W50S8P24B00010001 Amendment.pdf

PDF 185 KB Posted

Attached to
3d Printer Room Upgrade Federal contract opportunity
Solicitation number
W50S8P24B0001
Issued by
Department of the Army National Guard

About this file

This amendment to a solicitation modifies drawings and the statement of work in response to questions received. The project consists of upgrades to Facility 112 at Rickenbacker Air Base in Columbus, Ohio to accommodate a new 3D printer, including installing a 50-amp power supply, additional overhead lighting, and a new double door access. The project value is estimated between $25,000 to $100,000. The solicitation is a competitive small business set-aside pursuant to FAR Part 14 with an award made to the responsible bidder offering the most advantageous price. The period of performance is 120 days but power and door work must be completed within 35 days of award. The soliciting agency is the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F8V3CE4010AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Incorporate changes to the Statement of Work and Draw ings in response to RFI’s received.

2. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Feb-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8P24B0001

X 9B. DATED (SEE ITEM 11)

12-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Feb-2024

CODE

USPFO OH 121 MISSION SUPPORT CONTRACTING

7370 MINUTEMAN WAY

COLUMBUS OH 43217-1161

W50S8P 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8P24B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

TABLE OF CONTENTS

CONSTRUCTION SOLICITATION SF 1442

SECTION 00 01 10 – TABLE OF CONTENTS

SECTION 00 10 00 – SOLICITATION

‐ CLINS

‐ DELIVERY

SECTION 00 21 00 – INSTRUCTIONS

SECTION 00 45 00 – REPS AND CERTS

SECTION 00 72 00 – GENERAL CONDITIONS

SECTION 01 00 00 – GENERAL REQUIRMENTS

ATTACHMENT 1 – STATEMENT OF WORK

ATTACHMENT 2 – DRAWINGS

‐ 2.1 NLZG242002 B885 3D Printer Setup A‐101 UPDATE ‐ 2.2 NLZG242002 B885 3D Printer Setup DWG S‐001

ATTACHMENT 3 – RFI (FORMAL REQUEST FOR INFORMATION FORM)

ATTACHMENT 4 – EAL REQUEST

ATTACHMENT 5 – INSTALLER’S GUIDE

ATTACHMENT 6 – UFGS

to:

CONSTRUCTION SOLICITATION SF 1442

SECTION 00 01 10 – TABLE OF CONTENTS

SECTION 00 10 00 – SOLICITATION

‐ CLINS

‐ DELIVERY

SECTION 00 21 00 – INSTRUCTIONS

SECTION 00 45 00 – REPS AND CERTS

SECTION 00 72 00 – GENERAL CONDITIONS

SECTION 01 00 00 – GENERAL REQUIRMENTS

ATTACHMENT 1 – STATEMENT OF WORK 02.02.2024

ATTACHMENT 2 – DRAWINGS

‐ 2.1 NLZG242002 B885 3D Printer Setup A‐101 UPDATE 02.02.2024

‐ 2.2 NLZG242002 B885 3D Printer Setup DWG S‐001

ATTACHMENT 3 – RFI (FORMAL REQUEST FOR INFORMATION FORM)

ATTACHMENT 4 – EAL REQUEST

The following have been modified:

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Aritectural A-101 2.1 NLZG242002 B885 3D Printer Setup A-101 UPDATE 02.02.2024 Structural S-001 2.2 NLZG242002 B885 3D Printer Setup DWG S-001

(End of clause)

TABLE OF CONTENTS

CONSTRUCTION SOLICITATION SF 1442

SECTION 00 01 10 – TABLE OF CONTENTS

SECTION 00 10 00 – SOLICITATION

‐ CLINS

‐ DELIVERY

SECTION 00 21 00 – INSTRUCTIONS

SECTION 00 45 00 – REPS AND CERTS

SECTION 00 72 00 – GENERAL CONDITIONS

SECTION 01 00 00 – GENERAL REQUIRMENTS

ATTACHMENT 1 – STATEMENT OF WORK 02.02.2024

ATTACHMENT 2 – DRAWINGS

‐ 2.1 NLZG242002 B885 3D Printer Setup A‐101 UPDATE 02.02.2024 ‐ 2.2 NLZG242002 B885 3D Printer Setup DWG S‐001

ATTACHMENT 3 – RFI (FORMAL REQUEST FOR INFORMATION FORM)

ATTACHMENT 4 – EAL REQUEST

(End of Summary of Changes)