This document summarizes a pre-bid conference for a federal construction contract opportunity. The contract involves vertical construction of a new approximately 10,000 square foot Weapons Load Crew Training Facility at the 187th Fighter Wing in Montgomery, Alabama. The estimated value is between $5-10 million. Key requirements include sitework, foundations, structural components, architectural elements, and mechanical, electrical and utility systems. The project also includes seven bid options around additional demolition, specialized systems, security barriers and finishes. The pre-bid meeting outlined project timelines and requirements around bonding, liquidated damages, prevailing wage rates, and submission deadlines of July 18th for questions and July 27th for proposals. The Army National Guard is the contracting agency, and the project involves standards for antiterrorism, sustainability certification, and specialized systems for security and fire protection.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

187th FIGHTER WING

PRE-BID CONFERENCE

SOLICITATION NO.

W50S6N-23-B-0004

FAKZ039172 – Weapons Load Crew Training Facility, at the 187th Fighter Wing

INTRODUCTIONS

Contracting Personnel Mr. William “Craig” Kast, Contracting Officer CMSgt William Hall and Mr. Karey Elias, Contracting Specialist’s

Civil Engineering Lt. Col. Adam Sanders, Base Civil Engineer Maj. William Sanford, Deputy Base Civil Engineer

Architects Mr. David Donovan, Seay, Seay & Litchfield Architects Mr. Jake Johnson, Seay, Seay & Litchfield Architects

DISCLAIMER

The following is a brief overview of the IFB requirements

Contractors are cautioned to carefully read the requirements of the solicitation and comply accordingly

Projects W50S6N-23-B-0004

PROJECT TITLE: Weapons Load Crew Training Facility (WLT)

MAGNITUDE OF PROJECT: Between $5,000,000 and $10,000,000.

LOCATION: 187th Fighter Wing, Dannelly Field, Montgomery, Al.

Project will have seven bid option

PROPOSAL DUE DATE

DATE: 14:00 on 27 July 2023

Documents must be received prior to or on this date Questions (Written Only) Deadline: 14:00 on 18 July

LOCATION: 187th Fighter Wing C/O Base Contracting 5187 Selma Highway Montgomery, AL 36108-4824

Hand carried bids, deliver to Building 1502 Wing Auditorium

All documents should have proper signatures

SUBMISSION REQUIREMENTS

Bid Guarantee’s are required

Performance Bond and Payment Bond: On Awarded IFB

Liquidated Damages: $1,035.71

Performance Period: 425 days after NTP

Davis Bacon Wage Rates applicable: AL 20220093, dated 04/07/2023

Project Overview Weapons Load Crew Training Facility:

Vertical construction of new facility of approximately 10,000 square foot located between the new proposed AMU building and existing Squad Ops (B1313).

Single-story facility consisting of an administration area, trailer storage area, training classroom, and aircraft training hangar.

This project includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation/extension of existing utilities as indicated on the drawings.

Ground Floor

Proposed South Elevation Proposed North Elevation

Sitework:

Site work will comprise of on-site parking, pedestrian paving, landscape and retaining walls, sodding, and landscape planting.

Underground utility work will include all necessary power, sanitary, storm, gas, water, and telecommunications infrastructure. Coordination will be required with existing utilities to maintain operation through and around the site and will include power, sanitary, storm, gas, water, and data.

Special attention will need to be paid to layout, erosion control, and laydown operations due to the limitations of the site and existing utilities on site. Scope of work will include the rerouting of underground utilities.

Addendum No. 1 modifies the earthwork requirements for base bid. Changes include, but are not limited to, the following:

Existing site contains a grid of ¼”x3” copper electrodes abandoned in place, varying in depth. Some electrode locations contain a 1 ½” diameter steel pipe abandoned in place, and varying in depth.

Top 3’-0” of electrodes and pipes will be remove, and the resulting holes will be filled with grout.

General Contractor to remove grout, pipe, and electrodes to a depth required to install scheduled pavement, foundation system, undercut, finished grade etc. All copper materials removed are to be salvaged and delivered to the Government.

Eliminate lime stabilization for pavement areas as a subgrade improvement option.

Clarify requirements for scarifying and moisture conditioning in-situ soils at subgrade of engineered filled pad.

Potential clarification of allowable backfill materials and procedures for drilled pier foundation system (if required).

Site Utility Plan:

Foundation Drain Fire Water Sanitary Sewer Storm Drain Line Water Line Telecommunications Power Natural Gas Geothermal Field

Structural Systems:

The Base Bid structural system includes slab on grade with engineered fill/soil stabilized building pad, load bearing masonry, composite floor slab, open web joists, conventual metal roof decking, and metal building systems with insulated metal wall and roof panel assemblies.

A pending Addendum No. 1 could replace engineered fill pad with drilled piers, grade beams, and structural floor slab. Additional geotechnical borings have been taken. Final determination of required foundation system is imminent.

Building Systems:

Major building systems include a combination of ground source geothermal heat pump system, direct expansion system with condenser and air handler, and radiant heating.

Architectural:

Exterior finish with combination of brick, cast stone, and metal panel facades.

Standing seam metal roof panels over rigid insulation over conventional metal roof decking on low roof areas.

Metal building system with insulated metal roof and wall panels at hangar spaces.

Combination of aluminum curtain all assemblies and translucent wall assembly panels.

Special Project Requirements:

Supervision, Site Access, & Job-Site Trailer:

Contractor shall provide on-site supervision as required to successfully complete the work.

Contactor to provide on-site office space for Contractor personnel and project meetings.

Site access, laydown, etc.. Will have to be coordinated with the adjacent Aircraft Maintenance Unit Facility.

Refer to 01 3000 for project manager and site superintendent resume requirements.

Refer to 01 3000 for project manager requirements for on-site presence and attendance if third-party project management approach is utilized.

Regular progress meetings.

Frequency will be based upon progress schedule and work quality.

A minimum of bi-weekly meetings should be anticipated.

Third party project manager, if utilized, will be required to be on site a minimum of once a month - refer to administrative requirements specification.

HPSB Compliance:

Project has been designed to meet the USGBC/GBCI Guiding Principles Assessment.

The Contractor is expected to understand the Construction phase documentation required for GCBI GP TPC Assessment and include all administrative costs within the Contractor's Proposal. This includes the required Sustainability eNotebook submittals.

The Architect will pay all submission/registration fees.

Commissioning is required. The Government will employ the commissioning agent. Contractor will provide associated services included in project specifications and ancillary support – refer to commissioning specifications.

Security Construction:

Hangar areas containing F35 aircraft are considered controlled areas. Thus, project includes access control and intrusion detection.

Coordinate with Owner’s Security Vendor, ADVANTOR Systems.

Required devices are indicated on E4.1.

ADVANTOR has been consulted during the design process. A redacted scope of work / quote is included within specification section 28 1300. However, General Contractors shall contact ADVANTOR during the bid and receive updated “quote” for required ACS and IDS systems.

QFPE Requirement:

The Contractor must engage a QFPE to be involved during the construction process. The QFPE must meet the requirements of UFC 3-600-01 and provide site inspections and submittal review for the fire alarm, mass notification, fire sprinkler, and life safety systems.

The Contractor's QFPE will be ultimately responsible to certify all life safety systems.

All costs associated with the Construction QFPE shall be included within the bid. QFPE can be furnished via a subcontractor. However, the QFPE will be responsible to review and stamp drawings that may fall across different subcontractors (fire alarm, fire sprinkler, mass notification, etc…)

Project Management Software:

Contractor will be required to utilize Architect’s Newforma system for all project communication.

All submittals and RFI will be submitted electronically.

Web-based interface will be provided at no cost to the Contractor.

iPad applications will also be made available to contractor at no cost.

ANTITERRORISM AND BUILDING STANDOFF REQUIREMENTS:

The project site and building structural, architectural, electrical and mechanical systems have been designed to meet the prescribed levels of protection against terrorist attacks in accordance with the department of defense (DoD) unified Facilities Criteria (UFC) 4-010-01 DoD minimum antiterrorism standards for buildings.

Limited Source Requirements:

Refer to 01 6000. The following products/manufacturers must be provided by name with no exception:

ADVANTOR Systems Contractor shall contact ADVANTOR during the bid process and get updated pricing information.

Monaco Enterprises, Inc., for fire alarm transceiver antennae for communication with existing base fire alarm reporting systems.

BEST Access Keying Systems (Patented MX-8 Keying System) for all key cores. All cylinders/hardware must be compatible with and able to receive BEST MX-8 key cores.

Johnson Controls, Inc., for building automation and energy management systems and equipment.

Belgard for concrete pavers to coordinate with adjacent construction projects.

Site Remediation:

A remediation project was recently competed that treated high levels of TCE on the project site.

Site has been remediated and all known chemicals present in the soil on site have been reduced to below allowable thresholds.

The remediation process utilized electric resistance heating of the soil. At the time of the pre-bid conference, the soil temperatures on site are estimated at +/- 90 degrees Celsius.

Electric resistance heating system has been turned off and removed.

Soil temperatures will drop during the bid and award process. However, soil temperatures are expected to remain elevated above normal for an extended time.

Soil temperatures at the time of commencing earthwork for this project are not known. The Contractor shall take all precautions necessary to protect equipment and personnel working with, in, and around the project site.

Addendum No. 1 will clarify extent of remediation electrodes abandoned in place and Contractor’s responsibility to remove abandoned electrodes.

Addendum No. 1 will also add removal of stone from project site that was part of the remediation project and not indicated on the original site demolition plan. Stone can be used by the Contractor during the project but must be relocated to another area of the site prior to completion of the work.

Bid Option Description Bid Option #1 – (Additive): Demolish Building 1403 Includes building demolition, paving demolition, and utility demolition.

See sheets C1.2 and C3.2.

Bid Option #2 – (Additive): Aircraft Maintenance Power Includes 270VDC power converter and 460VAC disconnects and associated conduit and wiring.

Panels serving this equipment will remain as drawn for future installation of 270VDC and 460VAC equipment.

Bid Option #3 – (Additive): Aircraft Maintenance Compressed Air Systems Includes all compressors, dryers, air lines, hose reels, outlet devices, etc… associated with compressed air systems.

If not awarded, no compressed air systems will be installed as part of the project.

Bid Option #4 – (Additive): Security Barriers Architectural benches / security barriers shown on landscape plans.

Architectural paver system is included in the base bid.

Bid Option #5 – (Additive): Landscape Wall Installation of CMU, brick, and cast stone wall shown on landscape drawings.

If not awarded, install chain link fencing to connect WLT facility to existing chain link flight line security fencing at West side of site. Landscape wall between WLT and AMU facilities shall be included within the project base bid.

Bid Option #6 – (Additive): Bathroom Tile Hard tile on restroom floors and walls as indicated on note 3 on finish schedule in lieu of polished concrete and painted CMU walls.

Bid Option #7 – (Additive): Underslab Vapor Barrier Base bid – 15 mil membrane specified in section 03 3000.

Option – integrally bonded system specified in section 07 2650

Bid Option #8 – (PENDING): Alternate Foundation Systems Geotechnical borings have been taken. Foundation systems confirmation is imminent.

If results of new borings suggest engineered fill pad is acceptable following remediation process, no changes to drawings will be made and Addendum No.1 will not include Bid Option #8.

If result of new borings suggest engineered fill pad is unacceptable following remediation process, Addendum No. 1 will include a new Bid Option #8 that will show a drilled pier/structural floor slab foundation system.

Questions Send to:

william.hall.13@us.af.mil karey.l.elias.civ@army.mil

All RFI’s/questions must be submitted to the contracting office. DO not contact the A/E or CE directly.

ANSWERS TO QUESTIONS

All questions, on a non-attribution basis, and the answers will be posted to the website https://sam.gov/content/opportunities

All Addendums will be issued by an Amendment and posted to https://sam.gov/content/opportunities

Check website regularly and don’t forget to REFRESH the web page.

Award

Award will be a Firm Fixed Price

Funds are presently available.

SITE VISIT SECURITY AND SAFETY BRIEFING

You can have your cell phones, but no driving and talking on your cell phone

All photos must be approved by the Government.

All contractors must be accompanied by an escort during the site visit.

ONCE AGAIN PROPOSALS ARE DUE

NO LATER THAN

Thursday 27 July 2023 2:00 p.m. Central Time

Thank You

We appreciate your interest in this project Office Open Tuesday - Friday 0700- 17:30

Questions image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image1.png

File details come from the government source that posted it. Updated .