This is an invitation for bids for repair and maintenance services at a Montana Air National Guard facility. The solicitation is set aside for small businesses and involves repairs to a hangar building including replacement of the roof membrane, asphalt and drainage work, equipment installation, door and flooring upgrades, and mechanical and electrical work. The pre-bid conference is scheduled for June 13th and questions are due by June 23rd. The bid opening will take place on July 7th. Interested offerors must register in SAM and the solicitation is available only through SAM. The work must be performed by the prime contractor or similarly situated entities.

View the file

Other files

File Type Posted
C4 - Abstract of Offers - CS_KO.pdf PDF
B8 - Amendment 6 - Modification Solicitation W50S7L-23-B-0002-P0006 Bld 25.pdf PDF
B8 - Amendment 6 - Conform Solicitation W50S7L-23-B-0002-P0006 Bld 25.pdf PDF
B8 - Amendment 5 - Conform Solicitation W50S7L-23-B-0002-P0005 Bld 25.pdf PDF
B8 - Amendment 5 - Modification Solicitation W50S7L-23-B-0002-P0005 Bld 25.pdf PDF
Questions and Answers 2 W50S7L-23-B-0002 - 7 July 2023.pdf PDF
B8 - Amendment 4 - Modification Solicitation W50S7L-23-B-0002-P0004 Bld 25.pdf PDF
MTANG B25 Environmental remediation dwgs and cut sheets.pdf PDF
B8 - Amendment 4 - Conform Solicitation W50S7L-23-B-0002-P0004 Bld 25.pdf PDF
10 51 13 FL - Metal Lockers.pdf PDF
B8 - Amendment 3 - Conform Solicitation W50S7L-23-B-0002-P0002 Bld 25.pdf PDF
2023.06.29 - 1819 - MANG Building 25 - revised A2.00.pdf PDF
Questions and Answers W50S7L-23-B-0002 - 30 June 2023.pdf PDF
B8 - Amendment 3 - Modification Solicitation - W50S7L-23-B-0002-P0002 Bld 25.pdf PDF
B8 - Amendment 2 - Modification Solicitation - W50S7L-23-B-0002-P0002 Bld 25.pdf PDF
B8 - Amendment 2 - Conform Solicitation W50S7L-23-B-0002-P0002 Bld 25.pdf PDF
B7 - Pre-Bid Conference Minutes - W50S7L-23-B-0002.pdf PDF
B8 - Amendment 1 - Modification Solicitation - W50S7L-23-B-0002-P0001 Bld 25.pdf PDF
B8 - Amendment 1 - Conform Solicitation W50S7L-23-B-0002-P0001 Bld 25.pdf PDF
B8 - Amendment 1 - Conform Solicitation W50S7L-23-B-0002-P0001 Bld 25.pdf PDF
B8 - Amendment 1 - Modification Solicitation - W50S7L-23-B-0002-P0001 Bld 25.pdf PDF
A3 - JKSE172220 B25 SPEC VOL 1 Revised 5.30.23.pdf PDF
A3 - JKSE172220 B25 SPEC VOL 1.pdf PDF
A3 - JKSE172220 B25 SPEC VOL 1.pdf PDF
A3 - 1.26.22 - B-3 - JKSE172220 B25 SPEC VOL 2.pdf PDF
B8 - Solicitation - W50S7L-23-B-0002 Bld 25.pdf PDF
A3 - 4.19.23 - JKSE172220 - B25 - B-3 Drawings w_ABI.pdf PDF
B4 - SAM Wage Determination - MT20230062 Dated 4-28-2023.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

120th AIRLIFT WING

MONTANA AIR NATIONAL GUARD

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

TYPE B-3 SUBMITTAL

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 1

SECTION 32 13 14.13 - CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS

(11/17) Update to add 11/22 Changes

PART 1: GENERAL

1.1 UNIT PRICES

1.1.1 Measurements

The quantity of concrete to be paid for will be the volume of concrete in cubic yards including thickened edges, where required, placed in the completed and accepted pavement. Concrete will be measured in place in the completed and accepted pavement only within the neat line dimensions shown in the plan and cross section. No deductions will be made for rounded or beveled edges or the space occupied by pavement reinforcement, dowel bars, tie bars, or electrical conduits, nor for any void, or other structure extending into or through the pavement slab, measuring 3 cubic feet or less in volume. No other allowance for concrete will be made unless placed in specified locations in accordance with the approved contract modification. The quantity of other materials specified herein, and used in the construction of the work covered by this section, will not be measured for payment, but will be considered a subsidiary obligation, covered under the price per cubic yard for concrete. Joint sealing materials are covered in Section 32.13.74 JOINT SEALANTS FOR PAVEMENTS

1.1.2 Payments

1.1.2.1 Unit Price

Not applicable to this lump sum project.

1.1.2.2 Lump Sum

The quantity of concrete will be paid for and included in the lump-sum contract price. If less than 100 percent payment is due based on the pay factors stipulated below, a unit price of $80 per square yard will be used for purposes of calculating the payment reduction.

1.1.3 Payment Adjustment for Smoothness

1.1.3.1 Straightedge Testing

Record location and deviation from straightedge forall measurements. When more than 5.0 and less than or equal to 10.0 percent of all measurements made within a day’s production exceed the tolerance specified in paragraph SURFACE SMOOTHNESS, after any reduction of high spots or removal and replacement, the computed percent payment based on surface smoothness will be 95 percent. When more than 10.0 percent and less than or equal to 15.0 percent of all measurements exceed the tolerance, the computed percent payment will be 90 percent. When more than 15.0 and less than or equal to 20.0 percent of all measurements exceed the tolerance, the computed percent payment will be 75 percent. Remove and replace the days production when more than20.0 percent of the measurements exceed the tolerance, at no additional cost to the Government.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 2

1.1.4 Payment Adjustment for Thickness

Using the Average Thickness of the days production, determine the computed percent payment for thickness by entering the following table:

Computed Percent Payment for Thickness

Deficiency in Thickness Determined by cores inches

Pavements Equal to or Greater Than 8 inches Thick

Pavements Less Than 8 inches Thick

0.00 to 0.24 100 100

0.25 to 0.49 75 65

0.50 to 0.74 50 0

0.75 or greater 0 0

Where 0 percent payment is indicated, remove the entire day’s production and replace at no additional cost to the Government. Where either of the two cores from a day’s production show a thickness deficiency of 0.75 inch or greater, drill two more cores in the days production and compute the average thickness of the four cores. If this average shows a thickness deficiency of 0.75 inch or more remove the entire days production.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text bythe basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATIONOFFICIALS

(AASHTO)

AASHTO M 182 (2005; R 2017) Standard Specification for Burlap Cloth Made from Jute or Kenaf and Cotton Mats

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI 201.1R (2008) Guide for Conducting a Visual Inspection of Concrete in Service

ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete

ACI 214R (2011) Evaluation of Strength Test Results of Concrete

ACI 305R (2010) Guide to Hot Weather Concreting

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 3

ACI 306R (2016) Guide to Cold Weather Concreting ASTM INTERNATIONAL (ASTM)

ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM A184/A184M (2017) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement

ASTM A185/A185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete

ASTM A615/A615M (2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM C1017/C1017M (2013; E 2015) Standard Specificationfor Chemical Admixtures for Use in Producing Flowing Concrete

ASTM C1064/C1064M (2017) Standard Test Method for Temperature of Freshly Mixed Hydraulic- Cement Concrete

ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

ASTM C117 (2017) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing

ASTM C123/C123M (2014) Standard Test Method for Lightweight Particles in Aggregate

ASTM C1240 (2014) Standard Specification for Silica Fume Used in Cementitious Mixtures

ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)

ASTM C131/C131M (2014) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

ASTM C136/C136M (2014) Standard Test Method for Sieve.

Analysis of Fine and Coarse Aggregates

ASTM C138/C138M (2017a) Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete

ASTM C142/C142M (2017) Standard Test Method for Clay Lumps and Friable Particles in Aggregates

ASTM C143/C143M (2015) Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C150/C150M (2018) Standard Specification for Portland Cement

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 4

ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602/C1602M (2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete

ASTM C1646/C1646M (2016) Making and Curing Test Specimens for Evaluating Frost Resistance of Coarse Aggregate in Air-Entrained Concrete by Rapid Freezing and Thawing

ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete

ASTM C174/C174M (2017) Standard Test Method for Measuring Thickness of Concrete Elements Using Drilled Concrete Cores

ASTM C192/C192M (2016a) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory

ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete bythe Pressure Method

ASTM C260/C260M (2010a; R 2016) Standard Specificationfor Air-Entraining Admixtures for Concrete

ASTM C29/C29M (2017a) Standard Test Method for Bulk Density ("Unit Weight") and Voids in Aggregate

ASTM C294 (2012; R 2017) Standard Descriptive Nomenclature for Constituents of Concrete Aggregates

ASTM C295/C295M (2012) Petrographic Examination of Aggregates for Concrete

ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete

ASTM C31/C31M (2018b) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates

ASTM C39/C39M (2018) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C494/C494M (2017) Standard Specification for Chemical Admixtures for Concrete

ASTM C595/C595M (2018) Standard Specification for Blended Hydraulic Cements

ASTM C618 (2017a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C666/C666M (2015) Resistance of Concrete to Rapid Freezing and Thawing

ASTM C78/C78M (2018) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 5

with Third-Point Loading)

ASTM C88 (2018) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate

ASTM C881/C881M (2015) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete

ASTM C94/C94M (2017a) Standard Specification for Ready-Mixed Concrete

ASTM C989/C989M (2018) Standard Specification for Slag Cement for Use in Concrete and Mortars

ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)

ASTM D1752 (2004a; R 2013) Standard Specificationfor Preformed Sponge Rubber Cork and Recycled PVC Expansion

ASTM D2995 (1999; R 2009) Determining Application Rate of Bituminous Distributors

ASTM D3665 (2012; R 2017) Standard Practice for Random Sampling of Construction Materials

ASTM D4791 (2010) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse

ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates

U.S. AIR FORCE (USAF)

AF ETL 97-5 (1997) Proportioning Concrete Mixtures with Graded Aggregates for Rigid Airfield Pavements

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 130 (2001) Standard Recommended Practice for Estimating Scratch Hardness of Coarse Aggregate Particles

COE CRD-C 143 (1962) Specifications for Meters for Automatic Indication of Moisture in Fine

COE CRD-C 300 (1990) Specifications for Membrane-Forming Compounds for Curing Concrete

COE CRD-C 521 (1981) Standard Test Method for Frequency and Amplitude of Vibrators for Concrete

COE CRD-C 55 (1992) Test Method for Within-Batch Uniformity of Freshly Mixed Concrete

COE CRD-C 662 (2009) Determining the Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials, Lithium Nitrate Admixture and Aggregate (Accelerated Mortar-Bar Method)

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 6

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, SD-03 Product Data

Dowels; G Dowel Bar Assemblies; G Equipment Proposed Techniques; G SD-05 Design Data Preliminary Proposed Proportioning; G Proportioning Studies; G SD-06 Test Reports

Sampling and Testing; G Mixer Performance (Uniformity) Testing; G Repair Recommendations Plan; G

1.4 QUALITY CONTROL

1.4.1 Contractor Quality Control Staff

Submit American Concrete Institute certification for Contractor Quality Control staff. Qualifications and resumes for petrographer, surveyor, and concrete batch plant operator. All Contractor Quality Control personnel assigned to concrete construction are required to be American Concrete Institute (ACI) certified in the following grade:

a. CQC personnel responsible for inspection of concrete paving operations. The QC manager is required to be present during initial saw cutting operations.

b. CQC staff is required to oversee all aspects of sawing operations (sawing, flushing, vacuuming, checking for random cracking, lighting).

c. QC Manager must be on-site during production paving, have full authority over the production processes and crew members, and have a successful track record on similar projects.

d. Lead Foreman or Journeyman of the Concrete Placing, Finishing, and Curing Crews: ACI

Concrete Flatwork Technician/Finisher.

e. Field Testing Technicians: ACI Concrete Field-Testing Technician, Grade I.

f. Laboratory Testing Technicians: ACI Concrete Strength Testing Technician and Laboratory Testing Technician, Grade I orII.

1.4.2 Other Staff

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 7

Submit for approval, the qualifications and resumes for the following staff:

a. Petrographer: Bachelor of Science degree in geology or petrography, trained in petrographic examination of concrete aggregate according to ASTM C294 and ASTM C295/C295M and trained in identification of the specific deleterious materials and tests identified in this specification. Detail the education, training and experience related to the project-specific test methods and deleterious materials in the Resume and submit at least 20 days before petrographic and deleterious materials examination is to commence.

b. Licensed Surveyor: Perform all survey work under the supervision of a Licensed Surveyor.

c. Concrete Batch Plant Operator: National Ready Mix Concrete Association (NRMCA) Plant Manager certification.

1.4.3 Laboratory Accreditation and Validation

1.4.3.1 Aggregate Testing and Mix Proportioning

Aggregate testing and mixture proportioning studies are required tobe performed by a commercial laboratory.

1.4.3.2 Acceptance Testing

Provide all materials, labor, and facilities required for molding, curing, testing, and protecting test specimens at the paving site and in the laboratory. Provide steel molds for molding thebeam specimens.

Provide and maintain boxes or other facilities suitable for storing and curing the specimens at the paving site while in the mold within the temperature range stipulated by ASTM C31/C31M. Provide flexural loading equipment in accordance with ASTM C78/C78M.

1.4.3.3 Contractor Quality Control

All sampling and testing is required to be performed by an approved, on-site, independent, commercial laboratory, or for cementitious materials and admixtures, the manufacturer's laboratory.

1.4.3.4 Laboratory Inspection

The Government will inspect all laboratories requiring validation for equipment and test procedures prior to the start of any concreting operations for conformance to ASTM C1077. Schedule and provide payment for laboratory inspections. Additional payment or a time extension due to failure to acquire the required laboratory validation is not allowed. The laboratory is to maintain this certification for the duration of the project.

1.4.4 Preconstruction Testing of Materials

All sampling and testing is required to be performed. Use an approved commercial laboratory or, for cementitious materials and chemical admixtures, a laboratory maintained by the manufacturer of the material. Materials are not allowed to be used until notice of acceptance has been given. Additional payment or extension of time due to failure of any material to meet project requirements, or for any additional sampling or testing required is not allowed. Additional tests may be performed by the Government; such Government testing does not relieve any required testing responsibilities.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 8

1.4.4.1 Aggregates

Sample aggregates in the presence of a Government Representative. Obtain samples in accordance with ASTM D75/D75M and be representative of the materials to be used for the project. Perform all aggregate tests no earlier than 120 days prior to contract award. Submit test results a minimum of 7 days before commencing mixture proportioning studies.

1.4.4.2 Chemical Admixtures, Curing Compounds and Epoxies

At least 30 days before the material is used, submit certified copies of test results for the specific days production or batches to be used on the project. Provide test results less than 6 months old prior to use in the work. Retest chemical admixtures that have been in storage at the project site for longer than 6 months or that have been subjected to freezing and reject if test results do not meet manufacturer requirements.

1.4.4.3 Cementitious Materials

Cement, slag cement, and pozzolan will be accepted on the basis of manufacturer's certification of compliance, accompanied by mill test reports showing that the material in each shipment meets the requirements of the specification under which it is provided. Provide mill test reports no more than 1 month old, prior to use in the work. Do not use cementitious materials until notice of acceptance has been given. Cementitious materials may be subjected to testing by the Government from samples obtained at the mill, at transfer points, or at the project site. If tests prove that a cementitious material that has been delivered is unsatisfactory, promptly remove it from the project site. Retest cementitious material that has not been used within 6 months after testing and reject if test results do not meet manufacturer requirements.

1.4.5 Testing During Construction

During construction, sample and test aggregates, cementitious materials, and concrete as specified herein.

The Government will sample and test concrete and ingredient materials as considered appropriate. Provide facilities and labor as may be necessary for procurement of representative test samples. Testing by the Government does not relieve the specified testing requirements.

1.4.6 Acceptability of Work

The materials and the pavement itself will be accepted on the basis of production testing. The Government may make check tests to validate the results of the production testing. If the results of the production testing vary by less than 2.0 percent of the Government's test results, the results of the production testing will be used. If the results of the Government and production tests vary by 2.0 percent, but less than 4.0 percent, the average of the two will be considered the value to be used. If these vary by

4.0 percent or more, carefully evaluate each sampling and testing procedure and obtain another series of Government and production tests on duplicate samples of material. If these vary by 4.0 percent or more, use the results of the tests made by the Government and the Government will continue check testing of this item on a continuous basis until the two sets of tests agree within less than 4.0 percent on a regular basis. Testing performed by the Government does not relieve the specified testing requirements.

1.4.7 Acceptance Requirements

1.4.7.1 Evaluation

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 9

Provide all sampling and testing required for acceptance and payment adjustment, including batch tickets with all required acceptance testing. Individuals performing sampling, testing and inspection duties are required to meet the Qualifications. The Government reserves the right to direct additional samples and tests for any area which appears to deviate from the specification requirements. Testing in these areas are in addition to the days production testing, and the requirements for these areas are the same as those for a day’s production. Provide facilities for and, where directed, personnel to assist in obtaining samples for any Government testing.

1.5 DELIVERY, STORAGE, AND HANDLING

1.5.1 Bulk Cementitious Materials

Provide all cementitious materials in bulk at a temperature, as delivered to storage at the site, not exceeding 150 degrees F. Provide sufficient cementitious materials in storage to sustain continuous operation of the concrete mixing plant while the pavement is being placed. Provide separate facilities to prevent any intermixing during unloading, transporting, storing, and handling of each type of cementitious material.

PART 2: PRODUCTS

2.1 SYSTEM DESCRIPTION

This section is intended to stand alone for construction of concrete pavement. However, where the construction covered herein interfaces with other sections, construct each interface to conform to the requirements of both this section and the other section, including tolerances for both.

2.1.1 Surface Smoothness

2.1.1.1 Straightedge Testing

Provide the finished surfaces of the pavements with no abrupt change of1/4 inch or more, and all pavements within the limits specified when checked with an approved 12-foot straightedge.

Provide finished surfaces with a variation from a straight edge not greater than 1/4 inch in either the longitudinal or transverse direction.

2.1.1.2 Bumps ("Must Grind" Areas)

Reduce any bumps ("must grind" areas) by diamond grinding in accordance with subparagraph DIAMOND GRINDING OF PCC SURFACES. Taper such diamond grinding in all directionsto provide smooth transitions to areas not requiring diamondgrinding.

2.1.1.3 Testing Method

After the concrete has hardened sufficiently to permit walking thereon, but not later than 48 hours after placement, test the entire surface of the pavement in each day’s production in such a manner as to reveal all surface irregularities exceeding the tolerances specified above. If any pavement areas are diamond ground, retest these areas immediately after diamond grinding. Test the entire area of the pavement in both a longitudinal and a transverse direction on parallel lines. Perform the transverse lines 15 feet or less

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 10

apart, as directed. Perform the longitudinal lines at the centerline of each paving lane shown on the drawings, regardless of whether multiple lanes are allowed to be paved at the same time, and at the 1/8th point in from each side of the lane. Also test other areas having obvious deviations. Perform longitudinal testing lines continuous across all joints. Perform transverse testing lines for pilot lanes carried to construction joint lines and for fill-in lanes carried 24 inches across construction joints, and the readings in this area applied to the fill-in lane. Perform straightedge testing of the longitudinal edges of pilot lanes before paving fill-in lanes as specified below.

2.1.1.3.1 Straightedge Testing

Hold the straightedge in contact with the surface and moved ahead one-half the length of the straightedge for each successive measurement. Determine the amount of surface irregularity by placing the freestanding (unleveled) straightedge on the pavement surface and measuring the maximum gap between the straightedge and the pavement surface. Determine measurements along the entire length of the straight edge.

2.1.2 Plan Grade

Within 5 days after paving of each day’s production, test the finished surface ofthe pavement area by running lines of levels at intervals correspondingwith every longitudinal and transverse joint to determine the elevation at each joint intersection. Record the results of this survey and provide a copy to the Government at the completion of the survey of each day’s production. Provide finished surfaces of all airfield pavements that vary less than 1/2 inch above or below the plan grade line orelevation indicated.

The above deviations from the approved grade line and elevation are not permitted in areas where closer conformance with the planned grade and elevation is required for the proper functioning ofappurtenant structures. Provide finished surfaces of new abutting pavements that coincide at their juncture. Provide horizontal control of the finished surfaces of all airfield pavements that vary not more than 1/2 inch from the planalignment indicated.

2.1.3 Flexural Strength

Submit certified copies of laboratory test reports and sources for cement, supplementary cementitious materials (SCM), aggregates, admixtures, curing compound, epoxy, and proprietary patching materials proposed for use on this project. Each day’s production of pavement will be evaluated for acceptance in accordance with the following procedures.

2.1.3.1 Sampling and Testing

For acceptance, obtain one composite sample of concrete from each day’s production in accordance with ASTM C172/C172M from one batch or truckload. Fabricate and cure test beams 6 x 6 inches in accordance with ASTM C31/C31M; and tested in accordance with ASTM C78/C78M.

2.1.4 Thickness

Each day’s production of pavement will be evaluated for acceptance and payment adjustment in accordance with the following procedure. Drill two cores, between 4 and 6 inches in diameter, from the pavement, per days production. Drill the cores within 3 days after placement, filling the core holes with an approved non-shrink concrete, respraying the cored areas with curing compound, and for measuring the cores. Provide the results with the thickness measurement data. Record eight measurements of thickness

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 11

around the circumference of each core and one in the center, in accordance with ASTM C174/C174M.

Average the pavement thickness from the 2 cores for the days production and evaluate as described in paragraph PAYMENT ADJUSTMENT FORTHICKNESS above.

2.1.5 Evaluation of Cores

Record and submit testing, inspection, and evaluation of each core for surface paste, uniformity of aggregate distribution, segregation, voids, cracks, and depth of reinforcement or dowel(if present).

Moisten the core with water to visibly expose the aggregate and take a minimum of three photographs of the sides of the core, rotating the core approximately 120 degrees between photographs. Include a ruler for scale in the photographs. Provide plan view of location for each core.

2.1.6 Diamond Grinding of PCC Surfaces

Those performing diamond grinding are required to have a minimum of three years of experience in diamond grinding ofairfield pavements. In areas not meeting the specified limits for surface smoothness and plan grade, reduce high areas to attain the required smoothness and grade, except as depth is limited below. Reduce high areas by diamond grinding the hardenedconcrete with an approved equipment after the concrete is at a minimum age of 14 days. Perform diamond grinding by sawing with an industrial diamond abrasive which is impregnated in the saw blades. Assemble the saw blades in a cutting head mounted on a machine designed specifically for diamond grinding that produces the required texture and smoothness level without damage to the concrete pavement or joint faces. Provide diamond grinding equipment with saw blades that are 1/8-inch wide, a minimum of 60 blades per 12 inches of cutting head width, and capable of cutting a path a minimum of 3 ft wide. Diamond grinding equipment that causes ravels, aggregate fractures, spalls or disturbance to the jointsis not permitted. The maximum area corrected by diamond grinding the surface of the hardened concrete is 10 percent of the total area ofany day’s production. The maximum depth of diamond grinding is 1/4 inch. Provide diamond grinding machine equipped to flush and vacuum the pavement surface. Dispose of all debris from diamond grinding operations off Government property. Prior to diamond grinding, submit a Diamond Grinding Plan for reviewand approval. At a minimum, include the daily reports for the deficient areas, the location and extent of deficiencies, corrective actions,and equipment. Remove and replace all pavement areas requiring plan grade or surface smoothness corrections in excess of the limits specified above in conformance with paragraph REPAIR, REMOVAL AND REPLACEMENT OF NEWLY CONSTRUCTED SLABS. All areas in which diamond grinding has been performed are subject to the thickness tolerances specified in paragraph THICKNESS, above.

Prior to production diamond grinding operations, perform a test section at the approved location. Perform a test section that consists of a minimum of two adjacent passes with a minimum length of 40 feet to allowevaluation of the finish, transition between adjacent passes, and the results of crossing a transverse joint. Production diamond grinding operations are not to be performed prior to approval.

2.2 CEMENTITIOUS MATERIALS

Provide cementitious materials consisting of Portland cement, blended cement or only Portland cement in combination with supplementary cementitious materials (SCM), that conform to appropriate specifications listed below. New submittals are required when the cementitious materials sources or types change.

2.2.1 Portland Cement

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 12

Provide Portland cement conforming to ASTM C150/C150M, Type II or V,low alkali including false set requirements.

2.2.2 Blended Cements

Provide blended cement conforming to ASTM C595/C595M, Type IP, IS, or IL. Provide pozzolan added to the Type IP blend consisting of ASTM C618 Class F or Class N and that is interground with the cement clinker. Include a written statement from the manufacturer that the amount of pozzolan in the finished cement does not vary more than plus or minus 5 mass percent of the finished cement from lot to lot or within a lot.

Provide limestone added to the Type IL blend that is interground with the cement clinker. Include a written statement from the manufacturer that the amount of limestone in the finished cement does not vary more than plus or minus 2.5 mass percent of the finished cement from lot to lot or within a lot. Limit the percent of slag, pozzolan, or limestone to a maximum of IS(50), IP(35) or IL(15). The percentage and type of mineral admixture used in the blend is not allowed to change from that submitted for the aggregate evaluation and mixture proportioning.

2.2.3 Pozzolan

2.2.3.1 Fly Ash

Provide fly ash that conforms to ASTM C618, Class F, including the optional requirements for uniformity and effectiveness in controlling Alkali-Silica reaction with a loss on ignition not exceeding 6 percent.

Provide Class F fly ash for use in mitigating Alkali-Silica Reactivity with a total equivalent alkali content less than 4 percent.

2.2.3.2 Raw or Calcined Natural Pozzolan

Provide natural pozzolan that is raw or calcined and conforms to ASTMC618, Class N, including the optional requirements for uniformity and effectiveness in controlling Alkali-Silica reaction with a loss on ignition not exceeding 6 percent. Provide Class N pozzolan for use in mitigating Alkali-Silica Reactivity with a total equivalent alkali content less than3 percent.

2.2.3.3 Ultra Fine Fly Ash and Ultra Fine Pozzolan

Provide Ultra Fine Fly Ash (UFFA) and Ultra Fine Pozzolan (UFP)that conforms to ASTM C618, Class F or N, and the following additional requirements:

a. The strength activity index at 28 days of age of at least 95 percent of the control specimens.

b. The average particle size not exceeding 6 microns.

2.2.4 Slag Cement

Provide slag cement (ground-granulated blast-furnace slag) that conforms to ASTM C989/C989M, Grade 100 or Grade 120.

2.2.5 Supplementary Cementitious Materials (SCM) Content

Use of one of the SCMs listed below is optional, unless the SCM is required to mitigate ASR. The use of SCMs is encouraged in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 13

TABLE 2

SUPPLEMENTARY CEMENTITIOUS MATERIALS CONTENT

Supplementary Cementitious Material Minimum Content (percent)

Maximum Content (percent)

Class N Pozzolan and Class F Fly Ash

SiO2 + Al2O3 + Fe2O3 > 70 percent 25 35

SiO2 + A12O3 + Fe2O3 > 80 percent 20 35

SiO2 + A12O3 + Fe2O3 > 90 percent 15 35

UFFA and UFP 7 16

Slag Cement 40 50

Silica Fume 7 10

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 14

2.3 AGGREGATES

2.3.1 Aggregate Sources

2.3.1.1 Durability of Coarse Aggregate

Provide aggregate with a satisfactory service record in freezing and thawing of at least 5 years successful service in three concrete paving projects. Include a condition survey of the existing concrete and a review of the concrete-making materials, including coarse aggregates, cement, and mineral admixtures in the service record. Consider the previous aggregate source and test results, cement mill certificate data, mineral admixture chemical and physical composition, and the mix design (cement factor and water-cementitious material ratio) in the review. Provide service record performed by an independent third-party professional engineer, petrographer, or concrete materials engineer along with their resume. Include photographs and a written report addressing D-cracks and pop outs in accordance with ACI 201.1R in the service record. Provide coarse aggregate with a durability factor of 80 or more when subjected to freezing and thawing of specimens prepared in accordance with ASTM C1646/C1646M and tested in accordance with ASTM C666/C666M, Procedure A, when a coarse aggregate size group or source proposed for use does not have a satisfactory demonstrable service record. Test all coarse aggregate size groups and sources proposed for use individually.

2.3.1.2 Alkali-Silica Reactivity

Evaluate and test fine and coarse aggregates to be used in all concrete for alkali-aggregate reactivity. Test all size groups and sources proposed for use.

a. Evaluate the fine and coarse aggregates separately, using ASTM C1260. Reject individual aggregates with test results that indicate an expansion of greater than 0.08 percent after 28 days of immersion in1N NaOH solution, or perform additional testing as follows: utilize the proposed low alkali Portland cement, blended cement, and SCM, or Lithium Nitrate in combination with each individual aggregate. If only SCMs are being evaluated, test in accordance with ASTM C1567. If Lithium Nitrate is being evaluated, with or without SCMs, testing accordance with COE CRD-C 662. Determine the quantity that meets all the requirements of these specifications and that lowers the expansion equal to or less than 0.08 percent after 28 days of immersion in a 1N NaOH solution. Base the mixture proportioning on the highest percentage of SCM required to mitigate ASR-reactivity.

b. If any of the above options does not lower the expansion to less than 0.08 percent after 28 days of immersion in a 1N NaOH solution, reject the aggregate(s) and submit new aggregate sources for retesting. Submit the results of testing for evaluation and acceptance.

2.3.1.3 Combined Aggregate Gradation

In addition to the grading requirements specified for coarse aggregate and for fine aggregate, provide the combined aggregate grading meeting the following requirements:

a. Provide materials selected and the proportions used such that when the Coarseness Factor (CF) and the Workability Factor (WF) are plotted ona diagram as described in d. below, the point and its associated production tolerance thus determined falls within the parallelogram described

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 15

therein. Refer to TSPWG M 3-250-04.97-05 for combined aggregate plot area recommendations for the intended placement technique(s).

b. Determine the Coarseness Factor (CF) from the following equation:

CF = (cumulative percent retained on the 3/8 inch sieve)(100) (cumulative percent retained on the No. 8 sieve)

c. The Workability Factor (WF) is defined as the percent passing the No.8 sieve based on the combined gradation. Adjust the WF, prorated upwards only, by 2.5 percentage points for each 94 pounds of cementitious material per cubic yard greater than 564 pounds per cubic yard.

d. Plot a diagram using a rectangular scale with WF on the Y-axis with units from 20 (bottom) to 45

(top), and with CF on the X-axis with units from 80 (left side) to 30 (right side). On this diagram, plot a parallelogram with corners at the following coordinates (CF-75,WF-28), (CF-75, WF-40), (CF-45, WF-32.5), and (CF-45, WF-44.5). If the point determined by the intersection of the computed CF and WF does not fall within the above parallelogram, revise the grading of each size of aggregate used and the proportions selected as necessary. See AF ETL 97-5 for further details.

e. Plot the associated production tolerance limits, identified in Table6, around the CF and adjusted

WF point.

2.3.2 Coarse Aggregate

2.3.2.1 Material Composition

Provide coarse aggregate consisting of crushed or uncrushed gravel, crushed stone, crushed adequately seasoned air-cooled iron blast-furnace slag; steel furnace slag is not permitted, or a combination thereof.

Provide aggregates, as delivered to the mixers, consisting of clean, hard, uncoated particles meeting the requirements of ASTM C33/C33M except as specified herein. Provide coarse aggregate that has been washed sufficient to remove dust and other coatings. Provide iron blast-furnace slag conforming to the grading to be used in the concrete with a compact density of not less than 70 lb per cubic foot determined in accordance with ASTM C29/C29M. Provide coarse aggregate with no more than 40 percent loss when subjected to the Los Angeles abrasion test in accordance with ASTM C131/C131M. Provide coarse aggregates with a maximum sodium sulfate soundness loss of 12 percent, or with a magnesium sulfate soundness loss of 18 percent after five cycles when tested in accordance with ASTM C88.

2.3.2.2 Particle Shape Characteristics

Provide particles of the coarse aggregate that are generally spherical or cubical in shape. The quantity of flat particles and elongated particles in any size group coarser than the 3/8-inch sieve are not allowed to exceed 20 percent by weight as determined by the Flat Particle Test and the Elongated Particle Test of ASTM D4791. A flat particle is defined as one having a ratio of width to thickness greater than 3; an elongated particle is one having a ratio of length to width greater than 3.

2.3.2.3 Size and Grading

Provide coarse aggregate with a nominal maximum size of1.5 inches. Grade and provide the individual aggregates in two size groups meeting the individual grading requirements of ASTM C33/C33M, Size

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 16

No. 4 (1.5 to 0.75 inch) and Size No. 67 (0.75 inch to No. 4) to meet the coarseness and workability factor criteria for the proposed combined gradation. A third aggregate size group may be required to meet the above-mentioned coarseness and workability criteria of paragraph COMBINED AGGREGATE

GRADATION.

2.3.2.4 Deleterious Materials - Airfield Pavements

The amount of deleterious material in each size group of coarse aggregate is not allowed to exceed the limits shown in Table 5 below, determine in accordance with the test methods shown.

TABLE 5

LIMITS OF DELETERIOUS MATERIALS IN COARSE AGGREGATE FOR AIRFIELD

PAVEMENTS

Percentage by Mass Materials (h) Severe Weather

Clay lumps and friable particles (ASTM C142/C142M) 0.2 Shale (a) (ASTM C295/C295M) 0.1 Material finer than No. 200 sieve (b) ( ASTM C117) 0.5 Lightweight particles (c) (ASTM C123/C123M) 0.2 Clay ironstone (d) (ASTM C295/C295M) 0.1 Chert and cherty stone (less than 2.40 Sp. Gr.) (e) (ASTM C123/C123M and ASTM C295/C295M)

0.1

Claystone, mudstone, and siltstone (f) (ASTM C295/C295M) 0.1 Shaly and argillaceous limestone (g) (ASTM C295/C295M) 0.2 Other soft particles (COE CRD-C 130) 1.0 Total of all deleterious substances exclusive of material finer than No. 200 sieve

1.0

(a) Shale is defined as a fine-grained, thinly laminated or fissile sedimentary rock. It is commonly composed of clay or silt or both. It has been indurated by compaction or by cementation, but not so much as to have become slate.

(b) Limit for material finer than No. 200 sieve is allowed to be increased to 1.5 percent for crushed aggregates if the fine material consists of crusher dust that is essentially free from clay or shale.

(c) Test with a separation medium with a density of Sp. Gr. of 2.0. This limit does not apply to coarse aggregate manufactured from blast-furnace slag unless contamination is evident.

(d) Clay ironstone is defined as an impure variety of iron carbonate, iron oxide, hydrous iron oxide, or combinations thereof, commonly mixed with clay, silt, or sand. It commonly occurs as dull, earthy particles, homogeneous concretionary masses, or hard-shell particles with soft interiors. Other names commonly used for clay ironstone are "chocolate bars" and limonite concretions.

(e) Chert is defined as a rock composed of quartz, chalcedony or opal, or any mixture of these forms of silica. It is variable in color. The texture is so fine that the individual mineral grains are too small to be distinguished by the unaided eye. Its hardness is such that it scratches glass but is not scratched by a knife blade. It may contain impurities such as clay, carbonates, iron oxides, and other minerals. Cherty stone is defined as any type of rock (generally limestone) that contains chert as lenses and nodules, or irregular masses partially or completely replacing the original stone.

(f) Claystone, mudstone, or siltstone is defined as a massive fine-grained sedimentary rock that consists predominantly of indurated clay or silt without laminations or fissility. It may be indurated either by

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 17

compaction or by cementation.

(g) Shaly limestone is defined as limestone in which shale occurs as one or more thin beds or laminae.

These laminae may be regular or very irregular and may be spaced from a few inches down to minute fractions of an inch. Argillaceous limestone is defined as a limestone in which clay minerals occur disseminated in the stone in the amount of 10 to 50 percent by weight of the rock; when these make up from 50 to 90 percent, the rock is known as calcareous (or dolomitic) shale (or claystone, mudstone, or siltstone).

(h) Perform testing in accordance with the referenced test methods, except use the minimum sample size specified below.

2.3.2.5 Testing Sequence for Deleterious Materials in Coarse Aggregate- Airfields Only

No extension of time or additional payment due to any delays caused by the testing, evaluation, or personnel requirements is allowed. The minimum test sample size of the coarse aggregate is 200 pounds for the 3/4 inch and larger maximum size and 25 pounds for the No. 4 to 3/4-inch coarse aggregate.

Provide facilities for the ready procurement of representative test samples. The testing procedure on each sample of coarse aggregate for compliance with limits on deleterious materials is as follows:

Step 1: Wash each full sample of coarse aggregate for material finer than the No. 200 sieve. Discard material finer than the No. 200 sieve.

Step 2: Test remaining full sample for clay lumps and friable particles and remove.

Step 3. Test remaining full sample for chert and cherty stone with SSD density of less than 2.40 specific gravity. Remove lightweight chert and cherty stone. Retain other materials less than 2.40 specific gravity for Step 4.

Step 4: Test the materials less than 2.40 specific gravity from Step3 for lightweight particles (Sp. GR. 2.0) and remove. Restore other materials less than 2.40 specific gravity to the sample.

Step 5: Test remaining sample for clay-ironstone, shale, claystone, mudstone, siltstone, shaly and argillaceous limestone, and remove.

Step 6: Test a minimum of one-fifth of remaining full sample for other soft particles.

2.3.2.6 Deleterious Material - Road Pavements

The amount of deleterious material in each size group of coarse aggregate is not to exceed the limits in the following table when tested as indicated.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 18

LIMITS OF DELETERIOUS MATERIALS IN COARSE AGGREGATE FOR ROAD

PAVEMENTS

Percentage by Mass Clay lumps and friable particles (ASTM C142/C142M) 2.0 Material finer than No. 200 sieve (ASTM C117) 1.0 Lightweight particles (ASTM C123/C123M) 1.0 Other soft particles (COE CRD-C 130) 2.0 Total of all deleterious substances, exclusive of material finer than No. 200 sieve 5.0

The limit for material finer than the No. 200 sieve is allowed to be increased to 1.5 percent for crushed aggregates consisting of crusher dust that is essentially free from clay or shale. Use a separation medium for lightweight particles with a density of 2.0specific gravity. This limit does not apply to coarse aggregate manufactured from blast-furnace slag unless contamination is evident.

2.3.3 Fine Aggregate

2.3.3.1 Composition

Provide fine aggregate consisting of natural sand, manufactured sand, or a combination of the two, and composed of clean, hard, durable particles meeting the requirements of ASTM C33/C33M. Stockpile and batch each type of fine aggregate separately. Provide fine aggregate with particles that are generally spherical or cubical in shape.

2.3.3.2 Grading

Provide fine aggregate, as delivered to the mixer, with a grading that conforms to the requirements of ASTM C33/C33M and having a fineness modulus of not less than 2.50 nor more than 3.40.

2.3.3.3 Deleterious Material

The minimum test sample size for fine aggregate proposed for use in airfield paving is 10 pounds. The amount of deleterious material in the fine aggregate is not to exceed the following limits by mass:

Material Percentage by Mass Clay lumps and friable particles ASTM C142/C142M 1.0 Material finer than No. 200 sieve ASTM C117 3.0 Lightweight particles ASTM C123/C123M using a medium with a density of Sp. Gr. of 2.0

0.5

Total of all above 3.0

2.4 CHEMICAL ADMIXTURES

2.4.1 General Requirements

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 19

Only use chemical admixtures when the specific admixture type and manufacturer is the same material used in the mixture proportioning studies. Provide all chemical admixtures from the same manufacturer.

Provide air-entraining admixture conforming to ASTM C260/C260M. Use an accelerating admixture conforming to ASTM C494/C494M, Type C or Type E, when specified in paragraph MIXTURE PROPORTIONS below provided it is not used to reduce the amount of cementitious material. Calcium chloride and admixtures containing calcium chloride are not allowed. Provide retarding or water-reducing admixture that meet the requirements of ASTM C494/C494M, Type A, B, or D, except that the 6-month and 1-year compressive strength tests are waived. ASTM C494/C494M, Type F and G high range water reducing admixtures and Type S specific performance admixtures are not allowed. ASTM C1017/C1017M flowable admixtures are not allowed

2.4.2 Lithium Nitrate

Provide lithium admixture that consists of a nominal 30 percent aqueous solution of Lithium Nitrate, with a density of 10 pounds per gallon,with the approximate chemical form as shown below:

Constituent Limit (Percent by Mass)

LiNo3 (Lithium Nitrate) 30 plus or minus 0.5

SO4

-2 (Sulfate Ion) 0.1 (max)

Cl- (Chloride Ion) 0.2 (max)

Na+ (Sodium Ion) 0.1 (max)

K+ (Potassium Ion) 0.1 (max)

Provide the services of a manufacturer's technical representative experienced in dispensing, mixing, proportioning, placement procedures and curing of concrete containing lithium nitrate, at no expense to the Government. This representative is required to be present on the project prior to and during at least the first two days of placement using lithium nitrate.

2.4.3 High Range Water Reducing Admixture (HRWRA)

Provide a high-range water-reducing admixture that meets the requirements of ASTM C494/C494M, Type F or G, that is free from chlorides, alkalis, and is of the synthesized, sulfonated complex polymer type. Add the HRWRA to the concrete as a single component at the batch plant. Add the admixture to the concrete mixture only when its use is approved or directed, and only when it has been used in mixture proportioning studies to arrive at approved mixture proportions. Submit certified copies of the independent laboratory test results required for compliance with ASTM C494/C494M.

2.5 MEMBRANE FORMING CURING COMPOUND

Provide membrane forming curing compound that conforms to COE CRD-C 300and is white pigmented.

2.6 WATER

Provide water for mixing and curing that is fresh, clean, potable, and free of injurious amounts of oil, acid, salt, or alkali, except that non-potable water, or water from concrete production operations, may be

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 32 13 14 - 20

used if it meets the requirements of ASTM C1602/C1602M.

2.7 JOINT MATERIALS

2.7.1 Expansion Joint Material

Provide preformed expansion joint filler material conforming to ASTM D1751 or ASTM D1752 Type II or III. Provide expansion joint filler that is 3/4 inch thick, unless otherwise indicated, and provided in a single full depth piece.

2.7.2 Slip Joint Material

Provide slip joint material that is 1/4-inch thick expansion joint filler, unless otherwise indicated, conforming to paragraph EXPANSION JOINT MATERIAL.

2.8 REINFORCING

Provide reinforcement that is free from loose, flaky rust, loose scale, oil, grease, mud, or other coatings that might reduce the bond with concrete. Removal of thin powdery rust and tight rust is not required.

However, reinforcing steel which is rusted to the extent that it does not conform to the required dimensions or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .