ATTACHMENT 6 - QUESTIONS AND ANSWERS DOCUMENT 3.pdf
PDF 864 KB Posted
- Attached to
- Bldg 1070 and 1074 HVAC Replacements
- Solicitation number
- W50S8G24BA001
- Issued by
-
Department of the Army National Guard
About this file
This document is a Questions and Answers (Q&A) document related to a federal contract opportunity for the replacement of HVAC systems in Buildings 1070 and 1074 at Kirtland Air Force Base in New Mexico.
The key details are:
- The pre-bid conference and site visit are scheduled for May 8, 2024, with the pre-bid conference taking place in Building 1064 and the site visit in Buildings 1070 and 1074. Contractors who already have base access do not need to request passes.
- There are no limitations on subcontracting for this requirement.
- The bid opening will occur on May 29, 2024 at 1:00 PM, and only in-person, hand-delivered bids will be accepted.
- This is a Total Small Business Set-Aside with a NAICS code of 238220, and the magnitude of the project is between $100,000 and $250,000.
- Contractors who were unable to attend the pre-bid conference and site visit are still eligible to bid, as the information from those events is available in the solicitation documents.
- The contractor is responsible for providing a solution to route the new return ductwork from the new packaged unit into the building.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Document 3 W50S8G-24-B-A001
25 May 2024
Q1. Regarding the LJre-ōid meeting scheduled for 5/8/2024, will that take place at Building 1070?
A1. No, the pre-bid conference on the 8th will begin at Building 1064, in the Civil Engineering (CE) Conference Room, and will be followed by the site visit at Buildings 1070 and 1074.
Q2. Regarding the site visit, are bidding contractors able to walk the job and take pictures for reference during the bidding process?
A2. Yes, all who register to attend the event will have access to the area and to ask the customers specific questions regarding the requirement. ¸ƻdz ǿƛƭƭ ōŜ ƛƴŦƻNJƳŜŘ ŀǘ ǘƘŜ ǎƛǘŜ Ǿƛǎƛǘ ǘƘŜ ŜȄǘŜƴǘ ǘƻ ǿƘƛŎƘ ȅƻdz ǿƛƭƭ ōŜ ŀƭƭƻǿŜŘ ǘƻ ǘŀƪŜ LJƛŎǘdzNJŜǎΦ Please reference the solicitation for how to pre-register ŀƴŘ ƻōǘŀƛƴ LJŀǎǎŜǎ ƻƴ ōŀǎŜ LJNJƛƻNJ ǘƻ ǘƘŜ ŜǾŜƴǘΦ
Q3. Regarding the pre-bid conference / site visit, my team is already working on base, are we still required to send all the information and receive passes for the site visit?
A3. If they already have access to the base, we won’t need to get them passes but we’ll need names to ensure that we have them on an access roster prior to attendance. Our pre-bid conference will be in a conference room with limited seating and we want to ensure there is enough seating available for everyone attending.
Q4. Regarding the solicitation, I was wondering if there are any limitations on subcontracting?
A4. No, this requirement is not subject to limits on subcontracting.
Q5. I have looked at the documents for this opportunity, but I can not find the date for the site visit. Do you have requirements for attending?
A5. The site visit will be May 8, 2024 at 1300. Please reference Section L, Part 4 of the solicitation document for all things site visit.
-- End Questions and Answers 1 (¦LJƭƻŀŘŜŘ 7 May 2024) –
Q6. We weren't able to be there at the pre-bid conference and site visit, are we still allowed to bid on this contract?
A6. Yes, you will still be able to bid on this Invitation for Bid. The site visit / pre-bid conference have passed but the documents from the event are listed with the solicitation in SAM.gov as a reference to everything covered. Bids will be accepted at the bid opening, from all, in accordance with the solicitation documents.
Q7. Some package units do not include factory installed duct smoke detectors. In this instance, are smoke detectors still required?
A7. The smoke detectors are still required for this requirement.
Questions and Answers Document 2 W50S8G-24-B-A001
25 May 2024
Q8. In Bldg. 1074, the SOW describes an added return duct. Will this return duct need to be run inside the building?
A8. Yes, the return duct is required to be ran into the facility. The Contractor must provide a solution for this to happen.
Q9. Some RTUs do not have options for Ground Fault Protection (circuit breaker) or Phase loss with under/ over voltage protection, are these items still required?
A9. The Contractor is responsible for providing Ground Fault Protection and Phase Loss with under/over voltage protection using best means and methods practices PER the most recent NEC.
Q10. What does 'the magnitude of this project' mean?
A10. Per FAR 36.204,"Advance notices and solicitations shall state the magnitude of the requirement in terms of physical characteristics and estimated price range."
-- End Questions and Answers 2 (Uploaded 21 May 2024) –
Q11. How should the new return ductwork be routed from the new packaged unit into the building, please advise?
A11. The Contractor shall utilize best practice to provide return duct into facility.
-- End Questions and Answers 3 (Uploaded 25 May 2024) –