This document includes questions and answers related to a solicitation for renovations to Building 740 at Berry Field Air National Guard Base in Nashville, Tennessee. The solicitation will provide for selective demolition, interior and exterior renovations, new HVAC, electrical and plumbing systems, interior finishes, site improvements, and a rubber mat flooring installation. The contract value is between $1 million and $5 million and has an anticipated award date in 2020. The solicitation sets aside this opportunity for small businesses only and requires at least 15% of the work to be completed by the prime contractor's own employees. Interested parties must register in SAM and with BetaSAM to access solicitation documents including plans and specifications. The pre-bid conference and site visit will be scheduled upon solicitation release.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers 1-12 25 June 2020

W50S97-20-B-0001 Convert B740

1. The Drawings show that you are using an Advantor system for the access control. Are you using the VMS integration for the cameras with this same system? If so, will you accept an alternate system? Will you accept an alternate system for access control?

a. Response: The Base standard is Advantor. The IT drawings are for Rough-in only. This security system is not part of the solicitation.

2. Information outlet type “TF” is shown on Comm Legend, drawing IT2.1. However, there are no type “TF” outlets shown on drawing IT1.1. Will subsequent addendums include the addition of one or more type “TF” comm outlet locations? (Specs Sec 13010 and 13020)

a. Response: Yes, see revised sheet IT1.1.

3. Communications rough-ins appear to be specified in Division 13010 and also in 16060.

Please confirm that communications rough-ins and cable tray will be furnished/installed by

Division 16 (EC). (Specs Sec 13010 and 13020)

a. Response: It shall be the general contractor’s responsibility to determine scope between sub-contractors.

4. If the installer is required to hold “Certified Installer Plus” status with their chosen connectivity partner (IE; Leviton, Panduit, etc.), should there still be a requirement for 30% of installer/technicians to hold a BICSI certification? (Specs Sec 13010 and 13020)

a. Response: This is a qualification exception question for contracting.

5. Please confirm if NEC type CMP (Plenum-rated) UTP cabling and OFNP/OFCP (Plenum-rated) fiber are required for this project. (Specs Sec 13010 and 13020)

a. Response: HVAC plans indicate ducted returns in all areas. Plenum rated cables only required where a plenum type HVAC return system is utilized.

6. Regarding fiber backbone connectivity, is there a preference for armored versus non-armored fiber optic cable? (Specs Sec 13010 and 13020)

a. Response: Preference for Armor on cables above 96 Strand count and non armored

96 strand count and below, unless cable is installed in such a manner as to subject it to physical damage.

7. It is assumed that device type “PJ” as shown on drawing IT1.1 is for a projector. Please provide a faceplate/workstation detail for device type “PJ” as shown on drawing IT1.1.

(Specs Sec 13010 and 13020)

a. Response: See Detail A5 sheet IT2.1 Revised Legend to match.

8. The building has existing lightning protection. Will there be any modifications?

a. Response: The building has existing lightning protection. The new RTUs being installed will need to be bonded and connected to the existing lightning protection.

Question and Answers 1-12 25 June 2020

W50S97-20-B-0001 Convert B740

9. Will the Assembly room ceiling be painted?

a. Response: Yes. Refer to sheet A8.1 for the room schedules and note requiring the ceiling and new utilities to be painted black.

10. The boiler is being demolished, what about the hot water loop?

a. Response: Yes, the hot water loop is being demolished to the backflow preventer and replaced. Refer to sheet P1.0.

11. There is not information for the instant water heater on the schedule.

a. Response: Refer to detail “Gas Water Heaters Piping Schedule” on Sheet P2.1.

Intellihot iQ251 (2 units) w/ no storage.

12. We would like to submit for approval a substitution for 09561-Resnous Flooring, RezChip from Chem-Rez, Inc

a. Response: Replace Spec Section 09651 Resinous Flooring with the attached specification section 09651 Resinous Flake Flooring.