Solicitation Amendment W50S7X26QA0010001 SF 30.pdf
PDF 4 MB Posted
- Attached to
- B35 Critical Loop
- Solicitation number
- W50S7X26QA001
- Issued by
-
Department of the Army National Guard
About this file
This is a Standard Form 30 (SF 30) Amendment of Solicitation issued by the U.S. Air Force for solicitation W50S7X26QA001. Amendment 0001 is effective February 25, 2026, and extends the response due date by seven days from March 5, 2026, to March 12, 2026. The solicitation is administered by the Military User Support Force Activity KSANG 184 at F.E. Warren Air Force Base in Cheyenne, Wyoming. The project number is PRQE252854, which concerns B35 Critical Electrical Line Installation work. The Contracting Officer is Joshua Kingori, and the Point of Contact is Kevin Smith.
The amendment revises the Statement of Work and modifies contract clause 252.236-7001 (Contract Drawings and Specifications) to include updated technical documentation. The revised SOW is titled "SOW PRQE252854 B35 Critical Electrical line Installation - Revised" (dated February 25, 2026), replacing the previous version dated February 4, 2026. Contract drawings referenced include the "Proposed B35 Critical Power Circuit Routes_20250806." The amendment clarifies contractor responsibilities regarding drawings and specifications, including verification of figures, notification of discrepancies, and reproduction of contract documents as needed. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 05 Mar 2026 12 Mar 2026
Section I - Contract Clauses
Additional Information/Notes
The following clauses were modified:
252.236-7001Contract Drawings and Specifications.Aug 2000 hereby reads as follows:
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall-
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
W50S7X26QA0010001
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
SOW
SOW PRQE252854
B35 Critical Electrical line Installation - Revised
Proposed B35 Critical Power Circuit Routes_20250806
Proposed B35 Critical Power Circuit Routes_20250806
(End of clause)
Section J - List of Attachments
The attachments table has changed from:
Identifi er
Document Name
Document Description Reference Identifier
Date Line Item
Page N umbers
Docum ent Type
Provid ed Under Separa te Cover
0001 SoW PREQE2 52854 - Critical Line Installation
Statement of Work 04 Feb
Attach ment
No
0002 Proposed B35 Critical Power Circuit Routes _20250806
Drawings 04 Feb
Attach ment
No
To:
Identifi er
Document Name
Document Description Reference Identifier
Date Line Item
Page N umbers
Docum ent Type
Provid ed Under Separa te Cover
0001 SOW
PRQE252854
B35 Critical Electrical line Installation - Revised
Statement of Work 25 Feb
Attach ment
No
0002 Proposed B35 Critical Power Circuit Routes _20250806
Drawings 04 Feb
Attach ment
No
The following contract documents were added:
SOW PRQE252854 B35 Critical Electrical line Installation - Revised
The following contract documents were deleted:
SoW PREQE252854 - Critical Line Installation
Miscellaneous text in this section has been modified to:
1. SOW PRQE252854 B35 Critical Electrical line Installation - Revised
2. Proposed B35 Critical Power Circuit Routes
| IDCode: J |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0001 |
| EffDate: 25 FEB 2026 |
| ReqNo: |
| ProjNo: PRQE252854 |
| IssCode: W50S7X |
| AdmCode: |
| IssuedBy: W7M9 USPFO ACTIVITY KSANG 184 |
KO DODAAC FOR KSANG DO NOT DELETE, 52955 JAYHAWK DR SUITE 153
MCCONNELL AFB, KS 67221-9000
UNITED STATES
KEVIN SMITH, EMAIL: KEVIN.SMITH.124@US.AF.MIL TELEPHONE: 316-759-7591
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W50S7X26QA001 |
| SolDate: 05 FEB 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: This amendment is to increase the offer due date by 7 days from 5 March 2026 to 12 March 2026 and to included the revised statement of work. All other terms and conditions remain unchanged. |
POC: MSGT KEVIN SMITH
| ContNameTitle: |
| CoNameTitle: JOSHUA KINGORI |
| ContDate: |
| CODate: 25 FEB 2026 |
File details come from the government source that posted it. Updated .