A3 - 1.26.22 - B-3 - JKSE172220 B25 SPEC VOL 2.pdf

PDF 9 MB Posted

Attached to
REPAIR MAINTENANCE HANGAR, BLDG 25
Solicitation number
W50S7L23B0002
Issued by

About this file

This document provides details for an Invitation for Bids for repair and maintenance services at a National Guard facility. The solicitation seeks a firm fixed-price contract to provide labor, materials, equipment and supervision for repairs to an aircraft hangar building including a new roof system, asphalt and drainage work, floor upgrades, fire suppression modifications, and mechanical and electrical services. The project location is the Montana Air National Guard base in Great Falls, Montana. The performance period is 120 calendar days with an estimated value between $1-5 million. The North American Industry Classification code is 236220 and the opportunity is set aside 100% for small businesses with a size standard of $45 million. The pre-bid conference is scheduled for June 13th and questions are due by June 23rd, with bid opening on July 7th. Interested parties must register in the System for Award Management. The document provides procurement details for repair and maintenance services at a National Guard facility.

View the file

Other files

File Type Posted
C4 - Abstract of Offers - CS_KO.pdf PDF
B8 - Amendment 6 - Modification Solicitation W50S7L-23-B-0002-P0006 Bld 25.pdf PDF
B8 - Amendment 6 - Conform Solicitation W50S7L-23-B-0002-P0006 Bld 25.pdf PDF
B8 - Amendment 5 - Conform Solicitation W50S7L-23-B-0002-P0005 Bld 25.pdf PDF
B8 - Amendment 5 - Modification Solicitation W50S7L-23-B-0002-P0005 Bld 25.pdf PDF
Questions and Answers 2 W50S7L-23-B-0002 - 7 July 2023.pdf PDF
B8 - Amendment 4 - Modification Solicitation W50S7L-23-B-0002-P0004 Bld 25.pdf PDF
MTANG B25 Environmental remediation dwgs and cut sheets.pdf PDF
B8 - Amendment 4 - Conform Solicitation W50S7L-23-B-0002-P0004 Bld 25.pdf PDF
10 51 13 FL - Metal Lockers.pdf PDF
B8 - Amendment 3 - Conform Solicitation W50S7L-23-B-0002-P0002 Bld 25.pdf PDF
32 13 14.13 Spec update 6_30_23.pdf PDF
2023.06.29 - 1819 - MANG Building 25 - revised A2.00.pdf PDF
Questions and Answers W50S7L-23-B-0002 - 30 June 2023.pdf PDF
B8 - Amendment 3 - Modification Solicitation - W50S7L-23-B-0002-P0002 Bld 25.pdf PDF
B8 - Amendment 2 - Modification Solicitation - W50S7L-23-B-0002-P0002 Bld 25.pdf PDF
B8 - Amendment 2 - Conform Solicitation W50S7L-23-B-0002-P0002 Bld 25.pdf PDF
B7 - Pre-Bid Conference Minutes - W50S7L-23-B-0002.pdf PDF
B8 - Amendment 1 - Modification Solicitation - W50S7L-23-B-0002-P0001 Bld 25.pdf PDF
B8 - Amendment 1 - Conform Solicitation W50S7L-23-B-0002-P0001 Bld 25.pdf PDF
B8 - Amendment 1 - Conform Solicitation W50S7L-23-B-0002-P0001 Bld 25.pdf PDF
B8 - Amendment 1 - Modification Solicitation - W50S7L-23-B-0002-P0001 Bld 25.pdf PDF
A3 - JKSE172220 B25 SPEC VOL 1 Revised 5.30.23.pdf PDF
A3 - JKSE172220 B25 SPEC VOL 1.pdf PDF
A3 - JKSE172220 B25 SPEC VOL 1.pdf PDF
B8 - Solicitation - W50S7L-23-B-0002 Bld 25.pdf PDF
A3 - 4.19.23 - JKSE172220 - B25 - B-3 Drawings w_ABI.pdf PDF
B4 - SAM Wage Determination - MT20230062 Dated 4-28-2023.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPE B-3 SUBMITTAL

SPECIFICATIONS

VOLUME II: MECHANICAL, ELECTRICAL, CIVIL

REPAIR MAINTENANCE HANGER, BLDG 25

PN JKSE 172220

120TH AIRLIFT WING

MONTANA AIR NATIONAL GUARD

GREAT FALLS AIR NATIONAL GUARD BASE

GREAT FALLS, MT

20 December 2021

Prepared by

ROBERT PECCIA & ASSOCIATES

3147 Saddle Drive

Helena, MT 59601

406.447.5000

IMEG Corp. (Formerly MKK)

920 Front Street Suite 104

Helena, MT 59601

406.545.6421

TD&H ENGINEERING

1800 River Drive North

Great Falls, MT 59401

406.761.3010

THIS PAGE LEFT BLANK INTENTIONALLY

120th AIRLIFT WING PROJECT JKSE 172220

MONTANA AIR NATIONAL GUARD REPAIR MAINTENANCE HANGAR, BLDG 25

GREAT FALLS, MONTANA TYPE B-3 SUBMITTAL

REPAIR MAINTENANCE HANGAR, BLDG 25

MONTANA AIR NATIONAL GUARD, MONTANA

JKSE 172220

SMA PROJECT NO. 1819

VOLUME II – MECHANICAL, ELECTRICAL, CIVIL,

FIRE PROTECTION

TABLE OF CONTENTS

Enumeration of Drawings, Specifications and Addenda: The following are the Specifications and Drawings, and Addenda which form a part of this Contract:

See following Specifications for Bidding Requirements, Proposal, Special Conditions, etc.

SPECIFICATIONS

DIVISION 21

SECTION 21 13 13 - WET PIPE SPRINKLER SYSTEMS B1

DIVISION 22

SECTION 22 02 00 - BASIC PLUMBING REQUIREMENTS

SECTION 22 03 00 - ELECTRICAL EQUIPMENT AND WIRING

COORDINATION FOR PLUMBING SYSTEMS

SECTION 22 10 05 - PLUMBING PIPING

SECTION 22 10 06 - PLUMBING PIPING SPECIALTIES

SECTION 22 40 00 - PLUMBING FIXTURES

DIVISION 23

SECTION 23 02 00 – BASIC HVAC REQUIREMENTS

SECTION 23 03 00 – ELECTRICAL EQUIPMENT AND WIRING

COORDINATION FOR HVAC SYSTEMS

SECTION 23 05 13 - COMMON MOTOR REQUIREMENTS FOR HVAC

EQUIPMENT

SECTION 23 05 14 – ENCLOSED CONTROLLERS

SECTION 23 05 19 – METERS AND GAGES FOR HVAC PIPING

SECTION 23 05 23 – GENERAL DUTY VALVES FOR HVAC PIPING

SECTION 23 05 48 – VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING

AND EQUIPMENT

SECTION 23 05 53 – IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 93 – TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION 23 07 13 – DUCT INSULATION

SECTION 23 07 19 – HVAC PIPING INSULATION

SECTION 23 08 00 – COMMISSIONING OF HVAC

SECTION 23 09 13 – INSTRUMENTATION AND CONTROL DEVICES FOR

HVAC

SECTION 23 09 23 – DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

SECTION 23 11 23 – FACILITY NATURAL GAS PIPING

SECTION 23 21 13 – HYDRONIC PIPING

SECTION 23 21 14 – HYDRONIC SPECIALTIES

SECTION 23 25 00 – HVAC WATER TREATMENT

SECTION 23 31 00 – HVAC DUCTS AND CASINGS

SECTION 23 33 00 – AIR DUCT ACCESSORIES

SECTION 23 34 23 – HVAC POWER VENTILATORS

SECTION 23 37 00 – AIR OUTLETS AND INLETS

SECTION 23 73 13 – GAS FIRED HEATING AND AIR ROTATION UNITS

SECTION 23 82 00 – CONVECTION UNITS

DIVISION 24 – NOT USED

DIVISION 25 – NOT USED

DIVISION 26

SECTION 26 02 00 – BASIC ELECTRICAL REQUIREMENTS

SECTION 26 05 19 – LOW VOLTAGE ELECTRICAL POWER CONDUCTORS

AND CABLES

SECTION 26 05 26 – GROUNDING AND BONDING FOR ELECTRICAL

SYSTEMS

SECTION 26 05 29 – HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION 26 05 33.13 – CONDUIT

SECTION 26 05 33.16 – BOXES FOR ELECTRICAL SYSTEMS

SECTION 26 05 48 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL

SYSTEMS

SECTION 26 05 53 – IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 26 05 83 – WIRING CONNECTIONS

SECTION 26 27 26 – WIRING DEVICES

SECTION 26 28 13 – FUSES

SECTION 26 28 16.13 – ENCLOSED CIRCUIT BREAKERS

SECTION 26 28 16.16 – ENCLOSED SWITCHES

SECTION 26 41 13 – LIGHTNING PROTECTION FOR STRUCTURES

DIVISION 27

SECTION 27 05 28 – PATHWAYS FOR COMMUNICATIONS

SECTION 27 15 00 – HORIZONTAL CABLING FOR COMMUNICATIONS

DIVISION 28 – NOT USED

DIVISION 29 – NOT USED

DIVISION 30 – NOT USED

DIVISION 31

SECTION 31 00 00 – EARTHWORK

SECTION 31 05 19 - GEOTEXTILE

DIVISION 32

SECTION 32 11 20 – BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE

PAVING

SECTION 32 11 23 – AGGREGATE BASE COURSES

SECTION 32 13 14.13 – CONCRETE PAVING FOR AIRFIELD AND OTHER

HEAVY DUTY PAVEMENTS

SECTION 32 13 73 – COMPRESSION JOINT SEALS FOR CONCRETE

PAVEMENTS

SECTION 32 40 00 – CIVIL/SITE CONTRACTOR QUALITY CONTROL AND

QUALITY ASSURANCE \

SECTION 32 40 01 – CIVIL/SITE SPECIAL PROVISIONS

MONTANA PUBLIC WORKS (MPW)

MPW02112 – REMOVAL OF EXISTING PAVEMENT, CONCRETE CURB,

SIDEWALK, DRIVEWAY AND/OR STRUCTURES

MPW02502 – ASPHALT PRIME AND/OR TACK COAT

MPW02510 – ASPHALT CONCRETE PAVEMENT

MPW02528 – CONCRETE CURB AND GUTTER

MPW02529 – CONCRETE SIDEWALKS

MPW03310 – STRUCTURAL CONCRETE (NON-AIRFIELD)

END OF TABLE OF CONTENTS

MONTANA AIR NATIONAL GUARD REPAIR MAINTENANCE HANGAR, BUILDING 25

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 1

SECTION 21 13 13 – WET PIPE SPRINKLER SYSTEMS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Wet pipe automatic sprinkler systems.

2. Water supply piping to support systems.

B. Related Sections:

1. Division 21 Section "Wet-Pipe Sprinkler System"

2. Division 28 Section "Interior Fire Detection and Alarm System"

1.3 SYSTEM DESCRIPTION

A. Design Requirements

1. Relocate high expansion foam piping to eliminate conflict with aircraft tail. Recalculate system to ensure modifications do not alter system performance.

2. Relocate two butterfly valves and add piping to reduce maintenance issues. See drawings for location.

3. Add spool piece in rise in space above Rooms B109/B113/B118/B119 complex and shorten hanger rods to bring all sprinklers within 12 inches of ceiling. Repipe two branch lines as needed.

4. Replace painted sprinklers in Rooms B120/B121 (assume 10).

5. The system shall be designed for earthquakes as specified by UFC 3-600-01 and shall include all materials, accessories and equipment necessary to provide each system complete and ready for use.

6. Design and install each system to give full consideration to blind spaces, piping, electrical equipment, ductwork and all other construction and equipment to provide complete coverage in accordance with the drawings to be submitted for approval.

7. In the publications referred to herein, the advisory provisions shall be considered to be mandatory, as though the word "shall" had been substituted for "should" wherever it appears; reference to the "authority having jurisdiction" shall be interpreted to mean the

Fire Marshal, Montana Air National Guard.

B. Shop Drawings and Calculations

1. Shop drawings shall be prepared in accordance with Division 1 requirements of these specifications and the requirements of UFC 3-600-01.

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 2

2. Project drawings present one possible solution toward conformance to the referenced documents. The design demonstrated herein is based on a specific set of assumptions.

The design shall be verified by the Contractor and confirmed via shop drawings and calculations. Alternate designs are acceptable when approved by the Engineer and

Authority Having Jurisdiction.

3. System design densities, design areas and hose stream requirements are as included on project drawings.

4. Hydraulic calculations shall utilize the following friction loss coefficients (“C-Factors”) with the Hazen-Williams Formula, as dictated by NFPA 13:

a. 120 for steel pipe in deluge systems

b. 100 for steel pipe in all other systems

c. 140 for cement lined ductile iron pipe

d. 150 for chlorinated polyvinyl chloride pipe

5. Velocities in piping as determined by hydraulic calculations shall not exceed 20 ft/s.

6. Due to the configuration of the existing fire protection service piping system, there is no ability to perform water flow testing prior to removal of the existing fire pump systems.

The water flow test will be needed only for hydraulic calculation of the Building 321 fire sprinkler system. Fire pumps are sized based on existing conditions, known changes in the water supply system and a safety factor to account for potential corrosion of the existing piping. Temporary piping or hose configurations will be necessary to perform testing. Contractor shall coordinate with the Engineer to determine best steps for performing the water flow test.

1.4 SUBMITTALS

A. Submittals shall include shop drawings and calculations as described above, as well as manufacturer’s catalog or data sheets for all equipment intended to be installed.

B. All submittals shall be provided first to the Engineer for review and approval prior to submission to the Authority Having Jurisdiction.

C. Operation and Maintenance manuals shall be provided for all equipment intended to be installed.

D. As-built drawings and calculations shall be provided at project closeout.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: Prior to commencing work, submit data showing that the Contractor has successfully installed automatic sprinkler systems of the same type and design as specified herein, or that the Contractor has a firm contractual agreement with a subcontractor having the required experience. Include the names and locations of at least two installations where the

Contractor, or the subcontractor referred to above, has installed such systems. Indicate the type and design of each system, and certify that the system has performed satisfactorily for a period of at least 18 months.

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 3

B. Qualifications of System Technician: Installation drawings, shop drawings and as-built drawings shall be prepared, by or under the supervision of, an individual who is experienced with the types of works specified herein, and is currently certified by the National Institute for

Certification in Engineering Technologies (NICET) as an engineering technician with minimum

Level III certification in the Automatic Sprinkler System program. Contractor shall submit data for approval showing the name and certification of all involved individuals with such qualifications at or prior to submittal of drawings.

1.6 PROJECT CONDITIONS

A. All system installation and testing shall be at the discretion of the Montana Air National Guard.

The Contractor shall coordinate with Montana Air National Guard personnel to determine allowable working and testing times and locations.

1.7 WARRANTY

A. Contractor’s Warranty: Manufacturer's standard agreement in which Contractor agrees to repair or replace all equipment that does not comply with performance and other requirements specified in this Section within specified warranty period.

1. Warranty Period: Two years from date of Completion.

1.8 SPARE PARTS

A. Provide additional sprinklers per NFPA 13.

B. Submit spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. A list of special tools and test equipment required for maintenance and testing of the products supplied by the Contractor shall be included.

C. Provide spare parts for detection system as indicated in Division 28.

1.9 DELIVERY, STORAGE, AND HANDLING

A. All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.

PART 2 - PRODUCTS

2.1 MATERIALS, GENERAL

A. All materials and equipment shall be new.

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 4

B. Devices and equipment for fire protection service shall be of a make and type listed by the

Underwriter's Laboratories Inc. in the UL Fire Protection Directory, or approved by the Factory

Mutual System and listed in FM P7825.

2.2 FIRE DETECTION AND ALARM EQUIPMENT

A. Fire detection and alarm equipment shall be in accordance with Division 28 and the references listed in Part 1 of this specification.

2.3 SPRINKLERS

A. Sprinklers response types and temperature classification shall be per NFPA 13.

B. Replace painted sprinklers with similar style, temperature rating and response type.

2.4 BUTTERFLY VALVES

A. Butterfly valves 2-1/2 inch and larger in size shall be listed to 175 PSI with optional internal tamper switch. Body shall be ductile iron with a corrosion resistant coating. Seat shall be field replaceable without the use of special tools. The valve shall be provided with stem bushings to isolate the stem from the stem journal. The valve body shall be machined with a retaining lip for positive retention of the seat to provide drip tight shutoff at full rated differential pressure with the downstream piping removed.

2.5 ABOVEGROUND PIPING SYSTEMS

A. Pipe

1. Except as modified herein, pipe shall be black steel as permitted by NFPA 13 and shall conform to applicable provisions of ASTM A 795/A 795M, ASTM A 53/A 53M, or

ASTM A 135/A 135M.

2. Provide Schedule 40 for sizes less than 8 inches.

3. Provide Schedule 30 or Schedule 40 for sizes 8 inches and larger.

4. Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or shall be listed by Underwriters' Laboratories to have a corrosion resistance ratio (CRR) of 1.0 or greater after threads or grooves are cut or rolled formed.

B. Grooved Mechanical Joints and Fittings

1. Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer

a. Segmented welded fittings shall not be used.

2. Fitting and coupling houses shall be malleable iron conforming to ASTM A 47/A 47M, Grade 32510 or ductile iron conforming to ASTM A 536, Grade 65-45-12.

3. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe.

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 5

4. Nuts and bolts shall be heat-treated steel conforming to ASTM A 183 and shall be cadmium plated or zinc electroplated.

5. Grooved joints shall only be permitted in pipe sizes 1 1/2 inches and larger.

6. Use of plain-end fittings with mechanical couplings is not permitted.

C. Flanges

1. Flanges shall conform to NFPA 13 and ASME B16.1. Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21, 1/16 inch thick and full face or self-centering flat ring type.

2. Use of reducing flanges is not permitted.

D. Bolts, Nuts, and Washers

1. Bolts shall conform to ASTM A 449, Type 1 and shall extend no less than three full threads beyond the nut with bolts tightened to the required torque.

2. Nuts shall be hexagon type conforming to ASME B18.2.2; ASTM A 193/A 193M, Grade

5; or ASTM A 563M/ASTM A 563, Grade C3 or DH3.

3. Washers shall meet the requirements of ASTM F 436M ASTM F 436. Flat circular washers shall be provided under all bolt heads and nuts.

E. Pipe Hangers and Supports

1. Pipe hangers and supports shall be per NFPA 13 and UFC 3-600-01.

2. Seismic bracing shall be provided per the seismic zone identified in NFPA 13. Seismic bracing factors used in NFPA 13 calculations shall be as identified in UFC 3-310-01.

2.6 SIGNAGE

A. Provide signage per NFPA 13 requirements for the following:

1. Control valves

PART 3 - EXECUTION

3.1 GENERAL

A. Manufacturer's Representative

1. Provide the services of representatives or technicians from the manufacturers of the automatic sprinkler system, experienced in the installation and operation of the type of system being provided, to supervise installation, adjustment, preliminary testing and final testing of the system and to provide instruction to site personnel.

3.2 SYSTEM INSTALLATION

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 6

A. Equipment, materials, installation, workmanship, fabrication, assembly, erection, examination, inspection, and testing shall be in accordance with the documents referenced herein.

B. Installation shall be in accordance with NFPA 13 and UFC 3-600-01.

C. Piping in exposed areas shall be installed without diminishing exist access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, shall be installed to provide maximum headroom.

D. Install piping straight and true to bear evenly on hangers and supports.

E. Provide fittings for changes in direction of piping and for all connections. Make changes in piping sizes through standard reducing pipe fittings. Bushings shall not be used. Grooved-end or rubber-gasketed reducing coupling shall not be used.

F. Pipe joints shall conform to NFPA 13, except as modified herein.

1. Not more than four threads shall show after joint is made up.

2. Welded joints shall be permitted, only if welding operations are performed as required by

NFPA 13 at the Contractor's fabrication shop, not at the project construction site.

3. Flanged joints shall be provided where indicated or required by NFPA 13.

4. Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools shall be products of the same manufacturer. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances. Grooved joints shall not be used in concealed locations, such as behind solid walls or ceilings, unless an access panel is shown on the drawings for servicing or adjusting the joint.

G. Cut pipe accurately and work into place without springing or forcing.

H. Ream pipe ends and free pipe and fittings from burrs.

I. Clean with solvent to remove all varnish and cutting oil prior to assembly.

J. Make threaded joints with PTFE tape applied to male thread only.

K. Pipe Penetrations

1. Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted.

2. Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-drilled and provided with pipe sleeves. Each sleeve shall be Schedule 40 galvanized steel, ductile iron or cast iron pipe and shall extend through its respective wall or floor and be cut flush with each wall surface. Sleeves shall provide required clearance

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 7

between the pipe and the sleeve per NFPA 13. The space between the sleeve and the pipe shall be firmly packed with mineral wool insulation.

3. Where pipes penetrate fire walls, fire partitions, or floors, pipes shall be fire stopped in accordance with Section 07 84 00, “Firestopping”.

4. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe shall be sealed at both ends with plastic waterproof cement that will dry to a firm but pliable mass or with a mechanically adjustable segmented elastomer seal.

L. Escutcheons

1. Escutcheons shall be provided for pipe penetration of ceilings and walls. Escutcheons shall be securely fastened to the pipe at surfaces through which piping passes.

M. Drains

1. Drains shall be provided as indicated on drawings. Drains shall be positioned above finished grade to allow the connection of a hose consistent with the diameter of the drain.

3.3 PIPING LABELS

A. Provide permanent labels at 20 foot maximum intervals along pipe, indicating "WATER" on corresponding piping.

3.4 ELECTRICAL WORK

A. Electrical work shall be in accordance with Division 28.

3.5 FIELD QUALITY CONTROL

A. Preliminary Tests

1. The system, including the underground water mains, and the aboveground piping and system components, shall be tested to assure that equipment and components function as intended. The underground and aboveground interior piping systems and attached appurtenances subjected to system working pressure shall be tested in accordance with

NFPA 13 and NFPA 24.

B. Aboveground Piping

1. Hydrostatic Testing - Aboveground piping shall be hydrostatically tested in accordance with NFPA 13 at not less than 200 psi or 50 psi in excess of maximum system operating pressure and shall maintain that pressure without loss for 2 hours. There shall be no drop in gauge pressure or visible leakage when the system is subjected to the hydrostatic test.

The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested.

C. Testing of Alarm Devices

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 8

1. Each alarm switch shall be tested by flowing water through the inspector's test connection. Each water-operated alarm devices shall be tested to verify proper operation.

D. Final Acceptance Test

1. Begin the Final Acceptance Test only when the preliminary tests have been completed and verified. The Fire Protection Specialist shall conduct the Final Acceptance Test and shall provide a complete demonstration of the operation of the system. This shall include operation of control valves and flowing of inspector's test connections to verify operation of associated waterflow alarm switches. After operation of control valves has been completed, the main drain test shall be repeated to assure that control valves are in the open position. In addition, the representative shall have available copies of as-built drawings and certificates of tests previously conducted. The installation shall not be considered accepted until identified discrepancies have been corrected and test documentation is properly completed and received.

3.6 TRAINING REQUIREMENTS

A. Prior to final acceptance, the Contractor shall provide two sessions of 4 hours each of operation and maintenance training to Montana National Guard personnel on two different days. Each training session shall include emergency procedures and unique maintenance and safety requirements. Training areas will be provided in the same building as the protected areas. The training conducted shall use operation and maintenance manuals specified. Dates and times of the training period shall be coordinated through the Contracting Officer not less than two weeks prior to the session.

END OF SECTION 211320

120th AIRLIFT WING

MONTANA AIR NATIONAL GUARD

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 1

SECTION 22 02 00 - BASIC PLUMBING REQUIREMENTS

PART 1 GENERAL

1.1 APPLICABLE SCOPE

A. The Basic Plumbing requirements stated herein shall only apply to the Division 22 specifications.

B. The Division 22 Contractor shall comply with the requirements of this section OR the Division 01

General Requirements; whichever are MORE stringent.

C. The General Provisions of the Contract, including General and Supplementary Conditions and

Division 01 Specification Sections and Contract Documents apply to work in this section. Consult them for further instructions and be governed by the requirements thereunder.

1.2 SECTION INCLUDES

A. Summary of work

B. Regulatory and Code Requirements

C. Referenced Standards

D. Product Options and Substitutions

E. Submittals

F. Quality Assurance

G. Coordination

H. Construction Facilities and Temporary Controls

I. Delivery, Storage, and Handling

J. Field Conditions

K. Cleaning

L. System and Equipment Start-Up

M. Final Observation

N. Operation and Maintenance Data

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 2

O. Demonstrations

P. Project Record Drawing

Q. Warranty

R. Contract Closeout Procedure

1.3 RELATED REQUIREMENTS

A. Section 01 #### - General Requirements

B. Section 22 #### - Plumbing

C. Section 23 0593 - Testing, Adjusting and Balancing for HVAC; for TAB work associated with

Division 22

D. Section 23 0800 - Commissioning of HVAC; for Commissioning work associated with Division

22.

E. Section 23 0900 - Instrumentation and Control for HVAC; for Control work associated with

Division 22.

1.4 DEFINITIONS

A. "Provide" means Contractor is responsible for the furnishing and installation of.

B. "Exposed" means in equipment rooms, unfinished areas, above "pushup" ceilings, accessible pipe tunnels, exposed in occupied spaces, etc. where pipe is accessible.

C. "Concealed" means in such spaces as pipe chases, pipe trenches, above drywall ceilings, in walls and buried where pipe is inaccessible when building is completed.

D. “Mechanical Room” means any space or area which contains equipment providing heating, cooling, ventilation, plumbing distribution, or mechanical/plumbing system utility generation and distribution capabilities. These spaces are defined as “Mechanical Rooms” even if they are called by another name (i.e. boiler room, chiller room, machine room, etc.).

1.5 SUMMARY OF WORK

A. Work Included: Furnish all labor and materials and perform all operations necessary for the installation of complete and operating plumbing systems subject to the conditions of the contract.

The work also includes the completion of such plumbing and electrical details not mentioned or shown which are necessary for the successful operation of all systems; this includes the furnishing

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 3

of all materials for filling systems to make them operable, including water, refrigerant, oil and grease. Prove satisfactory operation of all equipment and controls to the Consulting Mechanical

Engineer on request.

B. Work Not Included (Specified Elsewhere): Certain labor and materials may be furnished and/or installed under other divisions of these specifications. Coordinate with other trades and arrange the work to make the parts fit together. The following items are to be accomplished under other divisions of these specifications.

1. Fixed concrete bases for plumbing equipment: Division 03. Anchor bolts, setting diagrams, base sizes and other required information furnished under Division 22.

2. Concrete for inertia bases for plumbing equipment: Division 03. Steel forms provided under

3. Masonry wall opening lintels: Division 04.

4. Wall openings and Chases: Under applicable sections according to information furnished under Division 22.

5. Access Panels: Furnished and located by Division 22 installer as specified in Division 08 for installation by appropriate trades.

6. Painting (except mechanical identification systems): Division 09.

7. Kitchen Equipment: Furnished and set in place Division 11. Final connections under

Division 22. Rough-in line sizes shall be as indicated in the Division 22 drawings. Final connection sizes per kitchen equipment shop drawings.

C. Equipment Furnished by Owner

1. General: Also see Division 01.

2. Rough in service pipes to locations as required by architectural and plumbing drawings and equipment shop drawings. Provide service valves on all pipes except waste and vent pipes, plug or cap these. Final connections to equipment will be made by Division 22 Contractor.

(This Contractor will provide all necessary equipment or items required for final connections to equipment).

D. Examination of Premises

1. Visit the premises before submitting bid as no extras will be allowed for lack of knowledge of existing conditions.

E. Inspection

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 4

1. Inspect work proceeding or interfacing with work of Division 22 Sections and report any known or observed defects that affect the work to the General Contractor. Do not proceed with work until defects are corrected.

1.6 REGULATORY AND CODE REQUIREMENTS

A. Apply for and pay for all permits (plan review fees), fees, licenses and inspections for this Division of work.

B. Do not include the cost of any "Plant Investment Fee" or "System Development Charge" for sewer and/or water charged by the utility. This will be arranged for and paid for by the Owner.

C. Do not include the cost of any "Gas Application Fee" charged by the Utility Company. This will be arranged for and paid for by the Owner.

D. Comply with state and local code requirements and ordinances. Comply with requirements of the

Utility Companies. In the case of differences between these requirements and ordinances, the most stringent shall govern. Call for inspections required by local building inspection authority.

E. Applicable Building Codes and Ordinances include but are not limited to the following:

1. International Building Code, 2015 Edition

2. International Mechanical Code, 2015 Edition

3. International Plumbing Code, 2015 Edition

4. International Fuel Gas Code, 2015 Edition

5. International Fire Code, 2015 Edition

6. International Energy Code, 2015 Edition

7. NFPA 54 - National Fuel Gas Code, 2015 Edition

8. NFPA 70 - National Electrical Code, 2014 Edition

9. Governing (AHJ) Fire Department Requirements

10. Governing (AHJ) Building Department Requirements

11. Jurisdictional Utility Company Requirements

12. State Department of Labor Requirements

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 5

13. State Department of Health Requirements

14. State and Federal Safety and Health Laws

15. ASHRAE Standards including but not limited to 55, 62.1 and 90.1, applicable versions

16. Requirements of Owner’s Insurance Carrier

1.7 REFERENCE STANDARDS

A. For products or workmanship specified by association, trade, or Federal Standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. The edition of the standard that shall be used, shall be the edition in effect at the bid date, or date of Owner/Contractor Agreement when there are no bids, except when a specific date is specified or when the standard is part of an applicable code that includes an edition date.

C. When required by individual Specifications section, obtain copy of standard. Maintain copy at job site during work until Substantial Completion.

D. Schedule of referenced organizations: See Division 01.

1.8 PRODUCT OPTIONS AND SUBSTITUTIONS

A. Substitutions - Prior to Bidding

1. See Instructions to Bidders.

2. Material, equipment or service specified by name is used as a basis of standard. Equivalents to items named in the specifications may be used if accepted before bidding. Requests for acceptance shall be received at the Consulting Mechanical Engineer's office at least (7) seven calendar days before bid opening.

3. When any product is specified ONLY by requirement to meet an industry standard or regulating body standard (such as U.L. AGA, AWWA, ANSI, etc.) and the item proposed carries approval of that body, no prior acceptance by the Consulting Mechanical Engineer is needed.

4. When any product or service is specified by requirement to meet a performance standard or is specified by a generic specification, (no manufacturers name listed) no prior acceptance by the

Consulting Mechanical Engineer is needed EXCEPT as specifically called for in these specifications.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 6

5. Action for substitutions specified herein will be given only after the receipt of complete data showing performance over entire range, make and project manual identification number, physical dimensions and material construction all SPECIFICALLY marked for the individual item. Letter of transmittal with all descriptive data shall be submitted to the Consulting

Mechanical Engineer's office. Data may not be returned; reference addenda for approval to bid.

6. All substitutions will be subject to section specific submittal requirements such as Delegated

Design Submittal Requirements; refer to individual sections for requirements. For a substitution to be considered delegated design requirements will be required to verify equivalency.

B. Substitutions - Requirements

1. Comply with Division 01.

2. Materials, equipment or services listed by several identifying names are intended to be bidder's choice, and any of the listed names may be bid without soliciting prior acceptance.

Where more than one name is given in the specifications, the basis of design named manufacturer's material, equipment or services is contemplated and any changes and their costs, required to accommodate the other named material or equipment as well as space requirements for the other named materials or equipment, must be assumed by the Contractor in his bid.

3. Material and equipment specified is used as a basis of standard, and while not specifically mentioned, material gauges, weights, appearance and space requirements must be met by any substitutions.

1.9 PLUMBING COST BREAKDOWN

A. The Contractor shall submit a Plumbing Cost Breakdown to the Engineer with the submittals.

Submittals will not be accepted without a Cost Breakdown received by the Engineer. If Plumbing bid compilation of total plumbing cost is different than form (included at the end of the specification), submit information in an orderly format of your own layout. Information is only used for verification of Engineer’s Cost Estimating Database. Form shall be returned separately via email or included with first shop drawing submittals.

1.10 SUBMITTALS

A. The Division 22 Contractor shall comply with the submittal requirements of this section OR the

Division 01 General Requirements; whichever are MORE stringent.

B. Submit material samples, shop drawings and product data as required by various sections of

Division 22. Make submittals to Architect. Do not make submittals directly to the Engineer.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 7

C. Submittals shall be made electronically using combined PDFs.

D. Individual section submittals are not acceptable. Submittals shall be grouped for efficiency. The

MAXIMUM number of first round submittals for this Division shall not exceed (6) SIX submittals.

E. The engineer shall be reimbursed, by the contractor, for time and expenses incurred reviewing any submittals requiring more than two rounds in order for approval to be achieved.

F. Submittals, depending on type, shall be processed in a different manner as follows:

1. Generic Devices: Generic devices that, through statements within said specification sections, do not identify submittal requirements will not be required to be submitted. These items shall comply with applicable industry or regulating body standards as specified. Information on these devices shall be included in the Operation and Maintenance Instruction Manuals.

2. Equipment & Materials: Submit submittals for all materials and equipment named in these specifications except as identified above. Specifically the following submittals shall be required:

a. Product data on all fixtures and equipment, including items called out by manufacturers name and model number.

b. All equivalent alternates or substituted items.

c. All changes from the plans or specifications.

d. Any additional submittals required by the various sections of Division 22 including but not limited to: shop drawings, samples, certificates, delegated design data, test reports, source/field quality control, sustainable design documentation, qualification statements, warranty documentation.

G. Equivalents & Substitutions: Where a product, other than the basis of design, is used the contractor shall be responsible for coordinating any differences. These differences include but are not limited to the following: changes required in piping, electrical wiring/service, space allocation, etc... The contractor shall be responsible to make all changes required to accommodate this equivalent product or substituted product. Any cost based change orders driven by this change shall be covered by the contractor; including costs from other trades.

H. Review of submittals, including shop drawings, is for general conformance with the design concept of the project and does not relieve this Contractor from the responsibility of furnishing equipment and materials of proper dimension, size, quantity, quality and all performance characteristics to efficiently perform the requirements and intent of the contract documents. Review does not relieve this Contractor from responsibility for errors on the submittals. Approval of a specific item does not include approval of the assembly of which the item is a component. If the submittals deviate from the contract documents, advise the Consulting Mechanical Engineer of the deviations in writing accompanying the submittals, including the reasons for the deviations. Coordinate all required changes with the other trades affected. If the Contractor occasions the changes, he shall pay any costs involved.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 8

I. The Contractor shall contact the engineer to request a list of non-Division 22 submittals that may be related to Division 22 work that the engineer would like to review during the course of the submittal process.

J. Do not begin work until associated submittals have been approved and returned.

K. Operation and Maintenance Manuals: All submittal information in addition to operating and maintenance information shall be included in the Operation and Maintenance Manual. See

Operation and Maintenance Data section of this specification.

1.11 QUALITY ASSURANCE

A. Designer Qualifications (applicable to Delegated Design scope where noted): Perform design under direct supervision of a Professional Engineer experienced in design of this type of work and licensed in the State in which the Project is located.

B. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with not less than three years of documented experience.

C. Installer Qualifications: Company specializing in performing the work of this section with minimum 10 years of experience.

D. Preparation: Base final installation of materials and equipment on actual dimensions and conditions at the project site. Field measure for materials or equipment requiring exact fit.

E. Workmanship: Perform work in accordance with good commercial practice. The good appearance of the finished work shall be of equal importance with its mechanical efficiency. All components shall be installed cleanly in a professional manor; where exposed, components shall be installed at right angles parallel to building walls while being high and tight as possible to structure. The

Architect/Engineer may reject work if workmanship and appearance are not satisfactory.

F. Supervision: Be responsible for and coordinate the work of all subcontractors working under

G. Copies of Documents at Project Site: Maintain at the project site a copy of each referenced document that prescribes execution requirements.

H. Installation Procedures: Confer and cooperate with other trades and coordinate the work in proper relation with theirs. Coordinate ceiling cavity space carefully with other trades.

I. Properly locate anchors, chases, recesses and openings required for the proper installation of the work. Arrange with the proper contractors for the building of anchors, etc. and for the leaving of the required chases, recesses and openings.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 9

J. Install all work to permit removal (without damage to other parts) of coils, heat exchanger bundles, boiler tubes, fan shafts and wheels, filters, belt guards, sheaves and drives, and all other parts which might require periodic replacement or maintenance. Arrange pipes, equipment to permit ready access to valves, traps, starters, motors, control components and to clear the openings of doors and of access panels.

K. Offsets, transitions and changes in direction in pipes shall be made as required. Maintain proper head room and pitch of sloping pipes whether or not indicated on the drawings. Furnish and install all fittings, traps, air vents, sanitary vents, etc., as required to effect these offsets, transitions and changes in direction.

L. Install equipment and materials in accordance with manufacturers' recommendations unless specifically indicated otherwise, or where local codes or regulations take precedence.

M. Conceal all piping in finished areas of the building except where otherwise noted on the drawings.

N. Protection

1. Where there are existing facilities, be responsible for the protection thereof, whether or not such facility is to be removed or relocated. Moving or removing any facility must be done so as not to cause interruption of the work or Owner's operation.

2. Close ends of pipe during construction with caps or plugs to prevent entry of foreign material.

Protect insulation against dirt, water, chemical or mechanical damage before, during and after installation. Protect fixtures and equipment against damage during mechanical work.

3. Provide protection for concrete slabs where cutting or threading of piping occurs, storage of equipment, etc.

1.12 COORDINATION

A. General: Coordinate and order the progress of plumbing work to conform to the General

Contractor's schedule and the progress of the work of the other trades. Complete the entire installation as soon as the condition of the building will permit.

B. Design Drawings and Specifications

1. Plumbing drawings are diagrammatic and because of the small scale, it is not possible to indicate every required offset, fitting, etc. Drawings are not to be scaled for dimensions. Take all dimensions from Architectural drawings, certified equipment drawings and from the structure itself before fabricating any work. Verify all space requirements, coordinating with other trades, and install the systems in the space provided without extra charges to the Owner.

2. Examine ALL Drawings and Specifications for other Divisions of the work, and if any discrepancies occur between the plans for the work of this Division and the plans for the work

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 10

of others, report such discrepancies to the General Contractor and obtain written instructions for any changes necessary.

3. The precedence of plumbing construction documents is as follows:

a. Addenda and modifications to the Drawings and Specifications take precedence over the original Drawings and Specifications.

b. Should there be a conflict within the Specifications or within Drawings of the same scale, the more stringent or higher quality requirements shall apply.

c. In the Drawings, the precedence shall be Drawings of larger scale over those of smaller scale, figured dimensions over scaled dimensions and noted materials over graphic indications.

d. Should a conflict arise between the Drawings and the Specifications for products indicated on the Drawings, the Specifications shall have precedence.

e. Should there be a conflict in dimensions or locations between Plumbing Drawings and

Architectural Drawings, the Architectural Drawings shall have precedence.

C. Utility Coordination:

1. Interruptions: Coordinate utility interruptions with the Owner, General Contractor and the

Utility Company. Plan work so that duration of the interruption is kept to a minimum.

2. Service: Coordinate the installation of new plumbing utility connections with the Owner, General Contractor and the Utility Company. Coordinate final information on size, location, demand and installation. Ensure that utility connections are achieved in an orderly and expeditious manner.

3. Existing Utilities:

a. The plans indicate the location, type and sizes of various utilities within the site where known. These utilities are indicated as accurately as possible. If utilities are encountered during construction which are not shown on the drawings, ask for instructions from the

Architect. Any relocation or remodeling required will then be directed by change order.

Assume all responsibility for protection of all utilities, shown or not, and repair any damage caused by this construction at no extra charge to the Owner.

b. Investigate with proper authorities for all existing water taps, etc. and make arrangements to pay for all removal charges in original bid.

c. Owners of all underground facilities shall be notified at least 3 business days prior to excavation so that the owners can locate and mark underground facilities. (Utility

Notification Center of Colorado)

D. Cutting and Patching: The plumbing contractor shall be responsible for the cost of cutting and patching for work under Division 22 caused by improper coordination or notification. Comply with the requirements of Division 01.

E. Refer to Electrical One-line diagrams for the required Amps Interrupting Capacity (AIC) rating of all electrical devices.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 11

1.13 COORDINATION DRAWINGS

A. The mechanical/plumbing contractor shall facilitate coordination meetings with the General

Contractor, Electrical Contractor, Fire Protection Contractor, Low Voltage Contractor and other required trades to provide an AIA G202-2013 Level of Development (LOD) 400 level "fabrication model" for the creation of coordination/fabrication drawings/model. This fabrication model shall be created using a Building Information Modeling (BIM) software that is approved by the

Architect.

B. This model and resulting drawings shall be coordinated prior to fabrication and construction.

C. Coordinated drawings shall show systems installed in the space provided, free of conflicts, without any extra charges to the Owner.

1.14 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

A. Comply with Division 01.

1.15 DELIVERY, STORAGE, AND HANDLING

A. General

1. Comply with Division 01.

2. Provide for proper storage of all materials and equipment and assume responsibility for losses due to any cause. All storage shall be within the contract limit lines of the building site. Off site storage will be allowed if permitted under Division 01 requirements. Cover and store all equipment and materials out of elements and off of the ground; any rusted or weather damaged item will not be permitted to be used. Make arrangements with other contractors on the job for introduction into the building of equipment too large to pass through finished openings.

B. Furnished By Others

1. Check and sign for materials to be furnished by others for installation under Division 22 upon delivery. Assume responsibility for the storage and safekeeping of such materials from time of delivery until final acceptance.

1.16 FIELD CONDITIONS

A. Ambient Conditions: Ambient conditions (pre, during and post install) shall be within the requirements of the selected product manufacturer.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 12

1.17 CLEANING

B. Clean exposed surfaces of piping, hangers and other exposed items of grease, dirt or other foreign material. Remove rubbish and debris resulting from the operations and leave equipment spaces clean and ready for use. Refinish or repaint items at the discretion of the Architect.

1.18 SYSTEM AND EQUIPMENT START-UP

A. System and equipment start-up shall be as identified with the various specification sections of

B. General: Verify that:

1. Building enclosure is complete.

2. Excess building materials and debris have been removed.

3. Building is broom clean.

C. Inspect preceding work to ensure that:

1. Electrical: Verify with Division 26 contractor that:

a. Temporary services are disconnected and permanent utility services are capable of full load.

b. Connections in main switchgear and sub-panels are tight.

c. Necessary tests and check meter readings have been made.

2. Mechanical:

a. Specified tests on piping and related systems have been made.

b. Operational and performance tests have been made.

c. Each piece of equipment comprising a part of system has been checked for proper lubrication, drive rotation, belt tension, proper control sequence, and any other condition that may cause damage to equipment or endanger personnel.

D. Start-Up and Testing:

1. Notify Architect at least two (2) days in advance of the start-up of mechanical systems.

2. Complete tests required by applicable code and code authorities including health codes.

3. Ensure that control systems are fully operational in automatic mode.

GREAT FALLS, MONTANA

PROJECT JKSE 172220

REPAIR MAINTENANCE HANGAR, BLDG 25

BASIC PLUMBING REQUIREMENTS 22 02 00 - 13

4. After test runs have been completed and systems have been demonstrated to be satisfactory and ready for permanent operation, clean or replace permanent pipeline strainers, properly adjust valve and pump packings, secure drive guards in place, check lubrication and replenish if required.

5. If systems are not to continue in use following the start-up procedures take steps to insure against accidental operation or operation by unauthorized personnel.

6. The contractor to adjust settings thru first year as required by Mechanical Engineer.

7. Balancing shall occur after the start-up procedures have been completed.

1.19 FINAL OBSERVATION

B. Prior to notifying the Architect/Engineer that the project is ready for the final observation the

Contractor must submit the O & M manuals (15) fifteen days prior and the Balance Report (7) seven days prior and shall verify, in writing, that:

1. All systems are complete along with balancing.

2. All systems have been properly started and are operational.

3. All controls are complete, operational and sequences have been checked and are functioning properly.

C. When the Contractor notifies the Architect/Engineer that the project is ready for a final observation, the Architect/Engineer will visit the job site and will prepare a final observation list of all the items on the project that shall be finished or corrected before the project can be accepted.

D. When the Contractor notifies the Architect/Engineer that all items on the above final observation list have been completed and corrected, the Architect/Engineer will visit the project to ascertain that all the items on the final observation list have been corrected and can be accepted.

E. Architect/Engineer shall be paid by this Contractor for all other successive trips to the project that are made necessary because not all the items in the final observation list were corrected at the time of the second visit described above.

F. The Architect/Engineer will…

This is the start of the file's text. The full file is on GovTribe.