Attach_07_AfdLgt_AF66_Submittal_Register_DRAFT.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
REPAIR AIRFIELD LIGHTING, 177TH FIGHTER WING, NJANG
Solicitation number
W50S8F-22-B-0001
Issued by

About this file

This solicitation package is for repair and replacement of airfield lighting at the 177th Fighter Wing in Egg Harbor Township, New Jersey. The contractor shall demolish existing structures, furnish labor and materials, and perform work according to provided drawings and specifications to repair the antiquated lighting system and provide efficient LED fixtures. Types of fixtures to be installed include Types A, D1, D2, F, G, H, and K lights along with NEMA receptacles, photocells, switches, conduit, and wiring. The contractor must also provide a lighting control system and record drawings, operations and maintenance manuals, and warranty documents upon project completion. Bids are due by [DATE REDACTED] and must include payment and performance bonds. The pre-bid conference will be held on [DATE REDACTED] at the 177th Fighter Wing. The magnitude of construction is estimated between $500,000 to $1,000,000. Bidders must review and adhere to all solicitation requirements and amendments on SAM.gov.

View the file

Other files

File Type Posted
W50S8F-22-B-0001_OF-1419_KO_Signed.pdf PDF
W50S8F-22-B-0001_Bid_Open_Attendees_20220729.pdf PDF
W50S8F-22-B-0001_AfdLgt_BidOpen_PPT.pdf PDF
22-B-0001_AfdLgt_SF30_Solicitation_Amenment_02.pdf PDF
22-B-0001_AfdLgt_RFI_LOG_FINAL_20210721.pdf PDF
22-B-0001_AfdLgt_RFI_LOG_FINAL_attachments_20210721.pdf PDF
Attach_08_REV01__Wage_Rate_DOL_NJ20220025_MOD_04_06-24-2022..pdf PDF
22-B-0001_AfdLgt_SF30_Solicitation_Amenment_01.pdf PDF
Attach_01_REV01_22-B-001_Attachment_Schedule.xlsx XLSX spreadsheet
22-B-0001_AfdLgt_PreProposal_Conf_PPT.pdf PDF
22-B-0001_AfdLgt_PreProposal_Conf_SIGN-IN.pdf PDF
Attach_03_22-B-0001_AfdLgt_Sect_00100_Instructions.docx DOCX document
Attach_09_22-B-0001_Insurance_Requirements.docx DOCX document
W50S8F-22-B-0001_SF1442_Solicitation_Final.pdf PDF
Attach_08_Wage_Rate_DOL_NJ20220025_MOD_03_06-17-2022.txt TXT text file
Attach_011_22-B-0001_AfdLgt_OPSEC.pdf PDF
Attach_02_22-B-0001_AfldLgt_NOTES.docx DOCX document
Attach_06_AfdLgt_Design Drawings.pdf PDF
Attach_01_22-B-001_Attachment_Schedule.xlsx XLSX spreadsheet
Attach_05_AfdLgt_Design_Specifications_Redacted.pdf PDF
Attach_04_22-B-0001_AfdLgt_SOW_20220511.pdf PDF
Attach_012_22-B-0001_AfdLgt_177FW_VicinityMaps.pdf PDF
Attach_010_22-B-0001_AfdLgt_EMS_Commitment_Statement.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSRepair Airfield LightingAQRC162003
TO BE COMPLETED BY PROJECT ENGINEERContractorTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
SUBMITTAL NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMFGR'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATION INSTRUCTIONPERFORMANCE TEST REPORTOTHERSUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
ALL SUBMITTALS SHALL BE SUBMITTED THROUGH PROJECT MANAGEMENT SOFTWARE PER THE SOWAPPROVEDDISAPPROVED
1Job Specific Safety PlanxPrior to NTP
2Job Specific Quality Control PlanxPrior to Mobilization
3Key Personnel LetterPrior to NTP
4List of Proposed Sub-Contractors10 Days After NTP
5Project Schedule: AF 3064 (or equivalent)x10 Days After NTP
6AF 3065 – Progress Report DRAFTx10 Days After NTP
7EMS Training CertificationxNTP
8MSDS Sheets as requiredxNTP
9Submittal LogxNTP
10Project Specific Submittals
11Type A Light Fixture per LED Lighting Fixture SchedulexxxxxNTP
12Type D1 Light Fixture per LED Lighting Fixture SchedulexxxxxNTP
13Type D2 Light Fixture per LED Lighting Fixture SchedulexxxxxNTP
14Type F Light Fixture per LED Lighting Fixture SchedulexxxxxNTP
15Type G Light Fixture per LED Lighting Fixture SchedulexxxxxNTP
16Type H Light Fixture per LED Lighting Fixture SchedulexxxxxNTP
17Type K Light Fixture per LED Lighting Fixture SchedulexxxxxNTP
18NEMA 7-20 Receptacles in HousingxxxxxNTP
19PhotocellsxxxxxNTP
20Heavy Duty, Surface Mounted SwitchxxxxxNTP
21RGS ConduitxxxxxNTP
22#12, #10, #8, #6 and other associated wiringxxxxxNTP
23Lighting Control SystemxxxxxNTP
24Other submittals as required by Specifications or DrawingsxxxxxNTP
25Field Test ReportsxNLT 5 days from date of test
26CLOSE-OUT DOCUMENTS - Quantity Hard copies plus 1 PDF copy
27Contractor Warranties3
28Record drawings3
29O&M Manual3333
30Maintenance Summary Forms3
31DD 1354 Worksheet1

AF FORM 66

AF Form 66 Oct '89 Submittals required by Specifications and Drawings shall be made, regardless of whether or not they are listed on AF Form 66. Page &P of &N