RFI 2 - 045-046-047-Roof-Plot.pdf
PDF 235 KB Posted
- Solicitation number
- W50S8K24QA001
About this file
This document appears to be a set of roof plans and associated notes for repairs to buildings 45, 46, and 47 at the Jefferson Barracks site. The plans detail the required repairs, including removing and replacing the existing asbestos-containing roof shingles, repairing damaged roof decking and framing, replacing gutters and downspouts, and repairing chimneys. The repairs are to be performed across the entirety of the roofs of the three buildings to provide a fully waterproof and structurally sound roof system with a 25-year warranty. The work must be performed in strict compliance with all applicable environmental and safety regulations regarding asbestos abatement. The plans also indicate that a separate solicitation, W50S8K24QA001, has been issued for the demolition of these three buildings once the roof repairs are complete.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M K
R
EV
IS
IO
N D
AT
E
D R
AW
N
C H
EC
KE
D
SC
AL
E
C
AT
EG
O
R Y
C O
D E
D
AT
E
D R
AW
IN
G N
O
AP
PR
O
VE
D B
Y
C H
EC
KE
D B
Y
D R
AW
N
B Y
SH
EE
T O
F
AI
R
NA
TI
ON
AL
GU
AR
D
CI
VI
L
E N G
IN
E
ER
IN
G
GEO
GRA
PH
IAE
S C
I EN
TIA
EQ
UE
CO
NF
IN
IA
PE
NE
TR
AM
US
NORTH
Graphic Scale: 1/16"=1'-0"
0 16' 32' 48' 64'
045-046-047-ROOF
SCALE: 1/16"=1'-0"
ROOF PLAN - BLDG 47
SCALE: 1/16"=1'-0"
ROOF PLAN - BLDG 46
SCALE: 1/16"=1'-0"
ROOF PLAN - BLDG 45
SCALE: 1/16"=1'-0"
KEYED NOTES (SHEET A1 ONLY)
GENERAL NOTES (FOR ALL SHEETS)
LEGEND
EDGE OF ROOF
20'-0"± ABV. GRADE
EXISTING ROOF VENTILATOR LOCATION
AREAS OTHER THAN THOSE DEPICTED ON THE PLANS MAY ALSO REQUIRE REPAIS.
A COMPLETE SURVEY SHALL BE DONE ON EACH ROOF AND REPAIRS SHALL BE MADE
TO THE ENTIRE SURFACE OF THE 3 ROOFS INVOLVED AS REQUIRED TO PROVIDE
WATERIGHT & STRUCTURALLY SOUND CONST. AREAS REQUIRING REPAIR SHALL BE
REPORTED TO THE CONTRACTING OFFICER FOR VERIFICATION. REPAIR AS
DIRECTED.
ANY ROOF DECKING DAMAGED BEFORE OR AFTER DEMOLITION SHALL BE
REPORTED TO THE CONTRACTING OFFICER FOR VERIFICATION. REPLACE WITH
NEW DECKING AS DIRECTED. CONTRACTOR SHALL PROTECT EXPOSED ROOF FROM
ANY WEATHER DAMAGE DURING CONSTRUCTION.
WHERE ROOF DECKING IS DAMAGED. ALSO INSPECT ROOF JOISTS FOR FURTHER
DAMAGE. REPORT ANY DAMAGED ROOF JOISTS OR SHEATING TO HE
CONTRACTING OFFICER FOR VERIFICATION AND REPLACE AS DIRECTED.
THE ENTIRE ROOF OF ALL 3 BUILDINGS INVOLVED IN THIS PROJECT SHALL BE
WARRANTIED FOR A MINIMUM OF 25 YEARS.
IT HAS BEEN SUBSTANTIATED BY MATERIAL TESTING THAT THE EXISTING ROOF
SHINGLES ON BUILDINGS 45, 46, AND 47 AT JEFFERSON BARRACKS CONTAIN
APPROXIMATELY 50% ASBESTOS FIBERS.
CONTRACTOR IS RESPONSIBLE TO ASSURE THAT DEMOLITION PROCEDURES AND
DISPOSAL OF THE ASBESTOS BEARING MATERIALS ARE DONE IN STRICT
ACCORDANCE WITH MISSOURI DEPARTMENT OF NATURAL RESOURCES AND EPA
REGULATIONS. BASE BIO-ENVIORNMENTAL AND MISSOURI DNR PERSONNAL WILL
MAKE OCCASIONAL VISITS THROUGHOUT THE PROJECT TO ASSURE AONCURRENCE.
NEW SHINGLES MUST ASTHETICALLY MATCH EXISTING AS PER REQUIREMENTS OF
DEPARTMENT OF INTERIOR AND MISSOURI DEPARTMENT OF NATURAL RESOURCES
FOR REHABILITATION OF HISTORIC BUILDINGS.
INSTALLATION OF THE NEW SHINGLES MUST BE DONE IN STRICT ACCORDANCE
WITH THE MANUFACTURERS RECOMMENDATIONS FOR SAFE HANDLING. CUTTING,
ETC...(INCLUDING DISPOSAL OF DROPPINGS) AS WELL AS ALL APPLICABLE RULES
AND REGULATIONS FOR INSTALLATION OF MATERIALS OF THIS TYPE (EPA, OSHA,
ETC.)
ALL SLOPES AND DIMENSIONS ARE TO BE FIELD VERIFIED.
ALL NEW OR EXISTING WOOD FASCIA BOARDS, SOFFIT MOLDINGS, TRIM
VENTILATIONS, METAL GUTTERING, DOWNSPOUTS AND DOWNSPOUT HANGERS SHALL
BE PAINTED. SEE SPECIFICATIONS.
ANY WOOD FASCIA BOARDS, MOULDINGS OR TRIM WHICH ARE MISSING OR
DAMAGED SHALL BE REPLACED SEE PALNS & DETAILS FOR KEYED IN WOOD TRIM
PIECES MISSING. REPORT TO CONTRACTING OFFICER ABOUT VERIFICATION OF
DAMAGED WOOD FASCIA BOARDS WHICH ARE NOT KEYED ON THESE DRAWINGS.
15 LB ASPHALTIC FELT. (1 PLY) SHALL BE INSTALLED BENEATH NEW SHINGLES
(TYPICAL) PROVIDE ICE PROTECTION UNDERLAYMENT AT EVES.
WHERE DISSIMILAR METALS OCCUR PAINT LEAST VIEWABLE WITH BITUMINOUS
PAINT. SEE SPECIFICATIONS.
CONTRACTOR TO COORDINATE INSTALLATION OF LIGHTING PROTECTION
SYSTEM WITH NEW ROOF PROVIDE COMPLETE WATERTIGHT INSTALLTION
REFERNCES ON THE DRAWINGS TO SMACNA ARE FROM THE SMACNA
ARCHITEVTURAL SHEET METAL MANUAL. FOURTH EDITION 1987.
2' -0
'-0
2' -0
2'-0" 225'-0"± 2'-0"
2' -0
'-0
2' -0
2'-0" 225'-0"±
2' -0
'-0
2' -0
2'-0" 225'-0"±
2 2
65417
2 2
17 4 5 6
4 5 7
3 9 14
3 9
100% 50%
100%
50%
100% 50%
100%
75%
25% 1 15
2'-0"
EJ
DS DS
EJ
V
TYP.
V
TYP.
V
TYP.
TYPICAL
EJ EJ
EJ EJ EJ EJ
EJ
DS DS DS
DS DSDSDS
TYP
TYP11
A2
A2
HIGH POINT OF PORCH ROOF
17'-0" ± ABV. GRADE
EDGE OF ROOF
20'-0"ABV GRADE
A2
EJEJ EJ DS DSDSDS DS EJ
EJ EJ DS DSDSDS EJ
EJ
2'-0"
V
TYP.
TYPICALV
TYP.
TYP.
EJ 2
TYP.
50%50% 10%
50%10%
LINE OF WALL
BELOW, TYP.
HIGH POINT OF PORCH ROOF
17'-0" ± ABV. GRADE
TYP.
A2
EDGE OF ROOF
20'-0"ABV GRADE
EJ
DS DS
V
TYP.
TYP.
TYPICAL
EJ EJ
EJ
EJ
DS DSDSDS
TYP10
A2
TYP.
A2 54 50% 50%
TYP.
EJ DS EJ DS DSEJ
HIGH POINT OF PORCH ROOF
17'-0" ± ABV. GRADE
7 30%
EJ
ROOF RIDGE, TYP.
54 100% 100% 7 75%
8 9
EXISTING PORCH ROOF TO REMAIN. NO WORK REQUIRED. NOT TO USE THIS
ROOF AS A WORK SURFACE. STRUCTURAL SOUNDNESS IN QUESTION.
EXISTING ROOF VENTILATOR TO BE REPAIRED OR REPLACED SEE DTLS. 2/A2 AND
3/A2.
REMOVE EXISTING TEMPORARY ROOF PATCH. REMOVE ROTTED WOOD DECK AND
FRAMING IN THIS AREA AND REPLACE WITH NEW SEE DTL. 2/A2.
REMOVE EXISTING ROTTED AND/OR DIALPIDATED WOOD FACIA. REPLACE WITH
NEW TO MATCH EXISTING.
REMOVE EXISTING ROTTED AND/OR DILAPIDATED WOOD T&G SOFFIT. REPLACE
WITH NEW TO MATCH EXISTING. SEE DTL. 1/A2.
REMOVE ALL EXISTING REMAINING METAL GUTTER. INSTALL NEW TO MATCH
EXISTING AFTER FASCIA HAS BEEN PAINTED. SEE DTL. 5/A2.
REMOVE EXISTING ROTTED JOIST ENDS AS REQUIRED AND "SCAB-ON" NEW LUMBER
TO PROVIDE NECESSARY FRAMING FOR SOFFITS AND FASCIA. SEE DTL. 4/A2.
REPAIR MORTAR ON TOP OF EXISTING CHIMNEY TO PROVIDE FOR DRAINAGE. ALSO
REPAIR FLUE PIPE AT TOP OF CHIMNEY.
TUCKPOINT BRICK CHIMNEY ABOVE ROOF LINE. SEE DTL. 6/A2. REMOVE EXISTING
MTL. FLASHING AND PROVIDE NEW PER DETAIL. 7/A2.
REBUILD BRICK CHINEY TO 12'-0" ABOVE ROOF LINE. TUCKPOINT EXISTING
BRICK ABOVE ROOF LINE SEE DTL. 5/A2. REMOVE EXISTING MTL. FLASHING AND
ROOF FRAMING IN THIS AREA SHALL BE REPLACED WITH NEW. CHIMNEY FLASHING
SHALL BE REMOVED AND REPLACED PER DETAIL 7/A2.
REMOVE ALL EXISTING ROOFING INCLUDING SHINGLES, RIDGE CAP, FELTS AND
FASTENERS.
REMOVE EXISTING LEAD VENT FLASHING AND PROVIDE NEW FLASHING PER DETAIL
3/A3.
REMOVE ALL EXISTING RIDGE CANT BOARDS.
PROVIDE DOWNSPOUT DOWN TO PORCH ROOF LEVEL WITH ELBOW AT BOTTOM.
PROVIDE SPLASHOUT DOWN TO PORCH ROOF LEVEL WITH BELOW AT BOTTOM.
PROVIDE SPLASH PAN (EVEN IF ROOF DOESNT EXIST.) TYPICAL OF 3. SEE DTL.
12/A2.
V
DS
EXISTING PLUMBING VENT LOCATION
LIGHTING PROTECTION SEE DTLS 1/A3,2/A3&4/A3
ROOF SLOPE
RUN
R
IS
E
# % KEYED NOTE AND APPROXIMATE PERCENTAGE PER SIDE (IF SHOWN)
OF MATERIAL TO BE REMOVED AND/OR REPLACED
DOWNSPOUT LOCATION. REPLACE AS REQUIRED TO MATCH EXISTING.
SEE DTL 9B/A2. MAKE NOTE OF EXIST. LOCATIONS PRIOR TO DEMOLITION.
APPROXIMATE AREA OF EXIST. TEMPORARY ROOF PATCHES TO BE REMOVED
SEE KEYED NOTE 3
PLUG EXISTING 5'Ø STAND PIPES & ABANDON. TYPICAL OF
9 PER BUILDING.
PROVIDE DOWNSPOUT DOWN TO GRADE WITH ELBOW @ BOTTOM.
PROVIDE PRECAST CONC. SPLASH BLOCKS @ EACH LOCATION.
TYPICAL OF 6 PER BUILDING. ADJUST LOCATION OF
DOWNSPOUTS AS REQ'D TO AVOID EXIST. STANDARDS.
10%
Sc an ne d by S an ch ez
A ss oc ia te s, In c.
T el
: 3
-5
-7
Fa x:
-5
-3
- s an ch ez js an ch ez .c om w w w .js an ch ez .c om Fi le na m e:
D :\J ob s\
M
AN
G
Je ffe rs on
B ar ra ck s sc an s
- J oh n
- S on nt ag \0
-0
-0
-R oo f.d w g
D at e:
0/
/2
T im e:
1:
8/ 6/
1:
:2
AM
, P lo tte d by : J
. M
AT
TH
EW
S
AutoCAD SHX Text Missouri Air National Guard
AutoCAD SHX Text Jefferson Barracks NGB
AutoCAD SHX Text St. Louis, Missouri 63125
| Sheets and Views |
| Plot |
| PSALL |
File details come from the government source that posted it. Updated .