Lighting Study.pdf
PDF 453 KB Posted
- Attached to
- High Bay Lighting Project - Rosecrans MAP
- Solicitation number
- W50S7G-25-B-A006
- Issued by
-
Department of the Army National Guard
About this file
These are facility floor plan drawings for five different buildings (Buildings 1, 16, 18, 301, and 302), depicting proposed spacing and fixture layouts. Each building's floor plan includes specific technical notes about fixture mounting, distribution, and spacing configurations. Notable details include:
Building 16 has infrared heaters positioned on the floor to heater 35°, with beams every 240° height, and a note about narrow 35° distribution of fixtures. Building 18 is proposing a new spacing layout with multiple fixture and equipment placements. Building 301 shows a proposed new spacing layout with evenly distributed fixtures. Building 302 includes a note that spacing can be reduced, with a grid-like arrangement of fixtures throughout the floor plan. Building 1 has a note about fixture mounting heights using white heights of 469", 434", and 437" as reference points, with a sloped ceiling configuration.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1608616531C Stamp
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .