About this file
This is a site visit/conference presentation for a federal construction solicitation at McConnell Air Force Base. Solicitation W50S7X-26-Q-A001 seeks a contractor to perform Building 35 Critical Line Installation work on a firm-fixed-price basis. The work involves a 60-day construction period following the Notice to Proceed. The estimated contract value ranges between $100,000 and $250,000. The solicitation is set aside 100% for small businesses and classified under NAICS code 238210. The procurement is being conducted by the 184th Maintenance Squadron at McConnell AFB in Kansas, with Contracting Officer 2 Lt Joshua Kingori, Contracting Specialist MSgt Kevin Smith, Contracting Office Representative Lt Col Paul Weskalnies, and Project Superintendent Mr. Rick Rader serving as the primary government contacts.
Offers must be submitted electronically to 184wg.msg.contracting@us.af.mil by 9:00 A.M. CST on March 5, 2026. All proposals require a signed Standard Form 1442 (blocks 14-20 completed with original signature from a company official authorized to bind the company), completed offer schedule with all items priced, and current Representations and Certifications data from SAM.gov entered within the past year. All amendments to the solicitation must be acknowledged. Written questions must be submitted by 9:00 A.M. CST on February 27, 2026, via email with subject line "W50S7X-26-Q-A001 RFI's." Evaluation will be based on price and price-related factors. All solicitation documents, plans, specifications, and questions and answers will be posted on sam.gov. The applicable wage determination is KS20260057, dated January 2, 2026.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LETHAL | READY | RESILIENT
B35 Critical Line Installation
McConnell AFB Site Visit/Conference
12 February 2026 184 MSC McConnell AFB, KS
LETHAL | READY | RESILIENTLETHAL | READY | RESILIENT
INTRODUCTION
• Contracting Officer
• 2 Lt Joshua Kingori
• Contracting Specialist:
• MSgt Kevin Smith
• Contracting Office Representative (COR):
• Lt Col Paul Weskalnies
• Project Superintendent:
• Mr. Rick Rader
SYNOPSIS
• Solicitation:
• W50S7X-26-Q-A001 – Building 35 Critical Line Installation
• Disclosure of Magnitude:
• $100,000 and $250,000
• IAW FAR 36.204(c)
• Contract Award:
• Firm-Fixed Price
• Set Aside:
• 100% Small business
• NAICS
• 238210
SYNOPSIS (CONT)
• Offer Evaluation Criteria:
• Price
• Price Related Factors
• Contact Information
• 184WG.MSG.CONTRACTING@us.af.mil mailto:184WG.MSG.CONTRACTING@us.af.mil mailto:184WG.MSG.CONTRACTING@us.af.mil
SOLICITATION, PLANS &
SPECIFICATIONS
• All information will be available on https://sam.gov
• Solicitation
• Plans and Specifications
• Questions & Answers Document
• Site Visit Presentation
• Amendments
• Please remember to check the site regularly & Refresh your web page https://sam.gov/
PERIOD OF PERFORMANCE
• Construction Period
• 60 Days after Notice to Proceed
SOLICITATION PACKAGE
• Section A:
• Offer
• Standard Form (SF) 1442 front and back signed
• Offer Schedule
• All items must be priced
• Section K:
• Representations and Certifications
• Complete and return only additional certifications found in this section
• Offer must have entered current and complete data w/in the past year in Online
Representations and Certifications at https://www.sam.gov
• ALERT:
• If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating you are the authorized Entity Admin before registration will be activated https://www.sam.gov/
SOLICITATION PACKAGE (CONT)
• When completing the “Offeror” portion of the SF 1442
• Complete blocks 14-20
• Must be signed by an official with the authority to contractually bind the company
• In accordance with FAR 4.102
• One copy of SF 1442 required to have an original signature
• All amendments to the solicitation must be acknowledged
• Send all offers to 184wg.msg.contracting@us.af.mil mailto:184wg.msg.contracting@us.af.mil
SOLICITATION PACKAGE (CONT.)
• All items on previous slides are in the solicitation instructions
• It is the responsibility of the offeror to make sure their offer conforms to the solicitation
OFFER DUE DATES
• All offers are due:
• 9:00 A.M. (CST) 5 March 2026
• Electronic offers will be accepted
• Send to 184wg.msg.contracting@us.af.mil
• Subject: W50S7X-26-Q-A001 Offer; Company name
• Offers must be signed by an officer of your company
• All amendments must be acknowledged
IMPORTANT REMINDERS
• Questions concerning this project must be received by:
• 9:00 AM (CST) 27 February 2026
• Questions should be submitted in writing only
• EMAIL: 184wg.msg.contracting@us.af.mil
• Subject: W50S7X-26-Q-A001 RFI’s
• DO NOT CALL TECHNICAL PERSONNEL
• This will delay getting an answer
• Wage Determination Applicability:
• KS20260057, Dated 01/02/2026
ANSWERS TO RFI’S
• All questions, on a non-attribution basis and answers will be posted:
• https://www.sam.gov
• If necessary, addendums, issued by amendment will also be posted
• Remember:
• Check the web site regularly
• Don’t forget to refresh the page
FINAL REMINDERS AND HELPFUL
WEBSITES
• Offerors are STRONGLY Cautioned to CAREFULLY read the REQUIREMENTS of the SOLICITATION and COMPLY ACCORDINGLY
• https://www.sam.gov
• Both contracting opportunities and wage determination modules
• https://www.aptac-us.org
SITE VISIT TO FOLLOW
•QUESTIONS?
| B35 Critical Line Installation |
| Introduction |
| Synopsis |
| Synopsis (Cont) |
| Solicitation, plans & specifications |
| Period of Performance |
| Solicitation package |
| Solicitation package (cont) |
| Solicitation package (cont.) |
| Offer due dates |
| Important reminders |
| Answers to rfi’s |
| Final reminders and helpful websites |
| Site visit to follow |