The document is a PowerPoint presentation for a pre-bid conference for Solicitation W50S97-25-B-A003, covering site lighting construction at Berry Field Air National Guard Base in Nashville, TN. The project involves installing 19 light poles with 21 lights, associated conduit, wire, trenching, and installation, with an estimated cost range between $250,000 and $500,000. It is a 100% small business set-aside under NAICS Code 236220, with a small business size standard of $45 million.
Key procurement details include a firm-fixed price contract with a 90-calendar day construction period after Notice to Proceed, bid due date of 1:00 PM CST on 9 September 2025, and an option (CLIN 002) for repairing culverts B808 and B809. Bidders must be registered in SAM.gov, submit a valid Bid Bond, complete Standard Form 1442, price all line items, and acknowledge all amendments. The Tennessee National Guard will award to the lowest responsible bidder, considering only price and price-related factors, with the intent to award without discussions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S9725BA003_Abstract of Bids.pdf | ||
| Bid Opening Roster.pdf | ||
| 25BA003 Site Lighting and Culvert QA 7-10.pdf | ||
| 25BA003 Site Lighting and Culvert QA 1-6.pdf | ||
| Preproposal minutes W50S97B0003.pdf | ||
| Site Visit Roster.pdf | ||
| Solicitation Amendment W50S9725BA0030001 SF 30.pdf | ||
| Attachment 3-Culvert Repair SOW 07312025.pdf | ||
| Attachment 4-Culvert Repair Drawings.pdf | ||
| Solicitation - W50S9725BA003.pdf | ||
| Attachment 1- SOW BKTZ212006 Site Lighting.pdf | ||
| Attachment 2-Design BKTZ212006 Site Lighting.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S97-25-B-A003 BKTZ212006 Site Lighting, B735.B746.Track CLIN 001 - Site Lighting, B735.B746.Track CLIN 002 (Option 001) – Repair Culvert B808, B809
Pre-Bid Conference 20 August 2025
118 MSC
BERRY FIELD ANGB
NASHVILLE, TN
INTRODUCTION
Capt Greg Allen– Contracting Officer
MSgt Dakota Beasley– Contract Specialist
Daniel Reissner– COR/Technical Representative
SYNOPSIS
Construct Site Lighting, B735.B746.Track The estimated cost range -$250,000 and $500,000.
A firm-fixed price contract will be awarded.
Award is 100% small businesses (NAICS – 236220) Small Business Size Standard is $45 Million Option 001 Based on FY Funds availability.
Award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the government will consider only price and price related factors. The government intends to award without discussions.
SOLICITATION, PLANS
& SPECIFICATIONS
On the web: https://www.sam.gov/ Solicitation Specifications Drawings Statement of Work Questions & Answers document Pre-Bid presentation Amendments check regularly & refresh web page
IFB
In the invitation for bid (IFB), FAR Part 14, process, a public bid opening occurs when the bids are due and the prices are read to the public There can be no discussion No correction of mistakes in most cases Award is always to the low responsible bidder
CONTRACT PERIOD
Construction period is 90 calendar days after receiving the Notice to Proceed
BID PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11
Offer, Standard Form (SF) 1442 front and back signed Section 00 10 00 Line Items- all items must be priced A valid Bid Bond. Standard Form 24. Section 00 21 00 – Clause 52.228-1.
Section 00 70 00, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at https://www.sam.gov see 52.204-8 in solicitation ALERT: If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator before your registration will be activated.
BID PACKAGE IN ACCORDANCE WITH SECTION 00 10 00 NOTES, NOTE 11 - Continued When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature. Section 00 10 00 Line Items- all items must be priced All amendments to the solicitation must be acknowledged.
Mark the front of the envelope with the following: “BID No. W50S97-25-B-A003 and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
BID PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11 - Continued ALL ITEMS ON THE PREVIOUS SLIDES ARE IN THE SOLICITATION INSTRUCTIONS. IT IS THE RESPONSIBILITY OF THE BIDDER TO MAKE SURE THAT THEIR BID CONFORMS TO THE SOLICITATION.
BID DUE DATES
Bids are due 1:00 P.M. (CST) 09 September 2025
Proposal must be signed by officer of your company
Electronic offers will be accepted, must have before bid opening and with bid bond
IMPORTANT REMINDERS
All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to bid opening.
OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
Contractor must submit information listed in Section 00 21 00 Notes, paragraph 4.2 in order to gain access to installation for dropping off bids. Delivery must allow for vehicle inspection time at gate. Additional information will be requested after request such as DBIDS pre-enrollment. If cleared for site visit then you should already cleared for bid drop off and opening.
Wage determination TN20240178 , Dated 06/06/2025, Building is applicable
HELPFUL WEBSITES
https://www.sam.gov https://www.aptac-us.org/
HOW QUESTIONS WILL BE HANDLED
Questions must be submitted in writing only via email to:
gregory.allen.8@us.af.mil and dakota.beasley.2@us.af.mil Use Format in Section 00 21 00, Para 5.1
DO NOT CALL TECHNICAL PERSONNEL OR A&E- THIS WILL DELAY GETTING AN ANSWER
Due 5 business days prior to Bid Opening
ANSWERS TO QUESTIONS
All questions, on a non-attribution basis, and the answers will be posted to the web site https://www.sam.gov/ If necessary addendums, issued by an amendment, will also be posted Check web site regularly and don’t forget to refresh web page!!
IMPORTANT
OFFERORS ARE STRONGLY CAUTIONED TO CAREFULLY READ THE REQUIREMENTS OF THE SOLICITATION AND COMPLY ACCORDINGLY
Questions ???
Site Visit Follows This Briefing image1.png image2.svg
.MsftOfcResponsive_Fill_4472c4 { fill:#4472C4;
image3.png image4.svg
.MsftOfcResponsive_Fill_43bb8d { fill:#43BB8D;
image5.png image6.svg
.MsftOfcResponsive_Fill_70ad47 { fill:#70AD47;
image7.wmf image8.wmf
File details come from the government source that posted it. Updated .