QA 2 - High Bay Lighting.pdf
PDF 216 KB Posted
- Attached to
- High Bay Lighting Project - Rosecrans MAP Federal contract opportunity
- Solicitation number
- W50S7G-25-B-A006
- Issued by
- Department of the Army National Guard
About this file
This document is a Question Set for a High Bay Lighting project (Solicitation W50S7G-25-B-A006) covering multiple buildings. The questions and responses primarily address lighting specifications across Buildings 1, 16, 18, 52, 302, and 301, with a consistent theme of removing dimming requirements from the project scope. Key details include specific manufacturer and model requirements for replacement lights (e.g., Orion HHSL2430LHEUNVFD850LACF11WHT65SP for Building 52), clarifications on lighting layout, and confirmation that while lights can have dimming capability, dimming will not be utilized. Additional questions cover the number of circuits, light quantities, and placement of lights in various building areas, including special considerations for warehouse and Haz-Mat zones.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Signin.pdf | ||
| C4 - Abstract 1419 - Construction.pdf | ||
| 2nd_Visit_Sign-in_HighBayLighting.pdf | ||
| Solicitation Amendment W50S7G25BA0060001 SF 30.pdf | ||
| SOW ULYB242004 - High Bay Lighting Replacement - Revised 10 SEPT 25.pdf | ||
| QAs 9SEP2025.pdf | ||
| High Bay Pre-Bid Conference Slides.pdf | ||
| prebid sign in High Bay Lighting.pdf | ||
| SOW ULYB242004 - High Bay Lighting Replacement Revise.pdf | ||
| lighting bldg 52.pdf | ||
| Lighting Study.pdf | ||
| Solicitation - W50S7G25BA006.pdf | ||
| Wage Rate - MO20250081 Mod 09 14AUG2025.txt | TXT text file | |
| SOW ULYB242004 - High Bay Lighting Replacement.pdf | ||
| AF 66.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
High Bay Lighting
W50S7G-25-B-A006
Question Set #2
Building 1
Questions:
• I don’t see the Task lights in the prints either in the SOW, how many are they and what specs they have?
• no dimming on the future lights?
Dimming is not required and is to be removed from all building’s scope. The lights can have dimming capability but will not be utilized.
Building 18
• no dimming on the future lights?
Dimming is not required and is to be removed from all building’s scope. The lights can have dimming capability but will not be utilized.
• In Point 3 of the SOW you state that you want a 20X20 grid but in the prints, you propose a new layout with different spacing, which of those two do you want? Contractor shall follow the lighting layout provided
Building 16
• no dimming on the future lights?
Dimming is not required and is to be removed from all building’s scope. The lights can have dimming capability but will not be utilized.
Building 52
• The lights installed don’t match the one in the SOW-
(a) To replace the open storage area a Manufacturer: Orion b Model: HHSL2430LHEUNVFD850LACF11WHT65SP / HW-FC008 (this model is the one installed in building 16)
• One light was missing in the entrance. This light does not appear in the print. The total number is 30? All lights in the warehouse area are to be replaced.
• How many vapor-tight? I don’t see them on the walk either in the prints. Are the vapor-tight included in the 30? The explosion proof lights are not on the print. There are a total of 3 in the Haz-Mat area of the warehouse.
• How many circuits power the lights now. Circuits can stay the same.
• I have doubts about Points 2 and 4 of the SOW.
2) The lights shall be controlled from regular light switches in the same cabinet where the current switches are. We want the light switches to stay in the same location they current are in building 52.
4) The lights are to be dimmable with a on/off switch and slider for control.
• How many dimmers? Dimming is not required and is to be removed from all building’s scope. The lights can have dimming capability but will not be utilized.
Building 302
• No dimming on the future lights? Dimming is not required and is to be removed from all building’s scope. The lights can have dimming capability but will not be utilized.
• How many circuits control the lights now? Between 2 and 4
Building 301
• No dimming on the future lights? Dimming is not required and is to be removed from all building’s scope. The lights can have dimming capability but will not be utilized.
• How many circuits are there right now? Unknown