Questions and Answers 2 W50S7L-23-B-0002 - 7 July 2023.pdf
PDF 123 KB Posted
- Attached to
- REPAIR MAINTENANCE HANGAR, BLDG 25
- Solicitation number
- W50S7L23B0002
- Issued by
-
Department of the Army National Guard
About this file
This document contains questions and answers related to solicitation W50S7L-23-B-0002 for repair and maintenance work at Building 25 of the Montana Air National Guard base. The solicitation requires replacement of the lower roof membrane, asphalt and drainage repair, installation of floor rails, an overhead crane, door hardware, and a high-performance floor coating. Mechanical and electrical systems will also be repaired and upgraded. The contract duration is 120 days with a bid opening date of July 7, 2023. Attendance at the pre-bid conference on June 13 is encouraged to review site visit details and submit questions by June 23. The project is set aside for small businesses with a NAICS code of 236220 and size standard of $45 million.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS RELATED TO :
SOLICITATION W50S7L-23-B-0002
AS of 7 July 2023
Q42. At the walkthrough, it was identified that the 90KVA converter feeds Panel
SP (400Hz). This panel feeds the following: Cable Reel #1 and #2, along with 400
Hz wiremold in rooms B105 (2 breakers), B104 (1 breaker) and B119 (1 breaker). Please confirm that the 45KVA converter will be able to run the existing loads.
A42. Yes, there will need to be a written procedure, located at the panel, that would show which breakers will be on and which breakers will be off for use in the Avionic labs and same for when the reels in the hanger are to be used.
Q43. Can the existing converter pad be extended to fit the salvaged converter or does it need to be demo’d and replaced? If it can be extended, can a detail be provided?
A43. A new concrete pad will need to be provided.
Q44. Demo note #2 on A1.20 and A1.21 state to remove and reinstall downspouts. Demo notes #16 and #17 on A1.22 state that existing downspouts and gutters are to remain but detail 2/A1.22 state to remove gutter and downspout. Note #16 on A2.00, Note #2 on A2.01 call for new downspouts, and note #3 on A2.40 calls for new gutters. Please clarify if we are to provide new gutters and downspouts.
A44. Change Demo note #2 on A1.20 and A1.21 to read “remove and reinstall (e) downspouts at lower roof”, etc.
Change Demo notes #16 and #17 on A1.22 to read “remove (e) gutters at lower roof”
Change Note #16 on A2.00, Note #2 on A2.01, note #3 on A2.40 to read “install (n) gutters at lower roof”
Q45. Question as to the existing utilities and environmental system access lids elevations on the Apron side of B25. Can they be changed or need to will need to stay in place.
A45. The existing concrete that surrounds the environmental system access lids will also remain in place.
Q46. Does the existing concrete that surrounds all the other existing utilities (fire hydrant, inlets, interceptor, monument, manholes, bollards) remain as is or is the existing concrete around these structures to be removed?
A46. The intent is to leave existing concrete that surrounds other utilities in place, and pour the new concrete up to the existing in those locations.
Q47. Another thing you may want to address is the demo in the MOC on the architectural drawings (A1.21) does not align with the demo needed for the electrical and data (E1.01)?
A47. Remove (E) GWB at all interior wall surfaces as req. for (N) electrical and tele/data work – see Electrical drawings.
Q48. Per Spec Section 01 50 00 Part 1.3. -
Electric Power Service from Existing System: Electric power from Owner's exist ing system is available for use without metering and without payment of use cha rges. Provide connections and extensions of services as required for construction operations.
A48. The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14).
Q49. Page A2.00 Note 6: How many square feet of new rubber flooring is needed to be added to the "remainder" of existing room?
A49. 434 SQFT of flooring is needed to complete the room.
Q50. Amendment 3 provided a Locker spec. but it does not state the size and height of the lockers. Please provide.
A50. The wall lockers are 30" W x 21" deep X 78" tall.
Q51. Q&A response to question 23: Solicitation section 01 00 00.8 states utilities will be at no charge to the contractor. This is also noted in section 01 50 00 1.3.B.
Please advise.
A51. The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense.
Q52. 2.2 E. Body Coats 1.Resin: Epoxy Novalak Clear 1.Resin: Epoxy Novalak
Clear Question: Natural silica aggregate, is this to be done to full rejection of silica or what coverage rate. This should be spelled out. This all depends on the level of anti-slip desired and cleanability.
A52. 36 grit Aluminum Oxide will be used at approximate rate of 50-60% rejection in the body coat. The B25 floor needs to approximately the same roughness as the B80
Floor.
Q53. F. Topcoats Novalak clear This calls for additional 8mils of clear Novalak that’s Matte finish. Novalak is not considered Matte finish.
A53. Change to Semigloss finish
Q54. I have found some conflicting information for the roofing scope and would like to have some clarifications. New roof assembly shown on sheet A1.22 shows that we are to leave the existing base layer of insulation in place and install a new system on top of it. Keynote 1 on the same sheet solidifies that. Keynote 1 on sheet A2.40 states that we are to remove all roofing down to metal deck, paint deck, and then install a new roofing system. Can you please confirm which method we are to use.
A54. Delete Keynote 1 drawing page A2.40