Addendum 2.pdf

PDF 92 KB Posted

Attached to
Repair Electrical Distribution
Solicitation number
W50S6N-20-B-0003
Issued by

About this file

This document contains an addendum to plans and specifications for a federal contract opportunity to repair an electrical distribution system, as well as details of the related federal contract opportunity.

Addendum 2 to the repair of the Electrical Distribution System project at the 187 Fighter Wing in Montgomery, AL provides revisions to the contract duration and electrical details. The contract duration is changed to 425 calendar days from notice to proceed to substantial completion, plus 30 additional days for punch list completion. The general note for pad-mounted transformer pad installation is also updated to require the contractor to furnish and install two-inch by 10-foot galvanized ground rods and number 2/0 copper ground bus wire.

The related federal contract opportunity posted on the Federal Business Opportunities website seeks services to provide all labor, materials, equipment and supervision necessary to remove existing overhead primary distribution lines and structures and replace the existing system with an underground primary distribution system. Ancillary work will also be required to provide a complete operational electrical distribution system. The solicitation is issued by the Department of the Army Alabama Army National Guard for the repair of the Electrical Distribution System at the 187 Fighter Wing in Montgomery, Alabama.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 8 September 2020

To: Mr. Stephen Shanks

Subject: ADDENDUM NO. 2

Project: REPAIR ELECTRICAL DISTRIBUTION

Job #: SSL# 15227

ANG# FAKZ162003

From: David Donovan

The plans and Specifications of the subject project, dated 14 July 2020 are amended as follows: (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern)

Item No. 1: Refer to specification section 01 1000 “Summary.” Delete paragraph 1.03

“Contract Duration” and replace it with the following:

1.03 CONTRACT DURATION

A. 425 calendar days from notice to proceed to substantial completion, this is in addition to 30 days for the punch list to be completely accomplished.

Item No. 2: Refer to drawing sheet E4.1 “ Electrical Details.” Delete general note 3 on detail 1 “Detail – Pad-Mounted Transformer Pad Installation” and replace it with the following:

3. Two ¾ inch x 10 foot galvanized ground rods and #2/0 copper ground bus wire to be furnished and installed by the Contractor.

End of Addendum #2