW AND EXISTING DDC

DRAWING IS A DIAGRAMMATIC ONLY 1.

PARTITION 4

SENSOR

TEMPERATURE

MONITOR

POWER

ELECTRIC

BUILDING 112

MONITOR

POWER

ELECTRIC

MONITOR

POWER

ELECTRICAL

10WATER

DOMESTIC

METER

(EXISTING)

NATURAL GAS

METER MODULE

(EXISTING)

DOMESTIC WATER

METER

(EXISTING)

NATURAL GAS

METER

(EXISTING)

MONITOR

POWER

ELECTRICAL

(EXISTING)

DOWN SWITCH

HVAC SHUT

PROVIDE WITH PRINTER

LOCATED IN BUILDING B117

UTILITY MONITORING AND CONTROL SYSTEM

3 17

102. SEE DETAIL ON M-703.

THE POWER SERVING BUILDING 112 IN BUILDING

WIRING ASSOCIATED WITH THE MONITORING OF

INSTALL NEW POWER MONITOR INCLUDING ALL

BUILDING 112 IS POWERED FROM BUILDING 102. 11.

REQUIRED.

DEMOLISH ANY EXISTING POWER MONITOR AS

AND INCLUDE ALL WIRING. SEE DETAIL ON M-703.

COORDINATE THE LOCATION TO MONITOR POWER

NEW POWER MONITOR FOR INCOMING POWER. 10.

BUILDING 102. SEE DETAIL ON M-703.

THE POWER SERVING BUILDING 103 INSIDE OF

WIRING ASSOCIATED WITH THE MONITORING OF

INSTALL NEW POWER MONITOR INCLUDING ALL

BUILDING 103 IS POWERED FROM BUILDING 102. 9.

UPGRADED.

UNTIL REMAINDER OF BUILDING HVAC IS

REMAINING BUILDING CONTROLLERS TO REMAIN 8.

BUILDING UTILIZING EXISTING I/O.

AREA IN B101 WITH NEW OPEN ARCHITECTURE

REPLACE EXISTING BUILDING CONTROLLING SCIF 7.

BUILDING UTILIZING EXISTING I/O.

BUILDING WITH NEW OPEN ARCHITECTURE

REPLACE EXISTING BUILDING CONTROLLING 6.

EXISTING MONITOR. SEE DETAIL ON SHEET M-703.

INCLUDING ALL WIRING ASSOCIATED WITH THE

REMOVE AND REPLACE EXISTING MONITOR

EXISTING POWER MONITOR TO BE REPLACED. 5.

PROVIDE ALARM OUTPUT TO DDC.4.

IN ADJACENT BUILDING 102.

BUILDING 103 TO CONNECT TO NETWORK SWITCH 3.

CONFIGURATION IS ACCEPTABLE.

WIRING TO ACCOMMODATE NEW NETWORK

REPLACEMENT AND REROUTING OF CONTROL

SENSORS TO REMAIN. AT CONTRACTOR'S OPTION,

CONTROL WIRING TO EXISTING CONTROLLERS AND 2.

CONTROLLERS WITH EXISTING CONDITIONS.

QUANTITY AND CONFIGURATION OF FIELD

NETWORK CONFIGURATION AND COORDINATE

DIAGRAMMATICALLY. FIELD VERIFY EXISTING

NEW SYSTEM CONTROLLERS ARE INDICATED 1.

DOWN SWITCH

HVAC SHUT

FPOC - LEVEL 3

IT SWITCH

CONTROLLER

DDC BUILDING

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED

TYPICAL 2

PRIMARY CWP

STARTER

ASC

TWINNED ACH

AAC

TYPICAL 2

SECONDARY CWP

VFD

ASC

14-ZONE AHU

AAC TYPICAL 2

SECONDARY HWP

VFD

ASC

HWB

ASCBC

DX AHU

AAC

TYPICAL 2

SPLIT DX AHU

ASC

8-ZONE MZU

AAC

TYPICAL 14

VAV CONTROLLER

CHILLED BEAM

ASC

BC

BC

ETHERNET CAT6E

ARRANGEMENT

SERVING SECURED AREAS. FIELD VERIFY FINAL

LAYOUT IS SHOWN BASED ON CONTROLLER

SWITCH - LEVEL 2

DDC IT ETHERNET

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:56:44 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_12\M-102.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-102.dgn

M-102

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

GENERAL SHEET NOTES

SHEET KEYNOTES

E M

C S A

R C

H

IT

E C

T U

R E

ETHERNET

SWITCH

NETWORK

CONTROLLER

BUILDING

BUILDING 105

GLOBAL

SENSOR

TEMPERATURE

ETHERNET

SWITCH

NETWORK

BUILDING 106

AHU-1

SENSOR

TEMPERATURE

AHU-2

SENSOR

TEMPERATURE

ETHERNET

SWITCH

NETWORK

CONTROLLER

BUILDING

EXISTING

1 TYPICAL

BUILDING 107

EXISTING

TYPICAL

EXISTING

TYPICAL 2

EXF

STARTER

ROOM 115

SENSOR

TEMPERATURE

ROOM 109

SENSOR

TEMPERATURE

COMM ROOM 111

SENSOR

TEMPERATURE

NATURAL GAS

METER MODULE

SWITCH

SHUTDOWN

EMERGENCY

SWITCH

SHUTDOWN

EMERGENCY

DOMESTIC WATER

METER

CONTRACTOR FURNISHED AND INSTALLED

NETWORK SERVER

BASE FIBER NETWORK

B A

S E F

IB

E R N

E T

W O

R K

B A

S E F

IB

E R N

E T

W O

R K

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 3.

TO THE NEW DDC.

APPLICATION CONTROLLERS AND FIELD DEVICES

REQUIRED TO CONNECT THE EXISTING

PROVIDE NEW SYSTEM CONTROLLERS AS 2.

NETWORK IS NOT INDICATED.

AND DETAILED CONFIGURATION OF EXISTING

QUANTITY OF EXISTING SYSTEM CONTROLLERS

CONTROL SYSTEM ARCHITECTURE. ACTUAL

REPRESENTATION OF NEW AND EXISTING DDC

DRAWING IS A DIAGRAMMATIC ONLY 1.

MONITOR

POWER

ELECTRIC

MONITOR

POWER

ELECTRIC

MONITOR

POWER

ELECTRIC

PROVIDE WITH PRINTER

LOCATED IN BUILDING 117

UTILITY MONITORING AND CONTROL SYSTEM

4 17

DOWN SWITCH

HVAC SHUT

THE EXISTING OPERATOR WORKSTATION.

CONTRACTING OFFICER FOR THE REMOVAL OF

BASE DDC SYSTEM. COORDINATE WITH THE

DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE

PROVIDE A LAPTOP AND A CONNECTION TO THE 8.

AND INCLUDE ALL WIRING. SEE DETAIL ON M-703.

COORDINATE THE LOCATION TO MONITOR POWER

NEW POWER MONITOR FOR INCOMING POWER. 7.

TO THE DDC SYSTEM.

TO PROVIDE A PULSE OUTPUT TO BE CONNECTED

EXISTING GAS METER TO BE UPDATED/CHANGED 6.

ARCHITECTURE BUILDING UTILIZING EXISTING I/O.

CONTROLLING BUILDING WITH NEW OPEN

REPLACE EXISTING SIEMENS BUILDING5.

SYSTEM.

OUTPUT FROM EXISTING WATER METER TO DDC

PROVIDE NEW WIRING AS REQUIRED TO CONNECT 4.

PROVIDE ALARM OUTPUT TO DDC.3.

CONFIGURATION IS ACCEPTABLE.

WIRING TO ACCOMMODATE NEW NETWORK

REPLACEMENT AND REROUTING OF CONTROL

SENSORS TO REMAIN. AT CONTRACTOR'S OPTION,

CONTROL WIRING TO EXISTING CONTROLLERS AND 2.

CONTROLLERS WITH EXISTING CONDITIONS.

QUANTITY AND CONFIGURATION OF FIELD

NETWORK CONFIGURATION AND COORDINATE

DIAGRAMMATICALLY. FIELD VERIFY EXISTING

NEW SYSTEM CONTROLLERS ARE INDICATED 1.

DOWN SWITCH

HVAC SHUT

LEVEL 3

IT SWITCH FPOC -

COMM NETWORK

COORDINATE WITH EXISTING

GOVERNMENT-FURNISHED

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED

PACKAGED AHU

AAC

TYPICAL 11

VAV CONTROLLER

FAN POWERED

ASC

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED BC

SWITCH - LEVEL 2

DDC IT ETHERNET

ETHERNET CAT6E

ETHERNET CAT6E

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:47:24 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_13\M-103.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-103.dgn

M-103

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

E M

C S A

R C

H

IT

E C

T U

GENERAL SHEET NOTES

SHEET KEYNOTES

ETHERNET

SWITCH

NETWORK

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

BUILDING 109

EXISTING

EXISTING

EXISTING

EXF

STARTER

REF

STARTER

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

SPLIT DX AHU

CONTROLLER

APPLICATION

EXISTING

MECH ATTIC

SENSOR

TEMPERATURE

MECH ROOM 378

SUPPLY FAN

COLD WEATHER

EXISTING

MECH ATTIC

EF

STARTER

EXISTING

MECH ATTIC

EF

STARTER

EXISTING

MECH ATTIC

EF

STARTER

MECH ATTIC

EF

STARTER

MECH ATTIC

EF

STARTER

1 TYPICAL

2 TYPICAL

MECH ATTIC

EF

STARTER

EXISTING

TELECOMM 135A

SENSOR

TEMPERATURE

ELECTRICAL 135

SENSOR

TEMPERATURE

SERVER 305

SENSOR

TEMPERATURE

ETHERNET

SWITCH

NETWORK

ETHERNET

SWITCH

NETWORK

RECEIVING

SHIPPING /

SENSOR

TEMPERATURE

ADMIN

SENSOR

TEMPERATURE

OFFICE 100

SENSOR

TEMPERATURE

NCC 101

SENSOR

TEMPERATURE

CLASSROOM 200

SENSOR

TEMPERATURE

BUILDING 112

BUILDING 113

EXISTING

EXISTING

NATURAL GAS

METER

NATURAL GAS

METER MODULE

BASE FIBER NETWORK

B A

S E F

IB

E R N

E T

W O

R K

B A

S E F

IB

E R N

E T

W O

R K

CONTRACTOR FURNISHED AND INSTALLED

NETWORK SERVER

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 3.

TO THE NEW DDC.

APPLICATION CONTROLLERS AND FIELD DEVICES

REQUIRED TO CONNECT THE EXISTING

PROVIDE NEW SYSTEM CONTROLLERS AS 2.

NETWORK IS NOT INDICATED.

AND DETAILED CONFIGURATION OF EXISTING

QUANTITY OF EXISTING SYSTEM CONTROLLERS

CONTROL SYSTEM ARCHITECTURE. ACTUAL

REPRESENTATION OF NEW AND EXISTING DDC

DRAWING IS A DIAGRAMMATIC ONLY 1.

MONITOR

POWER

ELECTRIC

SHEET M-101

SEE NOTE 11 ON

MONITOR

POWER

ELECTRIC

(EXISTING)

NATURAL GAS

METER MODULE

(EXISTING)

WATER

METER DOMESTIC

(EXISTING)

MONITOR

POWER

ELECTRIC

DOMESTIC WATER

METER

(EXISTING)

METER

NEW WATER

METER

NEW WATER

ON M-503

SEE PHOTO 1

ON M-503

SEE PHOTO 1

PROVIDE WITH PRINTER

LOCATED IN BUILDING B117

UTILITY MONITORING AND CONTROL SYSTEM

5 17

DOWN SWITCH

(3) HVAC SHUT

THE EXISTING WORKSTATION.

CONTRACTING OFFICER FOR THE REMOVAL OF

BASE DDC SYSTEM. COORDINATE WITH THE

DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE

PROVIDE A LAPTOP AND A CONNECTION TO THE 7.

SYSTEM.

REPLACED TO ALLOW CONNECTION TO THE DDC

EXISTING GAS METER TO BE REPAIRED OR 6.

EXISTING MONITOR. SEE DETAIL ON M-703.

INCLUDING ALL WIRING ASSOCIATED WITH THE

REMOVE AND REPLACE EXISTING MONITOR

EXISTING POWER MONITOR TO BE REPLACED. 5.

ARCHITECTURE BUILDING UTILIZING EXISTING I/O.

CONTROLLING BUILDING WITH NEW OPEN

REPLACE EXISTING SIEMENS BUILDING 4.

DDC METER.

PULSE OUTPUT FROM EXISTING WATER METER TO

PROVIDE NEW WIRING AS REQUIRED TO CONNECT 3.

CONFIGURATION IS ACCEPTABLE.

WIRING TO ACCOMMODATE NEW NETWORK

REPLACEMENT AND REROUTING OF CONTROL

SENSORS TO REMAIN. AT CONTRACTOR'S OPTION,

CONTROL WIRING TO EXISTING CONTROLLERS AND 2.

CONTROLLERS WITH EXISTING CONDITIONS.

QUANTITY AND CONFIGURATION OF FIELD

NETWORK CONFIGURATION AND COORDINATE

DIAGRAMMATICALLY. FIELD VERIFY EXISTING

NEW SYSTEM CONTROLLERS ARE INDICATED 1.

LEVEL 3

IT SWITCH FPOC -

FIBER COMMUNICATION NETWORK

GOVERNMENT-FURNISHED

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED BC

BC

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED BC

ETHERNET CAT6E

THIRD FLOOR

BC

ARRANGEMENT

SERVING SECURED AREAS. FIELD VERIFY FINAL

LAYOUT IS SHOWN BASED ON CONTROLLER

2ND FLOOR

BC

MECH ATTIC

BC

MECH ATTIC

BC

ETHERNET CAT6E

7-ZONE AHU

AAC

TYPICAL 7

VAV CONTROLLER

ASC

REF

VFD

ASC

TYPICAL 2

SECONDARY HWP

VFD

ASC

TYPICAL 2

SECONDARY CWP

VFD

ASC

TYPICAL 2

HWB

AAC

ACH

AAC

SPLIT DX AHU

AAC

DWH

AAC

MECH ROOM 246

AAC

8-ZONE MZU

AAC

REF

VFD

ASC

REF

STARTER

ASC

11-ZONE MZU

AAC

SPLIT DX AHU

AAC

REF

VFD

ASC

SWITCH - LEVEL 2

DDC IT ETHERNET

ETHERNET CAT6E

SWITCH - LEVEL 2

DDC IT ETHERNET

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:51:27 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_16\M-104.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

R

E V

IE

W

M-104.dgn

M-104

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

GENERAL SHEET NOTES

SHEET KEYNOTES

E M

C S A

R C

H

IT

E C

T U

R E

ETHERNET

SWITCH

NETWORK

BUILDING 117

OFFICE 101

SENSOR

TEMPERATURE

NATURAL GAS

METER MODULE

STORAGE 100

SENSOR

TEMPERATURE

TOOL ROOM 106

SENSOR

TEMPERATURE

ETHERNET

SWITCH

NETWORK

CONTROLLER

BUILDING

FIRST FLOOR

SENSOR

TEMPERATURE

SECOND FLOOR

SENSOR

TEMPERATURE

THIRD FLOOR

SENSOR

TEMPERATURE

OFFICE 111

SENSOR

TEMPERATURE

BUILDING 118

CONTRACTOR FURNISHED AND INSTALLED

NETWORK SERVER

BASE FIBER NETWORK

B A

S E F

IB

E R N

E T

W O

R K

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 3.

TO THE NEW DDC.

APPLICATION CONTROLLERS AND FIELD DEVICES

REQUIRED TO CONNECT THE EXISTING

PROVIDE NEW SYSTEM CONTROLLERS AS 2.

NETWORK IS NOT INDICATED.

AND DETAILED CONFIGURATION OF EXISTING

QUANTITY OF EXISTING SYSTEM CONTROLLERS

CONTROL SYSTEM ARCHITECTURE. ACTUAL

REPRESENTATION OF NEW AND EXISTING DDC

DRAWING IS A DIAGRAMMATIC ONLY 1.

MONITOR

POWER

ELECTRIC

DOMESTIC WATER

METER

(EXISTING)

NATURAL GAS

METER

(EXISTING)

MONITOR

POWER

ELECTRIC

PROVIDE WITH PRINTER

LOCATED IN BUILDING B117

UTILITY MONITORING AND CONTROL SYSTEM

6 17

AND INCLUDE ALL WIRING. SEE DETAIL ON M-703.

COORDINATE THE LOCATION TO MONITOR POWER

NEW POWER MONITOR FOR INCOMING POWER. 8.

BASE DDC SYSTEM.

DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE

PROVIDE A LAPTOP AND A CONNECTION TO THE 7.

ARCHITECTURE BUILDING UTILIZING EXISTING I/O.

CONTROLLING BUILDING WITH NEW OPEN

REPLACE EXISTING ALERTON BUILDING 6.

VERIFY.

EXISTING METER TO PULSED OUTPUT. FIELD

PROVIDE POWER SUPPLY AS REQUIRED TO ADAPT 5.

DETAIL ON M-703.

PROVIDE WITH WEATHERPROOF ENCLOSURE. SEE

NEW POWER MONITOR LOCATED OUTDOORS. 4.

FROM EXISTING TERMINAL PANEL IN BUILDING 137.

GOVERNMENT-FURNISHED NETWORK PATHWAY 3.

METER AS INDICATED TO ELECTRIC METER.

PULSE OUTPUT FROM EXISTING WATER OR GAS

PROVIDE NEW WIRING AS REQUIRED TO CONNECT 2.

CONTROLLERS WITH EXISTING CONDITIONS.

QUANTITY AND CONFIGURATION OF FIELD

NETWORK CONFIGURATION AND COORDINATE

DIAGRAMMATICALLY. FIELD VERIFY EXISTING

NEW SYSTEM CONTROLLERS ARE INDICATED 1.

DOWN SWITCH

(3) HVAC SHUT

BC

LEVEL 3

IT SWITCH FPOC

GOVERNMENT-FURNISHED

ETHERNET CAT6E

SWITCH - LEVEL 2

DDC IT ETHERNET

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:41:45 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_17\M-105.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-105.dgn

M-105

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

GENERAL SHEET NOTES

SHEET KEYNOTES

E M

C S A

R C

H

IT

E C

T U

R E

BUILDING 120

ETHERNET

SWITCH

NETWORK

CONTROLLER

BUILDING

OFFICE 101

SENSOR

TEMPERATURE

SERVER 103

SENSOR

TEMPERATURE

CONF 106B

SENSOR

TEMPERATURE

SIMULATOR 105

SENSOR

TEMPERATURE

CONF 106A

SENSOR

TEMPERATURE

TRAINING 107

SENSOR

TEMPERATURE

CONTROLLER

BUILDING

BUILDING 126

OFFICE 101

SENSOR

TEMPERATURE

MAINTENANCE 102

SENSOR

TEMPERATURE

OPERATIONS 103

SENSOR

TEMPERATURE

ETHERNET

SWITCH

NETWORK

CONTROLLER

BUILDING

BUILDING 127

OPEN AREA 100

SENSOR

TEMPERATURE

OPEN AREA 200

SENSOR

TEMPERATURE

EXISTING

EXISTING

EXISTING

ROOM 109

EXF

STARTER

RESTROOM 106

EXF

STARTER

RESTROOM 107

EXF

STARTER

CONTROLLER

BUILDING

BUILDING 137

1ST FLOOR

SENSOR

TEMPERATURE

BREAK ROOM 108

SENSOR

TEMPERATURE

TELECOMM 111

SENSOR

TEMPERATURE

BRIEFING 102A

SENSOR

TEMPERATURE

BRIEFING 102B

SENSOR

TEMPERATURE

TYPICAL 2

OFFICE 101B

SENSOR

TEMPERATURE

TYPICAL 2

OFFICE 205

SENSOR

TEMPERATURE

TYPICAL 2

OPEN BAY 110

SENSOR

TEMPERATURE

CONTRACTOR FURNISHED AND INSTALLED

NETWORK SERVER

BASE FIBER NETWORK

B A

S E F

IB

E R N

E T

W O

R K

B A

S E F

IB

E R N

E T

W O

R K

TO DDC

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 3.

TO THE NEW DDC.

APPLICATION CONTROLLERS AND FIELD DEVICES

REQUIRED TO CONNECT THE EXISTING

PROVIDE NEW SYSTEM CONTROLLERS AS 2.

NETWORK IS NOT INDICATED.

AND DETAILED CONFIGURATION OF EXISTING

QUANTITY OF EXISTING SYSTEM CONTROLLERS

CONTROL SYSTEM ARCHITECTURE. ACTUAL

REPRESENTATION OF NEW AND EXISTING DDC

DRAWING IS A DIAGRAMMATIC ONLY 1.

MONITOR

POWER

ELECTRIC

(EXISTING)

DOMESTIC WATER

METER

(EXISTING)

NATURAL GAS

METER MODULE

(EXISTING)

DOMESTIC WATER

METER

(EXISTING)

NATURAL GAS

METER MODULE

(EXISTING)

MONITOR

POWER

ELECTRIC

(EXISTING)

DOMESTIC WATER

METER

ON M-506

SEE PHOTO 2

NATURAL GAS

METER MODULE

(EXISTING)

MONITOR

POWER

ELECTRIC

PROVIDE WITH PRINTER

LOCATED IN BUILDING B117

UTILITY MONITORING AND CONTROL SYSTEM

7 17

OFFICER.

COORDINATE INSTALL WITH THE CONTRACTING

AN EXISTING MODEM IN THE BUILDING.

CONTRACTORS OPTION UTILIZE A WIFI SENSOR OR

MONITOR ROOM TEMPERATURE. AT

PROVIDE NEW TEMPERATURE SENSOR TO 11.

OFFICER.

REQUIRED. COORDINATE WITH CONTRACTING

CORRECTLY. REPAIR OR REPLACE METER AS

EXISTING GAS METER IS NOT READING 10.

AND INCLUDE ALL WIRING. SEE DETAIL ON M-703.

COORDINATE THE LOCATION TO MONITOR POWER

NEW POWER MONITOR FOR INCOMING POWER, 9.

FROM BUILDING 127. SEE DETAIL ON M-703.

EXISTING MONITOR. BUILDING IS FEED POWER

INCLUDING ALL WIRING ASSOCIATED WITH THE

REMOVE AND REPLACE EXISTING MONITOR

EXISTING POWER MONITOR TO BE REPLACED. 8.

CONNECT TO THE DDC SYSTEM.

EXISTING GAS METER IS NOT IN USE. DO NOT 7.

STATUS TO DDC NETWORK.

CONTROLLER TO COMMUNICATE THERMISTOR 6.

ARCHITECTURE BUILDING UTILIZING EXISTING I/O.

CONTROLLING BUILDING WITH NEW OPEN

REPLACE EXISTING SIEMENS BUILDING 5.

TELEPHONE LINE.

GOVERNMENT-FURNISHED PATHWAY VIA 4.

NOT USED3.

CONFIGURATION IS ACCEPTABLE.

WIRING TO ACCOMMODATE NEW NETWORK

REPLACEMENT AND REROUTING OF CONTROL

SENSORS TO REMAIN. AT CONTRACTOR'S OPTION,

CONTROL WIRING TO EXISTING CONTROLLERS AND 2.

CONTROLLERS WITH EXISTING CONDITIONS.

QUANTITY AND CONFIGURATION OF FIELD

NETWORK CONFIGURATION AND COORDINATE

DIAGRAMMATICALLY. FIELD VERIFY EXISTING

NEW SYSTEM CONTROLLERS ARE INDICATED 1.

DOWN SWITCH

HVAC SHUT

DOWN SWITCH

(2) HVAC SHUT

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED

LEVEL 3

IT SWITCH FPOC -

GOVERNMENT-FURNISHED

BC

ETHERNET CAT6E

SWITCH - LEVEL 2

DDC IT ETHERNET

ETHERNET CAT6E

ETHERNET CAT6E

SWITCH - LEVEL 2

DDC IT ETHERNET

ARRANGEMENT

SERVING SECURED AREAS. FIELD VERIFY FINAL

LAYOUT IS SHOWN BASED ON CONTROLLER

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:22:51 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_1\M-501.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-501.dgn

M-501

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

BUILDING ETRD-101

E T

R D -1

GENERAL SHEET NOTES

SHEET KEYNOTES

CWP

CWP

CWP

HWP

HWB

AHU

ACH

VAV

14 ZONES

TYPICAL

1EXF

EXF

DSW

TYPICAL 5

AHU 4

AHU 12

DSW AOU

AOU AOU

MZU 3

8 ZONES

EXF

EXF

NTS

T

T

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 4.

TO EMCS ARCHITECTURE DRAWINGS.

OWNER-PROVIDED NETWORK SWITCHES. REFER

CONNECT NEW BUILDING CONTROLLERS TO 3.

CONTROL DIAGRAMS.

120% OF THE TOTAL POINTS COUNT. REFER TO

REPLACED IN KIND AND PROVIDE CAPACITY FOR

PURPOSES, ASSUME EQUIPMENT WILL BE

OF ALL ASSOCIATED POINTS. FOR BIDDING

CONTROLLERS, AND MONITORING AND CONTROL

SUITABLE FOR CONNECTION OF APPLICATION

CONTROLLERS AND NETWORK ARCHITECTURE

DIAGRAMS. PROVIDE NEW BUILDING

CONTROLLER. REFER TO EMCS ARCHITECTURE

AND NOT CONNECTED TO THE NEW BUILDING

APPLICATION CONTROLLERS ARE TO BE RETAINED

APPLICATION CONTROLLER. EXISTING

ON AND IS EXECUTED BY THE EXISTING

FOR EQUIPMENT SERVING THESE SPACES RESIDES

PROGRAMMING OF THE SEQUENCE OF OPERATION

TEMPERATURE SENSORS. IT IS ASSUMED THAT

CONTROLLERS AND PROVIDE SPACE

WHERE INDICATED, RETAIN EXISTING APPLICATION 2.

CONTROL SYSTEM.

APPLICATION CONTROLLERS INTO NEW BUILDING

AS NECESSARY TO INTEGRATE EXISTING

CONFIGURATION. PROVIDE SYSTEM CONTROLLERS

FIELD-VERIFY EXISTING NETWORK 1.

8 17

CONTRACTING OFFICER.

SWITCH. COORDINATE LOCATION WITH

PROVIDE NEW HVAC EMERGENCY SHUTDOWN 19.

EXISTING BUILDING CONTROLLER PANEL.18.

INSTALL NEW ELECTRIC METER IN SWBD A.17.

TEMPERATURE SENSOR.

LOCATED AT GRADE. PROVIDE SPACE

ASSOCIATED AIR-SOURCE OUTDOOR UNIT 16.

REPLACED.

COMPLETED IN THE FUTURE WHEN HVAC UNIT IS

CONTROLLER. HVAC UNIT INTEGRATION WILL BE

EXECUTED BY THE EXISTING APPLICATION

SEQUENCE OF OPERATION RESIDES ON AND IS

LIFE. IT IS ASSUMED THAT PROGRAMMING OF THE

EXISTING EQUIPMENT IS NEAR END OF USEFUL 15.

EXISTING VAV AND CHILLED BEAM CONTROLLERS.

AND ACTIVE CHILLED BEAM EACH ZONE. RETAIN

PASSIVE VAV TERMINAL UNIT WITH HW REHEAT 14.

SERVED.

TEMPERATURE SENSOR FOR EACH SPACE

LOCATED ON ROOF. PROVIDE SPACE

ASSOCIATED AIR-SOURCE OUTDOOR UNITS 13.

LOCATED ON ROOF.

ASSOCIATED AIR-SOURCE OUTDOOR UNIT

DX AIR HANDLING UNIT LOCATED IN ATTIC. 12.

SYSTEM. RETAIN EXISTING VFDS.

VARIABLE SPEED DRIVES SERVING CHILLED BEAM

DUPLEX CHILLED WATER SECONDARY PUMPS ON 11.

HANDLER. RETAIN EXISTING VFDS.

VARIABLE SPEED DRIVES SERVING VAV AIR

DUPLEX CHILLED WATER SECONDARY PUMPS ON 10.

CONTROLLER.

PIPED IN PARALLEL WITH COMMON APPLICATION

TWINNED AIR-COOLED CHILLERS, TWO UNITS 9.

EXISTING STARTERS.

DUPLEX CHILLED WATER PRIMARY PUMPS. RETAIN 8.

VARIABLE SPEED DRIVES. RETAIN EXISTING VFDS.

DUPLEX HEATING WATER SECONDARY PUMPS ON 7.

CONTROLLER.

CIRCULATOR. RETAIN EXISTING APPLICATION

HEATING WATER BOILER WITH PRIMARY 6.

EXISTING APPLICATION CONTROLLER.

CHW/HW VAV AIR HANDLING UNIT. RETAIN 5.

AIR-SOURCE OUTDOOR UNITS LOCATED AT GRADE.

BURNER LOCATED IN ATTIC. ASSOCIATED

SPLIT DX AIR HANDLING UNIT WITH OUTBOARD NG 4.

EXISTING APPLICATION CONTROLLER.

ASSOCIATED ZONES AS INDICATED. RETAIN

PACKAGED DX/NG AIR HANDLING UNIT, NUMBER OF 3.

THE EXISTING METER.

DDC SYSTEM. COORDINATE THE REQUIRMENTS OF

EXISTING GAS METER TO BE CONNECTED TO THE 2.

ELECTRIC METER.

EXISTING DOMESTIC WATER METER. CONNECT TO 1.

ES

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:42:06 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_2\M-502.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-502.dgn

M-502

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

BUILDING ETRD-102

GENERAL SHEET NOTES

SHEET KEYNOTES

BUILDING ETRD-105

BUILDING ETRD-106 BUILDING ETRD-107

GRH

GRH

GRH

GRH

GRH

GRH

DSC

DSC DSC DSC DSC

DSW

T

T

T

T

T T

AHU

AHU

AOU

AOU

GRH

GRH

GRH

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

AHU

DSC

DSCAOU

EF

DSW 3

ERV

7 7

GRH

GRH

T

BUILDING ETRD-103

EUH

T

T

ERV11

TT

T T

T

EUH EUH EUH

TTT

T

T

T

NTS

NTS NTS

NTS

NTS

E T

R D -1

ES

SWBD B

13PANEL A

ES

13 PANEL A

ES

EF

13MDP

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 4.

TO EMCS ARCHITECTURE DRAWINGS.

OWNER-PROVIDED NETWORK SWITCHES. REFER

CONNECT NEW BUILDING CONTROLLERS TO 3.

CONTROL DIAGRAMS.

120% OF THE TOTAL POINTS COUNT. REFER TO

REPLACED IN KIND AND PROVIDE CAPACITY FOR

PURPOSES, ASSUME EQUIPMENT WILL BE

OF ALL ASSOCIATED POINTS. FOR BIDDING

CONTROLLERS, AND MONITORING AND CONTROL

SUITABLE FOR CONNECTION OF APPLICATION

CONTROLLERS AND NETWORK ARCHITECTURE

DIAGRAMS. PROVIDE NEW BUILDING

CONTROLLER. REFER TO EMCS ARCHITECTURE

AND NOT CONNECTED TO THE NEW BUILDING

APPLICATION CONTROLLERS ARE TO BE RETAINED

APPLICATION CONTROLLER. EXISTING

ON AND IS EXECUTED BY THE EXISTING

FOR EQUIPMENT SERVING THESE SPACES RESIDES

PROGRAMMING OF THE SEQUENCE OF OPERATION

TEMPERATURE SENSORS. IT IS ASSUMED THAT

CONTROLLERS AND PROVIDE SPACE

WHERE INDICATED, RETAIN EXISTING APPLICATION 2.

CONTROL SYSTEM.

APPLICATION CONTROLLERS INTO NEW BUILDING

AS NECESSARY TO INTEGRATE EXISTING

CONFIGURATION. PROVIDE SYSTEM CONTROLLERS

FIELD-VERIFY EXISTING NETWORK 1.

WITH EXISTING CONDITIONS.

BUILDING 112. COORDINATE THE FINAL LOCATION

PROVIDE POWER METER FOR POWER SERVING 18.

WITH EXISTING CONDITIONS.

BUILDING 103. COORDINATE THE FINAL LOCATION

PROVIDE POWER METER FOR POWER SERVING 17.

BASE DDC SYSTEM.

DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE

PROVIDE A LAPTOP AND A CONNECTION TO THE 16.

CONTRACTING OFFICER.

SWITCH. COORDINATE LOCATION WITH

PROVIDE NEW HVAC EMERGENCY SHUTDOWN 15.

AT DISTRIBUTION PANEL IN BUILDING 103.

PROVIDE NEW CURRENT TRANSMITTER MODULE 14.

PROVIDE NEW POWER MONITOR.13.

PARTITION.

102. PROVIDE TEMPERATURE SENSOR FOR EACH

CONNECT TO NEC SWITCH IN ADJACENT BUILDING

STORAGE FACILITY BUILDING 103 CONTROLS WILL 12.

CONNECTION TO DDC NOT REQUIRED.

ROOFTOP ERV CONTROLLED BY MANUAL SWITCH. 11.

CONNECT TO DDC SYSTEM.

EXISTING DOMESTIC WATER RISER AND METER. 10.

COORDINATE WITH ASSOCIATED OUTDOOR UNIT.

NEW THERMOSTAT FOR INDOOR UNIT. 9.

CONTROLLER.

A DISCRETE INPUT, TO THE NEW BUILDING

CONTROLLER. PROVIDE ALARM STATUS ONLY, AS

EXECUTED BY THE EXISTING APPLICATION

SEQUENCE OF OPERATION RESIDES ON AND IS

LIFE. IT IS ASSUMED THAT PROGRAMMING OF THE

EXISTING EQUIPMENT IS NEAR END OF USEFUL 8.

BY GAS RADIANT HEATER.

TEMPERATURE SENSOR FOR EACH SPACE SERVED

GAS RADIANT HEATERS. PROVIDE SPACE

RETAIN EXISTING LOCAL CONTROL SYSTEMS FOR 7.

EXISTING VAV CONTROLLERS.

FAN-POWERED VAV TERMINAL UNITS. RETAIN 6.

LOCATED ON ROOF.

PACKAGED ROOFTOP VAV AIR HANDLING UNIT 5.

BY INDOOR UNIT.

TEMPERATURE SENSOR FOR EACH SPACE SERVED

LOCATED ON ROOF. PROVIDE SPACE

MULTI-SPLIT SYSTEM. COMMON OUTDOOR UNIT 4.

PROVIDE SPACE TEMPERATURE SENSOR.

ASSOCIATED OUTDOOR UNIT LOCATED ON ROOF. 3.

TO THE DDC SYSTEM.

TO PROVIDE A PULSE OUTPUT TO BE CONNECTED

EXISTING GAS METER TO BE UPDATED/CHANGED 2.

AND CONNECT TO ELECTRIC METER.

DOMESTIC WATER RISER. PROVIDE NEW METER 1.

13VERIFY PANEL LOCATION

17 18

9 17 1

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:21:00 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_3\M-503.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

R

E V

IE

W

M-503.dgn

M-503

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

E T

R D -1

SHEET KEYNOTES

BUILDING ETRD-109 1st FLOOR BUILDING ETRD-109 3rd FLOOR

BUILDING ETRD-109 2nd FLOOR

DSW

ACH

AOU

AHU4

AOU

AOU

AOU AOU

AOU

AOU

AOU

AOU

REF

AHU

T

EXF

CWP

VAV

HWB

HWP

DSW5

BUILDING ETRD-109 MECHANICAL ATTIC

EXF

EXF

MZU

MZU

8 ZONES

11 ZONES

REF

REF 6

REF 6

AHU 13

EXF

EXF

EXF

EXF

GENERAL SHEET NOTES

REF

ABOVE

AHU3

T

4 UNITS

7 ZONES

TYPICAL

HWB

T T

NTS

NTS

NTS NTS

ES

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFYEXISTING GAS, AND 4.

TO EMCS ARCHITECTURE DRAWINGS.

OWNER-PROVIDED NETWORK SWITCHES. REFER

CONNECT NEW BUILDING CONTROLLERS TO 3.

CONTROL DIAGRAMS.

120% OF THE TOTAL POINTS COUNT. REFER TO

REPLACED IN KIND AND PROVIDE CAPACITY FOR

PURPOSES, ASSUME EQUIPMENT WILL BE

OF ALL ASSOCIATED POINTS. FOR BIDDING

CONTROLLERS, AND MONITORING AND CONTROL

SUITABLE FOR CONNECTION OF APPLICATION

CONTROLLERS AND NETWORK ARCHITECTURE

DIAGRAMS. PROVIDE NEW BUILDING

CONTROLLER. REFER TO EMCS ARCHITECTURE

AND NOT CONNECTED TO THE NEW BUILDING

APPLICATION CONTROLLERS ARE TO BE RETAINED

APPLICATION CONTROLLER. EXISTING

ON AND IS EXECUTED BY THE EXISTING

FOR EQUIPMENT SERVING THESE SPACES RESIDES

PROGRAMMING OF THE SEQUENCE OF OPERATION

TEMPERATURE SENSORS. IT IS ASSUMED THAT

CONTROLLERS AND PROVIDE SPACE

WHERE INDICATED, RETAIN EXISTING APPLICATION 2.

CONTROL SYSTEM.

APPLICATION CONTROLLERS INTO NEW BUILDING

AS NECESSARY TO INTEGRATE EXISTING

CONFIGURATION. PROVIDE SYSTEM CONTROLLERS

FIELD-VERIFY EXISTING NETWORK 1.

ES

NOTES 18,19

SEE PHOTO THIS PAGE AND

PHOTO 1 EXISTING WATER METER

19 18

10 17

UNIT.

NEW POWER MONITOR TO REPLACE EXISTING 21.

CONTRACTING OFFICER.

SWITCH. COORDINATE LOCATION WITH

PROVIDE NEW HVAC EMERGENCY SHUTDOWN 20.

OWNER.

COORDINATE THE FINAL LOCATION WITH THE

INSTALL WATER METER ON IRRIGATION LINE. 19.

THE OWNER.

BOILER. COORDINATE THE FINAL LOCATION WITH

INSTALL WATER METER ON LINE SERVING THE 18.

EACH ZONE. RETAIN EXISTING VAV CONTROLLERS.

PASSIVE VAV TERMINAL UNIT WITH HW REHEAT 17.

PROVIDE SPACE TEMPERATURE SENSOR.16.

EXISTING VFD.

ASSOCIATED WITH AIR HANDLING UNIT. RETAIN

RELIEF FAN ON VARIABLE SPEED DRIVE 15.

LOCATED AT GRADE.

ASSOCIATED AIR-SOURCE OUTDOOR UNIT 14.

CONTROLLER.

BURNER. RETAIN EXISTING APPLICATION

SPLIT DX AIR HANDLING UNIT WITH OUTBOARD NG 13.

FLOOR.

MECHANICAL ATTIC LOCATED ABOVE SECOND 12.

CONTROLLERS.

CIRCULATORS. RETAIN EXISTING APPLICATION

HEATING WATER BOILERS WITH PRIMARY 11.

VARIABLE SPEED DRIVES. RETAIN EXISTING VFDS.

DUPLEX HEATING WATER SECONDARY PUMPS ON 10.

VARIABLE SPEED DRIVES. RETAIN EXISTING VFDS.

DUPLEX CHILLED WATER SECONDARY PUMPS ON 9.

EXISTING DDC PANEL8.

ACTUATORS.

STARTER, TEMPERATURE SENSORS, AND

COLD WEATHER SUPPLY FAN. RETAIN EXISTING 7.

EXISTING VFD.

REFER TO EMCS ARCHITECTURE DRAWING. RETAIN

RELIEF FAN ASSOCIATED WITH AIR HANDLING UNIT. 6.

SENSOR.

OUTDOOR UNIT. PROVIDE SPACE TEMPERATURE

MULTI-SPLIT INDOOR UNITS PAIRED WITH COMMON 5.

APPLICATION CONTROLLER.

SPLIT DX/NG AIR HANDLING UNIT. RETAIN EXISTING 4.

EXISTING APPLICATION CONTROLLER.

CHW/HW VAV AIR HANDLING UNIT. RETAIN 3.

TO CONNECT TO DDC.

NATURAL GAS METER. PROVIDE OUTPUT MODULE 2.

DDC. SEE PHOTO 1 THIS PAGE.

EXISTING DOMESTIC WATER METER. CONNECT TO 1.

ES

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:21:32 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_4\M-504.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-504.dgn

M-504

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

BUILDING ETRD-112

GENERAL SHEET NOTES

SHEET KEYNOTES

BUILDING ETRD-113 1st FLOOR

BUILDING ETRD-113 2nd FLOOR

GRH

DSC

EXF

AOU

AOU

DSC3

DSW

DSW

DSW DSW

SERVICE

ELECTRICAL

T

DSWDSWDSWDSWDSWDSW DSWDSW

T

T

T

T

NTS

NTS

NTS

TYP 7

E T

R D -1

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 4.

TO EMCS ARCHITECTURE DRAWINGS.

OWNER-PROVIDED NETWORK SWITCHES. REFER

CONNECT NEW BUILDING CONTROLLERS TO 3.

CONTROL DIAGRAMS.

120% OF THE TOTAL POINTS COUNT. REFER TO

REPLACED IN KIND AND PROVIDE CAPACITY FOR

PURPOSES, ASSUME EQUIPMENT WILL BE

OF ALL ASSOCIATED POINTS. FOR BIDDING

CONTROLLERS, AND MONITORING AND CONTROL

SUITABLE FOR CONNECTION OF APPLICATION

CONTROLLERS AND NETWORK ARCHITECTURE

DIAGRAMS. PROVIDE NEW BUILDING

CONTROLLER. REFER TO EMCS ARCHITECTURE

AND NOT CONNECTED TO THE NEW BUILDING

APPLICATION CONTROLLERS ARE TO BE RETAINED

APPLICATION CONTROLLER. EXISTING

ON AND IS EXECUTED BY THE EXISTING

FOR EQUIPMENT SERVING THESE SPACES RESIDES

PROGRAMMING OF THE SEQUENCE OF OPERATION

TEMPERATURE SENSORS. IT IS ASSUMED THAT

CONTROLLERS AND PROVIDE SPACE

WHERE INDICATED, RETAIN EXISTING APPLICATION 2.

CONTROL SYSTEM.

APPLICATION CONTROLLERS INTO NEW BUILDING

AS NECESSARY TO INTEGRATE EXISTING

CONFIGURATION. PROVIDE SYSTEM CONTROLLERS

FIELD-VERIFY EXISTING NETWORK 1.

CONTRACTOR.

METER LOCATION WILL NEED TO BE VERIFIED BY

SYSTEM. THE LOCATION WAS NOT VERIFIED.

CONNECT EXISTING WATER METER TO DDC 11.

SERVES BUILDING.

REPLACE EXISTING POWER MONITOR THAT 10.

IN BUILDING 102.

COORDINATE POWER MONITOR THAT IS LOCATED 9.

SWITCH. CONNECTION TO DDC IS NOT REQUIRED.

EXISTING EXHAUST FAN IS CONTROLLED BY LOCAL 8.

BY GAS RADIANT HEATER

TEMPERATURE SENSOR FOR EACH SPACE SERVED

GAS RADIANT HEATERS. PROVIDE SPACE

RETAIN EXISTING LOCAL CONTROL SYSTEMS FOR 7.

AIR-SOURCE OUTDOOR UNITS LOCATED AT GRADE.6.

PROVIDE SPACE TEMPERATURE SENSOR.5.

SPLIT DX/NG FAN COIL4.

EXISTING DDC PANEL3.

TO CONNECT TO DDC.

NATURAL GAS METER. PROVIDE OUTPUT MODULE 2.

AND CONNECT TO DDC.

DOMESTIC WATER RISER. PROVIDE NEW METER 1.

R

E V

11 17

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:22:09 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_5\M-505.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-505.dgn

M-505

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

GENERAL SHEET NOTES

SHEET KEYNOTES

BUILDING ETRD-117 1st FLOOR

BUILDING ETRD-117 2nd FLOOR

BUILDING ETRD-118 1st FLOOR

BUILDING ETRD-118 2nd FLOOR

BUILDING ETRD-118 3rd FLOOR

AOU

DSW

GRH GRH

ELECTRICAL SERVICE

NGF

RFC4

DSW

AOU

AOU

TYP 3

RFC4

RFC 4

ELECTRICAL SERVICE

NTS

NTS

NTS

NTST

T

T

NGF

ON MEZZ ABOVE

GAS FURNACE

8 8

T

T

T

T

BELOW

IN MECH ROOM

DX/NG FAN COIL

BELOW

IN MECH ROOM

DX/NG FAN COIL

NTS

E T

R D -1

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 4.

TO EMCS ARCHITECTURE DRAWINGS.

OWNER-PROVIDED NETWORK SWITCHES. REFER

CONNECT NEW BUILDING CONTROLLERS TO 3.

CONTROL DIAGRAMS.

120% OF THE TOTAL POINTS COUNT. REFER TO

REPLACED IN KIND AND PROVIDE CAPACITY FOR

PURPOSES, ASSUME EQUIPMENT WILL BE

OF ALL ASSOCIATED POINTS. FOR BIDDING

CONTROLLERS, AND MONITORING AND CONTROL

SUITABLE FOR CONNECTION OF APPLICATION

CONTROLLERS AND NETWORK ARCHITECTURE

DIAGRAMS. PROVIDE NEW BUILDING

CONTROLLER. REFER TO EMCS ARCHITECTURE

AND NOT CONNECTED TO THE NEW BUILDING

APPLICATION CONTROLLERS ARE TO BE RETAINED

APPLICATION CONTROLLER. EXISTING

ON AND IS EXECUTED BY THE EXISTING

FOR EQUIPMENT SERVING THESE SPACES RESIDES

PROGRAMMING OF THE SEQUENCE OF OPERATION

TEMPERATURE SENSORS. IT IS ASSUMED THAT

CONTROLLERS AND PROVIDE SPACE

WHERE INDICATED, RETAIN EXISTING APPLICATION 2.

CONTROL SYSTEM.

APPLICATION CONTROLLERS INTO NEW BUILDING

AS NECESSARY TO INTEGRATE EXISTING

CONFIGURATION. PROVIDE SYSTEM CONTROLLERS

FIELD-VERIFY EXISTING NETWORK 1.

12 17

CONTRACTING OFFICER.

SWITCH. COORDINATE LOCATION WITH

PROVIDE NEW HVAC EMERGENCY SHUTDOWN 15.

SYSTEM.

REPLACE EXISTING POWER MONITOR WITH NEW 14.

BASE DDC SYSTEM.

DDC SYSTEM TO BE ABLE TO HAVE ACCESS TO THE

PROVIDE A LAPTOP AND A CONNECTION TO THE 13.

TEMPERATURE SENSOR.

DUCTLESS SPLIT SYSTEM. PROVIDE SPACE 12.

TO DDC.

SWITCH. PROVIDE NEW STARTER AND CONNECT

EXISTING EXHAUST FAN IS CONTROLLED BY LOCAL 11.

TEMPERATURE SENSOR.

NATURAL GAS FURNACE. PROVIDE SPACE 10.

SWITCH. CONNECTION TO DDC IS NOT REQUIRED.

EXISTING EXHAUST FAN IS CONTROLLED BY LOCAL 9.

BY GAS RADIANT HEATER.

TEMPERATURE SENSOR FOR EACH SPACE SERVED

GAS RADIANT HEATERS. PROVIDE SPACE

RETAIN EXISTING LOCAL CONTROL SYSTEMS FOR 8.

TEMPERATURE SENSOR.

APPLICATION CONTROLLER AND PROVIDE SPACE

SPLIT DX AIR HANDLING UNIT. RETAIN EXISTING 7.

SENSOR.

CONTROLLER AND PROVIDE SPACE TEMPERATURE

FLOOR. RETAIN EXISTING APPLICATION

HORIZONTAL GAS-FIRED FURNACE SERVES FIRST 6.

LADDER IN JANITOR CLOSET BELOW.

EQUIPMENT LOCATED ON MECHANICAL PLATFORM. 5.

TEMPERATURE SENSOR.

APPLICATION CONTROLLER AND PROVIDE SPACE

SPLIT DX/NG FAN COIL. RETAIN EXISTING 4.

EXISTING DDC PANEL.3.

TO CONNECT TO DDC.

NATURAL GAS METER. PROVIDE OUTPUT MODULE 2.

AND CONNECT TO DDC.

DOMESTIC WATER RISER. PROVIDE NEW METER 1.

ES

ES

ES

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:41:18 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_6\M-506.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-506.dgn

M-506

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

BUILDING ETRD-120

GENERAL SHEET NOTES

SHEET KEYNOTES

BUILDING ETRD-126

BUILDING ETRD-127 - 1st FLOOR

BUILDING ETRD-127 - 2nd FLOOR

BUILDING ETRD-137 - 1st FLOOR BUILDING ETRD-137 - MEZZANINE

E T

R D -1

HFC5

AOU

AOU

AOU

HFC5

HFC6

TYP 6

AOU AOU

AOU

AOU

AOU

NGF 3

EXF

EXF

EXF

GRH

GRH

RFC7

DSW9

ELECTRICAL SERVICE

AOU

DSW

ELECTRICAL SERVICE

ELECTRICAL SERVICE

T

9DSW

TRFC7

T

T

T

T

T

T

T

T

T

T

T

T

5 5

T

T

T

DSW

RFC7

3 DSW

T

T T

T

13 13

MEZZ ABOVE

FAN COIL ON

NTS NTS

NTS

NTS

NTS

NTS

T

REPAIR METER.

WORKING CORRECTLY, CONTRACTOR TO REPLACE

WATER METER FUNCTIONALITY. IF METER IS NOT

CONTRACTOR TO VERIFY EXISTING GAS, AND 4.

TO EMCS ARCHITECTURE DRAWINGS.

OWNER-PROVIDED NETWORK SWITCHES. REFER

CONNECT NEW BUILDING CONTROLLERS TO 3.

CONTROL DIAGRAMS.

120% OF THE TOTAL POINTS COUNT. REFER TO

REPLACED IN KIND AND PROVIDE CAPACITY FOR

PURPOSES, ASSUME EQUIPMENT WILL BE

OF ALL ASSOCIATED POINTS. FOR BIDDING

CONTROLLERS, AND MONITORING AND CONTROL

SUITABLE FOR CONNECTION OF APPLICATION

CONTROLLERS AND NETWORK ARCHITECTURE

DIAGRAMS. PROVIDE NEW BUILDING

CONTROLLER. REFER TO EMCS ARCHITECTURE

AND NOT CONNECTED TO THE NEW BUILDING

APPLICATION CONTROLLERS ARE TO BE RETAINED

APPLICATION CONTROLLER. EXISTING

ON AND IS EXECUTED BY THE EXISTING

FOR EQUIPMENT SERVING THESE SPACES RESIDES

PROGRAMMING OF THE SEQUENCE OF OPERATION

TEMPERATURE SENSORS. IT IS ASSUMED THAT

CONTROLLERS AND PROVIDE SPACE

WHERE INDICATED, RETAIN EXISTING APPLICATION 2.

CONTROL SYSTEM.

APPLICATION CONTROLLERS INTO NEW BUILDING

AS NECESSARY TO INTEGRATE EXISTING

CONFIGURATION. PROVIDE SYSTEM CONTROLLERS

FIELD-VERIFY EXISTING NETWORK 1.

WATER METER

SEE PHOTO 2 THIS SHEET

NEW WATER METER.

PHOTO 2

NEW WATER METER

13 17

CONTRACTING OFFICER.

SWITCH. COORDINATE LOCATION WITH

PROVIDE NEW HVAC EMERGENCY SHUTDOWN 17.

CONDITIONS.

OF NEW MONITOR TO BE VERIFIED WITH EXISTING

PROVIDE NEW POWER MONITOR. EXACT LOCATION 16.

PROVIDE NEW POWER MONITOR.15.

CONNECT TO THE DDC SYSTEM.

EXISTING GAS METER IS NOT IN USE DO NOT 14.

BY GAS RADIANT HEATER.

TEMPERATURE SENSOR FOR EACH SPACE SERVED

GAS RADIANT HEATERS. PROVIDE SPACE

RETAIN EXISTING LOCAL CONTROL SYSTEMS FOR 13.

TEMPERATURE SENSOR.

DUCTLESS SPLIT SYSTEM. PROVIDE SPACE 12.

UNIT HEATERS.

COMMON THERMOSTAT FOR SUSPENDED GAS 11.

CONNECTION TO DDC IS NOT REQUIRED.

CONTROLLED TO RUN ON CALL FOR HEAT.

RECIRCULATING DESTRATIFICATION FAN 10.

SENSOR FOR EACH SPACE SERVED.

OUTDOOR UNIT. PROVIDE SPACE TEMPERATURE

MULTI-SPLIT INDOOR UNITS PAIRED WITH COMMON 9.

SENSOR.

CONTROLLER AND PROVIDE SPACE TEMPERATURE

CEILING. RETAIN EXISTING APPLICATION

NG FAN COIL LOCATED ABOVE BREAK ROOM 8.

TEMPERATURE SENSOR.

APPLICATION CONTROLLER AND PROVIDE SPACE

SPLIT DX/NG FAN COIL. RETAIN EXISTING 7.

SERVED.

TEMPERATURE SENSOR FOR EACH SPACE

COMMON OUTDOOR UNIT. PROVIDE SPACE

MULTI-SPLIT HEAT PUMP FAN COILS PIPED TO 6.

TEMPERATURE SENSOR.

SPLIT HEAT PUMP FAN COIL. PROVIDE SPACE 5.

POWER MONITOR.

THE INCOMING POWER LOCATION AND ADD NEW

THE MEZZANINE ABOVE THE OFFICE. COORDINATE

EXISTING ELECTRICAL EQUIPMENT LOCATION ON 4

EXISTING DDC PANEL.3.

TO CONNECT TO DDC.

NATURAL GAS METER. PROVIDE OUTPUT MODULE 2.

AND CONNECT TO DDC.

DOMESTIC WATER RISER. PROVIDE NEW METER 1.

ES

ES

ES

R

E V

FILENAME: PLOT DATE: PLOT TIME:5/10/2023 12:42:57 PM

H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

\\USLAS0-APP385\ICS_workdir\134320\1056621_10\M-701.dgn$PWURL

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

P

L A

C E E

M C

S A

N D S

M A

R T M

E T

E R

S

C A

M P M

U R

R A

Y

W A

S H

IN

G T

O N

W A

S H

IN

G T

O N A

IR

N

A T

IO

N A

L G

U A

R D

C A

M P M

U R

R A

Y

W A

S H

IN

G T

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

C H

M H

IL

L H

D R J

V S

O U

T H J

A M

A

IC

A S

T R

E E

T

E N

G L E

W O

O D

C O

T E

L E (3

-0

F

A X (7

-9

M-701.dgn

M-701

T P

R

IC

E J P

IG

M A

N J M

C M

U R

R E

N

B U

IL

D

IN

G

M E

C H

A N

IC

A L

C O

N T

R O

L D

IA

G R

A M

S

NTS

CWP - CHILLED WATER PUMP

C O

N N

E C

T

IO

N

N E

T W

O R

K

DP

AI

D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

C H

IL

L E

D W

A T

E R L

O O

P

DI

R U

N S

T A

T U

S

SEQUENCE OF OPERATION

C O

N N

E C

T

IO

N

N E

T W

O R

K

DI

R U

N S

T A

T U

S

LEAD LAG

AS REQUIRED TO MAINTAIN LOOP DIFFERENTIAL PRESSURE AT SETPOINT.

THE DDC AND THE REMAINING PUMP SHALL START AND MODULATE SPEED

UPON FAILURE OF EITHER PUMP TO RUN, AN ALARM SHALL BE ISSUED AT

SPEED AS REQUIRED TO MAINTAIN LOOP DIFFERENTIAL AT SETPOINT.

AND BOTH PUMPS SHALL RUN AT THE SAME SPEED. DDC SHALL MODULATE

OPERATING AT 90% SPEED (ADJUSTABLE), THE LAG PUMP SHALL START

UPON A CALL FOR INCREASED PUMP SPEED WITH THE LEAD PUMP

(ADJUSTABLE, FIELD VERIFY).

REQUIRED TO MAINTAIN LOOP DIFFERENTIAL PRESSURE AT SETPOINT

DISTRIBUTION LOOP AND SHALL MODULATE LEAD PUMP SPEED AS

DDC SHALL MONITOR DIFFERENTIAL PRESSURE IN THE CHILLED WATER

START AND RUN AT MINIMUM SPEED (ADJUSTABLE, FIELD VERIFY).

UPON A CALL FOR COOLING AT ANY ZONE DEMAND, THE LEAD PUMP SHALL

IN THE DISTRIBUTION LOOP.

AS A LEAD/LAG PAIR CONTROLLED TO MAINTAIN DIFFERENTIAL PRESSURE

CHILLED WATER SECONDARY LOOP DISTRIBUTION PUMP SHALL OPERATE

NTS

HWP - HEATING WATER PUMP

C O

N N

E C

T

IO

N

N E

T W

O R

K

DP

AI

D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

H E

A T

IN

G W

A T

E R L

O O

P

DI

R U

N S

T A

T U

S

SEQUENCE OF OPERATION

C O

N N

E C

T

IO

N

N E

T W

O R

K

DI

R U

N S

T A

T U

S

LEAD LAG

AS REQUIRED TO MAINTAIN LOOP DIFFERENTIAL PRESSURE AT SETPOINT.

THE DDC AND THE REMAINING PUMP SHALL START AND MODULATE SPEED

UPON FAILURE OF EITHER PUMP TO RUN, AN ALARM SHALL BE ISSUED AT

SPEED AS REQUIRED TO MAINTAIN LOOP DIFFERENTIAL AT SETPOINT.

AND BOTH PUMPS SHALL RUN AT THE SAME SPEED. DDC SHALL MODULATE

OPERATING AT 90% SPEED (ADJUSTABLE), THE LAG PUMP SHALL START

UPON A CALL FOR INCREASED PUMP SPEED WITH THE LEAD PUMP

(ADJUSTABLE, FIELD VERIFY).

REQUIRED TO MAINTAIN LOOP DIFFERENTIAL PRESSURE AT SETPOINT

DISTRIBUTION LOOP AND SHALL MODULATE LEAD PUMP SPEED AS

DDC SHALL MONITOR DIFFERENTIAL PRESSURE IN THE HEATING WATER

START AND RUN AT MINIMUM SPEED (ADJUSTABLE, FIELD VERIFY).

UPON A CALL FOR HEAT AT ANY ZONE DEMAND, THE…