FAKZ 182352 Addendum No. 2 SIGNED.pdf
PDF 4 MB Posted
- Attached to
- F-35: Repair Hangar bldg 1201
- Solicitation number
- W50S6N-21-B-0003
About this file
This solicitation is for repair and renovation services for Hangar Building 1201 at Dannelly Field in Montgomery, Alabama. The scope of work includes removal and replacement of mechanical systems, partial removal and replacement of plumbing systems, removal and replacement of the metal retrofit roof and hangar floor slab, and modification of electrical systems. The project numbers are FAKZ182352. The magnitude is estimated between $5 million and $10 million. The NAICS code is 236210. The small business size standard is $39.5 million, and this award is 100% set aside for small business. A pre-bid conference will be held on June 8, 2021 at 10:00 am Central Time at building 1502 Wing Auditorium classroom at 5187 Selma Highway in Montgomery, Alabama. Interested contractors must submit an Entry Authority List to three listed government points of contact.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 5 July 2021
To: CMSgt. William Hall
Subject: ADDENDUM NO. 2
Project: F-35 – REPAIR HANGAR BUILDING 1201
Job #: ANG# FAKZ182352 / SSL# 18072
From: David Donovan
The plans and Specifications for the F-35 – Repair Hangar, Building 1201, dated March 2021 are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).
Item No. 1: Refer to drawings. Delete to following sheets and replace them with the attached drawings sheets with a revised date of 2 July 2021:
FP2.1 – First Floor North – Fire Protection Renovation Plan M2.2 – First Floor South – HVAC Renovation Plan E0.1 – Electrical Legend & Notes E4.1 – First Floor Plan North Auxiliary E4.2 – First Floor South Auxiliary E4.3 – Second Floor Plan North Auxiliary E4.4 – Second Floor Plan South Auxiliary E7.1 = Single Line Diagram - Power
Item No. 2: Refer to specifications. Delete specification 00 0102 “Project Information and Summary” and replace it with the attached section 00 0102 with a revised date of 2 July 2021.
End of Addendum #2
MATCH LINE
REFREF
150 SF
METAL TECH
SUPER OFFICE
149 SF
FAB SUPER
OFFICE
145 SF
STORAGE
2188 SF
METALS TECH
SHOP
58 SF
ELEV
60 SF
EQ.
175 SF
TFI STORAGE
1123 SF
ALIS
182 SF
QA CHIEF
1074 SF
QA COMMONS
79 SF
COMM
1144 SF
FABRICATIONS
SHOP
713 SF
BOILER
83 SF
VEST
110 SF
ENTRY
109C
173 SF
STAIR
237 SF
STAIR
317 SF
FIRE
PROTECTION
25982 SF
MAINTENANCE
HANGAR
547 SF
LOCKERS
80 SF
VEST
270 SF
BREAK ROOM
108A
236 SF
KITCHEN
108B
76 SF
ENTRY
109D
143 SF
ENTRY
109B
44 SF
VEST
109A
111 SF
LO SUPER
OFFICE
MATCH LINE
B CA D E F G H J K L M
B CA D E F G H J K L M
1A
1A
UP
UP
HHB Engineers, P.C.
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
18072/FAKZ182352
MARCH 2021
ASR
TLH
No. Revision Date
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
ADDENDUM 2 7/2/21
FIRST FLOOR
NORTH - FIRE
PROTECTION
RENOVATION
PLAN
FP2.1
AutoCAD SHX Text N
AutoCAD SHX Text
FP2.1
AutoCAD SHX Text
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
FIRST FLOOR NORTH - FIRE PROTECTION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N:\2019jobs\219017\Drawings\MECH\F-35 Repair Hangar Building 1201 Dannelly Field\Sheets\FP2.1 FIRST FLOOR NORTH - FIRE PROTECTION RENOVATION PLAN.dwg
AutoCAD SHX Text Andrew Robinson
AutoCAD SHX Text
6/30/2021 4:08 PM
AutoCAD SHX Text
PRATTVILLE, AL 334/358-2707
AutoCAD SHX Text
CONSULTING ENGINEERS
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text
AutoCAD SHX Text KEYED NOTES REMOVE EXISTING UPRIGHT OR PENDANT HEADS. PROVIDE NEW HEAD AT LOCATION TO MATCH NEW FLOOR PLAN. HEAD TO MATCH EXISTING. REPLACE UPRIGHT HEAD WITH PENDANT TYPE, MODIFY EXISTING HEAD LOCATIONS FOR NEW ROOM. OFFSET BRANCH LINE AROUND NEW ELEVATOR SHAFT. EXISTING WET PIPE AND HEF SYSTEM IN HANGER BAY TO REMAIN. MODIFY EXISTING BRANCH LINE TO ACCOMMODATE NEW VESTIBULE, PROVIDE NEW HEAD. PROVIDE SUPERVISED VALVE FOR ELEVATOR PIT SPRINKLER HEAD. PROVIDE SUPERVISED VALVE, FLOW SWITCH, CHECK VALVE AND INSPECTOR'S TEST CONNECTION'S FOR ELEVATOR MACHINE ROOM.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MATCH LINE MATCH LINE
UP
DW
10 10
9 9
A B C D
7 7
6 6
E F G H K L
11 11
10B 10B
FAB SUPER
OFFICE
VESTIBULE
ELECTRICAL
LO HAZMAT
STORAGE
125WHEEL AND TIRE
SHOP
ALIS ADMIN
LEAD
ELEC
OFFICE
CONFERENCE
ROOM
LO SHOP
BASE SITE
MANAGER
MENS
132 WOMENS
FABRICATIONS
SHOP
BOILER
PANEL STORAGE
STAIR
STAIR
VESTIBULE
FIRE
PROTECTION
JAN
MAINTENANCE
HANGAR
SUPPORT
SECTION
HIT
126WHEEL
STORAGE
FSE
COLLATERAL
STORAGE
133A
J
LO SUPER
OFFICE
VEST
140A
M
8 8
VESTIBULE
136A
HHB Engineers, P.C.
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
18072/FAKZ182352
MARCH 2021
ASR
TLH
No. Revision Date
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
ADDENDUM 2 7/2/21
FIRST FLOOR
SOUTH - HVAC
RENOVATION
PLAN
M2.2
AutoCAD SHX Text T
AutoCAD SHX Text 12/12
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text M2.2
AutoCAD SHX Text
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
FIRST FLOOR SOUTH - HVAC PLAN
AutoCAD SHX Text
AutoCAD SHX Text
EF
AutoCAD SHX Text
AutoCAD SHX Text M3.2
AutoCAD SHX Text
EXISTING PTHP-3
AutoCAD SHX Text
AutoCAD SHX Text
PTHP
AutoCAD SHX Text
AutoCAD SHX Text
EF
AutoCAD SHX Text
AutoCAD SHX Text
EF
AutoCAD SHX Text
AutoCAD SHX Text E8
AutoCAD SHX Text
AutoCAD SHX Text E6
AutoCAD SHX Text
AutoCAD SHX Text E6
AutoCAD SHX Text
AutoCAD SHX Text
HP1
AutoCAD SHX Text
AutoCAD SHX Text
OHP
AutoCAD SHX Text
AC-1
AutoCAD SHX Text
AC-5
AutoCAD SHX Text
AC-3
AutoCAD SHX Text
AC-4
AutoCAD SHX Text
AutoCAD SHX Text
ECH
AutoCAD SHX Text
AutoCAD SHX Text
ECH
AutoCAD SHX Text
AutoCAD SHX Text E6
AutoCAD SHX Text
AutoCAD SHX Text E6
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C6
AutoCAD SHX Text
AutoCAD SHX Text C6
AutoCAD SHX Text
AutoCAD SHX Text C6
AutoCAD SHX Text
AutoCAD SHX Text S8
AutoCAD SHX Text
NEW
AutoCAD SHX Text
AutoCAD SHX Text C8
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
EX. DUCT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R12
AutoCAD SHX Text
AutoCAD SHX Text C8
AutoCAD SHX Text R18
AutoCAD SHX Text
AutoCAD SHX Text S18
AutoCAD SHX Text
EX. 12X10 DUCT
AutoCAD SHX Text
AutoCAD SHX Text
OHP
AutoCAD SHX Text
AutoCAD SHX Text
HPI
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MVD
AutoCAD SHX Text
EX. 14/12
AutoCAD SHX Text
AutoCAD SHX Text
EF-2 THU 5
AutoCAD SHX Text
EF-8
AutoCAD SHX Text
BLANK-OFF PANEL OVER INSIDE OF EXISTING LOUVER, PROVIDE 2" RIGID INSULATION
AutoCAD SHX Text E6
AutoCAD SHX Text
LV
AutoCAD SHX Text
OVER THE TOP OF DOOR, BOTTOM 10'-0" AFG
AutoCAD SHX Text
AutoCAD SHX Text
30" UPTO EF-4
AutoCAD SHX Text
AutoCAD SHX Text
48" UPTO EF-5
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LV
AutoCAD SHX Text
AutoCAD SHX Text
LV
AutoCAD SHX Text
AutoCAD SHX Text 16/10
AutoCAD SHX Text
AutoCAD SHX Text E16
AutoCAD SHX Text
AutoCAD SHX Text E6
AutoCAD SHX Text
AutoCAD SHX Text E6
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N:\2019jobs\219017\Drawings\MECH\F-35 Repair Hangar Building 1201 Dannelly Field\Sheets\M2.2 FIRST FLOOR SOUTH - HVAC RENOVATION PLAN.dwg
AutoCAD SHX Text Andrew Robinson
AutoCAD SHX Text
6/30/2021 4:08 PM
AutoCAD SHX Text
PRATTVILLE, AL 334/358-2707
AutoCAD SHX Text
CONSULTING ENGINEERS
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text
AutoCAD SHX Text KEYED NOTES EXISTING OUTSIDE AIR UNIT CU-2/FCU-1 TO BE REUSED. BALANCE TO 825 CFM. REPLACE EXISTING "BIG ASS FAN" CONTROLLER, NEW CONTROLLER TO HAVE OFF INTERLOCK WITH FIRE ALARM SYSTEM 3 PLACES. EXISTING AC-5, 700 CFM TOTAL, 100 CFM OA FROM FCU-1. EXISTING AC-1, 500 CFM TOTAL 100 CFM OA. EXISTING AC-3, 500 CFM, 100 CFM OA FROM FCU-1. EXISTING AC-4 CEILING CASSETTE, 250 CFM 50 CFM FROM FCU-1. 6" DIA. OA DUCT TO WALL CAP. DELETED. 12/12 TRANSFER DUCT WITH 10/10 RETURN EACH ROOM. EXHAUST PLENUM. 4" INSULATED OUTSIDE AIR DUCT TO HP1-3, TERMINATE AT EXTERIOR WALL WITH LV-4. THERMOSTAT FOR IR-4, IR-5, IR-6 AND IR-7.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text SHEET NOTES 1. THERMOSTAT FOR EXISTING HVAC EQUIPMENT TO BE THERMOSTAT FOR EXISTING HVAC EQUIPMENT TO BE REUSED.
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an
W W
W .S
S L
A R
C H
.C O
M (M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
18072/FAKZ182352
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#19-065Tel: 334.285.1273
MARCH 2021
03-12-21
E0.1
ELECTRICAL LEGEND
& NOTES
CEILING OUTLETS
ELECTRICAL LEGEND
WALL OUTLETS
WALL SWITCHES (UNLESS OTHERWISE NOTED, MOUNT 48" A.F.F.)
TELEPHONE & TELEVISION SYSTEMS
BRANCH CIRCUITING
PANELS AND POWER
MISCELLANEOUS EQUIPMENT
FIRE ALARM/MASS NOTIFICATION SYSTEM
MISCELLANEOUS
LIGHTING CONTROLS
GENERAL ELECTRICAL NOTES:
SECURITY SYSTEM (ROUGH-IN)
FLOOR OUTLETS
Project Title
M o n tg o m er y
D o th an
W W
W .S
S L
A R
C H
.C O
M (M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
18072/FAKZ182352
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#19-065Tel: 334.285.1273
MARCH 2021
03-12-21
E4.1
FIRST FLOOR PLAN
NORTH AUXILIARY
SCALE: 1/8"=1'-0"
FIRST FLOOR PLAN NORTH - AUXILIARY1
E4.1
MATCH LINE
UP
UP
1 2
3MATCH LINE
9'- 8"
8'
1/8" = 1'-0
0 8 16 FT
GRAPHIC SCALE
SHEET NOTES:
METAL TECH
SUPER OFFICE
FAB SUPER
OFFICE
STORAGE
METALS TECH
SHOP
ELEV
EQ.
TFI STORAGE
ALIS
QA CHIEF
QA COMMONS
COMM
FABRICATIONS
SHOP
BOILER
VEST
ENTRY
109CSTAIR
STAIR
FIRE
PROTECTION
MAINTENANCE
HANGAR
plane power spot
LOCKERS
VEST
BREAK ROOM
108A
KITCHEN
108B
ENTRY
109D
ENTRY
109B
VEST
109A
LO SUPER
OFFICE
GENERAL NOTES:
Project Title
M o n tg o m er y
D o th an
W W
W .S
S L
A R
C H
.C O
M (M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
18072/FAKZ182352
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#19-065Tel: 334.285.1273
MARCH 2021
03-12-21
E4.2
FIRST FLOOR SOUTH
AUXILIARY
SCALE: 1/8"=1'-0"
FIRST FLOOR PLAN SOUTH - AUXILIARY1
E4.2
UP
MATCH LINE
2' - 6"
MENS
132 WOMENS
VESTIBULE
JAN
8'
1/8" = 1'-0
0 8 16 FT
GRAPHIC SCALE
SHEET NOTES:
FAB SUPER
OFFICE
VESTIBULE
ELECTRICAL
LO HAZMAT
STORAGE
125WHEEL AND TIRE
SHOP
BASE
SITE
MANAGER
ELEC
OFFICE
CONFERENCE
ROOM
LO SHOP
ALIS ADMIN LEAD
MENS
WOMENS
FABRICATIONS
SHOP
BOILER
PANEL STORAGE
STAIR
STAIR
VESTIBULE
FIRE
PROTECTION
JAN
MAINTENANCE
HANGAR
SUPPORT
SECTION
HIT
126WHEEL
STORAGE
FSE
COLLATERAL
STORAGE
133A
LO SUPER
OFFICE
VEST
140A
MATCH LINE
OPEN TO BELOW
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an
W W
W .S
S L
A R
C H
.C O
M (M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
18072/FAKZ182352
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#19-065Tel: 334.285.1273
MARCH 2021
03-12-21
E4.3
SECOND FLOOR
PLAN NORTH
AUXILIARY
SCALE: 1/8"=1'-0"
SECOND FLOOR PLAN NORTH - AUXILIARY1
E4.3
8'
1/8" = 1'-0
0 8 16 FT
GRAPHIC SCALE
SHEET NOTES:
ELEV
MECH
COMM
OFFICE
MAINTENANCE
OPERATIONS
CONTROL
LOCKER / PPE
STORAGE
CONFERENCE
SCHEDULER
JAN.
COMM
MX/CC
1ST SGT
MX SUPER
OFFICE
UDM
WORK ROOM
RA
AMXS CC
AMXS SUPER
MOF
STAIR
STAIR
SIPR VAULT
MECH.
TESTING
229A
WOMENS
MENS
VEST
209ANALYSIS
AMXS WORK
AREA
OPEN TO BELOW
CORRIDOR
233B
CORRIDOR
233C
TESTING
229B
ELEV LOBBY EMERGENCY 2-WAY COMMUNCIATIONS SYSTEM RISER2
E4.3
OPEN TO BELOW
MATCH LINE
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an
W W
W .S
S L
A R
C H
.C O
M (M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
18072/FAKZ182352
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#19-065Tel: 334.285.1273
MARCH 2021
03-12-21
E4.4
SECOND FLOOR
PLAN SOUTH
AUXILIARY
SCALE: 1/8"=1'-0"
SECOND FLOOR PLAN SOUTH - AUXILIARY1
E4.4
8'
1/8" = 1'-0
0 8 16 FT
GRAPHIC SCALE
SHEET NOTES:
CLASSROOM
MAINTENANCE
TRAINING
LOCKER / PPE
STORAGE
CONFERENCE
SIPR VAULT
MECH.
TESTING
229A
WORK ROOM
STAIR
BREAK
235TFI CC
BREAK
TFI ADMIN
STAIR
TFI SUPER.
COMM
SUPER.
MXG/CC
DEPUTY MXG/CD
ADMIN
236A
1ST SGT
FAB. FLIGHT
ACCESSORY
FLIGHT
MXS/CC
240 CMF CHIEF
EMF CHIEF
ADMIN
TFI 1ST SGT
CORRIDOR
233A
HERITAGE
ROOM
OPEN TO BELOW
CORRIDOR
233B
TESTING
229B
HALL
236B
Project Title
M o n tg o m er y
D o th an
W W
W .S
S L
A R
C H
.C O
M (M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
F R
E P
A
IR
H A
N G
A R
B L
D G
T
H F
W D
A N
N E
L L
Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
18072/FAKZ182352
JBG
JBG
No. Revision Date
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#19-065Tel: 334.285.1273
MARCH 2021
03-12-21
E7.1
SINGLE LINE
DIAGRAM - POWER
SINGLE LINE DIAGRAM - NEW 480 VOLT SYSTEM
DETAIL - SERVICE ENTRANCE FAULT CURRENT NAMEPLATE
SINGLE LINE DIAGRAM NOTES: KEYED NOTES:
F-35: REPAIR HANGAR BUILDING 1201 18072/FAKZ182352 TYPE B-3 (100%)
187TH FIGHTER WING, DANNELLY FIELD ANG, MONTGOMERY MARCH 2021
Revised 5 July 2021
PROJECT INFORMATION AND SUMMARY 00 0102 - 1
SECTION 00 0102 - PROJECT INFORMATION AND SUMMARY
PART 1 GENERAL
1.01 PROJECT IDENTIFICATION
A. Project Name:F-35: Repair Hangar Buidling 1201, located at 187th Fighter Wing, Air National Guard (ANG) Base at Dannelly Field, Montgomery, AL.
B. Government Project Number: FAKZ182352
C. Architect's Project Number: 18072
D. Owner's Representatives:
1. Contracting Officer: Mr. Craig Kast
2. Contracting Specialist: Mr. Stephen Shanks
3. Contracting Officer Representative: Major Adam Sanders, Base Civil Engineer
4. Alternate Contracting Officer Representative: Major William Sanford, Deputy Base Civil Engineer
1.02 CONTRACT DURATION
A. 365 calendar days from notice to proceed to beneficial occupancy, this is in addition to 30 days for the punch list to be completely accomplished. The Government intends to occupy the building upon completion and acceptance of punch list items.
1.03 PROJECT DESCRIPTION
A. Project Scope includes the renovation of the existing Hangar, Building 1201. The existing structure was built in 1952 and has undergone multiple renovations since its original construction. The ground floor will undergo a compete renovation while the existing second floor spaces will be undergo a partial renovation. The proposed project includes, but is not limited to, the following scopes of work as indicated on the Contract Documents:
1. Removal and replacement of select building mechanical systems. Some existing systems are new and scheduled to be maintained and/or extended. Refer to drawings.
2. Partial removal of existing plumbing systems and installation of new plumbing systems and fixtures.
Revised 5 July 2021
PROJECT INFORMATION AND SUMMARY 00 0102 - 2
3. Modification of existing building electrical systems and extension of existing services as required to support new construction as indicated on the drawings.
4. Removal and replacement of existing low sloped metal retrofit roofing systems on the lower roof areas. Primary hangar (high) roofing systems will remain without modification unless specifically noted otherwise.
5. Removal and replacement of the hangar floor slab to support new plumbing and electrical work as well as to increase the bearing capacity of the floor in support of the F35 aircraft. Entire hangar slab (both new and existing to remain) will be provided with a new epoxy floor coating.
6. Reconfiguration of interior space including removal and replacement of existing masonry and metal stud framed walls.
7. Removal and replacement of existing floor slabs as required for installation of new building elements in addition to the removal and replacement of the hangar floor slab noted above.
8. General finish upgrades throughout the facility.
B. Antiterrorism and Building Standoff Requirements:
1. The project site and building structural, architectural, electrical and mechanical systems have been designed to meet the prescribed levels of protection against terrorist attacks in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.
C. Intrusion Detection System (IDS), Access Controls, and CCTV:
1. The IDS system must be fully compatible with the existing USAF approved Advantor IDS Annunciator located in the 187th SFS BDOC.
2. As part of the base bid, the contractor is responsible for engaging Advantor Systems Cooperation (which is a sole source security system) for the procurement (purchase) and installation of the IDS, Access Controls, and CCTV systems. Refer to limited source justification included in the solicitation documents furnished by the Government.
3. The base bid shall include all plant, labor, and materials to provide all collateral support as required by Advantor (in addition to collateral support indicated in the contract documents) for installation of a fully operational IDS, Access Control, and CCTV systems as defined by Advantor System Corporation.
Revised 5 July 2021
PROJECT INFORMATION AND SUMMARY 00 0102 - 3
4. The required scope of work is as outlined in the drawings. ADVANTOR systems assisted in the design of the security systems and have furnished a "quote" as part of the design process. The "quote" is included in the project specifications for reference and identification of the required devices/materials. The Contractor shall contact ADVANTOR and receive an updated "quote" as part of the bid process.
All costs to install a complete and operational IDS, ACS, and CCTV system shall be included in the Contractor's bid.
D. Sustainability Design and Energy Conservation:
1. The project design incorporates Sustainability Concepts to achieve optimum resource efficiency, constructibility, sustainability, and energy conservation.
2. The project has not been registered with the USGBC and is not inteded to be registered. The project is not intended to achieve any level of LEED certification or any other sustainability certifications. however, in accordance with ANGETL 15-01-01, the project is intended to be "LEED Meritable" and incorporate sustainable design principles and criteria to the maximum extent possible.
3. In keeping with ANGETL 15-01-01 Contractor shall give preference to sustainable products and materials with higher levels of sustainability including but not limited to materials extracted and manufactured within 500 miles of the project site, materials manufactured using higher levels of recycled content, materials meeting VOC limitations, etc...
4. Where applicable, minimum thresholds for sustainability criteria are established within the technical specifications. Where not specifically indicated, the Contractor shall give preference to and provide materials that contribute the most to the project's sustainability goal.
5. Contractor shall provide "LEED Submittals" for all products, materials, and systems indicating a product or material's sustainable attributes for review and approval by the Government. However, input of LEED documentation into the USGBC's LEED Online system will not be required. Similarly, LEED credit templates documenting the project's LEED performance will not be required.
E. Government Furnished Furniture, furnishings and Equipment (FF&E):
1. Contractor's base bid shall include rough-ins for plumbing, mechanical, and electrical; including installation and final connection of all items indicated on the drawings as Government Furnished Contractor Installed (GFCI).
Revised 5 July 2021
PROJECT INFORMATION AND SUMMARY 00 0102 - 4
F. Contractor's Qualified Fire Protection Engineer (QFPE) Services (Added by Addendum No. 2)
1. The Contractor shall employ a Qualified Fire Protection Engineer (QFPE) meeting the requirements of UFC 3-600-01.
2. The QFPE shall review, sign, and certify all fire protection and life safety systems including; but, not limited to fire alarm, mass notification, and sprinkler systems included within the proposed project.
3. All shop drawing / calculations / material submittals for applicable life safety systems must be reviewed and stamped by the Contractor’ QFPE in accordance with section 9-6.3 of UFC 3-600-01.
4. Waterflow testing shall be performed under the direction of the Contractor’s QFPE in accordance with section 9-6.4 of UFC 3-600-01. Waterflow testing shall be performed by the Contractor in order to develop required hydraulic calculations. Use of waterflow testing performed by the Architect during design cannot be utilized by the Contractor for preparation of project submittals.
5. During Construction the Contractor’s QFPE must visit the site in intervals/quantities required to certify that the system has been installed in accordance with the project requirements. At a minimum, the QFPE shall attend/witness the above ceiling inspection and attend/witness final acceptance testing for all fire protection and life safety systems. Additional site inspections are at the discretion of the Contractor’s QFPE. The Contractor’s QFPE shall certify, in writing, that the system has been installed in accordance with project requirements. The Contractor’s QFPR certification shall be in writing, on company letterhead, and include the QFPE’s registration stamp.
1.04 PERMITS, FEES AND NOTICES
A. Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses, and inspections necessary for proper execution and completion of the Work which are customarily secured after award of the Construction Contract and which are in effect on the date of receipt of bids.
1. City of Montgomery Buidling Permit will not be required.
B. The Contractor shall comply with and give notices required by all laws, ordinances, rules, regulations, and lawful orders of public authorities applicable to performance of the Work.
Revised 5 July 2021
PROJECT INFORMATION AND SUMMARY 00 0102 - 5
1.05 USE OF SITE AND MISC. REQUIREMENTS
A. The space available to the contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is as per the Government's approval.
1. Other areas are off limits to all construction personnel.
B. Access to site will be limited; obtain the Government's approval of proposed routes of access.
C. Keep existing sidewalks, roads, parking lots and drives on site clear and available at all times. Promptly remove mud, dirt, debris, etc. from sidewalks, streets, and public right-of-way during construction as it occurs.
D. Storage areas on site are very minimal and will be limited to materials that are to be immediately used in the progress of the work. If additional storage is required, then Contractor shall secure and be responsible to pay for such off site storage in a fully bonded and insured facility acceptable to the Government, with all items clearly identified as being assigned to this project.
E. Provide secure temporary barricades, fencing, etc. as required to separate the public from construction operations. Compliant safety and/or warning signage is to be provided as well in conjunction with fencing and barricades.
1. Site safety and security is the General Contractor's responsibility. Fencing shall be provided as deemed necessary to protect the site from theft and damage and to prevent access to the site by the public. Location/extents of fencing is at the discretion of the Contractor.
F. Construction operations are not to affect any of the ongoing operations thought the site and/or adjacent sites. Construction equipment is not to be attached to, or swing over existing buildings to remain, public areas, occupied buildings or parking lots, right-of-ways, etc.
G. Comply with the Government's security requirements - refer to specification section 01 3553.
H. The contractor shall provide all testing, inspections, and similar services; these services also include those specified to be performed by an independent agency.
Revised 5 July 2021
PROJECT INFORMATION AND SUMMARY 00 0102 - 6
1.06 UTILITY OUTAGES AND SHUTDOWN
A. All electrical and communication shut downs shall be performed on a non-working day for the Government (Saturday, Sunday, Monday, or Holidays) unless specifically approved by the Contracting Officer Representative.
B. Limit shutdown of utility services to 8 hours at a time, arranged at least 72 hours in advance with the Government.
C. Prevent accidental disruption of utility services to other facilities.
1.07 PHASING OF WORK
A. The work of this project shall be completed in one phase. However, the Contractor shall coordinate the work as required to ensure all existing roadways and facilities adjacent to the project site remain open and accessible for use by the Government.
1.08 WORK SEQUENCE
A. Coordinate construction schedule and operations with Contracting Officer Representative.
1.09 PROJECT CONSULTANTS
A. The Architect, hereinafter referred to as Architect: Seay Seay & Litchfield P.C..
1. Address: 1115 South Court Street.
2. City, State, Zip: Montgomery AL 36104.
3. Phone/Fax: 334-263-5162 334-263-5170.
4. Project Manager: David Donovan, AIA
5. Prinicipals-in-Charge: Wes R. Osmer, AIA, LEED AP
B. Architect's Consultants:
1. Structural Engineering:
a. Grant Engineering
b. Address: 432 Herron Street
c. City, State, Zip: Montgomery, AL, 36104.
d. Phone/Fax: 334-265-4631 / 334-262-2111.
Revised 5 July 2021
PROJECT INFORMATION AND SUMMARY 00 0102 - 7
e. Contact: Terry Grant, P.E.
2. Plumbing, Mechanical & Fire Suppression Engineering:
a. HHB Engineers, PC
b. Address: 104 Josie Run
c. City, State, Zip: Prattville, AL 36066
d. Phone: 334-358-2707
e. Contact: Tom Hattemer, P.E.
3. Electrical Engineering:
a. Gunn & Associates
b. Address: 3102 Highway 14
c. City, State, Zip: Millbrook, AL 36054
d. Phone: 334-285-1273
e. Contact: Barry Gravlee, P.E.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
This page intentionally left blank
| ADD#2 |
| FP2.1 |
| M2.2 |
| Electrical Drawings |
| E0.1-Model |
| Sheets and Views |
| Model |
| E4.1-Model |
| Sheets and Views |
| Model |
| E4.2-Model |
| Sheets and Views |
| Model |
| E4.3-Model |
| Sheets and Views |
| Model |
| E4.4-Model |
| Sheets and Views |
| Model |
| E7.1-Model |
| Sheets and Views |
| Model |
00 0102-BSD-Project Information and Summary-07-05-2021
| 2021-07-05T16:05:56-0500 | |
| David Donovan |
File details come from the government source that posted it. Updated .