Pre-Bid slides Elect Distro.ppt

PPT presentation 431 KB Posted

Attached to
Repair Electrical Distribution
Solicitation number
W50S6N-20-B-0003
Issued by

About this file

This document provides details for a federal contract solicitation to repair the electrical distribution system at an Air National Guard facility in Montgomery, Alabama. The solicitation seeks services to remove existing overhead primary distribution lines and structures and replace them with a new underground primary distribution system using directional boring. Ancillary work includes reconnecting and replacing facility transformers, installing new secondary service laterals and facility service entrance panels, installing new switches, sectionalizing cabinets, hand holes and pull boxes, and documenting the new underground lines. Additional scope includes installing new street, parking lot, flight line and metering lighting. The contract is set aside for small businesses with a revenue size standard of $39.5 million. The quote due date is September 15, 2020. The contract period of performance is 270 calendar days from notice to proceed. The solicitation and plans are available at the Beta SAM website. The wage determination is AL20200087 dated January 3, 2020. The contracting agency is the Department of the Army Alabama Army National Guard.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S6N-20-B-0003

REPAIR ELECTRICAL DISTRIBUTION

SITE VISIT CONFERENCE
DATE: 26 August 2020
Location of Project:
187th Fighter Wing
Montgomery, Alabama

INTRODUCTIONS

Contracting Officer (KO)
Mr. Craig Kast (Primary)
Mr. Stephen Shanks (Modifications less than $250,000)
Contracting Specialist (CS)
Mr. Stephen Shanks
Contracting Officer Representative (COR)
Capt Nathan Brock (Primary)
Maj William Sanford (Alternate)
Maj Adam Sanders (Alternate)

INTRODUCTION

Your Name
Company
Your Position in Company
Are you a Prime or a Subcontractor

PROJECT OVERVIEW

Project scope includes removal of existing overhead electrical distribution line and support structures and installation of new underground electrical distribution systems.
Magnatude: $1,000,000 and $5,000,000
100% Small Business Set-Aside
NAICS: 237130
Size standard: $39,500,000 average annual revenue
Place of Performance
187th Fighter Wing
Montgomery AL

SOLICITATION, PLANS &

SPECIFICATIONS

Most Current: Dated 14 July 2020

On The Web - https://sam.beta.gov Contract Opportunities Solicitation Exhibits Questions & Answers Document Amendments Check Regularly & Refresh Web Page

SOLICITATION, PLANS

& SPECIFICATIONS

Export Controlled Material Company must be certified (via an approved DD Form 2345 by the Joint Certification Program (JCP) administered by the Defense Logistics Information Service (DLIS) Questions about this program or DD Form 2345 should be addressed to:

U.S./Canada Joint Certification Office DLA Logistics Information Services Federal Center, 74 Washington Ave., North Battle Creek, MI USA 49037-3084

Phone: (800) 352-3572 Email: jcp-admin@dla.mil

PERIOD OF PERFORMANCE

Construction Period Is 270 Calendar Days After Receiving The Notice To Proceed

DISCLAIMER

Offerors Are Strongly Cautioned To Carefully Read The Requirements Of The Solicitation And Comply Accordingly

WHAT YOU MUST SUBMIT

Bid in accordance with solicitation on Contract Opportunities.

2 bid items. Put price or input $0.00 or line through. Do not leave any blanks Section 00600 Representations and Certifications. Fill out all representations and include with bid package.

Bid Bonds

QUOTE DUE DATE

Quotes Due: 2:00 pm (local) 15 SEPTEMBER 2020 No Facsimile Offers Send or deliver to:

187th Fighter Wing Base Contracting Office, Bldg. 1502 Attn: Stephen Shanks 5187 Selma Highway Montgomery, AL 36108

Late bids WILL NOT be accepted.

BID EVALUATION

Award will be made to the responsible bidder whose Bid conforms to the IFB and is most advantageous to the Government considering only price and price related factors
Government will use all available systems for making responsibility determination.

www.SAM.gov www.CPARS.gov PPIRS-Past Performance Information Retrieval System.

Wage Determination for this Project under Davis Bacon Wage Rates AL20200087 dated 01/03/2020 10 days before closing Wage Determination will be checked for changes/updates.

If there is a change, it will be added as an amendment.

WAGE DETERMINATION

IMPORTANT REMINDERS

Submit a Complete Bid In Accordance With Instructions Be sure to acknowledge all amendments issued to beta.sam.gov, page 2, section 19 of the SF 1442 Sign and Date Bid, page 2, blocks 20A, 20B and 20C of SF 1442 Non-responsive Bids will be excluded from award Discussions will NOT be held

QUESTIONS/RFIs Submit Questions NLT COB 3 September 2020 Questions Received After 3 September 2020 may be held and addressed after bid close date.

ANSWER TO QUESTIONS

All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site https://www.beta.sam.gov/ Contract Oppotunities If Necessary Addendums, Issued By An Amendment, Will Also Be Posted Check Web Site Regularly And Don’t Forget To Refresh Web Page

WEBSITES

www.beta.sam.gov (to download RFP, plans and specs) www.sam.gov (be sure you are registered and current) www.piee.eb.mil (Wide Area Workflow) Make sure you are current and registered to submit invoices and receive electronic payment

QUESTIONS

File details come from the government source that posted it. Updated .