FAKZ182352 Type B3 Drawings Signed.pdf
PDF 41 MB Posted
- Attached to
- F-35: Repair Hangar bldg 1201
- Solicitation number
- W50S6N-21-B-0003
About this file
This document outlines a federal contract opportunity for repair services at Hangar 1201. The 187th Fighter Wing of the Alabama Army National Guard is seeking a firm fixed-price contract to repair Hangar 1201, including removing and replacing the building's mechanical systems, partially removing and replacing existing plumbing systems, and removing and replacing the existing metal retrofit roof, hangar floor slab, and modifying electrical systems. The magnitude of the project is estimated between $5 million to $10 million. The NAICS code is 236210 for the project. The solicitation number is W50S6N-21-B-0003. A pre-bid conference will be held on June 8, 2021 at 10:00am Central Time at Building 1502 Wing Auditorium classroom to brief on bid requirements and answer questions. A site visit will follow. Interested contractors must submit an Entry Authority List to three listed email addresses. The award is 100% set aside for small businesses with a size standard of $39.5 million or less.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T1.0
TITLE SHEET
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
187th Fighter Wing Dannelly Field - AL ANG Montgomery, AL
FAKZ 182352
Approvals:
Title: Signature: Date:
Base Commander
Base Civil Engineer
Base Project Engineer
Bio Environmental Eng.
Safety
Security Police
Base Communications
Fire Chief
Architect:
Design Team:
Option #3
Schedule of Bid Options:
Acoustical Baffles
Option #2
Second Floor Door Replacement
Option #1
Metal Retrofit Roof System
Option #4
Second Floor Ceiling & Floor Upgrades
Second Floor Hallway Upgrades
Plumbing, Mechanical, & Fire Protection:
Consulting Engineers:
Electrical:
Structural:
F-35 Repair Hangar Building 1201
Option #5
Option #6
Multi-purpose Room Finish UpgradesOption #7
Additional Plumbing Piping Replacement
Rev. Description Date
Type B-3 (100%) Submittal
202A
A101
1Ref
Re f
1 Ref
Re f
A101
Ref
1Re f
1 Re f
Ref
ROOM NAME
150 SF
1t
1i
A101
SIM
A101
SIM
A101
SIM
Building Elevation Tag
Interior Elevation Tag
Building Section Tag
Wall Section Tag
Detail Tag
General Symbol Legend
Room Tag
ADA Approved Turning Space
Spot Elevation
Door Tag (See Door Schedule)
Window Tag (See Window Schedule)
Wall/Storefront Tag (See Wall/Storefront Schedule)
Revision Tag (See Revision Schedule)
X Specific Note Tag
Electric Water Cooler (See Plumbing)
Fire Extinguisher Cabinet
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T2.0
GENERAL WORK
NOTES,
ABBREVIATIONS,
SYMBOLS &
DRAWING INDEX
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
General Project Notes:
GENERAL NOTES APPLY TO THE ENTIRE PROJECT. SPECIFIC NOTES APPLY TO ISOLATED
WORK AREAS AND ARE FOR THE CONVENIENCE OF THE CONTRACTOR. HOWEVER, ALL
ISOLATED WORK AREAS ARE NOT NOTED. SHOULD A CONDITION OCCUR THAT IS NOT
SPECIFICALLY NOTED, THE CONTRACTOR SHALL PROCEED WITH WORK PER GENERAL
DEMOLITION NOTES OR A SPECIFIC WORK NOTE(S) USED IN OTHER SIMILAR
CONDITIONS, WHICHEVER IS MORE STRINGENT, PER APPROVAL OF ARCHITECT.
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY CONDITIONS
1. CONTRACTOR TO VISIT SITE AND TO BECOME TOTALLY FAMILIAR WITH EXTENT OF
WORK REQUIRED PRIOR TO BID.
2. CONTRACTOR TO VERIFY DIMENSIONS OF INTERIOR PARTITION WALLS. IF
DISCREPANCY OCCURS, NOTIFY ARCHITECT PRIOR TO FRAMING.
3. CONTRACTOR TO VERIFY ALL FINISHED DIMENSIONS BEFORE INSTALLATION OF
CABINET WORK AND TRIMWORK.
4. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR THE CONVENIENCE OF THE
CONTRACTOR, VERIFY ALL EXISTING CONDITIONS. LOCATION OF WALLS SHALL BE
AS SHOWN ON PLAN RELATIVE TO EXISTING CONDITIONS.
5. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS WITH THE
DRAWINGS, IN PARTICULAR: WALL DIMENSIONS, INCOMING UTILITIES, ETC. REPORT
IMMEDIATELY TO THE ARCHITECT ANY VARIANCES OR FIELD CONDITIONS THAT
MAY CAUSE CONSTRUCTION PROBLEMS PRIOR TO COMMENCING WORK.
CONTRACTOR'S REPONSIBILITY TO COORDINATE THE WORK
1. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO COMMENCING.
FURNISH INFORMATION NECESSARY TO ADJUST, MOVE OR RELOCATE EXISTING
STRUCTURES, UTILITY POLES, LINES, SERVICES OF OTHER SYSTEMS LOCATED IN,
OR AFFECTED BY CONSTRUCTION. COORDINATE WITH LOCAL AUTHORITIES
HAVING JURISDICTION WITH CONSTRUCTION.
2. CONTRACTOR TO VERIFY APPLICABLE OPENINGS, DOOR SIZES, AND DIMENSIONS
OF MECHANICAL ROOMS WITH EQUIPMENT. IF DISCREPANCY OCCURS, NOTIFY
ARCHITECT PRIOR TO FRAMING.
3. CONTRACTOR TO COORDINATE PLUMBING AND MECHANICAL LINES WITH CEILING
HEIGHTS, ABOVE CEILING AREAS AND STRUCTURAL ELEMENTS.
4. CONTRACTOR TO VERIFY WITH STRUCTURAL, PLUMBING, MECHANICAL, AND
ELECTRICAL THE QUANTITY AND SIZES OF ALL SLEEVES REQUIRED. ALL SLEEVES
TO BE ONE HOUR RATED, PROVIDE GREATER RATING IF PENETRATING INTO HIGHER
RATED SPACE.
5. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT THE HEAD HEIGHT IS
NOT ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE.
6. CONTRACTOR TO COORDINATE PLUMBING, MECHANICAL, FIRE SPRINKLER,
ELECTRICAL, AND LIGHTING WITH STRUCTURAL ELEMENTS WHERE THERE IS
EXPOSED STRUCTURE. CONDUIT LINES, ECT. SHALL RUN AT RIGHT ANGLES OR
SEGMENTED BETWEEN COLUMN LINES AND BE CLEAN AND NEAT IN APPEARANCE.
7. COORDINATE LOCATION OF SWITCHES, OUTLETS, THERMOSTATS, LIGHTS, ETC. W/
SHELVING, TRIM, MARKER BOARDS, AND CABINETRY. MOVE AS REQUIRED TO
MISS SHELVING, STORAGE, CASEWORK, VISUAL DISPLAY BOARDS.
8. COORDINATE CONDUIT, PIPING, AND DUCTWORK SO THAT HEAD HEIGHT IS NOT
ENCUMBERED AND SERVICES ARE AS TIGHT UP TO STRUCTURE AS POSSIBLE,
THIS WILL INCLUDE JOGGING DUCTS, SPRINKLER LINES, PLUMBING LINES,
CONDUIT, ECT. UP AND DOWN OR AROUND AS REQUIRED TO ACHIEVE CEILING
HEIGHTS AS INDICATED. COORDINATE INSTALLATION AND SEQUENCING OF
DISCIPLINES TO ACHIEVE.
9. THE GENERAL CONTRACTOR SHALL STAKE OUT ALL MAJOR FEATURES SHOWN ON
THE SITE PLAN TO VERIFY THE SITE LAYOUT RELATIVE TO THE PROPERTY LINES AND
SITE CONDITIONS PRIOR TO ANY UTILITIES OR FOOTINGS BEING INSTALLED.
10. COORDINATE FINAL CEILING HEIGHT WITH ALL WINDOWS. ALL TRADES SHOULD BE
ABLE TO FIT WITHIN THE ALLOTTED SPACE IF COORDINATED BY THE GENERAL
CONTRACTOR AND EACH TRADE. IF FURR DOWNS ARE REQUIRED TO
ACCOMMODATE ABOVE CEILING ITEMS, THE CONTRACTOR IS RESPONSIBLE TO
PROVIDE FURR DOWNS AND COORDINATE LOCATIONS WITH THE ARCHITECT.
11. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY
THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK
WITH ALL TRADES. CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK
ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
12. CONTRACTOR WILL BE RESPONSIBLE FOR ALL LAYOUT FOR INTERIOR/EXTERIOR
WALLS AND FOUNDATION AND WILL BE RESPONSIBLE FOR MAINTAINING A
BENCHMARK AND CONTROL LINES AT EACH FLOOR LEVEL. CONTRACTOR IS ALSO
RESPONSIBLE FOR VERIFYING ACTUAL FLOOR HEIGHTS AND COORDINATING NEW
AND EXISTING FLOORS TO ALIGN.
13. EACH TRADE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND
INSTALLING CEILING OR WALL-MOUNTED ACCESS DOORS AS REQUIRED TO
ACCESS COMPONENTS OF ITS SYSTEM AND TO COORDINATE WITH OTHER
TRADES SO ACCESS IS MAINTAINED
14. PLUMBING, FIRE-PROTECTION, MECHANICAL, AND ELECTRICAL WORK REQUIRED BY
THIS CONTRACT IS NOTED ON CONTRACT DOCUMENTS. THE TRADE
CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR WORK
WITH ALL TRADES. CHANGE ORDERS SHALL NOT BE APPROVED FOR EXTRA WORK
ARISING FROM TRADE CONTRACTORS NOT COORDINATING WORK.
15. CONTRACTOR SHALL COORDINATE TO ASSURE ALL EQUIPMENT CAN BE BROUGHT
INTO THE BUILDING. THIS INCLUDES MANUFACTURE COMPONENT SIZE/ASSEMBLY,
CRITICAL PATH SCHEDULING, AND COORDINATION OF OTHER TRADES.
ACT Acoustical Ceiling Tile A/C Air Conditioning AB Anchor Bolt ADA American Disabilities Act AFF Above Finish Floor BM Beam BRG Bearing BRK Brick CFCI Contractor Furnished
Contractor Installed CIP Cast In Place CJ Control Joint CL Column Line CLG Ceiling CLR Clear CMU Concrete Masonry Unit COL Column CONC Concrete CONT Continuous CONTR Contractor COORDF Coordination CORR Corridor CT Ceramic Tile CTR Center DBL Double DET Detail DIA Diameter DR Drain DN Down DS Downspout DW Dishwasher DWG Drawing DWR Drawer EA Each EF Exhaust Fan EJ Expansion Joint EL Elevation ELEC Electrical EQ Equal EX Existing EXT Exterior FF Finish Floor FIN Finish FL Floor Line FlSNG Flashing FTG Footing GA Gauge GFRC Glass Fiber Reinforced
Concrete
GWB GWB
HT Height HM Hollow Metal HOR Horizontal HR Handrail HTR Heater HVAC Heating, Ventilation & Air
Conditioning HxWxL Height, width, length IN Inches INSUL Insulation INT Interior JST Joist
JT Joint LAM Laminate LAV Lavatory LVR Louver MIN Minimum MAX Maximum MECH Mechanical MET Metal MFR Manufacturer MH Man Hole MIN Minimum MISC Miscellaneous MLDG Moulding MO Masonry Opening MTD Mounted MW Microwave NIC Not In Contract NO Number NOM Nominal NTS Not to Scale OC On Center OFCI Owner Furnished
Contractor Installed OFOI Owner Furnished
Owner Installed OPP Opposite P Paint PL Plate / Property Line PL LAM Plastic Laminate PLYWD Plywood PNL Panel PT Pressure Treated R Radius / Riser RB Rubber Base REFR Refrigerator REINF Reinforce (D) REV Revised RM Room SCHED Schedule SECT Section SHT Sheet SHW Single Hung Window SIM Similar SPECS Specifications SQ Square SS Sanitary Sewer STD Standard SVT Solid Vinyl Tile STL Steel T Tile T&G Tongue & Groove TYP Typical UNO Unless Noted
Otherwise VERT Vertical VTR Vent Thru Roof VWC Vinyl Wall Covering WD Wood WWM Welded Wire Mesh WWF Welded Wire Fabric YP Yellow Pine
Typical Abbreviation Legend:General Project Notes (Continued):
CONTRACTOR'S RESPONSIBILTY TO COMPLY WITH APPLICABLE GOVERNING
CODES/AUTHORITIES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES, LAWS,
AND ORDINANCES. EACH TRADE CONTRACTOR IS RESPONSIBLE FOR
OBTAINING ALL PERMITS, INSPECTIONS, AND CERTIFICATES REQUIRED BY
GOVERNING ENTITIES.
2. CONTRACTOR TO CONFIRM ALL OSHA AND APPLICABLE STANDARDS TO
ASSURE SAFETY OF ALL PERSONS ON SITE DURING ENTIRE COURSE OF
CONSTRUCTION.
3. NEITHER THE ARCHITECT, NOR THE OWNER SHALL BE RESPONSIBLE FOR JOB
SAFETY. EACH TRADE CONTRACTOR SHALL BE RESPONSIBLE FOR JOB SITE
SAFETY AND SAFETY OF THE PUBLIC DURING CONSTRUCTION AND SHALL
PROVIDE APPROPRIATE WARNINGS, BARRICADES, ETC. AS REQUIRED PER
CODES.
4. PROMPTLY NOTIFY THE ARCHITECT IN WRITING IF ANY CONTRACT DOCUMENTS
ARE FOUND TO BE IN VARIANCE WITH THE APPLICABLE LAWS AND
ORDINANCES. NECESSARY CHANGES WILL BE MADE BY APPROPRIATE
MODIFICATIONS.
5. IF ANY WORK IS PERFORMED KNOWING IT TO BE CONTRARY TO SUCH CODES,
LAWS, ORDINANCES, RULES AND REGULATIONS, AND WITHOUT NOTICE TO
THE ARCHITECT, THAT TRADE CONTRACTOR ASSUMES FULL RESPONSIBILITY
AND BEARS COSTS ATTRIBUTED TO BRING WORK TO COMPLIANCE OF SUCH
CODES, LAWS, ORDINANCES, AND RULES AND REGULATIONS.
GENERAL PROVISIONS FOR FIRE RATED CONSTRUCTION
1. ALL RECESSED ACCESSORIES LOCATED IN FIRE RATED WALLS SHALL BE
EITHER OF FIRE RATED CONSTRUCTION OR COORDINATED WITH THE
ADJACENT TRADES TO ALLOW THE GYPSUM BOARD TO BE CONTINUOUS
BEHIND THE ACCESSORIES.
2. EACH RESPONSIBLE CONTRACTOR SHALL SEAL ALL PENETRATIONS MADE AS
PART OF THEIR WORK IN FIRE-RATED CONSTRUCTION AS REQUIRED BY ALL
APPLICABLE CODES. EACH CONTRACTOR TO VERIFY WITH LOCAL FIRE
MARSHAL OR BUILDING OFFICIAL HAVING JURISDICTION. EACH RESPONSIBLE
CONTRACTOR WILL SEAL ALL PENETRATIONS MADE AS PART OF THEIR WORK
THROUGH NON-RATED PARTITIONS. ALL FIRE CAULK TO BE THE SAME BRAND
AS DETERMINED BY CONTRACTOR.
3. ALL NEW AND EXISTING FIRE WALLS IN WORK AREAS ARE TO BE CARRIED TO
THE UNDERSIDE OF THE ROOF DECK AND SEALED AS REQUIRED FOR
NECESSARY FIRE RATINGS, AND LABELED PER THE AUTHORITY HAVING
JURISDICTION.
4. MATERIALS WITHIN PLENUMS. EXCEPT AS REQUIRED BY THE 2009
INTERNATIONAL MECHANICAL CODE SECTION 602.2.1.1 THROUGH
602.2.1.6, MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR
SHALL HAVE A FLAME SPEAD INDEX OF NOT MORE THAN 25 AND A SMOKE-
DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE
WITH ASTM E84 OR UL 723.
MISCELLANEOUS GENERAL PROVISIONS:
1. CONTRACTOR TO NOTIFY ARCHITECT IMMEDIATELY IF THERE ARE ANY
DISCREPANCIES WITH TAGGED DETAILS, ENLARGED PLANS, ELEVATIONS, ETC.
2. IN ROOMS WITH FLOOR DRAINS, SLOPE TO DRAIN AT 1 PERCENT SLOPE
UNLESS SPECIFICALLY NOTED OTHERWISE.
DRAWING INDEX
SHEET NO. SHEET NAME
07 MECHANICAL
M0.1 MECHANICAL SCHEDULES, LEGEND, ABBREVIATIONS, AND
NOTES
M0.2 MECHANICAL SCHEDULES CONTINUED
M0.3 MECHANICAL DETAILS
M0.4 MECHANICAL DETAILS
M0.5 MECHANICAL DETAILS
M1.1 FIRST FLOOR NORTH - HVAC DEMOLITION PLAN
M1.2 FIRST FLOOR SOUTH - HVAC DEMOLITION PLAN
M1.3 SECOND FLOOR NORTH - HVAC DEMOLITION PLAN
M1.4 SECOND FLOOR SOUTH - HVAC DEMOLITION PLAN
M2.1 FIRST FLOOR NORTH - HVAC RENOVATION PLAN
M2.2 FIRST FLOOR SOUTH - HVAC RENOVATION PLAN
M2.3 SECOND FLOOR NORTH - HVAC RENOVATION PLAN
M2.4 SECOND FLOOR SOUTH - HVAC RENOVATION PLAN
M2.5 DEMOLITION ROOF PLAN NORTH
M2.6 DEMO ROOF PLAN SOUTH
M3.1 LARGE SCALE MECH. ROOM DEMOLITION - SECOND
FLOOR
M3.2 LARGE SCALE BOILER ROOM DEMO. AND RENOV. - FIRST
FLOOR - HVAC
M4.1 ELEVATION AT EF-2 AND EF-3
M7.0 CONTROL DIAGRAM - LEGEND
M7.1 CONTROL DIAGRAM
M7.2 AHU-6 CONTROL DIAGRAM
M7.3 MAINTENANCE HANGARD 100 HEATING AND VENTILATION
CONTROL DIAGRAM
08 PLUMBING
P0.1 PLUMBING LEGEND, ABBREVIATIONS, AND GENERAL NOTES
P0.2 PLUMBING DETAILS
P0.3 PLUMBING DETAILS
P1.1 FIRST FLOOR NORTH - PLUMBING DEMOLITION PLAN
P1.1A FIRST FLOOR NORTH - PLUMBING DEMOLITION PLAN -
ALTERNATE
P1.2 FIRST FLOOR SOUTH - PLUMBING DEMOLITION PLAN
P1.2A FIRST FLOOR SOUTH - PLUMBING DEMOLITION PLAN -
ALTERNATE
P1.3 SECOND FLOOR NORTH - PLUMBING DEMOLITION PLAN
P1.4 SECOND FLOOR SOUTH - PLUMBING DEMOLITION PLAN
P2.1 FIRST FLOOR NORTH - PLUMBING RENOVATION PLAN
P2.1A FIRST FLOOR NORTH - PLUMBING RENOVATION PLAN -
ALTERNATE
P2.2 FIRST FLOOR SOUTH - PLUMBING RENOVATION PLAN
P2.2A FIRST FLOOR SOUTH - PLUMBING RENOVATION PLAN -
ALTERNATE
P2.3 SECOND FLOOR NORTH - PLUMBING RENOVATION PLAN
P2.4 SECOND FLOOR SOUTH - PLUMBING RENOVATION PLAN
P3.0 ENLARGED PLUMBING DEMOLITION PLANS
P3.1 ENLARGED PLUMBING - PRESSURE
P3.2 LARGE SCALE BOILER ROOM DEMO. & RENOV. PLAN -
FIRST FLOOR - PLUMBING
P3.2A LARGE SCALE BOILER ROOM RENOV. PLAN - FIRST FLOOR
PLUMBING ALT.
P4.1 ENLARGED PLUMBING - NON PRESSURE
P6.1 NORTH WASTE AND VENT RISER
P6.2 SOUTH WASTE AND VENT RISER
P7.1 NORTH WATER RISER DIAGRAM - ALTERNATE
P7.2 NORTH WATER RISER DIAGRAM - BASE BID
P7.3 SOUTH WATER RISER DIAGRAM
P7.4 GAS RISER DIAGRAM
09 ELECTRICAL
E0.1 ELECTRICAL LEGEND AND NOTES
E0.2 FIRST FLOOR PLAN HAZARDOUS CLASSIFICATION AREAS
E0.3 OVERALL BUILDING PLAN - LIGHTING PROTECTION SYSTEM
MODIFICATIONS
E1.1 FIRST FLOOR NORTH ELECTRICAL DEMOLITION
E1.2 FIRST FLOOR SOUTH ELECTRICAL DEMOLITION
E1.3 SECOND FLOOR PLAN NORTH ELECTRICAL DEMOLITION
E1.4 SECOND FLOOR PLAN SOUTH ELECTRICAL DEMOLITION
E2.1 FIRST FLOOR PLAN NORTH LIGHTING
E2.2 FIRST FLOOR PLAN SOUTH LIGHTING
E2.3 SECOND FLOOR PLAN NORTH ALTERNATE LIGHTING PLAN
E2.4 SECOND FLOOR PLAN SOUTH ALTERNATE LIGHTING PLAN
E2.5 LIGHTING CONTROL DETAILS
E3.1 FIRST FLOOR NORTH POWER
E3.2 FIRST FLOOR PLAN SOUTH POWER
E3.3 SECOND FLOOR PLAN NORTH
E3.4 SECOND FLOOR PLAN SOUTH POWER
E3.5 FIRST FLOOR PLAN MECHANICAL POWER
E3.6 SECOND FLOOR PLAN MECHANICAL POWER
E3.7 FIRST FLOOR NORTH GROUNDING
E3.8 FIRST FLOOR PLAN SOUTH GROUNDING
E4.1 FIRST FLOOR PLAN NORTH AUXILIARY
E4.2 FIRST FLOOR SOUTH AUXILIARY
E4.3 SECOND FLOOR PLAN NORTH AUXILIARY
E4.4 SECOND FLOOR PLAN SOUTH AUXILIARY
E4.5 SECURE DOOR DETAILS
E5.1 LUMINAIRE SCHEDULE, DETAILS & NOTES
E5.2 PANELBOARD SCHEDULES
E6.1 FIRE ALARM/MASS NOTIFICATION RISER, DETAILS & NOTES
E6.2 COMMUNICATIONS DETAILS & NOTES
E7.1 SINGLE LINE DIAGRAM - POWER
E7.1A SINGLE LINE DIAGRAM - POWER - 208 VOLT SYSTEM
E7.2 ELECTRICAL GROUNDING DETAILS & NOTES
DRAWING INDEX
SHEET NO. SHEET NAME
00 TITLE
T1.0 TITLE SHEET
T2.0 GENERAL WORK NOTES, ABBREVIATIONS, SYMBOLS &
DRAWING INDEX
T3.0 TYPICAL MOUNTING HEIGHTS & CLEARANCES
01 LIFE SAFETY
LS1.0 LIFE SAFETY
LS2.0 FIRST FLOOR LIFE SAFETY PLAN
LS2.1 SECOND FLOOR LIFE SAFETY PLAN
04 ARCHITECTURAL
A0.1 SITE ACCESS / SECURITY PLAN & SITE DETAILS
A1.0 DEMOLITION NOTES
A1.1 FIRST FLOOR DEMO PLAN NORTH
A1.2 FIRST FLOOR DEMO PLAN SOUTH
A1.3 SECOND FLOOR DEMO PLAN NORTH
A1.4 SECOND FLOOR DEMO PLAN SOUTH
A1.5 DEMO ROOF PLAN NORTH
A1.6 DEMO ROOF PLAN SOUTH
A1.7 DEMO ELEVATIONS
A1.8 DEMO ELEVATIONS
A2.1 FIRST FLOOR PLAN NORTH
A2.2 FIRST FLOOR PLAN SOUTH
A2.3 SECOND FLOOR PLAN NORTH
A2.4 SECOND FLOOR PLAN SOUTH
A2.5 WALL TYPES
A2.6 ROOF DETAILS
A2.7 ROOF PLAN BASE BID
A2.7A ROOF PLAN ALTERNATE
A3.1 FIRST FLOOR FINISH SCHEDULE & LEGEND
A3.2 SECOND FLOOR FINISH SCHEDULE
A3.3 DOOR SCHEDULE FIRST FLOOR
A3.4 DOOR SCHEDULE SECOND FLOOR
A3.5 STOREFRONT SCHEDULE
A3.6 STOREFRONT DETAILS
A3.7 DOOR & WINDOW DETAILS
A3.8 DOOR AND WINDOW DETAILS
A4.1 BUILDING ELEVATIONS
A4.2 BUILDING ELEVATIONS
A5.1 DETAILS
A5.2 ENLARGED ELEVATOR PLANS, SECTIONS, & DETAILS
A5.3 DETAILS
A6.1 FIRST FLOOR RESTROOM ENLARGED FLOOR PLAN
A6.2 SECOND FLOOR RESTROOM ENLARGED FLOOR PLAN
A6.3 CASEWORK DETAILS
A7.1 CASEWORK ELEVATIONS
A7.2 CASEWORK ELEVATIONS 2
A8.1 FIRST FLOOR RCP NORTH
A8.2 FIRST FLOOR RCP SOUTH
A8.3 SECOND FLOOR RCP NORTH
A8.4 SECOND FLOOR RCP SOUTH
A9.1 FIRST FLOOR PATTERN PLAN NORTH
A9.2 FIRST FLOOR PATTERN PLAN SOUTH
A9.3 SECOND FLOOR PATTERN PLAN NORTH
A9.4 SECOND FLOOR PATTERN PLAN SOUTH
05 STRUCTURAL
S1.0 GENERAL STRUCTURAL NOTES
S2.0 FIRST FLOOR PLAN
S3.0 PLAN NOTES, LEGEND, SCHEDULES & SECTIONS
S4.0 STRUCTURAL DETAILS
06 FIRE PROTECTION
FP1.1 FIRST FLOOR NORTH - FIRE PROTECTION DEMOLITION
PLAN
FP1.2 FIRST FLOOR SOUTH - FIRE PROTECTION DEMOLITION
PLAN
FP1.3 SECOND FLOOR NORTH - FIRE PROTECTION DEMOLITION
PLAN
FP1.4 SECOND FLOOR SOUTH - FIRE PROTECTION DEMOLITION
PLAN
FP2.1 FIRST FLOOR NORTH - FIRE PROTECTION RENOVATION
PLAN
FP2.2 FIRST FLOOR SOUTH - FIRE PROTECTION RENOVATION
PLAN
FP2.3 SECOND FLOOR NORTH - FIRE PROTECTION RENOVATION
PLAN
FP2.4 SECOND FLOOR SOUTH - FIRE PROTECTION RENOVATION
PLAN
M A X
" M A X
" M
IN
PAPER TOWEL
DISPENSER
MIRROR
SOAP
DISPENSER
ROBE
HOOK
TO
T
O P
O F
H O
O K
" T
YP
LAVATORY. PROVIDE ADA
INSULATION KIT WHEN REQUIRED
URINAL
42" MIN
MAX
1' - 0"
" M
IN
" M
IN
" M
IN
" M
IN
WATER
CLOSET
TOILET
PAPER
DISPENSER
SANITARY
NAPKIN
DISPOSAL
HORIZONTAL
GRAB BAR
VERTICAL GRAB BAR
MIN
1' - 3"
39 MIN - 41 MAX
" A B O
V E
FI
N
IS
H
ED
F
LO
O R
SHOWER ROD
FOLDING SHOWER SEAT FOR
TRANSFER-TYPE SHOWERS. LOCATE
ON WALL OPPOSITE THE CONTROLS
AND HAND SHOWER WALL.
TOWEL BAR
ALLOWABLE
MOUNTING
AREA
TO
B
O
TT
O M
O F
RE
FL
EC
TI
V E
S U
RF
AC
E
" M A X
H A
FF
M
IN
M A X
H A
FF
M
IN
M
AX
ACAL
MAX.
15"
MAX.
15"
" M
IN
" M A X
CONTROLS AND HAND
SHOWER SHALL BE
LOCATED WITHIN HATCH
AREA
HAND SHOWER GLIDE
RAIL NOT SHOWN,
SEE SPECS
TRANSFER SHOWER CONTROL WALL
LOCATED OPPOSITE SEAT WALL.
4" MAX.
18"
" M A X
/2 " M
A X.
1 1/2" MAX.
22" - 23"
15" - 16"
" M
A X
O F
C O
M
PA
TM
EN
T
EN
TR
Y
AL-SHAPED
SHOWER
SEAT
16" - 18"
M
IN
M
AX
12 MIN
36 MIN.
HORIZONTAL
GRAB BAR
TYPICAL ADA MOUNTING HEIGHTS (UNLESS OTHERWISE NOTED)
TO
F
IR
E
EX
TI
N G
U
IS
H
ER
H A N D
LE
'-6
" M A X
A D
A M
AX
" M
AX
FIRE
EXTINGUISHER
CABINET
" M
AX
" M
IN
ADA ELECTRIC
WATER COOLER
DIRECTION INDICATOR
HALL CALL
CONTROLS
ELEVATOR DOOR
H A
FF
" M
IN
" M
A X.
M
IN
" M
IN
MIN.
8"
" M
AX
6" MAX.
11" MIN
CL
5" MAX. 15" MIN.
MIN. CLEAR DEPTH
48"
M
IN
C
LE
AR
W
ID
TH
ADA ELECTRIC
FOUNTAIN SKIRT
WHERE LOCATED IN
CIRCULATION PATH
2 1/2" MAX
" M
AX
/2 " M
A X
15-16"
60" MIN
" M
IN
" M
IN
3" MAX
" M
AX
M
IN
M
AX
" M A X
2' - 0"
27" MAX
" M
AX
FOLDING SHOWER SEAT FOR
TRANSFER-TYPE SHOWERS. LOCATE
ON WALL OPPOSITE THE CONTROLS
AND HAND SHOWER WALL.
CONTROLS AND HAND SHOWER
SHALL BE LOCATED WITHIN
HATCH AREA
STANDARD ROLL-IN TYPE SHOWER
COMPARTMENT SIZE AND CLEARANCE
" M
IN
18" MIN
(A)
FRONT APPROACH, PULL SIDE
" M
IN
(B)
FRONT APPROACH, PUSH
SIDE
" M
IN12" MIN
(C)
FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
36" MIN
" M
IN
(D)
HINGE APPROACH, PULL SIDE
42" MIN
" M
IN
(E)
HINGE APPROACH, PULL SIDE
" M
IN
22" MIN
(F)
HINGE APPROACH, PUSH SIDE
(G)
HINGE APPROACH, PUSH SIDE, DOOR
PROVIDED WITH BOTH CLOSER AND
LATCH
" M
IN
22" MIN
24" MIN
" M
IN
(H)
LATCH APPROACH, PULL SIDE
(I)
LATCH APPROACH, PULL SIDE,
DOOR PROVIDED WITH CLOSER
" M
IN 24" MIN
24" MIN
" M
IN
(J)
LATCH APPROACH, PUSH SIDE
(K)
LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH CLOSER
24" MIN
" M
IN
" M
IN
12" MIN
(C)
PUSH SIDE, DOOR PROVIDED WITH
BOTH CLOSER AND LATCH
X > 8"4
" M
IN
(B)
PUSH SIDE
" M
IN
18" MIN
X > 8"
(A)
PULL SIDE
24" MIN
" M
IN
(D)
STOP OR LATCH APPROACH
22 MIN
m in
(C)
POCKET OR HINGE APPROACH
(B)
SIDE APPROACH
M
IN
m in
(A)
FRONT APPROACH
AREA OF
REFUGE
AREA OF
REFUGE
" M
IN
" M A X
CL
18 MIN
M
IN
CENTERED ON RAISED CHARACTERS
HEIGHT OF RAISED CHARACTERS ABOVE FLOOR LOCATION OF SIGNS AT DOORS
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T3.0
TYPICAL
MOUNTING
HEIGHTS &
CLEARANCES
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
1. ADA STANDARDS FOR ACCESSIBLE DESIGN AND ICC/ANSI A117.1 ARE THE REFERENCE
STANDARDS USED FOR SCOOPING PROVISIONS FOR ACCESSIBILITY. THE MORE STRINGENT
PROVISIONS OF THE TWO STANDARDS ARE INDICATED.
2. DIAGRAMS SHOWN ARE FOR MOUNTING HEIGHT INFORMATION ONLY. FIXTURES SHOWN ARE NOT
NECESSARILY INCLUDED IN THE PROJECT.
3. COORDINATE ADA REQUIREMENTS WITH ALL REQUIRED CONCEALED WOOD BLOCKING.
4. REFER TO MANUFACTURER'S LITERATURE REGARDING RECOMMENDATIONS FOR MOUNTING
PRODUCTS AND MATERIALS IN COMPLIANCE WITH ADA STANDARDS.
GENERAL NOTES:
3/8" = 1'-0"T3.0
5 ADA DOOR OPENING MANEUVERING CLEARANCES
1/8" = 1'-0"T3.0
1 TYPICAL SIGNAGE MOUNTING DIAGRAMS
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
LS1.0
LIFE SAFETY
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
Applicable Codes:
Building Code..............UFC 1-200-01 / 2018 INTERNATIONAL BUILDING CODE
BUILDING CODE
Structural Code...........3-301-01 / IBC 2018 Plumbing Code............3-420-01 / IBC 2018 Mechanical Code.........3-401-01 / IBC 2018 Fire Code..................3-600-01 / NFPA 101 Electrical Code...........3-501-01 / IBC 2018 / NFPA 70 Energy Code..............1-200-02 Life Safety Code........3-600-01 /NFPA 101 Accessibility Code......ARCHITECTURAL BARRIERS ACT STANDARDS Anti-Terrorism / Force Protection....4-010-01
IBC Chapter 3 and UFC 3-600-01 Occupancy & Use:
NFPA 101 Chapter 6:
• See Legend on Life Safety Plan
IBC Chapter 4 - Special Detailed Requirements:
• NOT APPLICABLE
IBC Chapter 5 - General Building Heights & Areas:
• Building Gross Square Footage
• Ground Floor = 44,403 SF
• Second Floor = 19,834 SF
• Construction Type = II-B, FULLY SPRINKLED
• Allowable Building Height TABLE 504.3
75 FEET ABOVE GRADE PLANE
• Allowable Number of Stories Above Grade Plane (PER TABLE 504.4)
TYPE S-1 OCCUPANCY - 3 STORIES ABOVE GRADE PLANE
TYPE B OCCUPANCY - 4 STORIES ABOVE GRADE PLANE
• Tabular Building Area (PER TABLE 506.2)
GROUP S-1 - 52,500 SQUARE FEET
GROUP B - 69,000 SQUARE FEET
• Frontage Increase Formula PER 506.3 I=(F/P -0.25)W/30 = (625/625-0.25) 30/30 = 0.75
• Allowable Building Area (PER SECTION 506.2) S-1 - 52,500 + (17,500*.75)=65,625 B - 69,000 + (23,000*.75)=86,250
• Fire Separation Requirements Per Table 508.4
OCCUPANCIES RATING (HR)
B | S-1 0
• Allowable Area Calculations (PER TABLE 508.4.2)
GROUND FLOOR - (34,773/65,625 + 9,630/86,250) = 0.64<1
SECOND FLOOR - (0/65,625 + 19,834/86,250) = 0.23<1
• Incidental Use Areas (PER TABLE 509) See occupancy table.
Boiler room contains equipment over 400,000 BTU, however fire rating is not required, as an automatic sprinkler system is provided
IBC Chapter 6 Types of Construction:
• Construction Type: II-B
• Fire Ratings (PER TABLE 601) as Follows (Except where noted otherwise)
Primary Structural Frame.............................. 0 HOUR Bearing Walls (Interior & Exterior)...................0 HOUR Non-Bearing Walls and Paritions (Interior)........0 HOUR Floor Construction and Secondary Members...0 HOUR Roof Construction and Secondary Members....0 HOUR
• UFC 4-211-01, 3-3.1.2, PROTECTION OF STRUCUTRAL MEMBERS
• Protection of structral members is not required in the hanger bay when protected by a UFC approved fire suppression system
• Required Fire Rating
• (Per Table 602) - NO FIRE SEPARATION REQUIRED, FIRE SEPARATION DISTANCE >
10 FEET
• UFC 4-211-01, 3-3.1.8 - Building Clear Space and Fire Spearation Distance Existing separation around the hanger is greater than 50'
UFC 3-600-01(replaces IBC Chapter 9) - Fire Protection Systems:
• SECTION 9-1 - EMERGENCY VEHICLE ACCESS
1. Facility REQUIRES two means of all-weather emergency vehicle ground access in accordance with 9-1.1 (UFC 4-211-01, 3-3.1.11)
2. Facility REQUIRES aerial apparatus access in accordance with 9-1.2
3. Existing Facility meets requirements.
• SECTION 9-2 - FIRE FLOW FOR FACILITIES
1. Existing Fire Flow will remain as it currently exists. Existing facility is served by two
2,000 gpm fire pumps served by a 12" main that feeds 75,000 gallons of on site water storage tanks. The fire supply will not be modified by this project. A future project, FAKZ 172201, will replace these pumps and upgrade the existing facility's HEF system.
• SECTION 9-3 - SERVICE MAINS AND LATERALS
1. Fire hydrants are provided in accordance with 9-3.5.8
A. Hydrants are spaced at 300 ft maximum B. Hydrant to be located within 150' of Fire Department Connection as part of
FAKZ172201
• UFC 4-211-01 (3-6.3.2)- FIRE HYDRANT SUPPLY
1. Hydrants are to be located with at least one within 100' of each corner of the building
2. Where aircraft parking apron abuts the building, located required hydrants protecting the building in these areas within 10 ft of the building A. Hydrants are to be low profile and no higher than 2.5' where within 25' of airfield pavement
3. Existing hydrants intended to remain. Existing configuration meets above listed requirements.
• SECTION 9-5 - FIRE PUMPS
1. Existing fire pumps (2-2,000 GPM pumps) and existing 75,000 gallon on site water storage will remain.
• SECTION 9-7 - AUTOMATIC SPRINKLER SYSTEMS
1. Existing wet pipe sprinkler system will be reconfigured as required to support new interior layout. No other changes to fire sprinkler system are contemplated as part of this project. Project FAKZ 172201 will provide new HEF system and provide compliance with applicable sections of UFC 3-600-01 for the facility water supply system.
• SECTION 9-10 - STANDPIPE SYSTEMS
1. Per 9-10, a standpipe system IS NOT required
• SECTION 9-17 - PORTABLE FIRE EXTINGUISHERS
1. Per 9-17.1, portable fire extinguishers ARE NOT required
2. Fire extinguishers are provided, see plans for locations
IBC Chapter 7 - Fire and Smoke Protection Features:
• Maximum Exterior Wall Openings (PER SECTION 705)
Fire Separation: Degree of Opening Protection: Allowable Area:
GREATER THAN 30 FT UNPROTECTED, SPRINKLERED , (UP, S) NO LIMIT
• Fire Walls (PER IBC SECTION 706) No fire walls are present within the scope of the project
• Fire Barriers (IBC 707) 1 HR fire barrier is required for Fire Protection Equipment Rooms per UFC 4-211-01 1 HR fire barrier is required between hangar bay and support areas
NFPA Chapter 8 - Fire and Smoke Protection Features:
• Shaft Enclosure (PER SECTION 8.6.5)
1 HR SHAFT ENCLOSURE REQUIRED AT NEW SHAFTS
1/2 HOUR SHAFT ENCLOSURE REQUIRED AT EXISTING SHAFTS
• Opening Protectives (Per Section 8.3.3) Type of Assembly Assembly Rating Required Opening Protection (Door/Sidelite)
ELEVATOR HOISTWAY 1 HOUR 1 HOUR / 1 HOUR
VERTICAL SHAFTS 1 HOUR 1 HOUR / 1 HOUR
CORRIDORS 1 HOUR 1 HOUR
OTHER FIRE BARRIER 1 HOUR 1/3 HOUR/ 3/4 HOUR
• Concealed Spaces (Per Section 8.6.11) Not Applicable
• See Legend on Life Safety Plan for Applicable UL Assemblies to be provided.
IBC Chapter 8, UFC 3-600-01, NFPA 101 - Interior Finishes:
• Finish Material Rating Requirements (Per NFPA 101)
BUSINESS (CHAPTER 38)
Exits and Exit Access Corridors
Interior Wall and Ceiling Finish - CLASS A OR B (38.3.3.2.1) Interior Floor Finish - CLASS I OR CLASS II (38.3.3.3.2)
Areas other than Exits and Exit Access Corridors Interior Wall and Ceiling Finish - CLASS A, B, OR C (38.3.3.2.2)
STORAGE (CHAPTER 42)
Exits and Exit Access Corridors
Interior Wall and Ceiling Finish - CLASS A, B, (7.1.4) Interior Floor Finish - CLASS I OR CLASS II (42.3.3.3.1)
Areas other than Exits and Exit Access Corridors Interior Wall and Ceiling Class A,B, or C (42.3.3.2) in storage spaces Interior Floor Finish - NO REQUIREMENT (42.3.3.3.2)
NFPA Chapter 7 (replaces IBC Chapter 10) - Means of Egress:
• Occupancy Load (PER TABLE 7.3.1.2, AS MODIFIED BY UFC 3-600-01):
See Occupancy Table
• Egress Capacity Sizing (PER TABLE 7.3.3.1)
See Code Calculations Table(s) See life safety plan for individual room egress analysis
• Minimum Stair Width (PER SECTION 7.3.3.1) See Code Calculations Table(s)
• Number of Means of Egress (PER SECTION 7.4.1) Total Number of Exits Required
Business Occupancy (CHAPTER 38)
GROUND FLOOR - 2 EXITS REQUIRED
Storage Occupancy (CHAPTER 42)
GROUND FLOOR - 1 EXITS REQUIRED
• Minimum exit requirements (UFC 4-211-01, 3-3.1.9)
1. Exits required around perimeter of hangar at maximum interval of 150 FT.
2. Exits required within 20 FT of each end of the hangar door
3. Exiting from routinely occupied areas over 100 SF through the hangar bay not allowed
4. Each required exit to be provided with panic hardware and door shall swing in the direction of exit travel
• Common Path of Egress Travel Distance
Business Occupancy (CHAPTER 38) 100 ft per 38.2.5.3.1
Storage Occupancy (CHAPTER 42) 100 feet per TABLE 42.2.5
Other (CHAPTER 7) Mechanical Equipment Rooms, Boiler Rooms, and Furnace Rooms - 100 ft per 7.12.1
• Exit Access Travel Distance Business Occupancy (CHAPTER 38)
300 FT per 38.2.6.3 See life saftey plan for exit access travel distance
Storage Occupancy (CHAPTER 42) 400 feet per TABLE 42.2.6
• Corridors Occupancy Type (B & S-1) requires:
NO FIRE RATING REQUIRED FOR CORRIDOR WALLS
Minimum Corridor Width Business Occupancy (CHAPTER 38) 44 inches per 38.2.3.2 Storage Occupancy (CHAPTER 42) 36 inches per 42.2.3
Dead End Corridors Business Occupancy (CHAPTER 38)
Maximum of 50 feet per 38.2.5.2.1 Storage Occupancy (CHAPTER 42)
Maximum of 100 feet per TABLE 42.2.5
Special Hangar Requirements
• Minimum separation - 50 ft (NFPA 409, 5.3.1)
• Minimum separation between hangar and adjacent spaces - 1 HR (UFC 4-211-01, 3-3.1.3)
• Minimum separation of fire protection rooms = 1 HR (UFC 4-211-01, 3-6.7)
• Hazardous classification of adjacent spaces - Class I, Division 2 unless suitably cut off (UFC
4-211-01, 3-7.1)
• Maximum Hangar area per draft curtain - 7,500 SF (NFPA 409, 5.17.2)
• Hangar Wall Construction - CMU to 10' AFF (UFC 4-211-01, 3-3.2.3)
• Hangar Door operability - emergency door operation required (UFC 4-211-01, 3-3.1.12)
Ground Floor Plan Code Calculations
Name
Occupancy Calculations Egress Width Calculations
Area (Square Feet)
Occupancy Factor (SF per Occupant) Total Occupant
Load (Occupants) Factor Type
Calculated Stair Egress
Width (inches)
Required Stair Egress Width (inches) Per
Table7.2.2.2.1.1(b)
Calculated Width (Other Egress
Components (inches))
Required Egress Width - Other Egress
Components (Inches) B (CONCENTRATED) 2286 SF 50 SF 47.00 Gross 14.10 36 9.40 44 B (CONFERENCE) 1565 SF 15 SF 105.00 Net 31.50 36 21.00 44 B (IT) 94 SF 300 SF 1.00 Gross 0.30 36 0.20 44 B (LOCKER ROOMS) 606 SF 50 SF 13.00 Gross 3.90 36 2.60 44 B (MECH) 206 SF 500 SF 3.00 Gross 0.90 36 0.60 44 BUSINESS 4746 SF 150 SF 37.00 Gross 11.10 36 7.40 44 STORAGE (S-1) HANGAR 26192 SF 500 SF 53.00 Gross 15.90 36 10.60 44 STORAGE (S-1) INDUSTRIAL 6580 SF 100 SF 67.00 Gross 20.10 36 13.40 44 STORAGE (S-1) MECHANICAL 1584 SF 500 SF 4.00 Gross 1.20 36 0.80 44 STORAGE (S-1) STORAGE 544 SF 500 SF 2.00 Gross 0.60 36 0.40 44
44403 SF 332.00 99.60 66.40
Second Floor Plan Code Calculations
Name
Occupancy Calculations Egress Width Calculations
Area (Square Feet)
Occupancy Factor (SF per Occupant) Total Occupant
Load Factor Type
Calculated Stair Egress
Width (inches)
Required Stair Egress Width (inches) Per
Table 7.2.2.2.1.1(b)
Calculated Width Other Egress
Components (inches))
Required Egress Width - Other Egress Components
(inches) B (CONCENTRATED) 5606 SF 50 SF 116.00 Gross 34.80 36 23.20 44 B (CONFERENCE) 2834 SF 15 SF 190.00 Net 57.00 36 38.00 44 B (IT) 560 SF 300 SF 4.00 Gross 1.20 36 0.80 44 B (LOCKER ROOMS) 329 SF 50 SF 7.00 Gross 2.10 36 1.40 44 B (MECH) 1093 SF 500 SF 4.00 Gross 1.20 36 0.80 44 B (STORAGE) 49 SF 500 SF 1.00 Gross 0.30 36 0.20 44 BUSINESS 9364 SF 150 SF 69.00 Gross 20.70 36 13.80 44
19834 SF 391.00 117.30 78.20
PLUMBING SCHEDULE
Name Male Occupancy Female Occupancy Men's WCs Women WCs Male Lavs Req Female Lavs Req. Drinking Fountains Service Sink
BUSINESS 127 32 5.675 1.6 5.6 1.6 2.11 1
*FIXTURE COUNT BASED UPON UTA
OCCUPANCY (158) IN ACCORDANCE
WITH ANG ETL 15-01-00
REF
R
EF
REF
UP
UP
UP
DW
DW
207 SF
BUSINESS
1126 SF
B (CONCENTRATED)
94 SF
B (IT)
50 SF
BUSINESS
1044 SF
BUSINESS
138 SF
BUSINESS
468 SF
BUSINESS
254 SF
BUSINESS 281 SF
BUSINESS
300 SF
BUSINESS
138 SF
BUSINESS
31 SF
B (MECH)
146 SF
BUSINESS
371 SF
B (CONFERENCE)
266 SF
BUSINESS
221 SF
BUSINESS 1160 SF
B (CONCENTRATED)
76 SF
B (MECH)
COMMON PATH OF
EGRESS TRAVEL = 34'
606 SF
B (LOCKER ROOMS)
93 SF
BUSINESS
1194 SF
B (CONFERENCE)
100 SF
B (MECH)
52 SF
BUSINESS
A5.3
1087 SF
BUSINESS
26192 SF
STORAGE (S-1)
HANGAR
4803 SF
STORAGE (S-1)
INDUSTRIAL
678 SF
STORAGE (S-1)
INDUSTRIAL
1099 SF
STORAGE (S-1)
INDUSTRIAL
1163 SF
STORAGE (S-1)
MECHANICAL
544 SF
STORAGE (S-1)
STORAGE
421 SF
STORAGE (S-1)
MECHANICAL
2 OCCUPANTS
0.3 2
23 OCCUPANTS
3.45
13 OCCUPANTS
1.
5.7
80 OCCUPANTS
OCCUPANT
6.15
53 OCCUPANTS
1.
1.65
1.65
1.65
1.
OCCUPANTS
9.45
OCCUPANTS
1OCCUPANT
OCCUPANT
49 OCCUPANTS
1 OCCUPANT
2 OCCUPANTS
2 OCCUPANTS
1.05
7 OCCUPANTS
3.6
2.55
COMMON PATH OF EGRESS
TRAVEL = 82'
2.7
2.55 17
0.15
0.3
0.3
2.55
3.15
3 OCCUPANT
0.45
1 OCCUPANT
0.15
COMMON PATH OF EGRESS
TRAVEL = 53'
OCCUPANTS
OCCUPANTS
1.2 8
1 OCCUPANT 1 OCCUPANT
1.95
11 OCCUPANTS
1.8
1 OCCUPANT
1 OCCUPANT
1 OCCUPANT
24 OCCUPANTS
3.
7.95
25 OCCUPANTS
2 OCCUPANTS
3.75
1.95
22.65
151 FROM ABOVE (CONTROLS)
COMMON PATH
OF EGRESS
TRAVEL = 33'
COMMON PATH OF
EGRESS TRAVEL = 62'
COMMON PATH OF EGRESS
TRAVEL = 59'
1.
5.
FROM ABOVE
(CONTROLS)
3.15
17.7
FROM ABOVE
(CONTROLS)
9.
1.
FROM ABOVE
(CONTROLS)
HANDICAP ACCESSIBLE EXIT LOCATION
EXIT TRAVEL PATH
FIRE EXTINGUISHER CABINETFEC
ELECTRIC WATER COOLER - SEE PLUMBINGEWC
EMERGENCY EXIT SIGNAGE
SYMBOLS LEGEND
IBC OCCUPANCY TYPE (B) BUSINESS
150 SF PER OCCUPANT PER NFPA 101
LOW HAZARD PER NFPA 101
GROUP S-1 - STORAGE PER IBC CHAPTER 3
100 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
NEW ONE HOUR RATED WALL
CONSTRUCTION
UL U905
GROUP S-1 - STORAGE PER IBC CHAPTER 3
500 SF PER OCCUPANT PER UFC 3-600-01
HIGH HAZARD CLASSIFICATION PER NFPA 101
CLASS I, DIVISION 2 PER NFPA 70
GROUP S-1 - STORAGE PER IBC CHAPTER 3
100 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
CLASS I, DIVISION 2 UP TO 18" ABOVE HANGAR FLOOR
PER UFC 4-211-01 SECTION 3-7.1
DENOTES PROPOSED LOCATION OF
DRAFTSTOPPING REQUIRED BY NFPA 409
SECTION 5.17.2
DENOTES EXISTING WALLS REQUIRED TO
BE ONE HOUR RATED. CONTRACTOR TO
PATCH, SEAL, AND FIRESTOP ALL EXISTING
AND NEW PENETRATIONS IN EXISTING WALL
ASSEMBLY
DENOTES LOCATION OF EXISTING WALLS
REQUIRED TO BE 1/2 HOUR FIRE RATED
REQUIRED BY NFPA 101 SECTION
8.6.5.3
IBC OCCUPANCY TYPE (B) BUSINESS
50 SF PER OCCUPANT PER NFPA 101
LOW HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
50 SF PER OCCUPANT PER NFPA 101
LOW HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
15 SF PER OCCUPANT PER NFPA 101
LOW HAZARD CLASSIFICATION PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
150 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
CLASS I, DIVISION 2 UP TO 18" ABOVE HANGAR FLOOR
PER UFC 4-211-01 SECTION 3-7.1
IBC OCCUPANCY TYPE (B) BUSINESS
500 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
300 SF PER OCCUPANT PER NFPA 101
LOW HAZARD CLASSIFICATION PER NFPA 101
GROUP S-1 - STORAGE PER IBC CHAPTER 3
500 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
CLASS I, DIVISION 2 UP TO 18" ABOVE HANGAR FLOOR
PER UFC 4-211-01 SECTION 3-7.1
23.6 17.7
118118 OCCUPANT LOAD
EGRESS REQUIREMENTS:
REQUIRED EGRESS COMPONENT WIDTH
REQUIRED STAIR COMPONENT WIDTH (WHERE APPLICABLE)
IBC OCCUPANCY TYPE (B) BUSINESS
DENOTES EXISTING FLOOR AND CEILING REQUIRED TO BE
ONE HOUR RATED. CONTRACTOR TO PATCH, SEAL AND
FIRESTOP ALL EXISTING AND NEW PENETRATIONS IN
EXISTING ASSEMBLY
SPECIFIC NOTES:
1 MODIFY HANGAR DOOR POWER SUPPLY AS REQUIRED TO MEET UFC 4-211-01 SECTION 3-7.2
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
LS2.0
FIRST FLOOR LIFE
SAFETY PLAN
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
1/8" = 1'-0"LS2.0
1 FIRST FLOOR LIFE SAFETY PLAN
EF
UP
UP
UP
DW
D W
DW
1331 SF
B (CONCENTRATED)
180 SF
BUSINESS
210 SF
BUSINESS
134 SF
B (IT)
49 SF
B (STORAGE)
329 SF
BUSINESS
185 SF
B (MECH)
1135 SF
BUSINESS
1184 SF
BUSINESS
623 SF
B (CONCENTRATED)
569 SF
B (CONFERENCE)
329 SF
B (LOCKER ROOMS)
320 SF
B (IT)
336 SF
B (MECH)
1104 SF
B (CONCENTRATED)
1485 SF
B (CONFERENCE)
797 SF
BUSINESS
531 SF
B (CONCENTRATED)
106 SF
B (IT)
780 SF
B (CONFERENCE)
129 SF
BUSINESS
739 SF
BUSINESS
201 SF
BUSINESS
517 SF
BUSINESS
OPEN TO BELOW
A5.3
186 SF
BUSINESS
1154 SF
B (CONCENTRATED)
572 SF
B (MECH)
413 SF
B (CONCENTRATED)
449 SF
B (CONCENTRATED)
973 SF
BUSINESS
11 OCCUPANTS
2.55
2 OCCUPANTS
1 OCCUPANT 1 OCCUPANT
2 OCCUPANTS
.6
9.
456363
1 OCCUPANT
52 OCCUPANTS
3.9
3.9
1.2
2 OCCUPANTS
2 OCCUPANTS
2 OCCUPANTS
OCCUPANTS
OCCUPANT
OCCUPANT
OCCUPANTS
1 OCCUPANT
OCCUPANTS
1 OCCUPANT
9 OCCUPANTS
1.65
1.05
0.6
4 OCCUPANTS 99 OCCUPANTS7.
7.
23.6 17.7 118 118
23 OCCUPANTS
7 OCCUPANTS
OCCUPANT
3.
1.
4.65
4.95
.2
2 OCCUPANTS
38 OCCUPANTS640
1 OCCUPANT
1 OCCUPANT
9 OCCUPANTS
1.
13 OCCUPANTS
1 OCCUPANT
1 OCCUPANT
1 OCCUPANT
OCCUPANT
2 OCCUPANTS
1 OCCUPANT
1 OCCUPANT
3.
4 OCCUPANTS
1 OCCUPANT
1.5
10 4 OCCUPANTS
2 OCCUPANTS
2 OCCUPANTS
27 OCCUPANTS
2.55
1 OCCUPANT
2.
30.2 22.65 151151
24 OCCUPANTS
7.
5.
3.
HANDICAP ACCESSIBLE EXIT LOCATION
EXIT TRAVEL PATH
FIRE EXTINGUISHER CABINETFEC
ELECTRIC WATER COOLER - SEE PLUMBINGEWC
EMERGENCY EXIT SIGNAGE
SYMBOLS LEGEND
IBC OCCUPANCY TYPE (B) BUSINESS
150 SF PER OCCUPANT PER NFPA 101
LOW HAZARD PER NFPA 101
GROUP S-1 - STORAGE PER IBC CHAPTER 3
100 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
NEW ONE HOUR RATED WALL
CONSTRUCTION
UL U905
GROUP S-1 - STORAGE PER IBC CHAPTER 3
500 SF PER OCCUPANT PER UFC 3-600-01
HIGH HAZARD CLASSIFICATION PER NFPA 101
CLASS I, DIVISION 2 PER NFPA 70
GROUP S-1 - STORAGE PER IBC CHAPTER 3
100 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
CLASS I, DIVISION 2 UP TO 18" ABOVE HANGAR FLOOR
PER UFC 4-211-01 SECTION 3-7.1
DENOTES PROPOSED LOCATION OF
DRAFTSTOPPING REQUIRED BY NFPA 409
SECTION 5.17.2
DENOTES EXISTING WALLS REQUIRED TO
BE ONE HOUR RATED. CONTRACTOR TO
PATCH, SEAL, AND FIRESTOP ALL EXISTING
AND NEW PENETRATIONS IN EXISTING WALL
ASSEMBLY
DENOTES LOCATION OF EXISTING WALLS
REQUIRED TO BE 1/2 HOUR FIRE RATED
REQUIRED BY NFPA 101 SECTION
8.6.5.3
IBC OCCUPANCY TYPE (B) BUSINESS
50 SF PER OCCUPANT PER NFPA 101
LOW HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
50 SF PER OCCUPANT PER NFPA 101
LOW HAZARD PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
15 SF PER OCCUPANT PER NFPA 101
LOW HAZARD CLASSIFICATION PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
150 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
CLASS I, DIVISION 2 UP TO 18" ABOVE HANGAR FLOOR
PER UFC 4-211-01 SECTION 3-7.1
IBC OCCUPANCY TYPE (B) BUSINESS
500 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
IBC OCCUPANCY TYPE (B) BUSINESS
300 SF PER OCCUPANT PER NFPA 101
LOW HAZARD CLASSIFICATION PER NFPA 101
GROUP S-1 - STORAGE PER IBC CHAPTER 3
500 SF PER OCCUPANT PER NFPA 101
ORDINARY HAZARD CLASSIFICATION PER NFPA 101
CLASS I, DIVISION 2 UP TO 18" ABOVE HANGAR FLOOR
PER UFC 4-211-01 SECTION 3-7.1
23.6 17.7
118118 OCCUPANT LOAD
EGRESS REQUIREMENTS:
REQUIRED EGRESS COMPONENT WIDTH
REQUIRED STAIR COMPONENT WIDTH (WHERE APPLICABLE)
IBC OCCUPANCY TYPE (B) BUSINESS
DENOTES EXISTING FLOOR AND CEILING REQUIRED TO BE
ONE HOUR RATED. CONTRACTOR TO PATCH, SEAL AND
FIRESTOP ALL EXISTING AND NEW PENETRATIONS IN
EXISTING ASSEMBLY
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
LS2.1
SECOND FLOOR
LIFE SAFETY PLAN
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
1/8" = 1'-0"LS2.1
1 Second Floor Life Safety Plan
EXISTING BUILDING 1202
EXISTING BUILDING 1201
EXISTING BUILDING 1203
CANTONMENT STREET
PE
RI
M
ET
ER
R
O
AD
R
IC
H A R D
S O
N R
O A D
CONTRACTOR PARKING AND LAYDOWN AREA
TEMPORARY FENCE FOR HANGAR
FLOOR REPAIR
CONTRACTOR TO ERECT TEMPORARY FENCE ALONG FLIGHT LINE AT
THE BEGINNING OF WORK. SEE SPECIFICATION SECTION 01 5000.
FENCE TO BE +/- 15'-0" OFF OF BUILDING EXTERIOR. COORDINATE
EXACT PLACEMENT OF TEMPORARY FENCE WITH THE GOVERNMENT.
FENCE IS INTENDED TO PREVENT UNAUTHORIZED ACCESS TO THE
ACTIVE AIRCRAFT PARKING APRON.
RELOCATE / RECONFIGURE TEMPORARY FENCE AS REQUIRED TO
PROVIDE VEHICULAR ACCESS TO THE THE HANGAR DOOR TO
FACILITATE INSTALLATION OF NEW CONCRETE HANGAR FLOOR
SYSTEMS. COORDINATE WORK TO LIMIT TIME REQUIRED TO
COMPLETE HANGAR FLOOR WORK. REINSTALL TEMPORARY SECURITY
FENCE IMMEDIATELY UPON COMPLETION OF HANGAR FLOOR WORK.
COORDINATE EXACT PLACEMENT OF TEMPORARY FENCE WITH THE
GOVERNMENT.
GOVERNMENT ESCORT WILL BE REQUIRED WHILE TEMPORARY
FENCING IS BEING INSTALLED, RECONFIGURED, AND REMOVED.
REMOVE ALL TEMPORARY FENCING SYSTEMS UPON FINAL
COMPLETION OF THE WORK.
CONTRACTOR'S ACCESS ROUTE
FOR HANGAR FLOOR REPLACEMENT
ACTIVITIES
TEMPORARY FENCE. ERECT AT
BEGINNING OF WORK AND MAINTAIN
IN PLACE FOR DURATION OF THE
PROJECT. RECONFIGURE AS
REQUIRED FOR HANGAR FLOOR
REPAIR. REMOVE TEMPORARY FENCE
UPON COMPLETION OF THE PROJECT
EXISTING FLIGHT LINE
SECURITY FENCE TO REMAIN
+/- 15'-0"
+/- 35'-0" M
IN
SEE PLAN
VARIES / MATCH EXISTING
6" MINIMUM COMPACTED SUBGADE
NEW CONCRETE SIDEWALK - SEE
SPECIFICATIONS PROVIDE
CONTROL JOINTS AT INTERVALS
NOT TO EXCEED SIDEWALK WIDTH
OR 10' - WHICHEVER IS LESS
FINISHED GRADE
M
IN
V
ER
IF
Y
V
ER
IF
Y
EXISTING SUBGRADE TO REMAIN
SELECT BACKFILL MATERIAL.
COMPACT TO 98% ASTM D 698
NEW AGGREGATE BASE COURSE -
MATCH EXISTING OR 12"
MINIMUM, WHICHEVER IS
GREATER. COMPACT TO 98%
ASTM D698
EXISTING BASE COURSE TO
REMAIN
EXISTING ASPHALT TO REMAIN
NEW ASPHALT PAVEMENT - SEE
SPECIFICATIONS. MATCH EXISTING
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.1
SITE ACCESS /
SECURITY PLAN &
SITE DETAILS
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
Rev. Description Date
1" = 30'-0"A0.1
1 SITE ACCESS PLAN
3/4" = 1'-0"A0.1
2 SIDEWALK DETAIL
3/4" = 1'-0"A0.1
3 PAVEMENT PATCH DETAIL
SPECIFIC DEMOLITION NOTES:
REMOVE EXISTING COLUMN - REFER TO STRUCTURAL DETAILS
EXISTING FRAME TO REMAIN. (PAINT) REMOVE DOOR AND HARDWARE. PATCH, REPAIR,
AND PREP EXISTING DOOR FRAME AS REQUIRED TO RECEIVE SCHEDULED DOOR.
REMOVE EXISTING CMU WALL AS REQUIRED TO INSTALL SCHEDULED WINDOW - SEE A2.1.
SHORE AS REQUIRED
DEMOLISH EXISTING WALL/WINDOW ASSEMBLY AS REQUIRED TO INSTALL NEW DOOR
ASSEMBLY. SEE OPENING SCHEDULE
REMOVE EXISTING WALL AS REQUIRED TO PROVIDE NEW OPENING - SHORE AS REQUIRED
REMOVE EXISTING DOOR AND FRAME ASSEMBLY. PATCH AND REPAIR EXISTING CMU AND
BRICK AS REQUIRED - SEE A2.1.
REMOVE EXISTING OPENING AS REQUIRED TO RECEIVE NEW OPENING ASSEMBLY. PATCH
AND REPAIR BRICK AND CMU AS REQUIRED TO COORDINATE WITH NEW OPENING SIZE. -
SEE A2.1
REMOVE EXISTING LOUVER. PATCH AND REPAIR EXISTING CMU AND BRICK AS REQUIRED -
SEE A2.1
PATCH EXISTING ROOF DECK IN THESE AREAS AS REQUIRED DUE TO REMOVAL OF
EXISTING MECHANICAL EQUIPMENT
EXISTING FLOOR SLAB IN THIS AREA HAS BEEN EVALUATED AND SURVEYED. THE EXISTING
SLAB IS ANTICIPATED TO BE NOMINALLY 12" THICK AND DOES NOT CONTAIN ANY
REINFORCING STEEL.
REMOVE EXISTING OVERSIZED DOOR AND FRAME ASSEMBLY. PATCH AND REPAIR/INSTALL
NEW CMU AS REQURED TO MAINTAIN 1 HOUR RATING.
SAND/STRIP/CLEAN EXISTING CONCRETE IN THESE AREAS AS REQUIRED TO INSTALL NEW
SPECIFIED FLOOR COATING - SEE SPECIFICATION SECTION 09 90 30
REMOVE EXISTING RETROFIT ROOF SYSTEM DOWN TO ORIGINAL STRUCTURAL CONCRETE
ROOF DECK.
REMOVE EXISTING DOOR AND FRAME. SHORE EXISTING WALL AS REQUIRED. REMOVE
ADJACENT WALL AND INFILL ADJACENT WALL AS REQUIRED TO COORDINATE WITH NEW
OPENING SIZE/LOCATION.
REMOVE EXISTING BRICK VENEER FROM CONCRETE SOFFIT TO FOUNDATION AS
REQUIRED TO INSTALL NEW MOISTURE MANAGEMENT SYSTEMS. REMOVE EXISTING SOD
AREAS, CONCRETE PAVING, AND ASPHALT PAVING AROUND PERIMETER OF BUILDING AS
REQUIRED TO ACCOMPLISH WORK. SEE DETAILS. S.O.W. SHALL INCLUDE DISCONNECTION,
REMOVAL, REINSTALLATION AND RECONNECTION OF EXISTING PLUMBING, MECHANICAL &
ELECTRICAL EQUIPMENT AND COMPONENTS AS REQUIRED TO ACHIEVE THE SPECIFIED
WORK. PLUG/INFILL ALL ABANDONED UTILITY PENTRATIONS AND OPENINGS TO MATCH
ADJACENT CONDITIONS.
REMOVE EXISTING DOOR AND FRAME. INSTALL NEW OPENING AND NEW BRICK/CMU WALL -
SEE DETAILS.
CLEAN EXISTING BRICK SCHEDULED TO REMAIN.
REMOVE EXISTING LOUVER. ENLARGE OPENING AS REQUIRED TO INSTALL NEW DOOR.
REMOVE EXISTING CANOPY INCLUDING ROOF, COLUMNS & FOUNDATIONS AND BACKFILL
ALL EXCAVATIONS AND SOD DISTURBED AREAS.
EXISTING PAINTED LETTERING TO REMAIN AND BE REPAINTED. PREPARE EXISTING
SURFACES AS REQUIRED TO INSTALL NEW PAINTED LETTERING - PROTECT EXISTING
ADJACENT SURFACES SCHEDULED TO REMAIN.
BASE BID: EXISTING DOOR AND FRAME TO REMAIN. ALTERNATE: EXISTING FRAME TO
REMAIN. REMOVE AND REPLACE DOOR AS REQUIRED. PATCH REPAIR AND PAINT EXISTING
FRAME TO REMAIN.
REMOVE EXISTING METAL STAIR AND ALL MECHANICAL/ELECTRICAL EQUIPMENT IN THIS
SPACE.
EXISTING EMERGENCY EYE WASH/SHOWER TO REMAIN
EXISTING WALL MOUNTED SINK TO REMAIN
REMOVE EXISTING CASEWORK AND SEE PLUMBING FOR INSTRUCTION ON HOW TO
TERMINATE EXISTING UTILITIES.
REMOVE EXISTING AWNING AND ASSOCIATED FOOTINGS, DOOR AND FRAME ASSEMBLY,
AND PORTIONS OF EXISTING WALL ASSEMBLIES AS REQUIRED FOR NEW CONSTRUCTION.
REMOVE EXISTING DOOR AND FRAME ASSEMBLY, AND PORTIONS OF EXISTING WALL
ASSEMBLIES AS REQUIRED FOR NEW CONSTRUCTION.
CAREFULLY REMOVE EXISTING BRICK VENEER, PREP AND CLEAN FOR REUSE AT EXISTING
MASONRY VENEER LOCATIONS INDICATED TO BE PATCHED USING SALVAGED BRICK
MASONRY VENEER MATERIALS.
SAW-CUT AND REMOVE EXISTING CONCRETE SLAB IN THIS LOCATION TO MAKE WAY FOR
NEW RECESSED WALK-OFF MAT. SEE DETAIL 6/A5.1 FOR ADDITIONAL REQUIREMENTS
REMOVE EXISTING DOWNSPOUT
REMOVE EXISTING SINKS, URINALS, WATER CLOSETS, TOILET ACCESSORIES, TOILET
PARTITIONS, AND URINAL SCREENS.
REMOVE EXISTING SHOWER STALLS, WALLS, FLOORS, BASES, PLUMBING FIXTURES,
ACCESSORIES, ETC.
REMOVE WALL TILE AND BASE TO SUBSURFACE OF WALL FOR INSTALLATION OF NEW
SPECIFIED FINISHES.
REMOVE EXISTING GUTTERS AND DOWNSPOUTS.
REMOVE EXISTING COAL SHOOT.
REUSE EXISTING CONCRETE DOWNSPOUT BOOT
REMOVE PORTION OF EXISTING CHAIN LINK FENCE AND INSTALL NEW FENCE IN
LOCATIONS SHOWN ON A2.1
REMOVE EXISTING BOILER STACK IN ITS ENTIRETY INCLUDING SUB-GRADE FOUNDATION
SYSTEMS. BACKFILL AND COMPACT AREA TO BRING GRADE BACK UP TO EXISTING
ADJACENT GRADE. PROTECT EXISTING BUILDING ELEMENTS FROM DAMAGE DURING
DEMOLITION
REMOVE EXISTING FIRE RATED HOLLOW METAL WINDOWS. PATCH WALL AS REQUIRED TO
MAINTAIN REQUIRED 1 HOUR FIRE RATING AND AS REQUIRED SO THAT TRANSITION
BETWEEN NEW AND EXISTING MATERIALS IS NOT VISIBLE
REMOVE FLOOR SLAB FOR NEW ELEVATOR - SEE STRUCTURAL
REMOVE EXISTING CURTAIN WALL ASSEMBLY AS REQUIRED TO INSTALL NEW ELEVATOR
SHAFT. INSTALL NEW CURTAIN WALL ASSEMBLY AS INDICATED. SEE OPENING SCHEDULE.
REFER TO PLUMBING. INSTALL NEW SUMP PIT/PUMP AND INFILL EXISTING PIT.
EXISTING TELECOMMUNICATIONS ENTRANCE TO BE RECONFIGURED. PROTECT EXISTING
INCOMING FIBER/COPPER AND REINSTALL IN NEW CONDUIT. SEE ELECTRICAL.
CAREFULLY CUT AND SALVAGE EXISTING METAL WALL PANELS IN THIS AREA FOR
REINSTALLATION AT EXISTING TELECOMMUNICATIONS SERVICE ENTRANCE. SEE NEW
ELEVATIONS.
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
S ou th C ou rt
St re et
M on tg om er y, A L
Te l.
4.
. 5
W
W W
.S
SL
A R
C H
.C O
M
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A1.0
DEMOLITION
NOTES
F3 5:
R E
PA
IR
H A
N G
A R
BL
D
G
7T
H F
W , D
A N
N E
LL
Y
FI
E
LD
, M
O N
TG
O
M E
RY
, A
L
18072/FAKZ182352
MARCH 2021
DCD/JBS
DCD, JGB
General Demolition Notes:
THE INTENT OF DEMOLITION IS TO ACCOMPLISH ALL WORK NECESSARY TO PROVIDE A FINISHED, COMPLETE BUILDING AS INDICATED IN THE PLANS AND SPECIFICATIONS. THE FOLLOWING GENERAL NOTES ARE APPLICABLE
TO ALL DEMOLITION ACTIVITIES REQUIRED BY THE SCOPE OF THE CONTRACT DOCUMENTS.
CONTRACTOR'S RESPONSIBILITY TO VERIFY ACCURACY OF EXISTING CONDITIONS:
1. DOCUMENTATION CONTAINED IN THESE CONSTRUCTION DOCUMENTS OF EXISTING CONDITIONS MAY
NOT BE ENTIRELY ACCURATE. CONTRACTOR IS TO TAKE THE INITIATIVE TO VISIT THE SITE PRIOR TO AND
DURING THE PRE-BID MEETING TO VERIFY ACTUAL CONDITIONS, THEREFORE RENDERING THE
CONTRACTOR RESPONSIBLE FOR AN ACCURATE REPRESENTATION OF THE EXISTING CONDITIONS.
2. CONTRACTOR TO VISIT SITE TO VERIFY EXISTING CONDITIONS AND SHALL BE RESPONSIBLE FOR
DETERMINING THE SCOPE OF WORK PRIOR TO DEMOLITION . EXISTING CONDITIONS SHALL BE
THOROUGHLY RESEARCHED PRIOR TO CONSTRUCTION AND ANY DRAWINGS SHALL BE IMMEDIATELY DISCUSSED WITH ARCHITECT PRIOR TO BEGINNING CONSTRUCTION IN THE AFFECTED AREA. CHANGE ORDERS WILL NOT BE APPROVED PRIOR TO WORK TAKING PLACE FOR EXISTING CONDITIONS READILY
APPARENT BY A THOROUGH OBSERVATION.
3. CONTRACTOR TO VERIFY ALL EXISTING FLOOR ELEVATIONS AND VERIFY WITH PLANS. REPORT ANY
DISCREPANCIES WITH ARCHITECT PRIOR TO CONSTRUCTION
4. CONTRACTOR SHALL VERIFY IF THERE ARE EXISTING TILE SETTING BEDS. IN SUCH CASE, CONTRACTOR IS RESPONSIBLE FOR DEMOING EXISTING SETTING BED(S) AND FILL EXISTING DEPRESSED CONCRETE SLAB AREAS WITH MATERIALS CONSISTENT WITH ADJACENT MATERIALS AND FINISHES REQUIRED TO MEET ALL
APPLICABLE CODES.
5. DIMENSIONS OF EXISTING STRUCTURES ARE ONLY FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS. LOCATION OF WALLS SHALL BE AS SHOWN ON
PLANS RELATIVE TO EXISTING CONDITIONS.
6. THE GOVERNMENT ASSUMES NO RESPONSIBILITY FOR EXISTING UNKNOWN CONDITIONS. EACH
CONTRACTOR SHALL COORDINATE NEW CONSTRUCTION WITH EXISTING CONSTRUCTION AND
INVESTIGATE IN A REASONABLE MANNER REGARDING HIDDEN CONDITIONS.
SAFEGUARDS DURING DEMOLITION:
1. CONTRACTOR TO MAKE SURE ALL INFRASTRUCTURE (POWER, GAS, WATER, CABLING, ETC...) IS TURNED
OFF AND/OR REMOVED PRIOR TO DEMOLITION. COORDINATE ALL OUTAGES IN ADVANCE WITH THE
GOVERNMENT TO ENSURE ONGOING OPERATIONS ARE REASONABLY MAINTAINED.
2. CONTRACTOR TO VERIFY ALL LOAD BEARING CONDITIONS AND PROVIDE SHORING AS REQUIRED IN ALL
AFFECTED AREAS PRIOR TO & DURING DEMOLITION AND/OR CONSTRUCTION.
3. ALL CURRENT OSHA AND APPLICABLE STANDARDS SHALL BE UPHELD TO ASSURE SAFETY OF ALL
PERSONS ON SITE DURING ENTIRE COURSE OF CONSTRUCTION.
CONTRACTOR'S RESPONSIBILITY TO REMOVE ALL ENCUMBRANCES REQUIRED FOR PROPER INSTALLATION OF
NEW SYSTEMS:
1. REMOVAL OF ALL ENCUMBRANCES INCLUDING BUT NOT LIMITED TO DUCTS, PIPING, WIRING, ETC… SHALL
BE DONE BY THE CONTRACTOR TO ACHIEVE PLANS AS SHOWN EVEN IF NOT SHOWN ON DEMOLITION
PLANS.
2. REMOVAL OF ALL ENCUMBRANCES INCLUDING BUT NOT LIMITED TO CONCRETE, WOOD, DUCTS, PIPING, WIRING, SHALL BE DONE BY THE CONTRACTOR TO ACHIEVE FLOOR PLANS AS SHOWN EVEN IF NOT
SHOWN ON DEMOLITION PLANS.
3. REMOVE ALL CEILINGS AND ITEMS ABOVE CEILINGS THAT ARE NOT REQUIRED IN THE RENOVATED BUILDING AND AS…