This federal solicitation seeks proposals to construct a C-130 flight simulator training facility. Key details include a 100% small business set-aside, with the Army National Guard and Department of the Army as the contracting agencies. Interested parties must register by email no later than 5 July for the combined pre-proposal site visit and conference scheduled for 6 July. Proposals are due by 25 July. The work includes divisions 2, 6, 9, 25-27, 31, 33, and 41 across volumes 1 and 2 of the specifications and drawings dated April 2022. Amendments provide answers to questions and update line items for various work divisions. The prevailing Davis-Bacon wage determination is also amended.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 05.pdf | ||
| ATTACHMENT 4 _ SOLICITATION RFI RESPONSES_UPDATED 15 Aug 22 (20 PAGES).pdf | ||
| Amendment 03.pdf | ||
| ATTACHMENT 4 _ SOLICITATION RFI RESPONSES (11 PAGES).pdf | ||
| Amendment 02.pdf | ||
| Amendment 01.pdf | ||
| Construct C-130 Flight Sim_PreProposal Conference Slides.pptx | PPTX presentation | |
| Pre-Proposal Site Visit Minutes.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| SPECS Vol 1.pdf | ||
| SPECS Vol 2.pdf | ||
| Exhibits B and C - Past Peformance Reference Questionnaire.docx | DOCX document | |
| W50S8J-22-R-0002 SAM.pdf | ||
| DRAWINGS.pdf | ||
| Exhibit A- Technical Evaluation - Subfactor 1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VBDZ179043
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make the follow ing changes:
1. To provide answ ers to fifteen (15) Requests for Information (RFI Numbers 80 - 94; Note that RFI's 01 - 79 w ere answ ered via Amendment
02) w hich w ere received in response to the solicitation, draw ings and specs. Interested contractors shall note that any changes made to the draw ings or specifications as a result of the answ ers provided shall be binding upon contract aw ard.
2. To update Line Items 0001AG; 0001AP; 0002; and 0006. See summary of changes for complete details.
3. To update the Wage Determination to the most current version.
1. CONTRACT ID CODE PAGE OF PAGES
1 33
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8J22R0002
X 9B. DATED (SEE ITEM 11)
29-Jun-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2022
CODE
USPFO NY 109 MISSION SUPPORT CONTRACTING
1 AIR NATIONAL GUARD RD
SCOTIA NY 12302-9572
W50S8J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8J22R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
SUBCLIN 0001AG
The CLIN description has changed from DIVISION 09 - Finishes to DIVISION 09 - Finishes &
DIVISION 06.
The CLIN extended description has changed from:
This sub line item includes all costs associated w/ Division 09 of the spec. This item must be priced.
To:
This sub line item includes all costs associated w/ Division 09 AND DIVISION 06 of the spec. This item must be priced.
SUBCLIN 0001AP
The CLIN description has changed from DIVISION 26 & 27 - Electrical & Comm to DIVISION 25 & 26 & 27.
The CLIN extended description has changed from:
This sub line item includes all costs associated w/ Division 26 AND Division 27 of the spec. This item must be priced.
This sub line item includes all costs associated w/ Division 25 AND Division 26 AND Division 27 of the spec. This item must be priced.
CLIN 0002
The CLIN description has changed from DIVISION 33 - Site Work & Utilities to DIVISION 02 & 31 & 33.
This line item includes all costs associated w/ Division 33 of the spec. This item must be priced.
This line item includes all costs associated w/ Division 02 AND Division 31 AND Division 33 of the spec. This item must be priced.
CLIN 0006
Provide Bridge Crane (Machine, Rails & Power). This item must be priced.
Provide Bridge Crane (Machine, Rails & Power). This item shall include all costs associated with Division 41 - Material Processing and Handling Equipment. This item must be priced.
The following have been modified:
SECTION 00010
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 - PRICING SCHEDULE, NOTES
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00110 – PROPOSAL PREPARATION INSTRUCTIONS
SECTION 00120 – PROPOSAL EVALUATION AND BASIS FOR AWARD
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 – Wage Determination
SECTION 1000 – GENERAL REQUIREMENTS
ATTACHMENT 1 – PROJECT SPECIFICATIONS Volume 1 dated April 2022 (914 Pages) ATTACHMENT 2 – PROJECT SPECIFICATIONS Volume 2 dated April 2022 (1022 Pages) ATTACHMENT 3 - DRAWINGS dated April 2022 (124 Pages) ATTACHMENT 4 – SOLICITATION RFI RESPONSES_UPDATED 15 Aug 22 (20 PAGES)
EXHIBIT A- Technical Evaluation Subfactor 1 – Experience Worksheet EXHIBIT B- Past Performance Questionnaire Instructions EXHIBIT C- Past Performance Reference Questionnaire
SECTION 00010 NOTES
NOTES
1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.
3. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
SECTION 00100
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE
1.1. You are invited to submit a proposal in response to our Request for Proposal W50S8J-22-R-0002 for Project No. VBDZ179043, Construct C-130 Flight Simulator Training Facility at Stratton ANGB. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
1.2. This solicitation is set-aside 100% for small businesses.
2. NOTICE OF PRE-PROPOSAL CONFERENCE
2.1. A pre-proposal conference will be conducted on 06 July 2022 at 1000 for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at Bldg. 25 (Civil Engineering) on Stratton Air National Guard Base, Scotia, NY. Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
2.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to 109.AW.FAL.MSC.Contracting@us.af.mil
Visitor’s Name Last Four Digits of Social Security No.
Driver’s License No., State Issued and Expiration Date Date of Birth Citizenship
2.3. This information must be provided in advance, not later than COB on 05 July 2022, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
2.4. Visitors will be escorted by a Government employee from the Installation’s Main Entry Gate to Pre- Proposal Conference location. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
2.6. A record of the conference shall be made and furnished to all prospective offerors via posting to Contract Opportunities website on-line at https://sam.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
3.1. Submit all questions via email to the contracting office at the address shown below. Do NOT contact the A-E or Engineering personnel directly. Doing so will only delay the response to your question.
Subject Line: Reference No. W50S8J-22-R-0002
Email: 109.AW.FAL.MSC.Contracting@us.af.mil
INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING
INFORMATION:
Date of Proposal Inquiry:
From: ______________________________
Company Name: ___________________________
Phone Number: ____________________________
Email address: _____________________________
Proposal Inquiry: Be specific as to part of solicitation you are questioning.
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN 25 July 2022 @ 3:00PM and will be posted as soon as possible thereafter. OFFERORS ARE STRONGLY ENCOURAGED
TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to Contract Opportunities website on-line at https://sam.gov.
3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities website on-line at https://sam.gov. Contract Opportunities is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Plans and specifications are locked on the Contract Opportunities website and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See the instructions on the Contract Opportunities website regarding registration as Interested bidders/offerors. Contractors must register with the Contract Opportunities website before accessing the system. (Please note the registration for access to the secure site takes approximately 15 business days, so plan accordingly.)
3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to:
www.sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page.
4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS
4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to thisRFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted at Contract Opportunities website on-line at https://sam.gov.
4.2. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the lasted information.
5. HAND CARRIED PROPOSALS/INVITATIONS
THIS SECTION IS NOT APPLICBLE. PROPOSALS MUST BE SUBMITTED ELECTRONICALLY. HAND
CARRIED PROPOSALS WILL NOT BE ACCEPTED.
6. WAGE DETERMINATION
6.1. The Construction Wage Rate Requirements formerly known as Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are General Decision NY20220002 dated 08/05/2022 for Schenectady County, New York.
In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes.
If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404- 5(c)(4) will apply.
6.2. Applicable wage rates can be found at https://www.sam.gov
7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
8. REMOVAL OF SECTIONS AT TIME OF AWARD
Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
9. DISPOSITION OF UNSUCCESSFUL PROPOSALS
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.
10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES
It has been determined that all reasonable amounts of water and electricity, where/if physically available, used in connection with this project will be furnished to contractor without cost. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services)
11. BID BONDS
The bid bond is due on the date as stated on the SF1442 block 13. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.
12. EXCEPTIONS
If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
13. CLAUSES
13.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
13.2. Clauses and provisions in this document may not appear in consecutive order.
14. BRAND NAME REQUIREMENTS
N/A
End of Section 00100
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
WAGE DETERMINATION
"General Decision Number: NY20220002 08/05/2022
Superseded General Decision Number: NY20210002
State: New York
Construction Types: Building, Heavy and Highway
Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington Counties in New York.
BUILDING CONSTRUCTION PROJECTS (For all counties except COLUMBIA, FULTON, GREENE & MONTGOMERY) (does not include single family homes and apartments up to a including 4 stories), HEAVY
AND HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/18/2022 2 02/25/2022 3 05/13/2022 4 05/20/2022 5 07/08/2022 6 07/22/2022
7 08/05/2022
* ASBE0040-002 05/01/2022
Rates Fringes
Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 38.40 24.42
HAZARDOUS MATERIAL HANDLER
Duties limited to preparation wetting;
stripping; removal;
scrapping; vacuuming;
bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 38.40 24.42
BOIL0197-002 01/01/2021
Rates Fringes
BOILERMAKER......................$ 38.59 26.00
BRNY0002-019 07/01/2018
Rates Fringes
BRICKLAYER
BRICKLAYERS, STONE MASONS,
CEMENT MASONS, PLASTERERS,
POINTERS, CAULKERS &
CLEANERS....................$ 36.19 20.48
HEAVY & HIGHWAY
CONSTRUCTION
CEMENT MASONS..............$ 37.23 19.51
MARBLE, TILE & TERRAZZO
FINISHERS...................$ 27.16 16.85
MARBLE, TILE & TERRAZZO
WORKERS.....................$ 34.66 19.58
CARP0279-006 07/01/2019
Rates Fringes
Carpenters:
HEAVY AND HIGHWAY
CONSTRUCTION (COLUMBIA AND
GREENE COUNTIES)
Carpenters, Millwrights, Pile Drivers...............$ 38.09 29.08
* CARP0291-005 07/01/2022
Rates Fringes
Carpenters:
SARATOGA COUNTY
BUILDING....................$ 34.00 23.18
WASHINGTON COUNTY
BUILDING....................$ 29.00 22.46
PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.
* CARP0291-008 07/01/2022
ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND
SCHOHARIE COUNTIES
Rates Fringes
Carpenters:
BUILDING CONSTRUCTION
(Excluding Montgomery County) Carpenters & Soft Floor Layers.....................$ 34.00 23.18 Piledriver.................$ 31.68 20.60
HEAVY & HIGHWAY
CONSTRUCTION
Carpenters.................$ 37.52 23.55
* CARP0291-010 07/01/2022
Rates Fringes
Carpenters:
CARPENTERS..................$ 37.52 23.55
DIVER TENDERS...............$ 34.02 21.10
DIVERS (Dry Day)............$ 38.52 23.55
DIVERS......................$ 62.52 23.55
PILEDRIVERS.................$ 33.02 21.10
* ELEC0236-001 06/01/2022
ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);
MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;
WASHINGTON
ELECTRICIAN......................$ 45.00 30.59
ELEC0363-004 04/01/2022
GREENE COUNTY (Portion of)
Rates Fringes
ELECTRICIAN......................$ 44.00 3%+36.67+a
FOOTNOTE:
a. Paid Holidays: New Year's Day, President's Day, Memorial Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day
ELEC1249-003 05/04/2020
Rates Fringes
ELECTRICIAN (LINE
CONSTRUCTION: LIGHTING AND
TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 27.72 6.75%+33.90 Groundman (Truck Driver)....$ 36.96 6.75%+33.90 Groundman Truck Driver (tractor trailer unit)......$ 39.27 6.75%+33.90 Lineman & Technician........$ 46.20 6.75%+33.90 Mechanic....................$ 36.96 6.75%+33.90
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249-004 05/03/2021
ELECTRICIAN (Line
Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :
Flagman....................$ 32.82 7%+34.40 Groundman digging machine operator...................$ 49.23 7%+34.40 Groundman truck driver (tractor trailer unit).....$ 46.50 7%+34.40 Groundman Truck driver.....$ 43.76 7%+34.40 Lineman and Technician.....$ 54.70 7%+35.40 Mechanic...................$ 43.76 7%+34.40 Substation:
Cable Splicer..............$ 60.17 7%+35.40 Flagman....................$ 32.82 7%+34.40 Ground man truck driver....$ 43.76 7%+34.40 Groundman digging machine operator...................$ 49.23 7%+34.40 Groundman truck driver (tractor trailer unit).....$ 46.50 7%+34.40 Lineman & Technician.......$ 54.70 7%+35.40 Mechanic...................$ 43.76 7%+34.40 Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 61.62 7%+35.40 Flagman....................$ 33.61 7%+34.40
Groundman Digging Machine Operator...................$ 50.42 7%+34.40 Groundman Truck Driver (tractor-trailer unit).....$ 47.62 7%+34.40 Groundman Truck Driver.....$ 44.82 7%+34.40 Lineman & Technician.......$ 56.02 7%+35.40 Mechanic...................$ 44.82 7%+34.40
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEC1249-007 05/02/2022
COLUMBIA COUNTY
Rates Fringes
ELECTRICIAN (LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY
AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC
SIGNAL SYSTEMS, TRAFFIC
MONITORING SYSTEMS AND ROAD
WEATHER INFORMATION SYSTEMS)
Flagman.....................$ 28.91 7%+34.90 Groundman Digging Machine Operator....................$ 43.37 7%+34.90 Groundman Truck Driver (Tractor-trailer unit)......$ 40.96 7%+34.90 Groundman Truck Driver......$ 38.55 7%+34.90 Lineman and Technician......$ 48.19 7%+36.90 Mechanic....................$ 38.55 7%+34.90
PAID HOLIDAYS:
a. Memorial Day, New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEC1249-008 01/01/2022
Rates Fringes
ELECTRICIAN (Line Construction)
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer..............$ 36.28 3%+5.14 Groundman..................$ 18.25 3%+5.14 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 34.43 3%+5.14 Tree Trimmer................$ 28.25 3%+10.23
a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.
ELEV0035-001 01/01/2022
ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of Durham, Greenville, New Baltimore, Coxcsackie and Athens);
MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND
WASHINGTON COUNTIES
Elevator Constructor.............$ 50.78 36.885+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ELEV0138-004 01/01/2022
COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,
GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY
(THE TOWNS OF HUNTER AND CATSKILL)
ELEVATOR MECHANIC................$ 64.63 36.885+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0158-008 07/01/2018
BUILDING
EXCLUDING MONTGOMERY COUNTY
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP A(1)..................$ 43.79 25.70+a GROUP A.....................$ 43.30 25.70+a 1..........................$ 45.04 25.70+a 2..........................$ 46.04 25.70+a GROUP B.....................$ 42.28 25.70+a GROUP C.....................$ 39.38 25.70+a
Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.
FOOTNOTE:
a. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING):
GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)
GROUP A(1): Crane Premiums:
1 over 150'- $1.00 2 over 200'- $2.00
GROUP A: Shovel, All Excavators (including rubber tire full swing), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under), maintenance engineer, self contained crawler, drill-hydraulic rock drill.
GROUP B: Backhoe, (rubber-tired backhoe/loader combination), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller
GROUP C: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4"" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack (belcrete system), seeding, and mulching machines, pumps
ENGI0158-026 07/01/2018
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 43.47 26.05+a GROUP 2.....................$ 42.56 26.05+a GROUP 3.....................$ 39.99 26.05+a GROUP 4.....................$ 47.47 26.05+a GROUP 5.....................$ 46.47 26.05+a GROUP 6.....................$ 45.47 26.05+a GROUP 7.....................$ 45.08 26.05+a
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY):
GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)
Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel
GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.
Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat
GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Fork Lift, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point
GROUP 4: Tower Cranes
GROUP 5: Cranes 50 tons and over
GROUP 6: Cranes 49 tons and below
GROUP 7: Master Mechanic
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
IRON0012-011 07/01/2019
ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY (Amsterdam, Charleston, Florida, Glen, Mohawk and Root);
RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON
COUNTIES:
Ironworkers:
Sheeter, Bucker-up..........$ 31.80 28.59 Sheeter.....................$ 31.80 28.59 Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone Derrickmen..................$ 31.55 28.59
* IRON0440-007 07/01/2022
FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);
MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.
Johnsville):
IRONWORKER
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 31.25 29.19
LABO0017-001 07/01/2019
COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
LABORER
COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson) (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY GROUP 1:...................$ 38.90 27.15+a GROUP 2:...................$ 43.15 27.15+a GREENE COUNTY (Township of Catskill) HEAVY & HIGHWAY:
GROUP 1:...................$ 34.15 27.15+a GROUP 2:...................$ 38.90 27.15+a GROUP 3:...................$ 43.15 27.15+a GROUP 4:...................$ 48.00 27.15+a
TUNNEL, SHAFT & CAISSON
WORK
GROUP 1....................$ 48.05 29.50+a
For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
HEAVY & HIGHWAY CLASSIFICATIONS
GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required
GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required
For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY (Township of Catskill)
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.
GROUP 1: Flagperson, gateperson
GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.
Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.
Ground man on milling machine
GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman
GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman
For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day
GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and Powderman;
Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air
LABO0035-001 07/01/2017
FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND
ST. JOHNSVILLE)
Laborers Building Construction Asbestos Removal............$ 24.00 20.64+a Blasters, Form Setters, MotorBuggy Operator (Rider Type)......................$ 23.00 20.64+a Hazardous Waste Removal Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 24.00 20.64+a
HEAVY & HIGHWAY:
GROUP 1:...................$ 28.05 23.74+a GROUP 2:...................$ 28.25 23.74+a GROUP 3:...................$ 28.45 23.74+a GROUP 4:...................$ 28.65 23.74+a Laborers....................$ 22.50 20.64+a Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind) Power Lift
(Walk Behind)...............$ 22.65 20.64+a Wagon Drill Operator........$ 22.90 20.64+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
GROUP 1: Common Laborers, Flagman, Outboard and Hand boats
GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw Operator on asphalt paver, Water pump operator (1 1/2"" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers
GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman
GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters
LABO0157-001 07/01/2017
FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton Park); SCHENECTADY and SCHOHARIE COUNTIES.
LABORER
BUILDING:
GROUP 1....................$ 28.74 20.14+a GROUP 2....................$ 30.09 20.14+a
HEAVY & HIGHWAY:
GROUP 1:...................$ 30.55 21.29+a GROUP 2:...................$ 30.75 21.29+a GROUP 3:...................$ 30.95 21.29+a GROUP 4:...................$ 31.15 21.29+a GROUP 5:...................$ 32.55 21.29+a
LABORER CLASSIFICATIONS
Group 1: Common Laborers
Group 2: Asbestos and Toxic Materials
Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
LABORER CLASSIFICATIONS
GROUP 1: Common laborers, flagman, outboard & hand boats
GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2"") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking laborers
GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb setters
GROUP 5: Hazardous waste removal
* LABO0190-001 07/01/2022
ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA
COUNTY (Townships of Stillwater, Halfmoon, Saratoga)
Laborers:
BUILDING:
GROUP 1....................$ 32.86 24.57
GROUP 2....................$ 34.21 24.57
LABORERS CLASSIFICATIONS
GROUP 1: Common Laborers
GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply
LABO0190-002 07/01/2018
ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).
GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO COUNTY (Townships of Stillwater, Halfmoon Saratoga)
HEAVY & HIGHWAY:
GROUP 1:...................$ 30.94 22.70
GROUP 2:...................$ 31.14 22.70
GROUP 3:...................$ 31.34 22.70
GROUP 4:...................$ 31.54 22.70
GROUP 5:...................$ 32.94 22.70
FOOTNOTE:
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
LABORERS CLASSIFICATIONS
GROUP 1: Common laborers, flagmen, outboard and hand boats
GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2"" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking laborers
GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb setters
GROUP 5: Hazardous waste removal
LABO0235-006 05/01/2018
COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):
HEAVY & HIGHWAY
GROUP 1....................$ 24.40 29.75+a GROUP 2....................$ 28.16 29.75+a GROUP 3....................$ 29.16 29.75+a
LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;
tool rooms
GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;
Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;
wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2"" or under; Nipper; Chucker;
Asphalt Workers
GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);
Laser Beam Operator; Form Setter/Aligners; Blasters
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and Christmas Day
PAIN0009-013 05/01/2021
Rates Fringes
GLAZIER..........................$ 34.35 19.72
PAIN0155-002 05/01/2018
COLUMBIA AND GREENE COUNTIES
Painters:
Drywall Finisher............$ 32.99 22.76 Lead Abatement Work.........$ 32.99 22.76 Painter/Paperhanger.........$ 32.99 22.76 Spray Rate..................$ 33.99 22.76
* PAIN0201-001 05/01/2022
Rates Fringes
Painters: