AF 66.pdf

PDF 251 KB Posted

Attached to
High Bay Lighting Project - Rosecrans MAP Federal contract opportunity
Solicitation number
W50S7G-25-B-A006
Issued by
Department of the Army National Guard

About this file

This is an Air Force Form 66 Schedule of Material Submittals for a High Bay Lighting Replacement project, with the project number ULYB242004. The document provides a structured template for tracking material and documentation submissions throughout the project lifecycle. Two primary line items are currently identified: Lights and Electrical, with multiple columns for tracking submission dates, approvals, follow-up actions, and contractor notifications. The form allows project engineers and contract administrators to systematically manage and document the submittal process, including tracking product data, shop drawings, samples, manufacturer recommendations, warranties, and operations & maintenance (O&M) documentation.

View the file

Other files for this federal contract opportunity

Other files attached to High Bay Lighting Project - Rosecrans MAP, newest first.
File Type Posted
Bid Opening Signin.pdf PDF
C4 - Abstract 1419 - Construction.pdf PDF
2nd_Visit_Sign-in_HighBayLighting.pdf PDF
QA 2 - High Bay Lighting.pdf PDF
Solicitation Amendment W50S7G25BA0060001 SF 30.pdf PDF
SOW ULYB242004 - High Bay Lighting Replacement - Revised 10 SEPT 25.pdf PDF
QAs 9SEP2025.pdf PDF
High Bay Pre-Bid Conference Slides.pdf PDF
prebid sign in High Bay Lighting.pdf PDF
SOW ULYB242004 - High Bay Lighting Replacement Revise.pdf PDF
lighting bldg 52.pdf PDF
Lighting Study.pdf PDF
Solicitation - W50S7G25BA006.pdf PDF
Wage Rate - MO20250081 Mod 09 14AUG2025.txt TXT text file
SOW ULYB242004 - High Bay Lighting Replacement.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

SCHEDULE OF MATERIAL SUBMITTALS ULYB242004 High Bay Lighting Replacement

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR CONTRAC-

OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUS- FOLLOW-UP NOTIFIED TOR RE- FINAL REMARKS

REFERENCE, TYPE OF MISSION IN CON- ENGINEER- PENSE SUBMIT- APPROVAL

SUBMITTAL DATE TRACTING ING DATE TAL

DIS-

APPROVED APPROVED

1 Lights x x x x 2 Electrical x

AF Form 66

L i n e

N u m b e r

C ol or S el ec ti on

M an uf ac ur er

R ec om m en da ti on s

M an uf ac tu re r W ar ra nt y

O

M 's

Pr od uc t D at a

Sh op

D ra w in gs

Sa m pl es