Attach_07_AfdLgt_AF66_Submittal_Register_DRAFT.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- W50S8F-22-B-0001
- Issued by
-
Department of the Army National Guard
About this file
This solicitation package is for repair and replacement of airfield lighting at the 177th Fighter Wing in Egg Harbor Township, New Jersey. The contractor shall demolish existing structures, furnish labor and materials, and perform work according to provided drawings and specifications to repair the antiquated lighting system and provide efficient LED fixtures. Types of fixtures to be installed include Types A, D1, D2, F, G, H, and K lights along with NEMA receptacles, photocells, switches, conduit, and wiring. The contractor must also provide a lighting control system and record drawings, operations and maintenance manuals, and warranty documents upon project completion. Bids are due by [DATE REDACTED] and must include payment and performance bonds. The pre-bid conference will be held on [DATE REDACTED] at the 177th Fighter Wing. The magnitude of construction is estimated between $500,000 to $1,000,000. Bidders must review and adhere to all solicitation requirements and amendments on SAM.gov.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | Repair Airfield Lighting | AQRC162003 | ||
| TO BE COMPLETED BY PROJECT ENGINEER | Contractor | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||
| NUMBER OF COPIES REQUIRED |
| SUBMITTAL NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MFGR'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATION INSTRUCTION | PERFORMANCE TEST REPORT | OTHER | SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| ALL SUBMITTALS SHALL BE SUBMITTED THROUGH PROJECT MANAGEMENT SOFTWARE PER THE SOW | APPROVED | DISAPPROVED | |||||||||||||||||||
| 1 | Job Specific Safety Plan | x | Prior to NTP | ||||||||||||||||||
| 2 | Job Specific Quality Control Plan | x | Prior to Mobilization | ||||||||||||||||||
| 3 | Key Personnel Letter | Prior to NTP | |||||||||||||||||||
| 4 | List of Proposed Sub-Contractors | 10 Days After NTP | |||||||||||||||||||
| 5 | Project Schedule: AF 3064 (or equivalent) | x | 10 Days After NTP | ||||||||||||||||||
| 6 | AF 3065 – Progress Report DRAFT | x | 10 Days After NTP | ||||||||||||||||||
| 7 | EMS Training Certification | x | NTP | ||||||||||||||||||
| 8 | MSDS Sheets as required | x | NTP | ||||||||||||||||||
| 9 | Submittal Log | x | NTP | ||||||||||||||||||
| 10 | Project Specific Submittals | ||||||||||||||||||||
| 11 | Type A Light Fixture per LED Lighting Fixture Schedule | x | x | x | x | x | NTP | ||||||||||||||
| 12 | Type D1 Light Fixture per LED Lighting Fixture Schedule | x | x | x | x | x | NTP | ||||||||||||||
| 13 | Type D2 Light Fixture per LED Lighting Fixture Schedule | x | x | x | x | x | NTP | ||||||||||||||
| 14 | Type F Light Fixture per LED Lighting Fixture Schedule | x | x | x | x | x | NTP | ||||||||||||||
| 15 | Type G Light Fixture per LED Lighting Fixture Schedule | x | x | x | x | x | NTP | ||||||||||||||
| 16 | Type H Light Fixture per LED Lighting Fixture Schedule | x | x | x | x | x | NTP | ||||||||||||||
| 17 | Type K Light Fixture per LED Lighting Fixture Schedule | x | x | x | x | x | NTP | ||||||||||||||
| 18 | NEMA 7-20 Receptacles in Housing | x | x | x | x | x | NTP | ||||||||||||||
| 19 | Photocells | x | x | x | x | x | NTP | ||||||||||||||
| 20 | Heavy Duty, Surface Mounted Switch | x | x | x | x | x | NTP | ||||||||||||||
| 21 | RGS Conduit | x | x | x | x | x | NTP | ||||||||||||||
| 22 | #12, #10, #8, #6 and other associated wiring | x | x | x | x | x | NTP | ||||||||||||||
| 23 | Lighting Control System | x | x | x | x | x | NTP | ||||||||||||||
| 24 | Other submittals as required by Specifications or Drawings | x | x | x | x | x | NTP | ||||||||||||||
| 25 | Field Test Reports | x | NLT 5 days from date of test | ||||||||||||||||||
| 26 | CLOSE-OUT DOCUMENTS - Quantity Hard copies plus 1 PDF copy | ||||||||||||||||||||
| 27 | Contractor Warranties | 3 | |||||||||||||||||||
| 28 | Record drawings | 3 | |||||||||||||||||||
| 29 | O&M Manual | 3 | 3 | 3 | 3 | ||||||||||||||||
| 30 | Maintenance Summary Forms | 3 | |||||||||||||||||||
| 31 | DD 1354 Worksheet | 1 |
AF FORM 66
AF Form 66 Oct '89 Submittals required by Specifications and Drawings shall be made, regardless of whether or not they are listed on AF Form 66. Page &P of &N