Pre-Bid slides Elect Distro.ppt
PPT presentation 431 KB Posted
- Attached to
- Repair Electrical Distribution
- Solicitation number
- W50S6N-20-B-0003
About this file
This document provides details for a federal contract solicitation to repair the electrical distribution system at an Air National Guard facility in Montgomery, Alabama. The solicitation seeks services to remove existing overhead primary distribution lines and structures and replace them with a new underground primary distribution system using directional boring. Ancillary work includes reconnecting and replacing facility transformers, installing new secondary service laterals and facility service entrance panels, installing new switches, sectionalizing cabinets, hand holes and pull boxes, and documenting the new underground lines. Additional scope includes installing new street, parking lot, flight line and metering lighting. The contract is set aside for small businesses with a revenue size standard of $39.5 million. The quote due date is September 15, 2020. The contract period of performance is 270 calendar days from notice to proceed. The solicitation and plans are available at the Beta SAM website. The wage determination is AL20200087 dated January 3, 2020. The contracting agency is the Department of the Army Alabama Army National Guard.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S6N-20-B-0003
REPAIR ELECTRICAL DISTRIBUTION
| SITE VISIT CONFERENCE |
| DATE: 26 August 2020 |
| Location of Project: |
| 187th Fighter Wing |
| Montgomery, Alabama |
INTRODUCTIONS
| Contracting Officer (KO) |
| Mr. Craig Kast (Primary) |
| Mr. Stephen Shanks (Modifications less than $250,000) |
| Contracting Specialist (CS) |
| Mr. Stephen Shanks |
| Contracting Officer Representative (COR) |
| Capt Nathan Brock (Primary) |
| Maj William Sanford (Alternate) |
| Maj Adam Sanders (Alternate) |
INTRODUCTION
| Your Name |
| Company |
| Your Position in Company |
| Are you a Prime or a Subcontractor |
PROJECT OVERVIEW
| Project scope includes removal of existing overhead electrical distribution line and support structures and installation of new underground electrical distribution systems. |
| Magnatude: $1,000,000 and $5,000,000 |
| 100% Small Business Set-Aside |
| NAICS: 237130 |
| Size standard: $39,500,000 average annual revenue |
| Place of Performance |
| 187th Fighter Wing |
| Montgomery AL |
SOLICITATION, PLANS &
SPECIFICATIONS
Most Current: Dated 14 July 2020
On The Web - https://sam.beta.gov Contract Opportunities Solicitation Exhibits Questions & Answers Document Amendments Check Regularly & Refresh Web Page
SOLICITATION, PLANS
& SPECIFICATIONS
Export Controlled Material Company must be certified (via an approved DD Form 2345 by the Joint Certification Program (JCP) administered by the Defense Logistics Information Service (DLIS) Questions about this program or DD Form 2345 should be addressed to:
U.S./Canada Joint Certification Office DLA Logistics Information Services Federal Center, 74 Washington Ave., North Battle Creek, MI USA 49037-3084
Phone: (800) 352-3572 Email: jcp-admin@dla.mil
PERIOD OF PERFORMANCE
Construction Period Is 270 Calendar Days After Receiving The Notice To Proceed
DISCLAIMER
Offerors Are Strongly Cautioned To Carefully Read The Requirements Of The Solicitation And Comply Accordingly
WHAT YOU MUST SUBMIT
Bid in accordance with solicitation on Contract Opportunities.
2 bid items. Put price or input $0.00 or line through. Do not leave any blanks Section 00600 Representations and Certifications. Fill out all representations and include with bid package.
Bid Bonds
QUOTE DUE DATE
Quotes Due: 2:00 pm (local) 15 SEPTEMBER 2020 No Facsimile Offers Send or deliver to:
187th Fighter Wing Base Contracting Office, Bldg. 1502 Attn: Stephen Shanks 5187 Selma Highway Montgomery, AL 36108
Late bids WILL NOT be accepted.
BID EVALUATION
| Award will be made to the responsible bidder whose Bid conforms to the IFB and is most advantageous to the Government considering only price and price related factors |
| Government will use all available systems for making responsibility determination. |
www.SAM.gov www.CPARS.gov PPIRS-Past Performance Information Retrieval System.
Wage Determination for this Project under Davis Bacon Wage Rates AL20200087 dated 01/03/2020 10 days before closing Wage Determination will be checked for changes/updates.
If there is a change, it will be added as an amendment.
WAGE DETERMINATION
IMPORTANT REMINDERS
Submit a Complete Bid In Accordance With Instructions Be sure to acknowledge all amendments issued to beta.sam.gov, page 2, section 19 of the SF 1442 Sign and Date Bid, page 2, blocks 20A, 20B and 20C of SF 1442 Non-responsive Bids will be excluded from award Discussions will NOT be held
QUESTIONS/RFIs Submit Questions NLT COB 3 September 2020 Questions Received After 3 September 2020 may be held and addressed after bid close date.
ANSWER TO QUESTIONS
All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site https://www.beta.sam.gov/ Contract Oppotunities If Necessary Addendums, Issued By An Amendment, Will Also Be Posted Check Web Site Regularly And Don’t Forget To Refresh Web Page
WEBSITES
www.beta.sam.gov (to download RFP, plans and specs) www.sam.gov (be sure you are registered and current) www.piee.eb.mil (Wide Area Workflow) Make sure you are current and registered to submit invoices and receive electronic payment
QUESTIONS
File details come from the government source that posted it. Updated .