22-B-0001_AfdLgt_RFI_LOG_FINAL_20210721.pdf

PDF 172 KB Posted

Attached to
REPAIR AIRFIELD LIGHTING, 177TH FIGHTER WING, NJANG
Solicitation number
W50S8F-22-B-0001
Issued by

About this file

This solicitation package seeks bids for a construction contract to repair airfield lighting at the 177th Fighter Wing in New Jersey. The project includes replacing antiquated hangar and apron lighting fixtures with more efficient technology. Bidders must review drawings, specifications and the statement of work to understand all requirements. A pre-bid conference and site visit will be held. The construction magnitude is valued between $500,000 and $1,000,000. Bid, payment and performance bonds are mandatory. The opportunity is offered by the Department of the Army National Guard to qualified contractors. Bids are due by the date specified in the instructions to offerors attachment.

View the file

Other files

File Type Posted
W50S8F-22-B-0001_OF-1419_KO_Signed.pdf PDF
W50S8F-22-B-0001_Bid_Open_Attendees_20220729.pdf PDF
W50S8F-22-B-0001_AfdLgt_BidOpen_PPT.pdf PDF
22-B-0001_AfdLgt_SF30_Solicitation_Amenment_02.pdf PDF
22-B-0001_AfdLgt_RFI_LOG_FINAL_attachments_20210721.pdf PDF
Attach_08_REV01__Wage_Rate_DOL_NJ20220025_MOD_04_06-24-2022..pdf PDF
22-B-0001_AfdLgt_SF30_Solicitation_Amenment_01.pdf PDF
Attach_01_REV01_22-B-001_Attachment_Schedule.xlsx XLSX spreadsheet
22-B-0001_AfdLgt_PreProposal_Conf_PPT.pdf PDF
22-B-0001_AfdLgt_PreProposal_Conf_SIGN-IN.pdf PDF
Attach_03_22-B-0001_AfdLgt_Sect_00100_Instructions.docx DOCX document
Attach_09_22-B-0001_Insurance_Requirements.docx DOCX document
W50S8F-22-B-0001_SF1442_Solicitation_Final.pdf PDF
Attach_08_Wage_Rate_DOL_NJ20220025_MOD_03_06-17-2022.txt TXT text file
Attach_011_22-B-0001_AfdLgt_OPSEC.pdf PDF
Attach_02_22-B-0001_AfldLgt_NOTES.docx DOCX document
Attach_06_AfdLgt_Design Drawings.pdf PDF
Attach_01_22-B-001_Attachment_Schedule.xlsx XLSX spreadsheet
Attach_05_AfdLgt_Design_Specifications_Redacted.pdf PDF
Attach_04_22-B-0001_AfdLgt_SOW_20220511.pdf PDF
Attach_012_22-B-0001_AfdLgt_177FW_VicinityMaps.pdf PDF
Attach_07_AfdLgt_AF66_Submittal_Register_DRAFT.xlsx XLSX spreadsheet
Attach_010_22-B-0001_AfdLgt_EMS_Commitment_Statement.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. Inquiry Date: Question Response

1 7/13/2022 For demoing the existing light bases and ground rod wells, Do you want them demolished to ground level or completely removed and backfill the holes in?

Reference Keynote 1 in Drawing ED‐101

2 7/13/2022 Do you want two separate circuits and contactors to control the perimeter security lighting, so that the inside lighting and outside lighting can be controlled separately for security purposes?

Yes

3 7/13/2022 Can you clarify that we are not doing any work in hangers #450, 451, 452?

Per SOW's Project description: "Project includes Phase 1B, Phase 2A, and Phase 2B as noted on the 100% design drawings.

No work is included for buildings 450, 451, or 452."

4 7/14/2022 Is the existing 3” conduit that is currently in use going to be abandoned in place upon demolition of the existing lighting? Or shall it be removed? Or repaired/reconnected to maintain continuity?

Per Sheetnote 3 in drawing ED‐101. "Electrical contractor to check the integrity of existing conduits…" after confirmation the previously utilized conduit will be abandoned in place.

5 7/14/2022 For grassy areas disturbed during construction is top soil and seeding required or are these areas just to be restored to grade?

Reference General Sheet note #9 in drawing # ES‐101

6 7/14/2022 Will the government be providing underground utility locating and marking to confirm conduit locations and other utilities? Or is this the responsibility of the Contractor?

The contractor shall be responsible to contact 1‐800 U‐Dig and forward the request ticket to the government. This will initiate an internal mark‐out with both the FAA and ANG tradesmen.

7 7/14/2022 Is there a designated storage and staging area provided for this contract work? If, so please provide.

Staging and storage areas will be coordinated with the Project

Manager/COR prior to work commencing

8 7/14/2022 Are there any height restrictions for lifting and excavation equipment?

Height restriction: 20 feet. Crane will require an approved FAA

7460 prior to mobilization.

9 7/14/2022 During the site visit it appeared that buildings 450, 451 and 452 (Phase 1A) lighting replacement has been completed. Can you please confirm that Phase 1A is not part of this project?

Per SOW's Project description: "Project includes Phase 1B, Phase 2A, and Phase 2B as noted on the 100% design drawings.

No work is included for buildings 450, 451, or 452."

10 7/14/2022 Please provide photos of existing interior and exterior fixtures in buildings 453, 454 and 454. Including pictures of data plate and breakers from Panels ‘PP’

Reference attachment 4A

11 7/14/2022 Please provide photos of new interior and exterior fixtures in buildings 450, 451 and 452. Reference attachment 4B 12 7/14/2022 Can degrees of angle be provided for each of the type D1 fixtures? Use scale provided in drawing ES‐101

13 7/15/2022 Can a soils/geotechnical report be provided for this project site? Or a report from a previous project site in the same area?

Geotechnical report for new B445 provided.

14 7/18/2022 Update to Drawing EL‐101 Keynote 9 ‐Basis of Design shall be ITERMANTIC #K122

2022-07-21T15:49:52-0400
ROJAS.NATALIA.1381141159

File details come from the government source that posted it. Updated .