FAKZ039172 - Type B3 Drawings SIGNED.pdf_safe.pdf
PDF 45 MB Posted
- Attached to
- Weapons Load Crew Training Facility
- Solicitation number
- W50S6N-23-B-0004
About this file
This file appears to be technical drawings related to a federal solicitation for a Weapons Load Crew Training Facility. The solicitation number is W50S6N-23-B-0004 and was issued by the Department of the Army Alabama Army National Guard seeking proposals to design and construct a training facility. Interested vendors should review the technical drawings to understand the requirements for this project, which includes constructing a new building and related infrastructure to support weapons load crew training. Proposals are due by the date specified in the solicitation document. The award will be granted to the responsive, responsible bidder offering the best value to the government.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
T1.0
TITLE SHEET
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
F-35: Weapons Load Crew Training Facility
Montgomery, AL
FAKZ 039172
187th Fighter Wing Dannelly Field -
AL ANG
ARCHITECTURALCIVIL STRUCTURAL MECHANICAL ELECTRICAL
SEAY SEAY & LITCHFIELD, P.C.
1115 SOUTH COURT STREET
MONTGOMERY, AL 36104
334-263-5162
PROFESSIONAL ENGINEERING CONSULTANTS
822 S MCDONGOUGH STREET
MONTGOMERY AL, 36104
334-262-7307
BLACKBURN DANIELS O'BARR
8805 COUNTY RD 40 E
LOWNDESBORO, AL 36752
334-265-0206
HHB ENGINEERS
104 JOSIE RUN
PRATTVILLE, AL 36066
334-358-2707
GUNN & ASSOCIATES, P.C.
3102 HIGHWAY 14
MILLBROOK, AL 36054
334-285-1273
Approvals:
Title: Signature: Date:
Base Commander
Base Civil Engineer
Base Project Engineer
Bio Environmental Eng.
Safety
Security Police
Base Communications
Fire Chief
Option #3
Schedule of Bid Options:
Security Barriers
Option #2
Aircraft Maintenance Compressed Air Systems
Option #1
Aircraft Maintenance Plane Power
Option #4
Demolish Building 1403
Landscape WallOption #5
Option #6 Bathroom Tile
Option #7 Underslab Vapor Barrier
No. Revision Date
David Donovan
Digitally signed by David Donovan DN: cn=David Donovan, o=SS&L, ou=SS&L, email=ddonovan@sslarch.com, c=US Date: 2023.04.28 11:45:56 -05'00'
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
T1.1
INDEX
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
F-35: Weapons Load Crew Training Facility
Montgomery, AL
FAKZ 039172
187th Fighter Wing Dannelly Field - AL ANG
GENERAL NOTES APPLY TO THE ENTIRE PROJECT. SPECIFIC NOTES APPLY TO ISOLATED WORK AREAS AND ARE FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, ALL ISOLATED WORK AREAS ARE NOT NOTED. SHOULD A CONDITION OCCUR THAT IS NOT SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROCEED WITH WORK PER GENERAL DEMOLITION NOTES OR A SPECIFIC WORK NOTE(S) USED IN OTHER SIMILAR CONDITIONS, WHICHEVER IS MORE STRINGENT, PER APPROVAL OF ARCHITECT.
1. CONTRACTOR TO NOTIFY ARCHITECT IMMEDIATELY IF THERE ARE ANY DISCREPANCIES WITH TAGGED DETAILS, ENLARGED PLANS, ELEVATIONS, ETC.
2. CONTRACTOR TO CONFIRM ALL OSHA AND APPLICABLE STANDARDS TO ASSURE SAFETY OF ALL PERSONS ON SITE DURING
ENTIRE COURSE OF CONSTRUCTION.
3. CONTRACTOR TO VERIFY ALL FINISHED DIMENSIONS BEFORE INSTALLATION OF CABINET WORK AND TRIMWORK.
4. CONTRACTOR TO VERIFY APPLICABLE OPENINGS, DOOR SIZES, AND DIMENSIONS OF MECHANICAL ROOMS WITH EQUIPMENT. IF
DISCREPANCY OCCURS, NOTIFY ARCHITECT PRIOR TO FRAMING.
5. CONTRACTOR TO COORDINATE PLUMBING AND MECHANICAL LINES WITH CEILING HEIGHTS, ABOVE CEILING AREAS AND
STRUCTURAL ELEMENTS.
6. CONTRACTOR TO VERIFY WITH STRUCTURAL, PLUMBING, MECHANICAL, AND ELECTRICAL THE QUANTITY AND SIZES OF ALL SLEEVES REQUIRED. ALL SLEEVES TO BE ONE HOUR RATED, PROVIDE GREATER RATING IF PENETRATING INTO HIGHER RATED
ASSEMBLY.
7. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT THE HEAD HEIGHT IS NOT ENCUMBERED AND SERVICES ARE AS TIGHT
UP TO STRUCTURE AS POSSIBLE.
8. CONTRACTOR TO COORDINATE PLUMBING, MECHANICAL, FIRE SPRINKLER, ELECTRICAL, AND LIGHTING WITH STRUCTURAL ELEMENTS WHERE THERE IS EXPOSED STRUCTURE. CONDUIT LINES, ETC. SHALL RUN AT RIGHT ANGLES OR SEGMENTED
BETWEEN COLUMN LINES AND BE CLEAN AND NEAT IN APPEARANCE.
9. COORDINATE LOCATION OF SWITCHES, OUTLETS, THERMOSTATS, LIGHTS, ETC. W/ SHELVING, TRIM, MARKER BOARDS, AND CABINETRY. MOVE AS REQUIRED TO MISS SHELVING, STORAGE, CASEWORK, VISUAL DISPLAY BOARDS.
GENERAL NOTES
20. IF ANY WORK IS PERFORMED KNOWING IT TO BE CONTRARY TO SUCH CODES, LAWS, ORDINANCES, RULES AND REGULATIONS, AND WITHOUT NOTICE TO THE ARCHITECT, THAT TRADE CONTRACTOR ASSUMES FULL RESPONSIBILITY AND BEARS COSTS ATTRIBUTED TO BRING WORK TO COMPLIANCE OF SUCH CODES, LAWS, ORDINANCES, AND RULES AND REGULATIONS.
21. EACH RESPONSIBLE CONTRACTOR SHALL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK IN FIRE-RATED CONSTRUCTION AS REQUIRED BY ALL APPLICABLE CODES. EACH CONTRACTOR TO VERIFY WITH LOCAL FIRE MARSHAL OR BUILDING OFFICIAL HAVING JURISDICTION. EACH RESPONSIBLE CONTRACTOR WILL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK THROUGH NON-RATED PARTITIONS. ALL FIRE CAULK TO BE THE SAME BRAND AS DETERMINED BY CONTRACTOR.
22. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK WITH ALL TRADES.
CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
23. NEITHER THE ARCHITECT, NOR THE OWNER SHALL BE RESPONSIBLE FOR JOB SAFETY. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR JOB SITE SAFETY AND SAFETY OF THE PUBLIC DURING CONSTRUCTION AND SHALL PROVIDE APPROPRIATE
WARNINGS, BARRICADES, ETC. AS REQUIRED PER CODES.
24. CONTRACTOR WILL BE RESPONSIBLE FOR ALL LAYOUT FOR INTERIOR/EXTERIOR WALLS AND FOUNDATION AND WILL BE RESPONSIBLE FOR MAINTAINING A BENCHMARK AND CONTROL LINES AT EACH FLOOR LEVEL. CONTRACTOR IS ALSO RESPONSIBLE FOR VERIFYING ACTUAL FLOOR HEIGHTS AND COORDINATING NEW AND EXISTING FLOORS TO ALIGN.
25. EACH TRADE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLING CEILING OR WALL-MOUNTED ACCESS DOORS AS REQUIRED TO ACCESS COMPONENTS OF ITS SYSTEM AND TO COORDINATE WITH OTHER TRADES SO ACCESS IS
MAINTAINED.
26. IN ROOMS WITH FLOOR DRAINS, SLOPE TO DRAINS @ 1% SLOPE.
27. COORDINATE WITH OWNER LOCATION TO TELEVISION TO PROVIDE WOOD BLOCKING AT OWNER SPECIFIED LOCATION.
10. REFER TO MECHANICAL FOR ADDITIONAL LOUVERS NOT TAGGED.
11. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT HEAD HEIGHT IS NOT ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE, THIS WILL INCLUDE JOGGING DUCTS, SPRINKLER LINES, PLUMBING LINES, CONDUIT, ETC. UP AND DOWN OR AROUND AS REQUIRED TO ACHIEVE CEILING HEIGHTS AS INDICATED. COORDINATE INSTALLATION AND SEQUENCING
OF DISCIPLINES TO ACHIEVE.
12. THE GENERAL CONTRACTOR SHALL STAKE OUT ALL MAJOR FEATURES SHOWN ON THE SITE PLAN TO VERIFY THE SITE LAYOUT RELATIVE TO THE PROPERTY LINES AND SITE CONDITIONS PRIOR TO ANY UTILITIES OR FOOTINGS BEING INSTALLED.
13. ALL RECESSED ACCESSORIES LOCATED IN FIRE RATED WALLS SHALL BE EITHER OF FIRE RATED CONSTRUCTION OR COORDINATED WITH THE ADJACENT TRADES TO ALLOW THE GYPSUM BOARD TO BE CONTINUOUS BEHIND THE ACCESSORIES.
14. REFER TO CONTRACT DOCUMENTS FOR CONCEALED WOOD BLOCKING REQUIREMENTS.
15. COORDINATE FINAL CEILING HEIGHT WITH ALL WINDOWS. ALL TRADES SHOULD BE ABLE TO FIT WITHIN THE ALLOTTED SPACE IF COORDINATED BY THE GENERAL CONTRACTOR AND EACH TRADE. IF FURR DOWNS ARE REQUIRED TO ACCOMMODATE ABOVE CEILING ITEMS, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE FURR DOWNS AND COORDINATE LOCATIONS WITH THE
ARCHITECT.
16. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS WITH THE DRAWINGS, IN PARTICULAR: WALL DIMENSIONS, INCOMING UTILITIES, ETC. REPORT IMMEDIATELY TO THE ARCHITECT ANY VARIANCES OR FIELD CONDITIONS THAT MAY CAUSE
CONSTRUCTION PROBLEMS PRIOR TO COMMENCING WORK.
17. ALL MATERIAL SPECIFIED IS TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND SPECIFICATIONS.
TRADE CONTRACTORS ARE TO CONSTRUCT PROJECT IN ACCORDANCE WITH THE DOCUMENTS. ANY DEVIATION FROM THE INTENT OF THE DOCUMENTS WITHOUT ARCHITECT'S APPROVAL ARE AT THE TRADE CONTRACTOR'S RISK AND MAY RESULT IN
WORK BEING REWORKED AT THE TRADE CONTRACTOR'S EXPENSE. (MATERIAL AND LABOR)
18. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES, LAWS, AND ORDINANCES. EACH TRADE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS, INSPECTIONS, AND CERTIFICATES REQUIRED BY GOVERNING ENTITIES.
19. PROMPTLY NOTIFY THE ARCHITECT IN WRITING IF ANY CONTRACT DOCUMENTS ARE FOUND TO BE IN VARIANCE WITH THE APPLICABLE LAWS AND ORDINANCES. NECESSARY CHANGES WILL BE MADE BY APPROPRIATE MODIFICATIONS.
DRAWING INDEX
SHEET NO. SHEET NAME
09 ELECTRICAL
E0.1 LEGEND & NOTES
E0.2 LEGEND & NOTES
E0.3 OVERALL BUILDING PLAN - LIGHTNING PROTECTION SYSTEM
E0.4 FIRST FLOOR PLAN HAZARDOUS CLASSIFICATION AREAS
E1.1 SITE PLAN
E2.1 FLOOR PLAN LIGHTING
E2.2 LIGHTING CONTROL DETAILS
E3.1 FIRST FLOOR PLAN POWER
E3.2 FIRST FLOOR PLAN MECHANICAL POWER
E3.3 FIRST FLOOR PLAN GROUNDING
E3.4 GROUNDING DETAILS
E3.5 EQUIPMENT SCHEDULE AND DETAILS
E4.1 FIRST FLOOR PLAN AUXILIARY
E5.1 LUMINAIRE SCHEDULE, DETAILS, & NOTES
E5.2 PANEL SCHEDULES & DETAILS 480/277V
E5.3 PANEL SCHEDULES - 208/120V
E6.1 SECURE DOOR DETAILS
E6.2 COMMUNICATIONS DETAILS & NOTES
E6.3 COMMUNICATIONS DETAILS & NOTES
E6.4 COMMUNICATIONS DETAILS & NOTES
E6.5 COMM ROOM DETAILS
E7.1 SINGLE LINE DIAGRAM - POWER
E7.2 ELECTRICAL GROUNDING DETAILS & NOTES
E7.3 PRIMARY SINGLE LINE
E7.4 TRANSFORMER DETAILS
10 FIRE ALARM
FA0.1 FIRE ALARM MATRIX AND GENERAL NOTES
FA0.2 FIRE ALARM RISER AND DETAILS
FA1.1 FIRE ALARM AND DETECTION NEW WORK PLAN
DRAWING INDEX
SHEET NO. SHEET NAME
07 MECHANICAL
M0.1 MECHANICAL LEGENDS AND GENERAL NOTES
M0.2 MECHANICAL SCHEDULES
M0.3 MECHANICAL SCHEDULES
M0.4 MECHANICAL DETAILS
M0.5 MECHANICAL DETAILS
M0.6 MECHANICAL DETAILS
M0.7 MECHANICAL DETAILS
M2.0 GEOTHERMAL SYSTEM SITE MAP
M2.1 FIRST FLOOR - MECHANICAL PLAN
M2.2 UPPER MECHANICAL PLAN - IR HEATING
M3.1 LARGE SCALE MECHANICAL PLANS - MEZZANINE
M3.2 LARGE SCALE MECHANICAL PLANS - MEZZANINE PIPING
M4.1 HVAC ELEVATIONS
M4.2 HVAC ELEVATIONS
M4.3 BUILDING SECTION
M4.4 BUILDING SECTION
M7.0 CONTROL DIAGRAM LEGEND AND GENERAL NOTES
M7.1 AHU-1 CONTROL DIAGRAM
M7.2 GEOTHERMAL PUMP CONTROL DIAGRAM
M7.3 COMPRESSED AIR SYSTEM CONTROL DIAGRAM
M7.4 TRAINING BAY HEATING AND VENTILATION CONTROL DIAGRAM
08 PLUMBING
P0.1 PLUMBING NOTES, LEGEND, AND SCHEDULES
P0.2 PLUMBING DETAILS
P0.3 PLUMBING DETAILS
P0.4 PLUMBING DETAILS
P2.1 FIRST FLOOR - PLUMBING PLAN
P3.1 LARGE SCALE PLUMBING PLANS - FIRST FLOOR
P3.2 LARGE SCALE PLUMBING PLANS - MEZZANINE
P4.1 GAS RISER DIAGRAM
P4.2 WASTE AND VENT RISER DIAGRAM
P4.3 WATER RISER DIAGRAM
DRAWING INDEX
SHEET NO. SHEET NAME
04 ARCHITECTURAL
A1.1 DEMOLITION FLOOR PLAN
A2.1 FIRST FLOOR PLAN
A2.2 ROOF PLAN
A2.3 WALL TYPE PLAN AND DETAILS
A2.4 ROOF DETAILS
A3.1 FINISH SCHEDULES
A3.2 DOOR SCHEDULE AND DETAILS
A3.3 DOOR DETAILS
A3.4 GLAZED OPENING SCHEDULE
A3.5 DOOR & WINDOW DETAILS
A3.6 GLAZED OPENING DETAILS
A3.7 LOUVER DETAILS
A4.1 ELEVATIONS
A4.2 ELEVATIONS
A5.1 BUILDING SECTION
A5.2 WALL SECTIONS
A5.3 SECTIONS
A5.4 SECTION CALLOUTS
A6.1 ENLARGED FLOOR PLANS, ELEVATIONS, AND DETAILS
A8.1 REFLECTED CEILING PLAN
05 STRUCTURAL
S0.1 GENERAL NOTES - SCHEDULES - TYPICAL DETAILS
S0.2 TYPICAL DETAILS
S1.1 FIRST FLOOR AND FOUNDATION PLAN
S1.2 MEZZANINE & ROOF FRAMING PLAN
S2.1 SECTIONS AND DETAILS
S2.2 SECTIONS AND DETAILS
S2.3 SECTIONS AND DETAILS
S2.4 SECTIONS AND DETAILS
06 FIRE PROTECTION
FX0.1 FIRE SPRINKLER GENERAL NOTES
FX1.1 FIRE SPRINKLER NEW WORK PLAN
FX1.2 FIRE SPRINKLER DETAILS
DRAWING INDEX
SHEET NO. SHEET NAME
00 TITLE
T1.0 TITLE SHEET
T1.1 INDEX
T2.0 GENERAL WORK NOTES, ABBREVIATIONS & SYMBOLS
T3.0 TYPICAL MOUNTING HEIGHTS & CLEARANCES
01 LIFE SAFETY
LS1.0 LIFE SAFETY
LS2.0 LIFE SAFETY EVALUATION
02 LANDSCAPE
L1.0 LANDSCAPE SITE PLAN
L2.0 ENLARGED LANDSCAPE SITE PLAN & DETAILS
03 CIVIL
C1.1 SITE DEMOLITION PLAN
C1.2 BUILDING 1403 SITE DEMOLITION PLAN
C2.1 SITE LAYOUT PLAN
C3.1 SITE GRADING & DRAINAGE PLAN
C3.2 BUILDING 1403 SITE GRADING & DRAINAGE PLAN & EROSION
CONTROL PLAN
C4.1 SITE UTILITIES PLAN
C5.1 SITE EROSION & SEDIMENT CONTROL PLAN
C6.1 SITE DETAILS
C7.1 SITE DETAILS
C8.1 SITE DETAILS
C9.1 SITE DETAILS
C10.1 SITE DETAILS
C11.1 SITE DETAILS
No. Revision Date
202A
A101
1Ref
Re f
1 Ref
Re f
A101
Ref
1Re f
1 Re f
Ref
ROOM NAME
150 SF
1t
1i
A101
SIM
A101
SIM
A101
SIM
Building Elevation Tag
Interior Elevation Tag
Building Section Tag
Wall Section Tag
Detail Tag
General Symbol Legend
Room Tag
ADA Approved Turning Space
Spot Elevation
Door Tag (See Door Schedule)
Window Tag (See Window Schedule)
Wall/Storefront Tag (See Wall/Storefront Schedule)
Revision Tag (See Revision Schedule)
X Specific Note Tag
Electric Water Cooler (See Plumbing)
Fire Extinguisher Cabinet
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
T2.0
GENERAL WORK
NOTES,
ABBREVIATIONS &
SYMBOLS
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
General Project Notes:
GENERAL NOTES APPLY TO THE ENTIRE PROJECT. SPECIFIC NOTES APPLY TO ISOLATED
WORK AREAS AND ARE FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, ALL
ISOLATED WORK AREAS ARE NOT NOTED. SHOULD A CONDITION OCCUR THAT IS NOT
SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROCEED WITH WORK PER GENERAL
DEMOLITION NOTES OR A SPECIFIC WORK NOTE(S) USED IN OTHER SIMILAR
CONDITIONS, WHICHEVER IS MORE STRINGENT, PER APPROVAL OF ARCHITECT.
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY CONDITIONS
1. CONTRACTOR TO VISIT SITE AND TO BECOME TOTALLY FAMILIAR WITH EXTENT OF
WORK REQUIRED PRIOR TO BID.
2. CONTRACTOR TO VERIFY DIMENSIONS OF INTERIOR PARTITION WALLS. IF
DISCREPANCY OCCURS, NOTIFY THE GOVERNMENT PRIOR TO FRAMING.
3. CONTRACTOR TO VERIFY ALL FINISHED DIMENSIONS BEFORE INSTALLATION OF
CABINET WORK AND TRIMWORK.
4. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR THE CONVENIENCE OF THE
CONTRACTOR, VERIFY ALL EXISTING CONDITIONS. LOCATION OF WALLS SHALL BE
AS SHOWN ON PLAN RELATIVE TO EXISTING CONDITIONS.
5. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS WITH THE
DRAWINGS, IN PARTICULAR: WALL DIMENSIONS, INCOMING UTILITIES, ETC. REPORT
IMMEDIATELY TO THE GOVERNMENT ANY VARIANCES OR FIELD CONDITIONS THAT
MAY CAUSE CONSTRUCTION PROBLEMS PRIOR TO COMMENCING WORK.
CONTRACTOR'S REPONSIBILITY TO COORDINATE THE WORK
1. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO COMMENCING.
FURNISH INFORMATION NECESSARY TO ADJUST, MOVE OR RELOCATE EXISTING
STRUCTURES, UTILITY POLES, LINES, SERVICES OF OTHER SYSTEMS LOCATED IN,
OR AFFECTED BY CONSTRUCTION. COORDINATE WITH LOCAL AUTHORITIES
HAVING JURISDICTION WITH CONSTRUCTION.
2. CONTRACTOR TO VERIFY APPLICABLE OPENINGS, DOOR SIZES, AND DIMENSIONS
OF MECHANICAL ROOMS WITH EQUIPMENT. IF DISCREPANCY OCCURS, NOTIFY
THE GOVERNMENT PRIOR TO FRAMING.
3. CONTRACTOR TO COORDINATE PLUMBING AND MECHANICAL LINES WITH CEILING
HEIGHTS, ABOVE CEILING AREAS AND STRUCTURAL ELEMENTS.
4. CONTRACTOR TO VERIFY WITH STRUCTURAL, PLUMBING, MECHANICAL, AND
ELECTRICAL THE QUANTITY AND SIZES OF ALL SLEEVES REQUIRED. ALL SLEEVES
TO BE ONE HOUR RATED, PROVIDE GREATER RATING IF PENETRATING INTO HIGHER
RATED SPACE.
5. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT THE HEAD HEIGHT IS
NOT ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE.
6. CONTRACTOR TO COORDINATE PLUMBING, MECHANICAL, FIRE SPRINKLER,
ELECTRICAL, AND LIGHTING WITH STRUCTURAL ELEMENTS WHERE THERE IS
EXPOSED STRUCTURE. CONDUIT LINES, ECT. SHALL RUN AT RIGHT ANGLES OR
SEGMENTED BETWEEN COLUMN LINES AND BE CLEAN AND NEAT IN APPEARANCE.
7. COORDINATE LOCATION OF SWITCHES, OUTLETS, THERMOSTATS, LIGHTS, ETC. W/
SHELVING, TRIM, MARKER BOARDS, AND CABINETRY. MOVE AS REQUIRED TO
MISS SHELVING, STORAGE, CASEWORK, VISUAL DISPLAY BOARDS.
8. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT HEAD HEIGHT IS NOT
ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE,
THIS WILL INCLUDE JOGGING DUCTS, SPRINKLER LINES, PLUMBING LINES,
CONDUIT, ECT. UP AND DOWN OR AROUND AS REQUIRED TO ACHIEVE CEILING
HEIGHTS AS INDICATED. COORDINATE INSTALLATION AND SEQUENCING OF
DISCIPLINES TO ACHIEVE.
9. THE GENERAL CONTRACTOR SHALL STAKE OUT ALL MAJOR FEATURES SHOWN ON
THE SITE PLAN TO VERIFY THE SITE LAYOUT RELATIVE TO THE PROPERTY LINES AND
SITE CONDITIONS PRIOR TO ANY UTILITIES OR FOOTINGS BEING INSTALLED.
10. COORDINATE FINAL CEILING HEIGHT WITH ALL WINDOWS. ALL TRADES SHOULD BE
ABLE TO FIT WITHIN THE ALLOTTED SPACE IF COORDINATED BY THE GENERAL
CONTRACTOR AND EACH TRADE. IF FURR DOWNS ARE REQUIRED TO
ACCOMMODATE ABOVE CEILING ITEMS, THE CONTRACTOR IS RESPONSIBLE TO
PROVIDE FURR DOWNS AND COORDINATE LOCATIONS WITH THE GOVERNMENT.
11. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY
THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK
WITH ALL TRADES. CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK
ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
12. CONTRACTOR WILL BE RESPONSIBLE FOR ALL LAYOUT FOR INTERIOR/EXTERIOR
WALLS AND FOUNDATION AND WILL BE RESPONSIBLE FOR MAINTAINING A
BENCHMARK AND CONTROL LINES AT EACH FLOOR LEVEL. CONTRACTOR IS ALSO
RESPONSIBLE FOR VERIFYING ACTUAL FLOOR HEIGHTS AND COORDINATING NEW
AND EXISTING FLOORS TO ALIGN.
13. EACH TRADE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND
INSTALLING CEILING OR WALL-MOUNTED ACCESS DOORS AS REQUIRED TO
ACCESS COMPONENTS OF ITS SYSTEM AND TO COORDINATE WITH OTHER
TRADES SO ACCESS IS MAINTAINED
14. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY
THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK
WITH ALL TRADES. CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK
ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
15. CONTRACTOR SHALL COORDINATE TO ASSURE ALL EQUIPMENT CAN BE BROUGHT
INTO THE BUILDING. THIS INCLUDES MANUFACTURE COMPONENT SIZE/ASSEMBLY,
CRITICAL PATH SCHEDULING, AND COORDINATION OF OTHER TRADES.
ACT Acoustical Ceiling Tile A/C Air Conditioning AB Anchor Bolt ADA American Disabilities Act AFF Above Finish Floor BM Beam BRG Bearing BRK Brick CFCI Contractor Furnished
Contractor Installed CIP Cast In Place CJ Control Joint CL Column Line CLG Ceiling CLR Clear CMU Concrete Masonry Unit COL Column CONC Concrete CONT Continuous CONTR Contractor COORDF Coordination CORR Corridor CT Ceramic Tile CTR Center DBL Double DET Detail DIA Diameter DR Drain DN Down DS Downspout DW Dishwasher DWG Drawing DWR Drawer EA Each EF Exhaust Fan EJ Expansion Joint EL Elevation ELEC Electrical EQ Equal EX Existing EXT Exterior FF Finish Floor FIN Finish FL Floor Line FlSNG Flashing FTG Footing GA Gauge GFRC Glass Fiber Reinforced
Concrete
GWB GWB
HT Height HM Hollow Metal HOR Horizontal HR Handrail HTR Heater HVAC Heating, Ventilation & Air
Conditioning HxWxL Height, width, length IN Inches INSUL Insulation INT Interior JST Joist
JT Joint LAM Laminate LAV Lavatory LVR Louver MIN Minimum MAX Maximum MECH Mechanical MET Metal MFR Manufacturer MH Man Hole MIN Minimum MISC Miscellaneous MLDG Moulding MO Masonry Opening MTD Mounted MW Microwave NIC Not In Contract NO Number NOM Nominal NTS Not to Scale OC On Center OFCI Owner Furnished
Contractor Installed OFOI Owner Furnished
Owner Installed OPP Opposite P Paint PL Plate / Property Line PL LAM Plastic Laminate PLYWD Plywood PNL Panel PT Pressure Treated R Radius / Riser RB Rubber Base REFR Refrigerator REINF Reinforce (D) REV Revised RM Room SCHED Schedule SECT Section SHT Sheet SHW Single Hung Window SIM Similar SPECS Specifications SQ Square SS Sanitary Sewer STD Standard SVT Solid Vinyl Tile STL Steel T Tile T&G Tongue & Groove TYP Typical UNO Unless Noted
Otherwise VERT Vertical VTR Vent Thru Roof VWC Vinyl Wall Covering WD Wood WWM Welded Wire Mesh WWF Welded Wire Fabric YP Yellow Pine
Typical Abbreviation Legend:General Project Notes (Continued):
CONTRACTOR'S RESPONSIBILTY TO COMPLY WITH APPLICABLE GOVERNING
CODES/AUTHORITIES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES, LAWS,
AND ORDINANCES. EACH TRADE CONTRACTOR IS RESPONSIBLE FOR
OBTAINING ALL PERMITS, INSPECTIONS, AND CERTIFICATES REQUIRED BY
GOVERNING ENTITIES.
2. CONTRACTOR TO CONFIRM ALL OSHA AND APPLICABLE STANDARDS TO
ASSURE SAFETY OF ALL PERSONS ON SITE DURING ENTIRE COURSE OF
CONSTRUCTION.
3. NEITHER THE ARCHITECT, NOR THE GOVERNMENT SHALL BE RESPONSIBLE
FOR JOB SAFETY. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR
JOB SITE SAFETY AND SAFETY OF THE PUBLIC DURING CONSTRUCTION AND
SHALL PROVIDE APPROPRIATE WARNINGS, BARRICADES, ETC. AS REQUIRED
PER CODES.
4. PROMPTLY NOTIFY THE GOVERNMENT IN WRITING IF ANY CONTRACT
DOCUMENTS ARE FOUND TO BE IN VARIANCE WITH THE APPLICABLE LAWS
AND ORDINANCES. NECESSARY CHANGES WILL BE MADE BY APPROPRIATE
MODIFICATIONS.
5. IF ANY WORK IS PERFORMED KNOWING IT TO BE CONTRARY TO SUCH CODES,
LAWS, ORDINANCES, RULES AND REGULATIONS, AND WITHOUT NOTICE TO
THE GOVERNMENT, THAT TRADE CONTRACTOR ASSUMES FULL
RESPONSIBILITY AND BEARS COSTS ATTRIBUTED TO BRING WORK TO
COMPLIANCE OF SUCH CODES, LAWS, ORDINANCES, AND RULES AND
REGULATIONS.
GENERAL PROVISIONS FOR FIRE RATED CONSTRUCTION
1. ALL RECESSED ACCESSORIES LOCATED IN FIRE RATED WALLS SHALL BE
EITHER OF FIRE RATED CONSTRUCTION OR COORDINATED WITH THE
ADJACENT TRADES TO ALLOW THE GYPSUM BOARD TO BE CONTINUOUS
BEHIND THE ACCESSORIES.
2. EACH RESPONSIBLE CONTRACTOR SHALL SEAL ALL PENETRATIONS MADE AS
PART OF THEIR WORK IN FIRE-RATED CONSTRUCTION AS REQUIRED BY ALL
APPLICABLE CODES. EACH CONTRACTOR TO VERIFY WITH LOCAL FIRE
MARSHAL OR BUILDING OFFICIAL HAVING JURISDICTION. EACH RESPONSIBLE
CONTRACTOR WILL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK
THROUGH NON-RATED PARTITIONS. ALL FIRE CAULK TO BE THE SAME BRAND
AS DETERMINED BY CONTRACTOR.
3. ALL FIRE WALLS ARE TO BE CARRIED TO THE UNDERSIDE OF THE ROOF DECK
AND SEALED AS REQUIRED FOR NECESSARY FIRE RATINGS, AND LABELED PER
THE AUTHORITY HAVING JURISDICTION.
4. MATERIALS WITHIN PLENUMS. EXCEPT AS REQUIRED BY THE 2009
INTERNATIONAL MECHANICAL CODE SECTION 602.2.1.1 THROUGH
602.2.1.6, MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR
SHALL HAVE A FLAME SPEAD INDEX OF NOT MORE THAN 25 AND A SMOKE-
DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE
WITH ASTM E84 OR UL 723.
MISCELLANEOUS GENERAL PROVISIONS:
1. CONTRACTOR TO NOTIFY THE GOVERNMENT IMMEDIATELY IF THERE ARE ANY
DISCREPANCIES WITH TAGGED DETAILS, ENLARGED PLANS, ELEVATIONS, ETC.
2. IN ROOMS WITH FLOOR DRAINS, SLOPE TO DRAIN AT 1 PERCENT SLOPE
UNLESS SPECIFICALLY NOTED OTHERWISE.
*PROVIDED FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT NECCESSARILY INCLUDED IN PROJECT*
M A X
" M
A X
" M
IN
PAPER TOWEL
DISPENSER
MIRROR
SOAP
DISPENSER
ROBE
HOOK
TO
TO
P O
F H O
O K
" T
YP
LAVATORY. PROVIDE ADA
INSULATION KIT WHEN REQUIRED
URINAL
42" MIN
MAX
1' - 0"
" M
IN
" M
IN
" M
IN
" M
IN
WATER
CLOSET
TOILET
PAPER
DISPENSER
SANITARY
NAPKIN
DISPOSAL
HORIZONTAL
GRAB BAR
VERTICAL GRAB BAR
MIN
1' - 3"
39 MIN - 41 MAX
ALLOWABLE
MOUNTING
AREA
TO
B
O
TT
O M
O F
RE
FL
EC
TI
V E
S U
RF
AC
E
" M A X
H A
FF
M
IN
M A X
16" - 18"
M
IN
M
AX
12 MIN
36 MIN.
HORIZONTAL
GRAB BAR
TYPICAL ADA MOUNTING HEIGHTS (UNLESS OTHERWISE NOTED)
" M
IN
18" MIN
(A)
FRONT APPROACH, PULL SIDE
" M
IN
(B)
FRONT APPROACH, PUSH
SIDE
" M
IN12" MIN
(C)
FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
36" MIN
" M
IN
(D)
HINGE APPROACH, PULL SIDE
42" MIN
" M
IN
(E)
HINGE APPROACH, PULL SIDE
" M
IN
22" MIN
(F)
HINGE APPROACH, PUSH SIDE
(G)
HINGE APPROACH, PUSH SIDE, DOOR
PROVIDED WITH BOTH CLOSER AND
LATCH
" M
IN
22" MIN
24" MIN
" M
IN
(H)
LATCH APPROACH, PULL SIDE
(I)
LATCH APPROACH, PULL SIDE,
DOOR PROVIDED WITH CLOSER
" M
IN 24" MIN
24" MIN
" M
IN
(J)
LATCH APPROACH, PUSH SIDE
(K)
LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH CLOSER
24" MIN
" M
IN
" M
IN12" MIN
(C)
PUSH SIDE, DOOR PROVIDED WITH
BOTH CLOSER AND LATCH
X > 8"4
" M
IN
(B)
PUSH SIDE
" M
IN
18" MIN
X > 8"
(A)
PULL SIDE
24" MIN
" M
IN
(D)
STOP OR LATCH APPROACH
22 MIN
m in
(C)
POCKET OR HINGE APPROACH
(B)
SIDE APPROACH
M
IN
m in
(A)
FRONT APPROACH
TO
F
IR
E
EX
TI
N G
U
IS
H
ER
H
AN
D
LE
'-6
" M
AX
A D
A M
AX
" M
AX
FIRE
EXTINGUISHER
CABINET
ADA ELECTRIC
WATER COOLER
H A
FF
" M
IN
" M
A X.
M
IN
" M
IN
MIN.
8"
" M
AX
6" MAX.
11" MIN
CL
5" MAX. 15" MIN.
MIN. CLEAR DEPTH
48"
M
IN
C
LE
AR
W
ID
TH
ADA ELECTRIC
FOUNTAIN SKIRT
WHERE LOCATED IN
CIRCULATION PATH
AREA OF
REFUGE
AREA OF
REFUGE
"M
IN
"M A X
CL
18 MIN
M
IN
CENTERED ON RAISED CHARACTERS
HEIGHT OF RAISED CHARACTERS ABOVE FLOOR LOCATION OF SIGNS AT DOORS
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
T3.0
TYPICAL
MOUNTING
HEIGHTS &
CLEARANCES
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
1. ADA STANDARDS FOR ACCESSIBLE DESIGN AND ICC/ANSI A117.1 ARE THE REFERENCE
STANDARDS USED FOR SCOOPING PROVISIONS FOR ACCESSIBILITY. THE MORE STRINGENT
PROVISIONS OF THE TWO STANDARDS ARE INDICATED.
2. DIAGRAMS SHOWN ARE FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT
NECESSARILY INCLUDED IN THE PROJECT.
3. COORDINATE ADA REQUIREMENTS WITH ALL REQUIRED CONCEALED WOOD BLOCKING.
4. REFER TO MANUFACTURER'S LITERATURE REGARDING RECOMMENDATIONS FOR MOUNTING
PRODUCTS AND MATERIALS IN COMPLIANCE WITH ADA STANDARDS.
GENERAL NOTES:
3/8" = 1'-0"T3.0
2 ADA DOOR OPENING MANEUVERING CLEARANCES
1/8" = 1'-0"T3.0
5 TYPICAL SIGNAGE MOUNTING DIAGRAM
HANDICAP ACCESSIBLE EXIT LOCATION
EXIT TRAVEL PATH
ELECTRIC WATER COOLER - SEE PLUMBINGEWC
EMERGENCY EXIT SIGNAGE
LIFE SAFETY LEGEND
FIRE EXTINGUISHER ON BRACKET
(TYPE 4A:80B:C)
FEB
ROOM TAG
ROOM NAME
150 SF
BUSINESS B OCCUPANCY GROUP (IBC 2018)
50 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD (NFPA 101)
BUSINESS B OCCUPANCY GROUP (IBC 2018)
500 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD (NFPA 101)
OCCUPANT LOAD
REQUIRED DOOR WIDTH
REQUIRED STAIR WIDTH
SMOKE PARTITION TO EXTEND FROM TRUE
FLOOR TO UNDERSIDE OF TRUE ROOF
ABOVE. SEE PLAN FOR LOCATION OF
SMOKE PARTITION VERSUS FIRE RATED WALL
CONSTRUCTION.
BUSINESS B OCCUPANCY GROUP (IBC 2018)
15 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD (NFPA 101)
BUSINESS B OCCUPANCY GROUP (IBC 2018)
150 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD (NFPA 101)
1-HR RATED WALL ASSEMBLY
UL NO. U905
STORAGE S-1 OCCUPANCY GROUP (IBC 2018)
500 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD (NFPA 101)
FIRE EXTINGUISHER CABINET
(TYPE 2A:10B:C)
FEL
STORAGE S-1 OCCUPANCY GROUP (IBC 2018)
500 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD (NFPA 101)
6743 SF
S-1 (HANGAR)
584 SF
S-1 (STORAGE)
487 SF
BUSINESS
(MECHANICAL)
651 SF
BUSINESS
(COLLABORATION)
114 SF
BUSINESS
(UNCONCENTRATED) 432 SF
BUSINESS
(CONCENTRATED)
905 SF
BUSINESS
(UNCONCENTRATED)
2 OCCUPANTS
1 OCCUPANT
1 OCCUPANT
1 OCCUPANT
44 OCCUPANTS
4 OCCUPANTS
9 OCCUPANTS
1 OCCUPANT
14 OCCUPANTS
0.6 44
0.6
0.45
0.45
6.75
1.8
0.
4.35
4.2
0.3
1 OCCUPANT
FEB
FEB
FEB
EWC
FEC
FEC
FEB
FEB
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
LS1.0
LIFE SAFETY
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
1/8" = 1'-0"LS1.0
1 LEVEL 1
FIRST FLOOR PLAN CODE CALCULATIONS
Name
Occupancy Calculations Egress Width Calculations
Area (SF)
Occupancy Factor (SF per Occupant)
Factor Type
Total Occupant
Load (Occupants)
Other Egress Component
Width
Calculated Width (Other
Egress Components)
(Inches)
Required Egress Width
(Inches)
BUSINESS (COLLABORATION) 651 SF 15 SF NET 44.00 0.2 8.80 44
BUSINESS (CONCENTRATED) 432 SF 50 SF NET 9.00 0.2 1.80 44
BUSINESS (MECHANICAL) 487 SF 500 SF NET 1.00 0.2 0.20 44
BUSINESS (UNCONCENTRATED) 114 SF 150 SF GROSS 1.00 0.2 0.20 44
BUSINESS (UNCONCENTRATED) 905 SF 150 SF GROSS 7.00 0.2 1.40 44
S-1 (HANGAR) 6743 SF 500 SF GROSS 14.00 0.2 2.80 44
S-1 (STORAGE) 584 SF 500 SF GROSS 2.00 0.2 0.40 44
9916 SF 78.00 15.60
PLUMBING FIXTURE CALCULATIONS
Name Male
Occupancy Female
Occupancy
MALE
WATER
CLOSETS
FEMALE
WATER
CLOSETS MALE LAV
FEMALE
LAV
DRINKING
FOUNTAINS
BUSINESS 4 1 0.16 0.04 0.1 0.025 0.05
4 1 0.16 0.04 0.1 0.025 0.05
1/8" = 1'-0"LS1.0
2 MECHANICAL MEZZANINE
PLUMBING FIXTURE CALCULATIONS ARE BASED UPON UTA OCCUPANCY OF 5 PERSONNEL
AND 80% MALE OCCUPANCY RATES IN ACCORDANCE WITH ANGETL 15-01-00
No. Revision Date
GENERAL NOTE
REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL HAZARD
CLASSIFICATIONS.
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
LS2.0
LIFE SAFETY
EVALUATION
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
APPLICABLE CODES:
BUILDING CODE..............UFC 1-200-01 / 2018 INTERNATIONAL BUILDING CODE
STRUCTURAL CODE...........UFC 3-301-01
PLUMBING CODE............UFC 3-420-01
MECHANICAL CODE.........UFC 3-401-01
FIRE CODE..................UFC 3-600-01 / NFPA 101
ELECTRICAL CODE...........UFC 3-501-01
ENERGY CODE..............UFC 1-200-02
ACCESSIBILITY CODE......2010 ADA STANDARDS
LIFE SAFETY CODE........UFC 3-600-01
UFC 4-211-01, 13 APRIL 2017, AIRCRAFT MAINTENANCE HANGARS, WITH CHANGE 3
SUNDOWN POLICY FOR FOAM FIRE SUPPRESSION SYSTEMS, CHANGE 2,
29 DECEMBER-22
NFPA 409
NFPA 101
AIRCRAFT HANGAR NOTES:
PROVIDE HANGAR CONSTRUCTION, LIFE SAFETY, AND FIRE DEPARTMENT ACCESS IN ACCORDANCE WITH UFC 3-600-01 EXCEPT WHERE ADDITIONAL REQUIREMENTS ARE ADDED BY UFC 4-211-01.
USE NATIONAL FIRE PROTECTION AGENCY NFPA 409 ONLY WHERE EXPLICITLY NOTED.
IF THERE IS A CONFLICT, UFC 4-211-01 SUPERSEDES UFC 3-600-01 AND NFPA STANDARDS.
AIRCRAFT HANGAR CLASSIFICATION (NFPA 409): GROUP III
SUNDOWN POLICY CLASSIFICATION: TIER 2 FACILITY
IBC CHAPTER 3 AND UFC 3-600-01 OCCUPANCY & USE:
NFPA 101 CHAPTER 6:
HANGAR BAY
IBC SECTION 311: STORAGE GROUP S-1
NFPA 101 CHAPTER 40: INDUSTRIAL
SUPPORT AREAS
IBC SECTION 304 & 311: BUSINESS GROUP B & STORAGE GROUP S-2
NFPA 101 CHAPTER 38 & 42: BUSINESS & STORAGE
IBC CHAPTER 4 - SPECIAL DETAILED REQUIREMENTS:
� NOT APPLICABLE
IBC CHAPTER 5 - GENERAL BUILDING HEIGHTS & AREAS:
� CONSTRUCTION TYPE = II-B, SPRINKLED, GROUP S-1 B, SEPARATED
� ALLOWABLE BUILDING HEIGHT (PER TABLE 504.3)
GROUP S-1 - 75 FEET ABOVE GRADE PLANE
GROUP B - 75 FEET ABOVE GRADE PLANE
� ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLANE (PER TABLE 504.4)
GROUP S-1 - 3 STORIES ABOVE GRADE PLANE
GROUP B - 4 STORIES ABOVE GRADE PLANE
� TABULAR BUILDING AREA (PER TABLE 506.2)
GROUP S-1 - 70,000 SQUARE FEET
ACTUAL GROUP S-1 AREA = 6,786 SQUARE FEET
GROUP B - 92,000 SQUARE FEET
ACTUAL GROUP B AREA = 3,183 SQUARE FEET
� ALLOWABLE BUILDING AREA (PER SECTION 506.2)
S-1 = 6,786/70,000 = .097 B = 3,183/92,000 = .035
.097+.035 = .132, SUM OF RATIOS IS LESS THAN 1
� FIRE SEPARATION REQUIREMENTS SEPARATED OCCUPANCIES
OCCUPANCIES RATING (HR)
B | S-1 0
� PROTECTION FROM HAZARDS PER NFPA 101
38.3.2-PROVIDE SMOKE PARTITIONS TO SEPARATE BUSINESS FROM STORAGE WHEN
FIRE SUPPRESSION IS PROVIDED. SEE PLAN FOR LOCATION OF SMOKE PARTITIONS.
IBC CHAPTER 6 TYPES OF CONSTRUCTION:
� CONSTRUCTION TYPE: II-B
� FIRE RATINGS (PER TABLE 601) AS FOLLOWS (EXCEPT WHERE NOTED OTHERWISE)
PRIMARY STRUCTURAL FRAME.............................. 0 HOUR
BEARING WALLS (INTERIOR & EXTERIOR)...................0 HOUR
NON-BEARING WALLS AND PARITIONS (INTERIOR)........0 HOUR
FLOOR CONSTRUCTION AND SECONDARY MEMBERS...0 HOUR
ROOF CONSTRUCTION AND SECONDARY MEMBERS....0 HOUR
� REQUIRED FIRE RATING (PER TABLE 602)
OCCUPANCY FIRE SEPARATION REQ.
TYPE (ACTUAL) SEPARATION
B GREATER THAN 10'-0" 0 HR
S-1 GREATER THAN 10'-0" 0 HR
NFPA 409 8.2.1/UFC 4-211-01 3-3.1.8 REQUIRES MINIMUM SEPARATION OF 50'-0"
SEPARATION BETWEEN BUILDINGS IS A MINIMUM OF 52'-11".
IBC CHAPTER 8, UFC 3-600-01, NFPA 101 - INTERIOR FINISHES:
� FINISH MATERIAL RATING REQUIREMENTS (PER NFPA 101)
INDUSTRIAL (CHAPTER 40)
WALLS & CEILINGS
EXITS AND EXIT ACCESS CORRIDORS - CLASS A OR B (40.3.3.2 / 7.1.4)
ALL OTHER AREAS - CLASS A, B, OR C (40.3.3.2)
FLOORS
EXITS AND EXIT ACCESS CORRIDORS - CLASS I OR II (40.3.3.3.1)
ALL OTHER AREAS - CLASS I OR II (40.3.3.3.1 / 10.2.7)
BUSINESS (CHAPTER 38)
WALLS & CEILINGS
EXITS AND EXIST ACCESS CORRIDORS - CLASS A OR B (38.3.3.2.1)
ALL OTHER AREAS - CLASS A, B, OR C (38.3.3.2.2)
FLOORS
EXITS AND EXIT ACCESS CORRIDORS - CLASS I OR II (38.3.3.3.2)
ALL OTHER AREAS - CLASS I OR II (38.3.3.3.3 / 10.2.7)
UFC 3-600-01(REPLACES IBC CHAPTER 9) - FIRE PROTECTION SYSTEMS:
� SECTION 9-1 - EMERGENCY VEHICLE ACCESS
1. FACILITY DOES REQUIRE ALL-WEATHER EMERGENCY VEHICLE GROUND ACCESS IN
ACCORDANCE WITH 9-1.1 ALL-WEATHER EMERGENCY VEHICLE GROUND ACCESS IS
PROVIDED.
2. FACILITY DOES NOT REQUIRE AERIAL APPARATUS ACCESS IN ACCORDANCE WITH 9-1.2
� SECTION 9-2 - FIRE FLOW FOR FACILITIES
1. THE FIRE FLOW FOR THE FACILITY IS 1,000 GPM @ 20PSI FOR 2 HOURS IN ACCORDANCE
WITH UFC 3-600-01 9-2.1 AND NFPA 1.
� SECTION 9-3 - SERVICE MAINS AND LATERALS
1. FIRE HYDRANTS ARE PROVIDED IN ACCORDANCE WITH 9-3.5.8.2
A. ALL PARTS OF THE FACILITY EXTERIOR ARE WITHIN 350 FT OF A HYDRANT
2. FIRE HYDRANTS ARE PROVIDED IN ACCORDANCE WITH 9-3.5.8.4
A. ONE HYDRANT IS LOCATED WITH 150FT OF THE FIRE DEPARTMENT CONNECTION
B. SPACE BETWEEN FIRE HYDRANTS AT EXTERIOR STORAGE LOCATION DOES NOT EXCEED
300 FT.
3. UFC 4-211-01 3-6.3.2 ADDITIONAL REQURIEMENTS
A. HYDRANTS PROTECTING THE BUILDING ARE LOCATED AT MAXIMUM INTERVAL OF 300 FT
B. AT LEAST ONE HYDRANT IS LOCATED WITHIN 100 FT. OF EACH CORNER OF THE BUILDING.
� SECTION 9-5 - FIRE PUMPS
1. A FIRE PUMP IS NOT REQUIRED TO MEET FIRE PROTECTION DEMAND
� SECTION 9-7 - AUTOMATIC SPRINKLER SYSTEMS
1. PER 9-7.2.1, AN AUTOMATIC SPRINKLER SYSTEM IS REQUIRED
� SECTION 9-10 - STANDPIPE SYSTEMS
1. PER 9-10, A STANDPIPE SYSTEM IS NOT REQUIRED
� SECTION 9-17 - PORTABLE FIRE EXTINGUISHERS
1. FIRE EXTINGUISHERS ARE PROVIDED, SEE PLANS FOR LOCATIONS
� SECTION 9-18 FIRE ALARM SYSTEMS
1. PER 9-18.1 A FIRE ALARM SYSTEM IS REQUIRED. THE FACILITY WILL BE PROVIDED WITH
COMBINATION FIRE ALARM/MASS NOTIFICAITON SYSTEM.
NFPA CHAPTER 40 (REPLACES IBC CHAPTER 10) - MEANS OF EGRESS:
� OCCUPANCY LOAD (PER TABLE 7.3.1.2):
SEE OCCUPANCY TABLE
� EGRESS CAPACITY SIZING (PER TABLE 40.3.3.1)
SEE CODE CALCULATIONS TABLE(S)
SEE LIFE SAFETY PLAN FOR INDIVIDUAL ROOM EGRESS ANALYSIS
� MINIMUM STAIR WIDTH (PER SECTION 40.3.3.1)
SEE CODE CALCULATIONS TABLE(S)
� NUMBER OF MEANS OF EGRESS (PER UFC 4-211-01, 3-3.1.9)
TOTAL NUMBER OF EXITS REQUIRED FOR GROUP S-1 WITHIN HANGAR BAY
� PROVIDE EXITS AROUND ENTIRE PERIMETER OF HANGAR BAY AT MAX
SPACING OF 150'-0".
� PROVIDE EXIT DOORS WITHIN 20'-0" OF EACH END OF THE HANGAR BAY
DOOR OPENING IN LIEU OF 150'-0".
� SUPPORT AREAS MAY NOT EXIT THROUGH THE HANGAR BAY WITH THE
EXCEPTION OF NORMALLY UNOCCUPIED ROOMS LESS THAN 100 SF.
� PROVIDE EACH REQUIRED EXIT FROM THE HANGAR BAY WITH PANIC
HARDWARE AND SWING THE DOOR IN THE DIRECTION OF EGRESS TRAVEL
TOTAL NUMBER OF EXITS REQUIRED FOR GROUP B
BUSINESS OCCUPANCY (CHAPTER 38)
GROUND FLOOR - 1 EXIT REQUIRED, PROVIDED THAT EXIT CAN BE REACHED
WITHIN THE DISTANCE PERMITTED AS A COMMON PATH OF TRAVEL.
� COMMON PATH OF EGRESS TRAVEL DISTANCE
INDUSTRIAL OCCUPANCY (CHAPTER 40)
0 FT FOR HIGH HAZARD AREAS PER TABLE 40.2.5.1
100 FT FOR ORDINARY HAZARD AREAS PER TABLE 40.2.5.1
BUSINESS OCCUPANCY (CHAPTER 38)
100 FT (WHEN SERVING LESS THAN 50 OCCUPANTS) PER 38.2.5.2.1
� EXIT ACCESS TRAVEL DISTANCE
INDUSTRIAL OCCUPANCY (CHAPTER 40)
75 FT FOR HIGH HAZARD AREAS PER TABLE 40.2.6.1
250 FT FOR ORDINARY HAZARD AREAS PER TABLE 40.2.6.1
BUSINESS OCCUPANCY (CHAPTER 38)
300 FEET PER 38.2.6.3
� CORRIDORS
OCCUPANCY TYPE ( INDUSTRIAL AND BUSINESS) REQUIRES:
NO FIRE RATING REQUIRED FOR CORRIDOR WALLS
SEE LIFE SAFTEY PLAN FOR LOCATIONS OF RATED WALLS
MINIMUM CORRIDOR WIDTH
INDUSTRIAL OCCUPANCY (CHAPTER 40)
36 INCHES PER 40.2.3.2
MINIMUM CORRIDOR WIDTH
BUSINESS OCCUPANCY (CHAPTER 38)
44 INCHES PER 38.2.3.2
DEAD END CORRIDORS
INDUSTRIAL OCCUPANCY (CHAPTER 40)
MAXIMUM OF 50 FEET FOR ORDINARY HAZARD AREAS PER NFPA 101
40.6.4
NOT PERMITTED FOR HIGH HAZARD AREAS PER NFPA 101 42.6.3
BUSINESS OCCUPANCY (CHAPTER 38)
MAXIMUM OF 50 FEET PER 38.2.5.2.1
MISCELLANEOUS PROVISIONS
UFC 4-211-01, 3-3.1.10, PROVIDE DRAFT CURTAINS IN ACCORDANCE WITH NFPA 409
� NFPA 409 DOES NOT REQUIRE DRAFT CURTAINS IN GROUP III HANGARS .
UFC 4-211-01, 3-3.1.11, EXTERIOR FIREFIGTHING ACCESSIBLITY IS PROVIDED ON THE NORTH
AND SOUTH SIDE OF THE FACILITY
UFC 4-211-01, 3-3.2.3, EXTERIOR WALLS IN HANGAR BAY IS CONSTRUCTED WITH CMU UP TO
AT LEAST 10' AFF.
UFC 4-211-01, 3-3.1.12, HANGAR DOOR HAS ABILITY TO OPERATE UNDER EMERGENCY
CONDITIONS
No. Revision Date
IBC CHAPTER 7 - FIRE AND SMOKE PROTECTION FEATURES:
� MAXIMUM EXTERIOR WALL OPENINGS (PER IBC SECTION 705)
FIRE SEPARATION: DEGREE OF OPENING PROTECTION: ALLOWABLE AREA: ACTUAL AREA:
NORTH ELEVATION UNPROTECTED, SPRINKLERED , (UP, S) NO LIMIT 39%
SOUTH ELEVATION UNPROTECTED, SPRINKLERED , (UP, S) NO LIMIT 50%
EAST ELEVATION UNPROTECTED, SPRINKLERED , (UP, S) NO LIMIT 36%
WEST ELEVATION UNPROTECTED, SPRINKLERED , (UP, S) NO LIMIT 11%
� FIRE BARRIERS (PER NFPA 8.3.2)
A 1-HOUR FIRE RATED WALL IS PROPOSED BETWEEN THE LOAD CERTIFICATION BAY AND ALL ADJACENT SPACES
PER UFC 4-211-01 3-3.1.3.
A 1-HOUR FIRE RATED WALL IS PROPOSED SURROUNDING THE FIRE PROTECTION ROOM PER UFC 4-211-01 3-6.7.
� SHAFT ENCLOSURE (PER NFPA 8.3.1 / 7.3.1.2)
NO SHAFTS ARE PRESENT WITHIN THE SCOPE OF THE PROJECT
� OPENING PROTECTIVES (PER NFPA 8.3.4)
TYPE OF ASSEMBLY ASSEMBLY RATING REQUIRED OPENING
PROTECTION (DOOR/SIDELITE)
FIRE BARRIER 1 HR 3/4 HR / 3/4 HR
� CONCEALED SPACES (PER SECTION 718)
NOT APPLICABLE
� SEE LEGEND ON LIFE SAFETY PLAN FOR APPLICABLE UL ASSEMBLIES TO BE PROVIDED.
AMU
WEAPONS LOAD TRAINING
EXISTING FENCE TO REMAIN.
SEE CIVIL.
NEW SECTION OF FENCE.
CONNECT TO EXISTING FENCE LINE AND
NEW WALL.
L2.0
L2.0
L2.0
L2.0
1222 1 2 2 2 2 2 1
LEGEND
AREA TO RECEIVE
GRASS SOD
ASPHALT- SEE CIVIL
CONCRETE PAVERS
- SEE CIVIL
CONCRETE PAVING
- SEE CIVIL
NOT IN SCOPE
CONCRETE EDGE BAND
- SEE CIVIL
SITE FURNITURE
DASHED LINE
INDICATES EXTENTS
OF PROJECT SCOPE
1 SPECIFIC NOTE TAG
INDICATES FUTURE
CONSTRUCTION
(NOT IN SCOPE)
SPECIFIC NOTES:
1 2 3 4PROVIDE CAST STONE BENCH WITH WOOD
BACKLESS SEAT. SEE 4/L2.0
REFER TO SPECIFICATION SECTION 01 2300 BID OPTIONS.
IF BID OPTION IS NOT AWARDED, INSTALL CHAIN LINK
FENCING IN THIS LOCATION.
NEW REMOVABLE BOLLARDS AND BOLLARD HOLDER.
SEE DETAILS AND SPECIFICATIONS.
PROVIDE 48" LONG CAST STONE BENCH. SEE 4/L2.0
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
L1.0
LANDSCAPE SITE
PLAN
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
1" = 20'-0"L1.0
1 SITE PLAN
0' 20' 50' 100'
0' - 1"
EQ EQ
WRAP BRICK AROUND JAMBS (TYPICAL)
GATES - PROVIDE DIAGONAL BRACING AS REQUIRED
HEAVY DUTY HINGES BY GATE MANUFACTURER
SLIDE BOLT BY GATE MANUFACTURER
CANE BOLT BY GATE MANUFACTURER
RECESSED STRIKE EMBEDDED IN CONCRETE (TYPICAL)
0' - 5" 0' - 5"
L2.0
Sim
4" MAXIMUM
EDGE OF ADJACENT BUILDING
5"x5"x3/8" STEEL TUBE, FILL
WITH CONCRETE
1/2" PEJ, ALL SIDES
PAVING - SEE CIVIL
SLOPE TOP OF CONCRETE AWAY
FROM STEEL TUBE
STONE CAP INSTALL SEALANT AT ALL WALL
CAP JOINTS
WRAP BRICK AROUND JAMBS
0' - 4" 0' - 4"
CONCRETE FOOTING
4" FENCE SLAT
4"X4"X1/4" GATE FRAMING
EQUAL TO ROCKCAST SL200
STAINLESS STEEL PINS
GROUT-FILLED 8" CMU
WEEP
TERMINATION BAR AND SEALANT
MORTAR NET
METAL DRIP EDGE
12" GROUT-FILLED CMU
CAST STONE
WEEP
TERMINATION BAR AND SEALANT
MORTAR NET
METAL DRIP EDGE
GROUT FILL
FINISH GRADE - SEE CIVIL
PEJ
CONCRETE PAVING -
SEE CIVIL
2' - 6"
BRICK
EPOXY COATING
EPOXY PAINT
4" CMU
EQUAL TO ROCKCAST CO100
STAINLESS STEEL THROUGH WALL FLASHING WITH
3/4" HEMMED DRIP EDGE (BOTH SIDES) , SET IN
FULL BED OF SEALANT
0' - 0 7/8"
SLOPE
DAMP-PROOFING
DAMP-PROOFING
" A
B O
V E
FI
N
IS
H F
LO
O
R
#5 @ EACH JAMB & @ 24" O.C. CENTERED.
FILL CELLS SOLID WITH CONCRETE FULL
HEIGHT OF WALL AT LOCATION OF #5 BARS
S
PL
IC
E
D
IA
S
PL
IC
E
(3) #5 CONTINUOUS
TOPE & BOTTOM WITH #
4 @ 18" O.C.
CONTINUOUS HORIZONTAL MASONRY JOINT
REINFORCEMENT @ 16" O.C. (TYPICAL)
CONTINUOUS U-BLOCK WITH #
5 TOP & BOTTOM
FILL ALL CELLS WITH
CONCRETE BELOW GRADE
V A R
IE
S
S
EE
C
IV
IL
EQUAL TO LANDSCAPE FORMS UNIVERSE
SYSTEM BACKLESS (25" AND 71" UNITS)
(SEE LANDSCAPE PLAN FOR LOCATIONS)
CASTSTONE BENCH EQUAL TO
SOCRATES BY LANDSCAPE FORMS
PAVERS - SEE SPECS
SAND LEVELING BED
CONCRETE PAVING
BASE - SEE CIVIL
LIME-STABILIZED SUBGRADE
PEJ
CURB AND GUTTER - SEE CIVIL
ASPHALT PAVING - SEE CIVIL
3/4" CHAMFER TYPICAL
0' - 2"
/4
CONCRETE ENCASEMENT
STEEL PIPE SLEEVE
TOP OF FINISH GRADE
OR SURFACE MATERIAL
1/2" DIA. STEEL ROD
6" SCH 40 STEEL PIPE
GRIND SMOOTH ALL
ROUGH AREAS AND EDGES
1' - 6" MIN DIA.
PERMANENTLY HINGED TOP
COVER PLATE
S
EE
C
IV
IL
CONCRETE RETAINING
WALL - SEE CIVIL
3/8" PEJ WITH SEALANT
S
EE
C
IV
IL
V A R
IE
S
V A R
IE
S
S
EE
C
IV
IL
1-1/2" X 1 1/2" STEEL TUBE
1-1/2" X 1-1/2" STEEL TUBE, SPACE 4'-0"
O.C.
5/8" SOLID STEEL BALUSTRADE 4" O.C.
MAX
SOLID STEEL BAR
J.B. NO. 203 (STEEL)
CORE CONCRETE DIAMETER & DEPTH PER
DESIGN REQUIREMENTS, SECURE WITH
EPOXY GROUT
M
IN
IM
U M
M
IN
IM
U M
PAINTED STEEL GUARDAIL - SEE ELEVATION
CONCRETE PAVING - SEE
CIVIL
CONCRETE RETAINING
WALL - SEE CIVIL
3/8" PEJ WITH SEALANT
CORE CONCRETE DIAMETER & DEPTH PER
DESIGN REQUIREMENTS, SECURE WITH
EPOXY GROUT
PAINTED STEEL GUARDAIL - SEE ELEVATION
CONCRETE WALK - SEE CIVIL
SECTION ELEVATION
S
EE
C
IV
IL
V A R
IE
S
CONCRETE WALK - SEE CIVIL
3/8" PEJ WITH SEALANT
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
L2.0
ENLARGED
LANDSCAPE SITE
PLAN & DETAILS
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
1/2" = 1'-0"L2.0
2 DECORATIVE FENCE GATE
1" = 1'-0"L2.0
3 DECORATIVE FENCE SECTION
1" = 1'-0"L2.0
1 LANDSCAPE WALL
1" = 1'-0"L2.0
4 RAISED PLANTER SECTION - BID OPTION
1" = 1'-0"L2.0
5 Removable Bollard Detail
1" = 1'-0"L2.0
6 GUARDRAIL DETAIL
PROVIDE SECOND SLEEVE WITH
HINGED COVER PLATE AT
BOLLARD HOLDER - SEE CIVIL
A1.12
A1.1
A1.1
A1.1
DEMOLISH BUILDING 1403 IN ITS ENTIRETY - SEE BID OPTIONS
DEMOLISH BUILDING 1403 IN ITS ENTIRETY - SEE BID OPTIONS
DEMOLISH BUILDING 1403 IN ITS ENTIRETY - SEE BID OPTIONS
DEMOLISH BUILDING 1403 IN ITS ENTIRETY - SEE BID OPTIONS DEMOLISH BUILDING 1403 IN ITS ENTIRETY - SEE BID OPTIONS
LEGEND:
EXISTING TO BE DEMOLISHED -
REFER TO BID OPTIONS
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
A1.1
DEMOLITION
FLOOR PLAN
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
1/8" = 1'-0"A1.1
1 B1403 DEMOLITION PLAN
1/8" = 1'-0"A1.1
2 1403 EAST DEMOLITION ELEVATION
1/8" = 1'-0"A1.1
3 B1403 SOUTH DEMOLITION ELEVATION
1/8" = 1'-0"A1.1
4 WEST DEMO ELEVATION
1/8" = 1'-0"A1.1
5 B1403 NORTH DEMOLITION ELEVATION
General Demolition Notes:
THE INTENT OF DEMOLITION IS TO ACCOMPLISH ALL WORK
NECESSARY TO REMOVE EXISTING BUILDING 1403 IN ITS
ENTIRETY INCLUDING ALL FOOTINGS, FOUNDATIONS, ETC...
REFER TO CIVIL DRAWINGS TO FOR EXTENT OF SITE PAVING
AND SITE UTILITY DEMOLITION.
THE FOLLOWING GENERAL NOTES ARE APPLICABLE TO ALL
DEMOLITION ACTIVITIES REQUIRED BY THE SCOPE OF THE
CONTRACT DOCUMENTS.
CONTRACTOR'S RESPONSIBILTY TO VERIFY ACCURACY OF
EXISTING CONDITIONS:
1. DOCUMENTATION CONTAINED IN THESE CONSTRUCTION
DOCUMENTS OF EXISTING CONDITIONS MAY NOT BE
ENTIRELY ACCURATE. CONTRACTOR IS TO TAKE THE
INITIATIVE TO VISIT THE SITE PRIOR TO AND DURING THE
PRE-BID MEETING TO VERIFY ACTUAL CONDITIONS,
THEREFORE RENDERING THE CONTRACTOR RESPONSIBLE
FOR AN ACCURATE REPRESENTATION OF THE EXISTING
CONDITIONS.
2. CONTRACTOR TO VISIT SITE TO VERIFY EXISTING
CONDITIONS AND SHALL BE RESPONSIBLE FOR
DETERMINING THE SCOPE OF WORK PRIOR TO
DEMOLITION . EXISTING CONDITIONS SHALL BE
THOROUGHLY RESEARCHED PRIOR TO CONSTRUCTION
AND ANY DISCREPANCIES SHALL BE IMMEDIATELY
DISCUSSED WITH THE GOVERNMENT PRIOR TO BEGINNING
CONSTRUCTION IN THE AFFECTED AREA. CHANGE
ORDERS WILL NOT BE APPROVED PRIOR TO WORK TAKING
PLACE FOR EXISTING CONDITIONS READILY APPARENT BY
A THOROUGH OBSERVATION.
3. CONTRACTOR TO VERIFY ALL EXISTING FLOOR
ELEVATIONS AND VERIFY WITH PLANS, REPORT ANY
DISCREPANCIES TO THE GOVERNMENT PRIOR TO
CONSTRUCTION.
4. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR
THE CONVENIENCE OF THE CONTRACTOR. CONTRACTOR
SHALL VERIFY ALL EXISTING CONDITIONS. LOCATION OF
WALLS SHALL BE AS SHOWN ON PLANS RELATIVE TO
EXISTING CONDITIONS.
5. THE GOVERNMENT ASSUMES NO RESPONSIBILITY FOR
EXISTING UNKNOWN CONDITIONS. EACH CONTRACTOR
SHALL COORDINATE NEW CONSTRUCTION WITH EXISTING
CONSTRUCTION AND INVESTIGATE IN A REASONABLE
MANNER REGARDING HIDDEN CONDITIONS.
SAFEGUARDS DURING DEMOLITION:
1. CONTRACTOR TO MAKE SURE ALL INFRASTRUCTURE
(POWER, GAS, WATER, CABLING, ETC...) IS TURNED OFF
AND/OR REMOVED PRIOR TO DEMOLITION.
2. CONTRACTOR TO VERIFY ALL LOAD BEARING CONDITIONS
AND PROVIDE SHORING AS REQUIRED IN ALL AFFECTED
AREAS PRIOR TO & DURING DEMOLITION AND/OR
CONSTRUCTION.
3. ALL CURRENT OSHA AND APPLICABLE STANDARDS SHALL
BE UPHELD TO ASSURE SAFETY OF ALL PERSONS ON SITE
DURING ENTIRE COURSE OF CONSTRUCTION.
CONTRACTOR'S RESPONSIBILITY REGARDING REMOVAL AND
DISPONSAL OF DEMOLISHED MATERIALS:
1. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR
COMPLYING WITH ALL LAWS, REGULATIONS, AND/OR
ORDINANCES REGARDING THE METHOD OF DEMOLITION
AND DISPOSAL OF WASTE MATERIALS. THE GOVERNMENT
ASSUMES NO LIABILITY FOR EXTRA WORK OR ADDITIONAL
COMPENSATION DUE TO FAILURE OF THE TRADE
CONTRACTOR OR SUBCONTRACTORS TO COMPLY WITH
ANY AND ALL SUCH REGULATIONS THAT APPLY.
CONTRACTOR'S RESPONSIBILTY REGARDING HAZARDOUS
MATERIALS:
1. CONTRACTOR SHALL COMPLY WITH ALL SPECIFIED
REQUIREMENTS AND GOVERNING
CODES/LAWS/REGULATIONS REGARDING REMOVAL AND
DISPOSAL OF HAZARDOUS MATERIALS, IF ENCOUNTERED.
2. IF HAZARDOUS MATERIALS ARE ENCOUNTERED, NOTIFY
THE GOVERNMENT PRIOR TO PROCEEDING.
A5.1
A5.1
274 SF
ENTRY
VESTIBULE
4258 SF
LOAD
CERTIFICATION
BAY
582 SF
CLASSROOM
A4.1
A4.1 2
A4.2
A4.22
171 SF
VESTIBULE
56 SF
MENS
2267 SF
TRAILER
STORAGE
57 SF
WOMENS
HATCHED AREA INDICATES
LOCATION OF MECHANICAL
MEZZANINE ABOVE
1.36%
0.
1.37%
0.
A5.2
A5.2
1 1
108 107
2 2
3 3
4 4
5 5
61 SF
VEST.
51 SF
STORAGE
A H
0.1 0.1
C
K
A6.1 7
A6.1
A5.3
107 SF
COMM
107 SF
ELEC
107 SF
FIRE
PROTECTION
31 SF
JAN
454 SF
TOOL STORAGE
350 SF
OFFICE SUITE
154 SF
KITCHENETTE
88 SF
CHIEF OFFICE
A3.3
A5.3
B
E F
D G
10' 0" MAINTENANCE
CLEARANCE
MCJ MCJ
MCJ
MCJ
LEGEND:
DOOR - SEE DOOR SCHEDULE
101 DOOR TAG - SEE DOOR SCHEDULE
ROOM NAME
101 ROOM TAG
A101
SIM
SECTION TAG
DASHED LINE INDICATES ROOF ABOVE
X SPECIFIC NOTE TAG
WALK OFF MAT
OPENING TAG - SEE OPENING SCHEDULE
MASONRY CONTROL JOINT
- SEE ELEVATIONS FOR LOCATIONS OF
MCJ ON EXTERIOR WALL ASSEMBLIES
MCJ
X
TAG - SEE LOUVER SCHEDULEX
A5.1
A5.2
H
941 SF
MECHANICAL
MEZZANINE
A2.3
A5.2
Sim
SPECIFIC NOTES:
6" WIDE PAINTED RED STRIPE. COORDINATE EXACT
LOCATION WITH CONTRACTING OFFICER
REPRESENTATIVE ON SITE.
PAINTED YELLOW STOP BAR 36" X 12". COORDINATE
EXACT LOCATION WITH CONTRACTING OFFICER
REPRESENTATIVE ON SITE.
PAINTED GREEN STRIPING 48" X 48" SQUARE
CENTERED ON EMERGENCY FIXTURE.
HANGAR DOOR SAFETY STRIPING
6" YELLOW BORDER x LENGTH OF DOOR x 5'-0" WIDE.
PROVIDE 6" YELLOW DIAGONAL LINES AT 48" O.C.
PROVIDE TEXT "DANGER" IN 12" HIGH LETTER AT EACH CORNER.
VISUAL DISPLAY BOARD - SEE SPECS. PROVIDE
10' LONG BOARDS IN ROOMS 1110 AND 1140.
6' LONG BOARD (FIELD VERIFY) IN ROOM 1273.
6 6" PAINTED YELLOW LEAD IN LINE
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
A2.1
FIRST FLOOR PLAN
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
1/8" = 1'-0"A2.1
1.1 FIRST FLOOR PLAN
0' 4' 8' 16' 32' 1/8" = 1'-0"A2.1
1 MEZZANINE PLAN
0' 4' 8' 16' 32'
MCJ
NOTES:
NO FIXED BUILDING ELEMENTS MAY BE LOCATED WITHIN THE INDICATED
10' - 0" MAINTENANCE CLEARANCE. GENERAL CONTRACTOR TO
COORDINATE MAINTENANCE CLEARANCE WITH ALL SUB CONTRACTORS.
A5.2
A5.2
DS
DS
DS
DS
DS
DS
DS
A2.2
3/4" / 1'-0"
1/2" / 1'-0"
1/2" / 1'-0"
A2.4
A2.4
A2.4
Sim
A2.4
Sim
VTR
A2.4
Sim
VTR
VTR
VTR
VTR
A2.4
Sim
A2.4
Sim
A2.4
VTR VTR
VTR VTR VTR
A2.4
ROOF PLAN LEGEND
STANDING SEAM METAL ROOF
(LINES FOR SEAMS ON METAL ROOF TYPES,
REFER TO SPECS FOR PANEL SIZES)
DOWNSPOUT + BOOTS (BOOTS NOT SHOWN)DS
VTR VENT THROUGH ROOF - SEE MECHANICAL/ PLUMBING
NOTE 1 - LOCATE ALL PENETRATIONS THROUGH METAL ROOF PANELS AT MIDPOINT IN ROOF PANEL
NOTE 2 - REFER TO ELECTRICAL FOR LIGHTNING PROTECTION - COORDINATE AS REQUIRED
GENERAL NOTES
17' - 4"
A5.4
A3.7
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
A2.2
ROOF PLAN
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
1/8" = 1'-0"A2.2
1 ROOF PLAN
1/8" = 1'-0"A2.2
2 PREFABRICATED ALUMINUM CANOPY
RC
RC
1 1
2 2
3 3
4 4
A
A
H
H
274 SF
ENTRY
VESTIBULE
4258 SF
LOAD
CERTIFICATION
BAY
171 SF
VESTIBULE
56 SF
MENS
2267 SF
TRAILER
STORAGE
57 SF
WOMENS
108 107
61 SF
VEST.
51 SF
STORAGE
0.1
C
N 12
N8
N8
N8
N8
N8
N8
N8N8
N8
N8
N8N8
N8 N8
N8 N8
N8
N 12
N 12
N8
N8
A3.3
B
B
E F
D G
1' - 2"
119' - 0"
1' - 2" 16' - 8" 24' - 0" 24' - 0" 24' - 0"
5' - 4" 3' - 5"
6' - 1" 2' - 9"
8' - 1"
0' - 9"
4' - 7"
0' - 11"0' - 7"
11' - 3"
3' - 0" 13' - 10" 3' - 9"
8' - 0"
2' - 0"
29' - 8" 12' - 3"
1' - 0"
2' - 0"
2' - 8"
118' - 9"
4' - 8"
1' - 6"
16' - 8" 6' - 4" 6' - 4" 56' - 6" 2' - 11"
8' - 0" 1' - 8"
1' - 5"
7' - 10" 7' - 9"
17' - 1"
8' - 4"
5' - 8"
28' - 3" 28' - 3"
SILL
PLAN
HEAD
CONFIRM 1 " REQUIRED CLEAR
SPACE FOR DEFLECTION
PROVIDE FLEXIBLE CLOSURE
STRIPS AS REQUIRED IN DECK
FLUTES
SEE STRUCTURAL FOR TOP OF
WALL BRACING
XX
TAG INDICATES WALL TYPE
OVER CMU MASONRY
**NOTE: IF WALL IS SCHEDULED TO
RECEIVE TILE, PROVIDE CONCRETE
BOARD AND WATERPROOFING FOR
TILE INSTALLATION. REFER TO FINISH
SCHEDULE, INTERIOR ELEVATIONS AND
SECTIONS, AND GYPSUM BOARD
ASSEMBLIES SPECIFICATIONS FOR
TYPES AND OTHER
SUBSTRATE/FURRING REQUIREMENTS**
TYPE N
N 12
A2.3
A2.3
A3.7
1/2" x 3" RAILS SPACED TO ALLOW
24" CLEAR BETWEEN RAILS
3/4" MINIMUM DIAMETER ROUND
STEEL RUNGS - CORRUGATED,
KNURLED, OR CRIMPED - EQUAL
SPACING NOT TO EXCEED 12" O.C.
(NOT LESS THAN 10" O.C.)
LADDER BRACKET - FASTEN AS
REQUIRED TO WALL AT 6'-0" MAX.
TOP RUNG LEVEL WITH LANDING
PROVIDE REMOVABLE CHAIN
ACCROSS LADDER OPENING
ADJACENT REMOVABLE
GUARDRAIL BEYOND
VERTICAL RAIL SUPPORT
BRACKET FASTEN AS REQUIRED
GUARDRAIL BRACKET, BEYOND
24"
10' - 6 1/2"
0' - 7"
EXPANSION BOLT TO FLOOR AND
MEZZANINE AS REQUIRED
TY
PI
C A L
CONTINUE STUDS AND GYPSUM BOARD
TO UNDERSIDE OF STRUCTURE ABOVE
BATT INSULATION
GYPSUM WALL BOARD
METAL STUD FRAMING
AS REQUIRED
BOND BEAM - SEE
STRUCTURAL
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
S tr ee t |
M on tg om er y, A L
T el . 3
. 2
. 5
W
W W
.S
SL
A R
C H
.C O
M
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E
SI
G N
A2.3
WALL TYPE PLAN
AND DETAILS
W E
A P
O N
S L
O A
D C
R E
W T
R A
IN
IN
G F
A C
IL
IT
Y
D A
N N
E L
L Y
F
IE
L D
FAKZ 039172 / 18138
MARCH 2023
ME
DCD
1/8" = 1'-0"A2.3
1 WALL TYPE PLAN
N12 11 5/8" N8 7 5/8"
TYPE PARTITION THICKNESS
1 1/2" = 1'-0"A2.3
2 PARTITION TYPE N
1/8" = 1'-0"A2.3
3 MEZZANINE WALL TYPE PLAN
1/2" = 1'-0"A2.3
5 Ladder Detail 1 1/2" = 1'-0"A2.3
4 Detail 8
SILICONE SEALANT AROUND CUT OF BOOT
EPDM RUBBER PIPE FLASHING
BUTYL TAPE BENEATH BASE AND
POLYURETHANE FILLET
METAL ROOF PANEL
SELF ADHERED ROOF UNDERLAYMENT
RIGID INSULATION
METAL ROOF DECK
VENT - SEE PLUMBING
INSTALL PER MANUFACTURER'S
REQUIREMENTS AND WARRANTY
REQUIREMENTS FOR ROOF SYSTEM
INSTALL PIPE IN CENTER OF PANEL TO
ALLOW BASE OF…