About this file
This is an Air Force Form 66 Schedule of Material Submittals for a High Bay Lighting Replacement project, with the project number ULYB242004. The document provides a structured template for tracking material and documentation submissions throughout the project lifecycle. Two primary line items are currently identified: Lights and Electrical, with multiple columns for tracking submission dates, approvals, follow-up actions, and contractor notifications. The form allows project engineers and contract administrators to systematically manage and document the submittal process, including tracking product data, shop drawings, samples, manufacturer recommendations, warranties, and operations & maintenance (O&M) documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Signin.pdf | ||
| C4 - Abstract 1419 - Construction.pdf | ||
| 2nd_Visit_Sign-in_HighBayLighting.pdf | ||
| QA 2 - High Bay Lighting.pdf | ||
| Solicitation Amendment W50S7G25BA0060001 SF 30.pdf | ||
| SOW ULYB242004 - High Bay Lighting Replacement - Revised 10 SEPT 25.pdf | ||
| QAs 9SEP2025.pdf | ||
| High Bay Pre-Bid Conference Slides.pdf | ||
| prebid sign in High Bay Lighting.pdf | ||
| SOW ULYB242004 - High Bay Lighting Replacement Revise.pdf | ||
| lighting bldg 52.pdf | ||
| Lighting Study.pdf | ||
| Solicitation - W50S7G25BA006.pdf | ||
| Wage Rate - MO20250081 Mod 09 14AUG2025.txt | TXT text file | |
| SOW ULYB242004 - High Bay Lighting Replacement.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
SCHEDULE OF MATERIAL SUBMITTALS ULYB242004 High Bay Lighting Replacement
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR CONTRAC-
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUS- FOLLOW-UP NOTIFIED TOR RE- FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- PENSE SUBMIT- APPROVAL
SUBMITTAL DATE TRACTING ING DATE TAL
DIS-
APPROVED APPROVED
1 Lights x x x x 2 Electrical x
AF Form 66
L i n e
N u m b e r
C ol or S el ec ti on
M an uf ac ur er
R ec om m en da ti on s
M an uf ac tu re r W ar ra nt y
O
M 's
Pr od uc t D at a
Sh op
D ra w in gs
Sa m pl es
File details come from the government source that posted it. Updated .