2023.06.29 - 1819 - MANG Building 25 - revised A2.00.pdf
PDF 520 KB Posted
- Attached to
- REPAIR MAINTENANCE HANGAR, BLDG 25
- Solicitation number
- W50S7L23B0002
- Issued by
-
Department of the Army National Guard
About this file
This document outlines an Invitation for Bids for repair and maintenance services at Building 25 of the Montana Air National Guard facility. Key details include:
-
The solicitation number is W50S7L23B0002 and seeks a firm fixed-price contract for roof replacement, asphalt and drainage repair, hangar bay floor modifications including installation of a high performance floor coating system, fire sprinkler system updates, and mechanical and electrical work. The performance period is 120 calendar days.
-
The pre-bid conference is scheduled for June 13, 2023 and the bid opening is July 7, 2023. The project location is the Montana Air National Guard facility in Great Falls, MT and the NAICS code is 236220.
-
The opportunity is set aside 100% for small businesses with a size standard of $45 million. The estimated value is between $1-5 million.
-
Interested contractors should register in SAM and monitor the Contract Opportunities page on SAM.gov for solicitation documents and any amendments. Questions are due by June 23, 2023.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. DIMENSIONS ARE TYPICALLY TAKEN TO GRID, FACE OF MASONRY, FACE OF CONCRETE, FACE
OF STUD OR DOOR/WINDOW OPENINGS. DIMENSIONS TO OPENINGS ARE NOMINAL, VERIFY
ALL OPENINGS WITH ROUGH OPENING REQUIREMENTS.
2. MASONRY IS DIMENSIONED NOMINALLY TO THE FACE. ACTUAL DIMENSIONS WILL BE +1/2"
FOR INSIDE DIMENSIONS AND MASONRY OPENINGS, AND -1/2" FOR OUTSIDE DIMENSIONS.
3. EXISTING CONSTRUCTION TO REMAIN SHOWN HALF-TONE, TYP.
4. SEE SHEET A1.00 FOR WALL TYPE DESIGNATIONS.SEE SHEET A1.00 FOR WALL TYPE
DESIGNATIONS.
SHEET NOTES - FLOOR PLAN
1A1A
1.71.7
10.510.5
10.610.6
EE
EE
A
A
C
C
D
D
CC
CC
AA
AA
B
B
E
E
F
F
G
G
H
H
J
J
K
K
L
L
M
M
A3.00 4
A3.00
A3.002
A3.00
MAINTENANCE
HANGAR BAY
B100
MTL SHOP
B107B
MTL. TECH SHOP
B107A
NDI SHOP
B109
PNEUDRALIC
B118
ELECTRO ENVIRO
SHOP
B119
BATTERY SHOP
B117
AVIONICS SHOP
B104
TIRE SHOP
B101
TIRE SHOP
SPRVSR
B101A
STAIRS
S001
S0
-B
B1
-B
B1
A- A
B102-A
B1
B- A
B106-A
B1
-B
B1
A- A
B1
B- A
B1
A- A
B1
C -B
B1
D -B
B107B-AB1
C -A
B1
D -A
B1
-A
S0
-B
B107B-D
B1
-A
B1
D -A
B1
-A
B1
A- A
B1
B- A
B1
-A
B118B-A
B1
A- A
B119B-A
B1
A- A
B121-C
S0
-B
B1
-A
B1
A- A
B122B-A
B123-B
B1
A- A
S0
-A
B1
-A
B1
-A
B127-AB128A-A
B128B-A
B1
-A
B1
A- B
B121A-A
B121-A
B120-A
B116-A
B1
-A
B1
-B
B1
-A
B1
-A
B1
-A
B1
-A
B1
-A
B1
-C
B119-A B119-B
B118-A
B1
C -A
B109-A
B1
-B
B1
-A
B103-A
B113-A
B109-B
B107A-A
B121-D
B1
-B
B120-B
B130-B
B1
-A
TIRE SHOP
OFFICE
B101B
TRAINING
B102
TUG ACCESS
B103
AVIONICS SHOP
TRAINING
B104A
SORVSR ECM
B105A
SPIR
B105B
ECM SHOP
B105
SPRVSR
AVIONICS
B104B
B104B-B
CORR.
A106
STAIRS
S002
MTL TECH
OFFICE
B107C
MTL TECH
SPRVSR
B107D
ELEV. MECH.
B108
B108-A
B107B-C
NDI SPRVSR
B109A
NDI STRG
B109B
JOAP LAB
B110
ACC OFFICE
B118D
FILM DVLPNT
B112
FILM VIEWING
B111
X RAY ROOM
B113
B1
-A
B118-B
TEST STND
B118C PNEUDRALIC
TRAINING
B118B
MECH. ELEC.
B114E
MECH. ELEC.
B114A
PNEUDRALIC
SPRVSR
B118A
ELECTRO
TRAINING
B119B SHOP LOCKERS
B116
B1
B- B
TOOL CRIB
B122B
MAINT. SUPPORT
EQUIP.
B120
ELECTRO/ENVIRO
SPRVSR
B119A
B122B-B
TOOL RM BENCH
STOCK
B122A
CORR.
B123
MSL
B121MSL OFFICE
B121A
WOMENS
LATRINE
B125
MENS LATRINE
B126
STORAGE
B124
STAIRS
S003
B123-A
BREAK ROOM
B127
ISO SPVSR
B128A
ISO OFFICE
B128B
ISO PHASE
B128
TUG ACCESS
B129
FLIGHT LINE
B130
CONF
B135
CLOSET
B134OFFICE
B133
OFFICE
B132
OFFICE
B131
7 7
A3.00
A2.00
B1
-A12
B1
B- A 12
14 14
B128A-B
B1
-C
A2.00
A2.00
FLOOR
FM1 RUBBER SECTIONAL FLOORING MAT
ARS ACID-RESISTANT SHEET FLOORING
AS ANTI STATIC SHEET FLOORING
V1 VINYL 1
HPC HIGH PERFORMANCE COATING
ROOM FINISH KEY
BASE
T1 TILE
WD WOOD
R4 4" RUBBER
WALL
P1 PAINT COLOR #1
P2 PAINT COLOR #2
CEILING
P1 PAINT COLOR #1
G
G
BREAK ROOM
B127
A2.00
RELOCATED REFRIGERATOR
(N) WATER BOTTLE FILL STATION
RELOCATED ICE MACHINE
FIRST FLOOR
100'-0"
B127-A
(N) BOTTLE FILLING STATION - SEE MECH.
RELOCATED ICE MACHINE - SEE MECH/ELECT.
(E) CABINETS TO REMAIN
PATCH, REPAIR, AND REPAINT GWB AS REQ. - MATCH ADJACENT
(E) WALL BASE TO REMAIN
1/
2"
VARIES - VERIFY
MIN.
3 1/2" 3/4"
VARIES - VERIFY
MIN.
3 1/2" (E) CONC. FLOOR SLAB
JOINT NOSING MORTAR
BACKER ROD
JOINT SEALANT
JOINT NOSING MORTAR
REMOVE (E) SPALLED, LOOSE,
DAMAGED CONC. SLAB AS REQ. -
PREP. FOR (N) NOSING MORTAR
PER MORTAR MFR.
CONSTRUCTION NOTES:
1. CUT A MIN. 1 1/2" X 3 1/2" BLOCK OUT IN THE (E) CONCRETE ON BOTH SIDES
OF THE JOINT OPENING.
2. ANY CLEANING AND INSTALLATION PROCEDURES SHALL CONFORM TO THE
MANUFACTURER'S PRODUCT DATA SHEET.
3. ANY SPALLS IN CONCRETE FACES SHALL BE FILLED WITH JOINT NOSING
MORTAR.
4. SEAL NEW JOINT FOLLOWING MANUFACTURER'S RECOMMENDED
PROCEDURES.
JOINT REPAIR NOTES:
MATERIALS SHALL BE PER SPECIFICATION SECTION 07 90 00.
THE FOLLOWING MATERIALS COMPLY WITH SPECIFICATIONS:
JOINT NOSING MORTAR: SIKADUR 72 JNS
CAULK: SIKAFLEX 2C NSTG
SELECT A BACKER ROD THAT IS CHEMICALLY COMPATIBLE WITH MORTAR AND CAULK.
SUBMIT PRODUCT DATA FOR ALL MATERIALS, INCLUDE A STATEMENT OF MATERIAL COMPATABILITY THAT
INDICATES ROD MATERIAL IS CHEMICALLY SUITABLE FOR USE WITH MORTAR AND CAULK.
PER 07 90 00 SECTION 3.01B, PREPARE SURFACE PER MORTAR MANUFACTURER'S GUIDANCE. FOR SIKAFLEX 72JNS, SURFACE SHALL BE CLEAN, OPEN TEXTURED CSP 3-4 TO DVP-4 BY BLAST CLEANING OR
EQUIVALENT MECHANICAL MEANS. REFER TO DATA SHEET FOR MORE DETAIL.
NOTE: THE MECHANICAL PROPERTIES OF SIKADUR 42 AND SIKAFLEX 1C SL VARY FROM SPECIFICATION.
THESE PRODUCTS ARE NOT APPROVED.
CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AT DETERIORATED SLAB.
BIM FILE PATH:
SHEET NO.:
TITLE:
copyright 2021 SMA, P.C.
REVISIONS:
KEYMAP:
HELENA
920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com
ARCHITECT SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY:
CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:
Pl ot
D at e:
BOZEMAN
109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com
C:\Users\Peterr\Documents\1819 - MANG Building 25-R23_peterrJNJMV.rvt
6/
/2
:4 4:
A
M
A2.00
JKSE172220
2023.06.29
FIRST FLOOR PLAN
PR/TJ
PR
REPAIR MAINTENANCE
HANGAR BLDG 25
JKSE172220
MONTANA AIR NATIONAL GUARD
GREAT FALLS AIR NATIONAL GUARD BASE
GREAT FALLS, MT
Type B-3 SUBMITTAL
N
KEYNOTES - LEVEL 1 FLOOR PLAN
1 REMOVE (E) DOOR RAILS & CONC. STRIP APPROX 6'-0" WIDE - FULL WIDTH OF BAY -
REPLACE W/ (N) CONC. SLAB TO MATCH (E) PER STRUCT.
2 SHADED AREA - INSTALL (N) HIGH-PERFORMANCE FLOOR COATING SYSTEM - APPLY (N)
FLOOR STRIPING TO MATCH (E) REMOVED STRIPING - COORD W/ FM AND GOVERNMENT
3 INSTALL (N) FLOOR COATING SYSTEM TO MATCH (N) FLOORING IN HANGAR BAY B100
4 INSTALL (N) ACID-RESISTANT SHEET FLOORING - REVERSE SWING OF DOOR B117-A
5 INSTALL (N) ANTI-STATIC SHEET FLOORING
6 INSTALL (N) RUBBER FLOORING TO MATCH (E) AT REMAINDER OF ROOM
7 (N) DOWNSPOUT
8 (E) CONC. SIDEWALK TO REMAIN
9 (N) ASPHALT PAVING & COMPACTED FILL AS REQ. - SEE CIVIL.
10 (N) CONC. SLAB AS REQ. W/ COMPACTED FILL - INSTALL (N) FLOORING TO MATCH (E)
ADJACENT - VERIFY
11 PATCH & REPAIR (E) GWB TO MATCH (E) & REPAINT - VERIFY
12 REINSTALL (E) DOOR W/ (N) HARDWARE PER DOOR SCHEDULE
13 (N) WALL MOUNTED CONTROLS FOR (N) ELECTRIC OPERATOR AT (E) OVERHEAD DOOR - SEE
ELECT.
14 (N) WASH SINK - SEE MECH - LOCATE ON WALL CENTERED IN LOCATION OF PREVIOUS
COUNTER AND SINKS. PATCH, REPAIR, AND PAINT EXISTING ADJACENT SURFACES AS
REQUIRED TO MATCH EXISTING CONDITIONS. FIELD VERIFY ALL ADJACENT TOILET
ACCESSORIES ON WALL (MIRRORS, SOAP DISPENSERS, ETC.) AND REMOVE/REINSTALL IN
EXISTING LOCATIONS AS REQ.
15 (N) SOLID YELLOW STRIPE - CENTER IN DOOR OPENING - COORD. W/ FM, GOVERNMENT
16 (N) EXTERIOR SOLID YELLOW STRIPE - CENTER IN DOOR OPENING - EXTEND OUT ON (N)
APRONG TO EDGE OF (E) CONC. APRON - VERIFY - SEE CIVIL - COORD. W/ FM, GOVERNMENT
17 (N) SOLID RED STRIPE - MATCH ORIGINAL LOCATION, VERIFY PRIOR TO REMOVAL OF (E)
FLOOR COATING SYSTEM - COORD. W/ FM, GOVERNMENT
18 FLOOR PATCH & JOINT REPAIR WORK AT THIS AREA PRIOR TO INSTALLATION OF (N) FLOOR
COATING
19 PATCH REPAIR (E) CONC. AS REQ. TYP. AT ALL DAMAGED FLOOR AREAS - FIELD VERIFY
20 (N) EXP. JOINT - W/ SEALANT & BACKER ROD PER SEALANT MFR. - SEE DETAIL THIS SHEET
1/16" = 1'-0"A2.00
1 BLDG 25 FIRST FLOOR PLAN
FIRST FLOOR DOOR SCHEDULE
DOOR #
WIDTH X
HEIGHT DOOR TYPE FRAME TYPE FIRE RATING HARDWARE HEAD DETAIL JAMB DETAIL
THRESHOLD
DETAIL COMMENTS
B101-A 8'-0"X10'-0" O.H. MFR - 3 INSTALL (N) SWEEPS, SEALS & BAFFLES AS REQ. - COORD W/ DOOR MFR.
B101-C 8'-0"X10'-0" O.H. MFR - 3 INSTALL (N) SWEEPS, SEALS & BAFFLES AS REQ. - COORD W/ DOOR MFR.
B103-A 14'-0"X10'-0" O.H. MFR - 1 INSTALL (N) SWEEPS, SEALS & BAFFLES AS REQ. - COORD W/ DOOR MFR. -
INSTALL (N) SAFETY EDGE AND EYE SENSORS AND (N) POWERED OPERATOR
AND CONTROLS EA. SIDE OF DOOR - SEE ELECT.
B105B-A 4'-0"X7'-0" H.M. H.M. - 2 REINSTALL (E) DOOR W/ (N) HARDWARE
B107B-B 12'-0"X10'-0" O.H. MFR - 3 INSTALL (N) SWEEPS, SEALS & BAFFLES AS REQ. - COORD W/ DOOR MFR.
B109-A 8'-0"X7'-0" H.M. H.M. - 4 INSTALL (N) SWEEPS, SEALS @ EXISTING DOOR
B117-A 3'-0"X7'-0" H.M. H.M. - 2 REINSTALL (E) DOOR W/ (N) HARDWARE
B121-B 8'-0"X8'-0" O.H. MFR - 3 INSTALL (N) SWEEPS, SEALS & BAFFLES AS REQ. - COORD W/ DOOR MFR.
B128A-B 3'-0"X7'-0" H.M. H.M. - 2 INSTALL (N) HM DOOR & FRAME IN (E) WALL
FIRST FLOOR ROOM FINISH SCHEDULE - EXISTING UNLESS NOTED BELOW
ROOM
NUMBER ROOM NAME
FLOOR BASE NORTH WALL EAST WALL SOUTH WALL WEST WALL
CODED NOTESMAT FIN CLR FIN CLR MAT FIN CLR MAT FIN CLR MAT FIN CLR MAT FIN CLR
B100 MAINTENANCE HANGAR BAY HPC Install (N) high performance coating system over (E) conc. flooring
B101 TIRE SHOP FM1 Install additional (N) rubber mat flooring to match (E)
B103 TUG ACCESS HPC Install (N) high performance coating system over (E) conc. flooring
B104 AVIONICS SHOP AS Install (N) anti-static flooring
B107A MTL. TECH SHOP HPC Install (N) high performance coating system over (E) conc. flooring
B107B MTL SHOP HPC Install (N) high performance coating system over (E) conc. flooring
B109 NDI SHOP HPC Install (N) high performance coating system over (E) conc. flooring
B117 BATTERY SHOP ARS Install addtional acid-resistant flooring
B118 PNEUDRALIC HPC Install (N) high performance coating system over (E) conc. flooring
B118B PNEUDRALIC TRAINING
B119 ELECTRO ENVIRO SHOP HPC Install (N) high performance coating system over (E) conc. flooring
B122A TOOL RM BENCH STOCK
B122B TOOL CRIB HPC Install (N) high performance coating system over (E) conc. flooring
B125 WOMENS LATRINE
B126 MENS LATRINE
B127 BREAK ROOM GWB P1 Patch & repair (E) GWB walls as req. for (N) work
B129 TUG ACCESS HPC Install (N) high performance coating system over (E) conc. flooring
1/8" = 1'-0"A2.00
2 B127-BREAK ROOM REMODEL PLAN
1/4" = 1'-0"A2.00
3 B127 BREAK ROOM REMODEL ELEVATION
3" = 1'-0"A2.00
4 TYPICAL FLOOR JOINT REPAIR DETAIL
NO. DATE REVISION DESCRIPTION
| Sheets |
| A2.00 - FIRST FLOOR PLAN |
File details come from the government source that posted it. Updated .