Pre-Bid Conference and Site Visit Questions and Answers Document_Updated 14 May 2024.pdf

PDF 617 KB Posted

Attached to
Bldg 1070 and 1074 HVAC Replacements
Solicitation number
W50S8G24BA001
Issued by

About this file

This document is the Pre-Bid Conference and Site Visit Questions and Answers for Solicitation W50S8G-24-B-A001 for the HVAC Replacement of Buildings 1070 and 1074 at the New Mexico Air National Guard (NMANG) on Kirtland Air Force Base.

The key details are:

  • Drawings for the buildings will be posted on the solicitation in SAM.gov.
  • Building 1070 will require coordinated gas and electric shutdown due to tenants, while Building 1074 is unoccupied.
  • Waste removal storage space will be coordinated at the pre-construction conference.
  • Building 1074 is in a controlled area requiring escorts, while Building 1070 is unrestricted.
  • All work will be performed outside the buildings, except for installing lockable thermostat boxes inside.
  • Building 1074 requires a return air duct for the new Trane HVAC unit, which has been added to the Statement of Work by amendment.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Conference and Site Visit Questions and Answers Document

W50S8G-24-B-A001 8 May 2024

Q1. Are the drawings available for these 2 buildings?

A1. Yes, the drawings will be posted on the solicitation in SAM.gov following this conference.

Q2. Will a coordinated shutdown of utilities be required for this project?

A2. Yes, Building 1070 will require gas and electric shutdown to be coordinated as there are tenants to this building. Building 1074 is unoccupied and will not require a coordinated shutdown.

Q3. Will there be space for our waste removal storage?

A3. Yes, this will be coordinated at the pre-construction conference.

Q4. Are there any special badging requirements for this project besides base access?

A4. No, this only requires base access. Please note: Building 1074 is in a controlled area, which means that all contractors accessing the area must be escorted to and from the job site. Building 1070 is unrestricted.

Q5. Will all work be conducted outside of the buildings?

A5. With the exception of providing the thermostats with lockable boxes located inside Buildings 1070 and 1074, all other work will be performed outside.

Q6. Will there be a return in Building 1074 for air conditioning?

A6. Yes, include a return for air conditioning for Building 1074. An update to the Statement of Work will be issued reflecting that this is needed and an amendment posted in SAM (W50S8G24BA0010001). This question is revised below.

Revised Question:

Q6. On Bldg 1074, the existing outdoor unit is a gas fired heating unit, no cooling, with no return air ducted back to the unit. The SOW states to replace with a Trane unit, sized by the contractor. In the field it was mentioned the desire to have a combination heating & cooling unit. From our site visit, the existing unit does not have a return duct from the building, and if we install a unit with cooling, this would typically require a return duct in order to provide proper cooling on what is essentially a once-thru or make-up air unit. Does the government desire a cooling unit, either D/X or evaporative cooling? If so, should the contractor install a properly sized return air duct? Please provide direction.

A6. The Government requirement is for a Trane package unit as stated in the Statement of Work (SOW). The new unit will require a return air duct. An amendment was issued to add the air return duct to the SOW.

-- End of Pre-Bid Conference and Site Visit Questions and Answers (Uploaded 10 May 2024; updated 14 May 2024)–