This federal contract opportunity notice announces a solicitation for services to repair Hangar Building 1201 at Dannelly Field in Montgomery, Alabama. The 187th Fighter Wing intends to award a firm fixed-price contract between $5 million and $10 million to replace the building's mechanical systems, partially remove and replace existing plumbing systems, remove and replace the metal retrofit roof and hangar floor slab, and modify electrical systems. The NAICS code is 236210 for general contractors, with a small business size standard of $39.5 million. This award is 100% set aside for small businesses. A pre-bid conference will be held on June 8, 2021 at 10:00am Central Time, followed by an optional site visit. Interested contractors must submit an entry authority list to specified email addresses. The response due date was not provided.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 14 July 2021
To: CMSgt. William Hall
Subject: ADDENDUM NO. 3
Project: F-35 – REPAIR HANGAR BUILDING 1201
Job #: ANG# FAKZ182352 / SSL# 18072
From: David Donovan
The plans and Specifications for the F-35 – Repair Hangar, Building 1201, dated March 2021 are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).
Item No. 1: Refer to drawings. Delete the following sheets and replace them with the attached drawings sheets with a revised date of 13 July 2021:
A2.4 – Second Floor Plan South A3.5 – Storefront Schedule M1.1 – First Floor North HVAC Demolition Plan M3.2 – Large Scale Boiler Room Demo and Renov First Floor
HVAC
P0.1 – Plumbing Legend, Abbreviations, and General Notes P0.3 – Plumbing Details P2.1 – First Floor North Plumbing Renovation Plan P2.2 – First Floor South Plumbing Renovation Plan
Item No. 2: Refer to specifications. Delete the following specification sections and replace them with the attached specifications sections with a revised date of 13 July 2021:
07 4113 – Metal Roof Panels (Bid Option) 07 4293 – Metal Soffit Panels 07 5400 – Thermoplastic Roofing Membrane 22 0000 – Plumbing 22 1513 – General Service Compressed Air Piping 22 1519 – General Service Packaged Air Compressors and
Receivers
- Note specification changes are indicated in bold italicized text.
F-35 – REPAIR HANGAR, BUILDING 1201 FAKZ182352
ADDENDUM NO. 3 Page 2 of 2 Seay Seay & Litchfield, P.C. 14 July 2021
Item No. 3: Refer to specifications. Add the attached specification section 32 3113 –
Chain Link Fences with a revised date of 13 July 2021.
End of Addendum #3
REF
R E F
UP
DW
D W
DW
10 10
9 9
A
A
B
B
C
C
D
D
7 7
6 6
5 5
E
E
F
F
G
G
H
H
K
K
L
L
A1.8 1
11 11
10B 10B
CLASSROOM
MAINTENANCE
TRAINING
LOCKER / PPE
STORAGE
CONFERENCE
SIPR VAULT
MECH.
TESTING
229A
WORK ROOM
STAIR
BREAK
235TFI CC
BREAK
TFI ADMIN
STAIR
TFI SUPER.
COMM
SUPER.
MXG/CC
DEPUTY MXG/CD
ADMIN
236A
1ST SGT
FAB. FLIGHT
ACCESSORY
FLIGHT
MXS/CC
240 CMF CHIEF
EMF CHIEF
ADMIN
TFI 1ST SGT
CORRIDOR
233A
A4.2 2
A4.21
234B
240 239
235A
234235236236A245247254
A7.2
J
J
A7.25
MULTI-PURPOSE
ROOM
A7.1
253252251250
MATCH LINE
OPEN TO BELOW
CORRIDOR
233B
TESTING
229B
HALL
236B
229A
M
M
8 8
247A249
A6.3 11
A6.3
A6.3 7
S im
A6.3 7
S im
A6.3
7 Sim
A6.3
7 Sim
A6.3
8 Sim
A6.3
2 2 2 2 2
A3.7
TYPICAL
A3.7
TYPICAL
KEY PLAN
MATCH LINE
LEGEND:
EXISTING WALL ASSEMBLY TO REMAIN
DOOR - SEE DOOR SCHEDULE
NEW CMU WALLS
(SEE WALL TYPE PLAN)
NEW METAL FRAMING WALLS
(SEE WALL TYPE PLAN)
DOOR TAG - SEE
DOOR SCHEDULE
WINDOW / STOREFRONT
A101
SIM
DETAIL SECTION
1i
202A
## SPECIFIC NOTE TAG
STC 50 RATED WALL
CONSTRUCTION. WALLS TO
EXTEND AND BE SEALED TIGHT TO
SECOND FLOOR SLAB ABOVE.
SPECIFIC NOTES:
1 PATCH EXISTING WALL WHERE OPENING IS
REMOVED. FEATHER FINISH OUT AS
REQUIRED TO TRANSITION BETWEEN NEW AND
EXISTING WITH TRANSITION VISIBLE. FILL
CAVITY WITH INSULATION. SEAL AS REQUIRED
TO MAINTAIN REQUIRED1 HOUR FIRE RATING.
2 INSTALL NEW WALL CLOSURE TRIM PIECE AT
EXISTING WALL TO CURTAIN WALL
INTERSECTION AT THIS LOCATION. REFER TO
DETAIL 5/A3.7
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A2.4
SECOND FLOOR
PLAN SOUTH
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
1/8" = 1'-0"A2.4
1 SECOND FLOOR PLAN - SOUTH
0' 4' 8' 16' 32'
Rev. Description Date 2 Addendum 3 7/13/21
SEE DOOR
SCHEDULE
A3.6
A3.6
A3.6
(Aluminum Curtain Wall System)
Opening Type 1
FI
EL
D V
ER
IF
Y
/2
FI
EL
D V
ER
IF
Y
/2
A
LI
G N W
/ E X.
A
LI
G N W
/ E X.
A
LI
G N W
/ E X.
A3.6
FIELD VERIFY
9' - 11 5/8"
EQ. SEE DOOR SCHEDULE EQ.
IG-2
IG-1
IG-1
IG-1 IG-1
IG-1
IG-1
IG-2 IG-2
SEE DOOR
SCHEDULE
(Aluminum Curtain Wall System)
Opening Type 2
A3.6
A3.6
FIELD VERIFY
5' - 2 3/8"
S
EE
D O
O R S
C H
ED
U
LE
SEE DOOR SCHEDULE
IG-1
A3.6
(Aluminum Curtain Wall System)
Opening Type 3
A3.6
A3.6
FI
EL
D V
ER
IF
Y
FI
EL
D V
ER
IF
Y
FIELD VERIFY
M A
TC
H E
X.
M
A
TC
H E
X.
M
A
TC
H E
X.
IG-2 IG-2 IG-2 IG-2 IG-2 IG-2
IG-1 IG-1 IG-1IG-1 IG-1 IG-1
IG-1 IG-1
A3.6
SURFACE APPLIED GRID TO MATCH
EXISTING GRIDS, APPLIED TO
INTERIOR AND EXTERIOR
(Aluminum Storefront System)
Opening Type 5
A3.7
A3.7
A3.6
SEE DOOR
SCHEDULE
FI
EL
D V
ER
IF
Y
FIELD VERIFY
/2
S-1
S-1
(Fire Rated Aluminum Storefront System)
Opening Type 9
A3.6
A3.6
A3.6
A3.6
A3.6
S
EE
R
EF
LE
C
TE
D C
EI
LI
N G
P
LA
N
SCHEDULE
SEE DOOR
FIELD VERIFY AND COORD. WITH OFFICE DEVISING WALLS
10' - 0"
FIELD VERIFY AND COORD. WITH OFFICE DEVISING WALLS
10' - 4 3/8"
FIELD VERIFY
5' - 0"
FIELD VERIFY
5' - 0"
S
EE
D O
O R S
C H
ED
U
LE
SCHEDULE
SEE DOOR
SCHEDULE
SEE DOOR
SCHEDULE
SEE DOOR EQ EQ EQ EQ
S-1 S-1 S-1
S-1 S-1S-1S-1S-1 S-1S-1 S-1
S-1S-1
S-1 S-1
S-1
(Aluminum Storefront System)
Opening Type 6
A3.6
A3.6
A3.6
A3.7
A3.7
TO
U
N D
ER
S
ID
E O
F
EX
C O
N C R
ET
E
FL
S
TR
U C
TU
R E
A
LI
G N W
/ E
XT
ER
IO
R W
IN
D
O W
S
IL
L
S
EE
D O
O R S
C H
ED
U
LE
FIELD VERIFY
EQ EQ
FIELD VERIFY
EQ EQ SEE DOOR SCH.
SEE DOOR
SCHEDULE
S-1
S-1 S-1
S-1 S-1
S-1 S-1 S-1
S-1
S-1S-1
S-1
S-1
(Fire Rated Aluminum Storefront System)
Opening Type 8
A3.7
A3.7
A3.6
FIELD VERIFY
7' - 3 1/4"
S
EE
D O
O R S
C H
ED
U
LE
SCHEDULE
SEE DOOR
S-2
(Aluminum Storefront System)
Opening Type 7
A3.7
A3.7
A3.6
A3.6
TO
U
N D
ER
S
ID
E O
F
EX
C O
N C R
ET
E
FL
S
TR
U C
TU
R E
S
EE
D O
O R S
C H
ED
U
LE
FIELD VERIFY
5' - 10 1/4"
18" MINIMUM
WITH DOOR 109
ALIGN
S-1
S-1 S-1 S-1
S-1
(Aluminum Storefront System)
Opening Type 10
A3.7
A3.7
FIELD VERIFY
6' - 0"
SEE DOOR
SCHEDULE
S-1
S
EE
D O
O R S
C H
ED
U
LE
SCHEDULE
SEE DOOR
(Aluminum Curtain Wall System)
Opening Type 11
A3.6
A3.7
FI
EL
D V
ER
IF
Y
FEILD VERIFY
5' - 3 5/8"
SEE DOOR
SCHEDULE
A3.7
IG-1 IG-1
IG-1
S
EE
D O
O R S
C H
ED
U
LE
SCHEDULE
SEE DOOR
(Aluminum Curtain Wall System)
Opening Type 12
A3.6
A3.6
FI
EL
D V
ER
IF
Y
SURFACE APPLIED GRID TO MATCH
EXISTING GRIDS, APPLIED TO
INTERIOR AND EXTERIOR
FI
EL
D V
ER
IF
Y
M A
TC
H E
X.
M
A
TC
H E
X.
M
A
TC
H E
X.
FIELD VERIFY
MATCH EX. MATCH EX.
A3.6
IG-2 IG-2 IG-2 IG-2
IG-1 IG-1
IG-1
IG-1 IG-1
IG-1
(Aluminum Curtain Wall System)
Opening Type 13
LOUVER - SEE SPECIFICATION
FE
IL
D V
ER
IF
Y
FIELD VERIFY
9' - 11 3/4"
M A
TC
E X.
M A
TC
H E
X.
M
A
TC
H E
X.
M
A
TC
H E
X.
IG-2 IG-2
IG-1
IG-1
IG-1IG-1
IG-1
IG-1
A3.6
A3.6
A3.6
SEE DOOR
SCHEDULE
(Aluminum Curtain Wall System)
Opening Type 14
A3.6
A3.6
FIELD VERIFY
C U R
TA
IN
W
A
LL
F R A M
E
M A
TC
H A
D
JA
C
EN
T
C U R
TA
IN
W
A
LL
F R A M
E
M A
TC
H E
XS
TI
N G
FIELD VERIFY
ELEVATOR SHAFT
COORDINATE WITH NEW ELEVATOR SHAFT
IG-1 IG-1
(Aluminum Curtain Wall System)
Opening Type 15
A3.6
C U R
TA
IN
W
A
LL
F R A M
E
M A
TC
H E
XI
S
TI
N G
FIELD VERIFY
EQ EQ
IG-1 IG-1
(Aluminum Storefront System)
Opening Type 4
S-1 S-1
S-1
FIELD VERIFY
SEE DOOR SCHEDULE
FI
EL
D V
ER
IF
Y
S
EE
D O
O R S
C H
ED
U
LE
SEE DOOR
SCHEDULE
A6.3
SIM
A6.3
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A3.5
STOREFRONT
SCHEDULE
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
THREE POCKET 90 DEGREE CORNER
Rev. Description Date 1 Addendum 1 6/16/21 2 Addendum 3 7/13/21
MATCH LINE MATCH LINE
B CA D E F G H J K L M
1A
1A
B CA D E F G H J K
1A
HHB Engineers, P.C.
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
18072/FAKZ182352
MARCH 2021
ASR
TLH
No. Revision Date
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
FIRST FLOOR
NORTH - HVAC
DEMOLITION
PLAN
M1.1
ADDENDUM 3 7/13/21
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text M1.1
AutoCAD SHX Text
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
FIRST FLOOR NORTH - HVAC DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REMOVE CEILING DIFFUSERS
AutoCAD SHX Text
REMOVE RA DUCT AND CAP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REMOVE SIDEWALL DIFFUSERS
AutoCAD SHX Text
AutoCAD SHX Text M3.2
AutoCAD SHX Text
REMOVE MAKE-UP AIR UNIT DUCTWORK
AutoCAD SHX Text
REMOVE 34/22 MAIN DUCT UP
AutoCAD SHX Text
REMOVE MAU-1 CONTROL PANEL
AutoCAD SHX Text
EX. PTHP-1
AutoCAD SHX Text
EX. PTHP-2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OA UP TO BE REUSED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REMOVE H&V UNIT THERMOSTAT
AutoCAD SHX Text
WALL RETURN TO BE REUSED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text M1.1
AutoCAD SHX Text
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
FIRST FLOOR NORTH - HVAC PIPING DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
REMOVE TO 6" BELOW FLOOR ABOVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N:\2019jobs\219017\Drawings\MECH\F-35 Repair Hangar Building 1201 Dannelly Field\Sheets\M1.1 FIRST FLOOR NORTH - HVAC DEMOLITION PLAN .dwg
AutoCAD SHX Text Andrew Robinson
AutoCAD SHX Text
7/14/2021 4:00 PM
AutoCAD SHX Text
PRATTVILLE, AL 334/358-2707
AutoCAD SHX Text
CONSULTING ENGINEERS
AutoCAD SHX Text KEYED NOTES EXISTING FLOOR MOUNTED HOT WATER AIR HANDLING UNIT TO BE REMOVED. REMOVE PIPE CONNECTIONS AND CONCRETE PAD. EXISTING HOT WATER SUPPLY AND RETURN PIPING TO BE REMOVED. REMOVE ALL SUPPLY AND RETURN DUCT FOR AHU 2-5; REMOVE, STORE, AND REUSE VAV TERMINALS AS INDICATED IN SCHEDULE; REMOVE THERMOSTATS. COORDINATE WITH NEW DUCTWORK SHOWN ON SHEET M2.1. REMOVE ALL HOT WATER SUPPLY AND RETURN FOR AHU 2-5 VAV TERMINALS TO POINT SHOWN. REMOVE SPLIT HEAT PUMP CU-2 AND ASSOCIATED INDOOR UNIT. REMOVE ALL DUCTWORK, PIPING AND CONTROLS. REMOVE CONCRETE PAD. EXISTING H&V UNIT TO BE REMOVED. REMOVE DUCT MOUNTED CHILLED WATER COIL AND COOL RUN OUT CONNECTION. PROVIDE NEW INSULATED DUCTWORK AT COIL SEGMENT. REMOVE WALL MOUNTED PROPELLER EXHAUST FAN. PROVIDE LOUVER SAME SIZE AS FAN WITH SHEET METAL CLOSURE PANEL AND 2" RIGID INSULATION. RELOCATE OUTDOOR UNIT FOR SECOND FLOOR COMM ROOM DUCTLESS MINI- SPLIT, SEE KEYED NOTE #2 M2.1. REMOVE CONCRETE PAD. INSTALL SHEET METAL CLOSURE PANEL ON INSIDE OF LOUVER. INSTALL 2" RIGID INSULATION BOARD ON INSIDE OF CLOSURE PANEL. PROVIDE S.S. COVER ON OUTSIDE WALL AND INSIDE WALL, FILL WITH BATT INSULATION (FIELD VERIFY SIZE). REMOVE VAV BOX AND THERMOSTAT, DUCTWORK, DIFFUSERS AND HWS/R RUNOUT PIPING, TYP. 5 PLACES (FIELD VERIFY SIZE).
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HHB Engineers, P.C.
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
18072/FAKZ182352
MARCH 2021
ASR
TLH
No. Revision Date
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
LARGE SCALE
BOILER ROOM
DEMO. AND
RENOV. - FIRST
FLOOR - HVAC
M3.2
ADDENDUM 3 7/13/21
AutoCAD SHX Text M1.1
AutoCAD SHX Text
AutoCAD SHX Text M3.2
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
BOILER ROOM DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING CHIMNEY TO BE REMOVED, SEE ARCHITECTURAL PLANS
AutoCAD SHX Text M2.1
AutoCAD SHX Text
AutoCAD SHX Text M3.2
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
BOILER ROOM MECHANICAL PLAN
AutoCAD SHX Text
FM
AutoCAD SHX Text
CA
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
AS
AutoCAD SHX Text
HS1
AutoCAD SHX Text P
AutoCAD SHX Text
HS2
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
BLR
AutoCAD SHX Text
AutoCAD SHX Text
BLR
AutoCAD SHX Text H
AutoCAD SHX Text
ET
AutoCAD SHX Text
HVAC MAKE-UP
AutoCAD SHX Text
EX. 3" HWS/HWR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
EX. 2" CWS/R
AutoCAD SHX Text
EX. HWS/R
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
IHP
AutoCAD SHX Text
AutoCAD SHX Text
OHP
AutoCAD SHX Text
SEE DTL. D/M0.2
AutoCAD SHX Text
CHEMICAL FEEDER WITH UNISTRUT SUPPORT
AutoCAD SHX Text
EXISTING MIXED AIR PLENUM
AutoCAD SHX Text
DRYWELL
AutoCAD SHX Text
PIPE SUPPORTS
AutoCAD SHX Text
EXTEND EXISTING CONC. PAD AS REQUIRED
AutoCAD SHX Text T
AutoCAD SHX Text
AHU-6
AutoCAD SHX Text
FD
AutoCAD SHX Text
NEW HVAC CONTROL PANEL
AutoCAD SHX Text
EMERGENCY BOILER AND WATER HEATER SHUT-OFF SWITCH
AutoCAD SHX Text
AH6
AutoCAD SHX Text
HT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONCRETE PAD
AutoCAD SHX Text
MASS FLOW METER REMOTE DISPLAY
AutoCAD SHX Text
NEW LINED DUCT AT REMOVED COOLING COIL
AutoCAD SHX Text
CONTROL PANEL FCD-E9
AutoCAD SHX Text
EXISTING LOUVER, PROVIDE NEW BIRD SCREEN
AutoCAD SHX Text
AutoCAD SHX Text
EUH
AutoCAD SHX Text
AutoCAD SHX Text
EF
AutoCAD SHX Text
AutoCAD SHX Text
12"X12" LOUVER
AutoCAD SHX Text
AutoCAD SHX Text N:\2019jobs\219017\Drawings\MECH\F-35 Repair Hangar Building 1201 Dannelly Field\Sheets\M3.2 LARGE SCALE BOILER ROOM DEMO. AND RENOV. - FIRST FLOOR - HVAC.dwg
AutoCAD SHX Text Andrew Robinson
AutoCAD SHX Text
7/14/2021 4:00 PM
AutoCAD SHX Text
PRATTVILLE, AL 334/358-2707
AutoCAD SHX Text
CONSULTING ENGINEERS
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
AutoCAD SHX Text KEYED NOTES REMOVE TWO LOW PRESSURE STEAM BOILERS, STEAM PIPING AND BOILER STACK. REMOVE BOILER FEED PUMP, FEED WATER PIPING AND CHEMICAL TANK. REMOVE ALL CONDENSATE RETURN PIPING. REMOVE BOILER RELIEF VALVE & DISCHARGE PIPING. 6" AL429C GAS VENT THROUGH ROOF. 6" GLAV. STEEL COMBUSTION AIR INTAKE THROUGH WALL, TURN DOWN WITH BIRD SCREEN PER MANUFACTURER'S INSTALLATION MANUAL. 3/4" CONDENSATE DRAIN CONCEALED IN WALL CONSTRUCTION, DISCHARGE AT MECH. ROOM FLOOR DRAIN. 4" INSULATED OUTSIDE AIR DUCT TO HP1-1, TERMINATE AT EXTERIOR WALL WITH LV-5. COMPRESSED AIR FLOW METER, SEE DETAIL B/M0.5. PIPE, RISE OVER AHU-6 TO COIL CONNECTION. PROVIDE HEAT TRACE ON CHILLED WATER PIPING. SAW-CUT EXISTING WALL, PROVIDE STEEL LINTEL TO SUPPORT WALL ABOVE OPENING. INSTALL FAN WITH BOTTOM APPROX. 8'-0" A.F.F.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Sheet Title
Project Title
M o n tg o m er y
D o th an W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
18072/FAKZ182352
MARCH 2021
ASR
TLH
No. Revision Date
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
PLUMBING
LEGEND,
ABBREVIATIONS,
AND GENERAL
NOTES
P0.1
ADDENDUM 3 7/13/21
AutoCAD SHX Text
REGULATOR
AutoCAD SHX Text
REG.
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXTENT OF DEMOLITION
AutoCAD SHX Text
CONNECT NEW TO EXISTING
AutoCAD SHX Text
* 4" SIZE UNLESS OTHER WISE NOTED ON DWG'S..
AutoCAD SHX Text
PIPE PENETRATION
AutoCAD SHX Text
SD
AutoCAD SHX Text
SHOWER DRAIN, 3"
AutoCAD SHX Text
MD
AutoCAD SHX Text
MECH ROOM DRAIN*
AutoCAD SHX Text
AD
AutoCAD SHX Text
AREA DRAIN*
AutoCAD SHX Text U & D
AutoCAD SHX Text
UP AND DOWN
AutoCAD SHX Text
RAIN WATER CONDUCTOR
AutoCAD SHX Text
RWC
AutoCAD SHX Text
DOWNSPOUT NOZZLE
AutoCAD SHX Text
DSN
AutoCAD SHX Text E.L.
AutoCAD SHX Text
EXPANSION LOOP
AutoCAD SHX Text
EMERGENCY ROOF DRAIN
AutoCAD SHX Text
ED
AutoCAD SHX Text
ROOF DRAIN*
AutoCAD SHX Text
RD
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text %%uPLUMBING LEGEND
AutoCAD SHX Text
WASTE PIPING
AutoCAD SHX Text
VENT PIPING
AutoCAD SHX Text
DOMESTIC COLD WATER PIPING
AutoCAD SHX Text
DOMESTIC HOT WATER PIPING
AutoCAD SHX Text
DOMESTIC HOT WATER RECIRC. PIPING
AutoCAD SHX Text
FLOW CONTROL VALVE, 1.0 GPM
AutoCAD SHX Text
FCO
AutoCAD SHX Text
CLEANOUT, FLOOR
AutoCAD SHX Text
WCO
AutoCAD SHX Text
CLEANOUT, WALL
AutoCAD SHX Text
GCO
AutoCAD SHX Text
CLEANOUT, GRADE
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
FLOOR DRAIN*
AutoCAD SHX Text F.D.
AutoCAD SHX Text
FLOOR SINK
AutoCAD SHX Text F.S.
AutoCAD SHX Text
VENT THROUGH THE ROOF
AutoCAD SHX Text
VTR
AutoCAD SHX Text
HOSE BIBB
AutoCAD SHX Text
HB
AutoCAD SHX Text
NATURAL GAS FUEL PIPING
AutoCAD SHX Text G
AutoCAD SHX Text
PIPE REDUCER/INCREASER
AutoCAD SHX Text
AutoCAD SHX Text
TRAP PRIMER
AutoCAD SHX Text
TP
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
EXISTING TO BE REMOVED
AutoCAD SHX Text
BELOW FLOOR
AutoCAD SHX Text
GATE VALVE IN VALVE BOX
AutoCAD SHX Text
WATER HEATER
AutoCAD SHX Text
BF
AutoCAD SHX Text
WHR
AutoCAD SHX Text %%uABBREVIATIONS
AutoCAD SHX Text
RT
AutoCAD SHX Text
RUNNING TRAP
AutoCAD SHX Text
RAIN WATER LEADER
AutoCAD SHX Text
RWL
AutoCAD SHX Text
MAKE UP WATER
AutoCAD SHX Text
MU
AutoCAD SHX Text
PUWH
AutoCAD SHX Text
POINT-OF-USE WATER HEATER
AutoCAD SHX Text
UNDERGROUND
AutoCAD SHX Text U.G.
AutoCAD SHX Text
ACID WASTE SANITARY DRAINAGE
AutoCAD SHX Text
AW
AutoCAD SHX Text
COMPRESSED AIR
AutoCAD SHX Text A
AutoCAD SHX Text
SHOP COMPRESSED AIR DROPS
AutoCAD SHX Text
PUMP DISCHARGE
AutoCAD SHX Text
PD
AutoCAD SHX Text
WH
AutoCAD SHX Text
WALL HYDRANT
AutoCAD SHX Text
RPZ
AutoCAD SHX Text
REDUCED PRESSURE ZONE CONTROL VALVE
AutoCAD SHX Text
HD
AutoCAD SHX Text
HUB DRAIN
AutoCAD SHX Text
INSTANTANEOUS WATER HEATER
AutoCAD SHX Text
IWH
AutoCAD SHX Text
CFH
AutoCAD SHX Text
CUBIC FEET PER HOUR
AutoCAD SHX Text
CIRCULATING PUMP
AutoCAD SHX Text
CP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
WST
AutoCAD SHX Text
WATER STORAGE TANK
AutoCAD SHX Text
GAS METER
AutoCAD SHX Text
RUNNING TRAP
AutoCAD SHX Text
COMMERCIAL WATER HAMMER
AutoCAD SHX Text
ARRESTOR "PDI SIZE"
AutoCAD SHX Text
RA
AutoCAD SHX Text P5.01A
AutoCAD SHX Text
SHEET REFERENCE
AutoCAD SHX Text
BACKFLOW PREVENTER
AutoCAD SHX Text
BFP
AutoCAD SHX Text
EXISTING TO REMAIN
AutoCAD SHX Text
DOMESTIC HOT WATER PIPING HEAT TRACED
AutoCAD SHX Text
AR
AutoCAD SHX Text
COMPRESSED AIR HOSE REEL
AutoCAD SHX Text
SAW-CUT AND PATCH CONCRETE FLOOR
AutoCAD SHX Text A
AutoCAD SHX Text
COMPRESSED AIR DROP
AutoCAD SHX Text N:\2019jobs\219017\Drawings\MECH\F-35 Repair Hangar Building 1201 Dannelly Field\Sheets\P0.1 PLUMBING LEGEND, ABBREVIATIONS, AND GENERAL NOTES.dwg
AutoCAD SHX Text Andrew Robinson
AutoCAD SHX Text
7/14/2021 3:18 PM
AutoCAD SHX Text
PRATTVILLE, AL 334/358-2707
AutoCAD SHX Text
CONSULTING ENGINEERS
AutoCAD SHX Text PLUMBING GENERAL NOTES: 1. DEMOLISH AND REMOVE PLUMBING FIXTURES AND PIPING SHOWN. EXISTING ROUGH-IN TO BE REUSED/MODIFIED WHERE POSSIBLE. DEMOLISH AND REMOVE PLUMBING FIXTURES AND PIPING SHOWN. EXISTING ROUGH-IN TO BE REUSED/MODIFIED WHERE POSSIBLE. 2. SLOPES & INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY SLOPES & INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY & INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY & INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY IS INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY IN ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY ORDER TO MAINTAIN PROPER SLOPES AND TO VERIFY TO MAINTAIN PROPER SLOPES AND TO VERIFY TO MAINTAIN PROPER SLOPES AND TO VERIFY MAINTAIN PROPER SLOPES AND TO VERIFY MAINTAIN PROPER SLOPES AND TO VERIFY PROPER SLOPES AND TO VERIFY PROPER SLOPES AND TO VERIFY SLOPES AND TO VERIFY SLOPES AND TO VERIFY AND TO VERIFY AND TO VERIFY TO VERIFY TO VERIFY VERIFY VERIFY CONNECTION TO EXISTING PIPE INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & TO EXISTING PIPE INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & TO EXISTING PIPE INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & EXISTING PIPE INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & EXISTING PIPE INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & PIPE INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & PIPE INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & INVERT. ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & ANY DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & DISCREPANCIES SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & SHALL BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & BE REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & REPORTED THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & THE GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & GENERAL CONTRACTOR. ALL PIPING SHALL BE LOCATED & CONTRACTOR. ALL PIPING SHALL BE LOCATED & CONTRACTOR. ALL PIPING SHALL BE LOCATED & ALL PIPING SHALL BE LOCATED & ALL PIPING SHALL BE LOCATED & PIPING SHALL BE LOCATED & PIPING SHALL BE LOCATED & SHALL BE LOCATED & SHALL BE LOCATED & BE LOCATED & BE LOCATED & LOCATED & LOCATED & & & DETERMINED WHEN TO BE INSTALLED TO AVOID CONFLICT WITH OTHER TRADES. 3. PIPING IN WALLS SHALL BE CONCEALED UNLESS OTHERWISE NOTED. PIPING IN WALLS SHALL BE CONCEALED UNLESS OTHERWISE NOTED. 4. KEEP ALL BURIED PIPING CLEAR OF FOOTINGS. COORD. W/STRUCTURAL. KEEP ALL BURIED PIPING CLEAR OF FOOTINGS. COORD. W/STRUCTURAL. 5. CONTRACTOR SHALL COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE CONTRACTOR SHALL COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE SHALL COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE SHALL COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE OF PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE PIPING AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE AND DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE DRAINS WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE WITH ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE ALL MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE MECHANICAL & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE & ELECTRICAL EQUIPMENT. NO PIPING SHALL BE ELECTRICAL EQUIPMENT. NO PIPING SHALL BE ELECTRICAL EQUIPMENT. NO PIPING SHALL BE EQUIPMENT. NO PIPING SHALL BE EQUIPMENT. NO PIPING SHALL BE NO PIPING SHALL BE NO PIPING SHALL BE PIPING SHALL BE PIPING SHALL BE SHALL BE SHALL BE BE BE INSTALLED ABOVE ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION ABOVE ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION ABOVE ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION WITH ARCHITECTURAL PLANS FOR EXACT LOCATION WITH ARCHITECTURAL PLANS FOR EXACT LOCATION ARCHITECTURAL PLANS FOR EXACT LOCATION ARCHITECTURAL PLANS FOR EXACT LOCATION PLANS FOR EXACT LOCATION PLANS FOR EXACT LOCATION FOR EXACT LOCATION FOR EXACT LOCATION EXACT LOCATION EXACT LOCATION LOCATION LOCATION OF PLUMBING FIXTURES, COMPLIANCE TO ADA CLEARANCES, AND FINISHES. 6. CONTRACTOR SHALL PROVIDE REQUIRED WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. CONTRACTOR SHALL PROVIDE REQUIRED WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. SHALL PROVIDE REQUIRED WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. SHALL PROVIDE REQUIRED WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. PROVIDE REQUIRED WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. PROVIDE REQUIRED WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. REQUIRED WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. REQUIRED WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. WATER, WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. WASTE, & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. & VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. VENT PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. PIPING, FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. FITTINGS & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. & INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. INSULATION, & MAKE FINAL CONNECTIONS TO EQUIPMENT. & MAKE FINAL CONNECTIONS TO EQUIPMENT. & MAKE FINAL CONNECTIONS TO EQUIPMENT. MAKE FINAL CONNECTIONS TO EQUIPMENT. MAKE FINAL CONNECTIONS TO EQUIPMENT. FINAL CONNECTIONS TO EQUIPMENT. FINAL CONNECTIONS TO EQUIPMENT. CONNECTIONS TO EQUIPMENT. CONNECTIONS TO EQUIPMENT. TO EQUIPMENT. TO EQUIPMENT. EQUIPMENT. EQUIPMENT. THESE PLANS ARE SCHEMATIC & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS PLANS ARE SCHEMATIC & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS PLANS ARE SCHEMATIC & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS ARE SCHEMATIC & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS ARE SCHEMATIC & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS SCHEMATIC & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS SCHEMATIC & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS & DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS BENDS, OFFSETS, VALVES, AND MISCELLANEOUS BENDS, OFFSETS, VALVES, AND MISCELLANEOUS OFFSETS, VALVES, AND MISCELLANEOUS OFFSETS, VALVES, AND MISCELLANEOUS VALVES, AND MISCELLANEOUS VALVES, AND MISCELLANEOUS AND MISCELLANEOUS AND MISCELLANEOUS MISCELLANEOUS MISCELLANEOUS FITTINGS FOR A COMPLETE INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH FOR A COMPLETE INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH FOR A COMPLETE INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH A COMPLETE INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH A COMPLETE INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH COMPLETE INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH COMPLETE INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH INSTALLATION. ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH ALL PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH PIPING EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH SHALL BE INSTALLED IN ACCORDANCE WITH SHALL BE INSTALLED IN ACCORDANCE WITH BE INSTALLED IN ACCORDANCE WITH BE INSTALLED IN ACCORDANCE WITH INSTALLED IN ACCORDANCE WITH INSTALLED IN ACCORDANCE WITH IN ACCORDANCE WITH IN ACCORDANCE WITH ACCORDANCE WITH ACCORDANCE WITH WITH WITH SPECIFICATIONS, LOCAL CODES AND ORDINANCES, AND MANUFACTURER'S INSTRUCTIONS. 7. SANITARY SEWER PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO SANITARY SEWER PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO SEWER PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO SEWER PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO A MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO MINIMUM SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO SLOPE OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO OF 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO 1.25%. WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO WASTE PIPING 3” & SMALLER SHALL BE INSTALLED TO PIPING 3” & SMALLER SHALL BE INSTALLED TO PIPING 3” & SMALLER SHALL BE INSTALLED TO 3” & SMALLER SHALL BE INSTALLED TO 3” & SMALLER SHALL BE INSTALLED TO & SMALLER SHALL BE INSTALLED TO & SMALLER SHALL BE INSTALLED TO SMALLER SHALL BE INSTALLED TO SMALLER SHALL BE INSTALLED TO SHALL BE INSTALLED TO SHALL BE INSTALLED TO BE INSTALLED TO BE INSTALLED TO INSTALLED TO INSTALLED TO TO TO PROVIDE A MINIMUM SLOPE OF 2.5%. 8. DO NOT SCALE DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. DO NOT SCALE DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. NOT SCALE DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. NOT SCALE DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. SCALE DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. SCALE DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. FIXTURE LOCATIONS, ROOM NAMES, & NUMBERS. LOCATIONS, ROOM NAMES, & NUMBERS. LOCATIONS, ROOM NAMES, & NUMBERS. ROOM NAMES, & NUMBERS. ROOM NAMES, & NUMBERS. NAMES, & NUMBERS. NAMES, & NUMBERS. & NUMBERS. & NUMBERS. NUMBERS. NUMBERS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT ELEVATIONS OF ALL PLUMBING FIXTURES. 9. ALL HOSE BIBS, WALL HYDRANTS, & VALVES W/THREADED HOSE CONNECTIONS SHALL BE EQUIPPED W/VACUUM BREAKER. ALL HOSE BIBS, WALL HYDRANTS, & VALVES W/THREADED HOSE CONNECTIONS SHALL BE EQUIPPED W/VACUUM BREAKER. 10. PROVIDE INSULATION, PIPE IDENTIFICATION AND OTHER REQUIREMENTS AS LISTED IN SPECIFICATIONS. PROVIDE INSULATION, PIPE IDENTIFICATION AND OTHER REQUIREMENTS AS LISTED IN SPECIFICATIONS. 11. ALL PIPING ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE ALL PIPING ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE PIPING ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE PIPING ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE AND SHALL NOT REST ON CEILING TILES OR BE AND SHALL NOT REST ON CEILING TILES OR BE SHALL NOT REST ON CEILING TILES OR BE SHALL NOT REST ON CEILING TILES OR BE NOT REST ON CEILING TILES OR BE NOT REST ON CEILING TILES OR BE REST ON CEILING TILES OR BE REST ON CEILING TILES OR BE ON CEILING TILES OR BE ON CEILING TILES OR BE CEILING TILES OR BE CEILING TILES OR BE TILES OR BE TILES OR BE OR BE OR BE BE BE SUPPORTED FROM CEILING TILES. 12. TUBING FITTINGS AND VALVES FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS TUBING FITTINGS AND VALVES FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS FITTINGS AND VALVES FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS FITTINGS AND VALVES FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS AND VALVES FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS AND VALVES FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS VALVES FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS VALVES FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS FOR NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS NITROGEN FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS FROM CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS CYLINDER BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS BANK REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS REGULATOR TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS TO TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS TIRE CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS CAGE TO BE INSTRUMENT GRADE TYPE 316 STAINLESS TO BE INSTRUMENT GRADE TYPE 316 STAINLESS TO BE INSTRUMENT GRADE TYPE 316 STAINLESS BE INSTRUMENT GRADE TYPE 316 STAINLESS BE INSTRUMENT GRADE TYPE 316 STAINLESS INSTRUMENT GRADE TYPE 316 STAINLESS INSTRUMENT GRADE TYPE 316 STAINLESS GRADE TYPE 316 STAINLESS GRADE TYPE 316 STAINLESS TYPE 316 STAINLESS TYPE 316 STAINLESS 316 STAINLESS 316 STAINLESS STAINLESS STAINLESS STEEL WITH COMPRESSION TYPE FITTINGS (SWAGELOCK OR SIMILAR). PROVIDE 3-PIECE FULL PORT INSTRUMENTATION BALL VALVE.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Sheet Title
Project Title
M o n tg o m er y
D o th an W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
18072/FAKZ182352
MARCH 2021
ASR
TLH
No. Revision Date
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
PLUMBING
DETAILS
P0.3
ADDENDUM 3 7/13/21
AutoCAD SHX Text
ANCHOR HOSE REEL TO CMU WALL
AutoCAD SHX Text
HOSE REEL
AutoCAD SHX Text
2" PVC INTAKE THRU WALL TO VENT CAP
AutoCAD SHX Text
2" CPVC VENT OFFSET AND VENT THRU ROOF
AutoCAD SHX Text P0.3
AutoCAD SHX Text A
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
HOT WATER DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ANCHOR TO WALL
AutoCAD SHX Text
UNION (TYP.)
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
LINE FILTER
AutoCAD SHX Text
LINE OILER
AutoCAD SHX Text
MAY BE COMBINED INTO A SINGLE ASSEMBLY
AutoCAD SHX Text
PRESSURE REGULATOR 100 SCFM, 125 TO 80 PSI DELIVERY
AutoCAD SHX Text
FULL PORT BALL VALVE
AutoCAD SHX Text P0.3
AutoCAD SHX Text B
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
HANGER HOSE REEL DETAIL
AutoCAD SHX Text
1/2" BALL VALVE FOR BLOW-DOWN AND TEST PORT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3/8" DIAMETER BY 100 - FOOT HOSE WITH 1/4" NPT CONNECTION
AutoCAD SHX Text
FEMALE QUICK DISCONNECT, 1/4" A-A-59439, TYPE 1, CLASS A, STYLE 2
AutoCAD SHX Text
10' AFF VERIFY WITH CONTRACTING OFFICER
AutoCAD SHX Text 4" WATERTIGHT BOX IN 18"x18"x6" CONCRETE PAD FLUSH W/FINISHED GRADE
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
TURNBUCKLE
AutoCAD SHX Text
1/2" BOLT
AutoCAD SHX Text
CONCRETE BALLAST PER TANK MANUFACTURER RECCOMENDATIONS
AutoCAD SHX Text P0.3
AutoCAD SHX Text C
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
BURIED STORAGE TANK DETAIL
AutoCAD SHX Text
3" VENT, SEE PLANS
AutoCAD SHX Text
24" MANHOLE WITH AIR-TIGHT COVER AND ACCESS RISER TO TANK TWO PLACES
AutoCAD SHX Text
4" SUCTION RISER
AutoCAD SHX Text
LEVEL SWITCH
AutoCAD SHX Text
36" VERIFY WITH CONTRACTING OFFICER
AutoCAD SHX Text
%%UCLEANOUT TO GRADE
AutoCAD SHX Text
%%UFLOOR CLEANOUT
AutoCAD SHX Text
FLOOR LINE
AutoCAD SHX Text
CLEANOUT AND ACCESS COVER. TOP OF COVER TO BE FLUSH W/TOP OF FLOOR.
AutoCAD SHX Text
1/8" BEND
AutoCAD SHX Text
BALANCE OF PIPING SAME AS CLEANOUT TO GRADE
AutoCAD SHX Text
1/8" BEND IF CLEANOUT OCCURS AT END OF LINE
AutoCAD SHX Text
WASTE LINE
AutoCAD SHX Text
WASTE LINE LENGTH TO SUIT
AutoCAD SHX Text
1/8 BEND
AutoCAD SHX Text
16" SQ. CONCRETE PAD TROWEL SMOOTH AND EDGE
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
BRASS CLEANOUT PLUG W/COUNTERSINK HEAD
AutoCAD SHX Text P0.3
AutoCAD SHX Text D
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CLEANOUT DETAILS
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
CAST IRON WASTE PIPE
AutoCAD SHX Text
HEAVY DUTY CAST IRON COUPLING
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
GROUT BED (IF ENCOUNTERED)
AutoCAD SHX Text
CONCRETE FLOOR/SLAB
AutoCAD SHX Text
CAST IRON FLOOR DRAIN
AutoCAD SHX Text
HEAVY DUTY NO-HUB CLAMP
AutoCAD SHX Text
TRAP PRIMER PIPING
AutoCAD SHX Text
CAST IRON DEEP-SEAL P-TRAP
AutoCAD SHX Text P0.3
AutoCAD SHX Text F
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FLOOR DRAIN DETAIL
AutoCAD SHX Text
WASTE STACK
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
WALL ACCESS COVER
AutoCAD SHX Text
FINISHED WALL
AutoCAD SHX Text
%%UWALL CLEANOUT
AutoCAD SHX Text
ASSE 1070 TEMPERATURE LIMITING DEVICE, SET AT 110°F
AutoCAD SHX Text
CW SUPPLY TO FIXTURE FAUCET
AutoCAD SHX Text
CW ANGLE SUPPLY W/STOP
AutoCAD SHX Text
HW ANGLE SUPPLY W/STOP
AutoCAD SHX Text P0.3
AutoCAD SHX Text E
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPICAL HAND SINK/LAVATORY PIPING DETAIL
AutoCAD SHX Text
ANCHOR STRAP
AutoCAD SHX Text
BALL VALVE, TYP.
AutoCAD SHX Text
CHECK VALVE, TYP.
AutoCAD SHX Text
DOMESTIC COLD WATER
AutoCAD SHX Text
CONDENSATE TO SINGLE ACID NEUTRALIZER
AutoCAD SHX Text
THERMAL EXPANSION TANK
AutoCAD SHX Text
DOMESTIC HOT WATER (120°F)
AutoCAD SHX Text
DOMESTIC RECIRCULATION RETURN
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
CP-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N:\2019jobs\219017\Drawings\MECH\F-35 Repair Hangar Building 1201 Dannelly Field\Sheets\P0.3 PLUMBING DETAILS.dwg
AutoCAD SHX Text Andrew Robinson
AutoCAD SHX Text
7/13/2021 4:34 PM
AutoCAD SHX Text
PRATTVILLE, AL 334/358-2707
AutoCAD SHX Text
CONSULTING ENGINEERS
MATCH LINE
REFREF
150 SF
METAL TECH
SUPER OFFICE
149 SF
FAB SUPER
OFFICE
145 SF
STORAGE
2188 SF
METALS TECH
SHOP
58 SF
ELEV
60 SF
EQ.
175 SF
TFI STORAGE
1123 SF
ALIS
182 SF
QA CHIEF
1074 SF
QA COMMONS
79 SF
COMM
1144 SF
FABRICATIONS
SHOP
713 SF
BOILER
83 SF
VEST
110 SF
ENTRY
109C
173 SF
STAIR
237 SF
STAIR
317 SF
FIRE
PROTECTION
25982 SF
MAINTENANCE
HANGAR
547 SF
LOCKERS
80 SF
VEST
270 SF
BREAK ROOM
108A
236 SF
KITCHEN
108B
76 SF
ENTRY
109D
143 SF
ENTRY
109B
44 SF
VEST
109A
111 SF
LO SUPER
OFFICE
MATCH LINE
B CA D E F G H J K L M
B CA D E F G H J K L M
1A
1A
UP
UP
HHB Engineers, P.C.
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
18072/FAKZ182352
MARCH 2021
ASR
TLH
No. Revision Date
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
FIRST FLOOR
NORTH -
PLUMBING
RENOVATION
PLAN
P2.1
ADDENDUM 3 7/13/21
AutoCAD SHX Text
AR
AutoCAD SHX Text
AR
AutoCAD SHX Text
AR
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text P2.1
AutoCAD SHX Text
AutoCAD SHX…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .