About this file

This document is a 100% Type B3 submittal for the construction of a new Security Building at the 117th Air Refueling Wing in Birmingham, Alabama. The project, identified as BRKR009063, includes site work, subgrade excavation, building foundations, architectural, plumbing, mechanical, electrical, and relocation of existing utilities for a new approximately 9,941 square foot building. The project magnitude is between $5,000,000 - $10,000,000. The NAICS code is 236220 with a small business size standard of $45,000,000. This award is 100% set aside for small businesses, and the contract will be awarded to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the government considering only price and price-related factors. A pre-bid conference will be held on July 18, 2024 at 10:00 am Central Time at the project site.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS,

OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

Volume II Specifications for the

A New Security Building at

Birmingham IAP (ANG)

Birmingham, Alabama

Type B3 (100%) Submittal – Volume II

Date: June 2024

Job No: 12072/BRKR 009063

Set No:

TABLE OF CONTENTS 00 0100 - 1

A New Security Building BRKR009063/12207 Type B3 (100%) Submittal 117th Air Refueling Wing, Birmingham, AL June 2024

SECTION 00 0100 – TABLE OF CONTENTS

VOLUME I

DIVISION 00 – PROJECT INFORMATION

00 0100 TABLE OF CONTENTS 6

00 0102 PROJECT INFORMATION AND SUMMARY 8

DIVISION 01 – GENERAL REQUIREMENTS

01 0450 CUTTING AND PATCHING 5

01 0500 FIELD ENGINEERING 3

01 2000 PRICE AND PAYMENT PROCEDURES 4

01 2300 BID OPTIONS 4

01 3000 ADMINISTRATIVE REQUIREMENTS 10

01 3001 SUBMITTALS 7

- SUBMITTAL REGISTER 23

01 3514.01 LEED-NC 2009 CREDIT SUMMARY 8

01 3553 SECURITY PROCEDURES 2

01 4000 QUALITY REQUIREMENTS 7

01 4100 REGULATORY REQUIREMENTS 3

01 4217 DEFINITIONS AND STANDARDS 3

01 5000 TEMPORARY FACILITIES AND CONTROLS 4

01 5100 TEMPORARY UTILITIES 3

01 5213 FIELD OFFICES AND SHEDS 2

01 5460 SAFETY AND HEALTH 5

01 5500 VEHICULAR ACCESS AND PARKING 3

01 5719 TEMPORARY ENVIRONMENTAL CONTROLS 9

01 6000 PRODUCT REQUIREMENTS 9

01 6116 VOLATILE ORGANIC COMPOUND CONTENT RESTRICTIONS 6

01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 9

01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 6

01 7800 CLOSEOUT SUBMITTALS 7

01 7900 DEMONSTRATION AND TRAINING 5

01 9113 GENERAL COMMISSIONING REQUIREMENTS 15

DIVISION 02 – EXISTING CONDITIONS

02 4100 DEMOLITION 5

02 7110 FOUNDATION DRAINAGE SYSTEMS 7

DIVISION 03 – CONCRETE

03 3000 CAST-IN-PLACE CONCRETE 30

DIVISION 04 – MASONRY

04 2000 UNIT MASONRY 15

04 7200 CAST STONE MASONRY 8

TABLE OF CONTENTS 00 0100 - 2

DIVISION 05 – METALS

05 1200 STRUCTURAL STEEL FRAMING 8

05 2100 STEEL JOIST FRAMING 5

05 3100 STEEL DECKING 7

05 4000 COLD-FORMED METAL FRAMING 7

05 4400 COLD-FORMED METAL TRUSSES 7

05 5000 METAL FABRICATIONS 10

05 5213 PIPE AND TUBE RAILINGS 5

DIVISION 06 – WOODS, PLASTICS, AND COMPOSITES

06 1000 ROUGH CARPENTRY 8

06 4100 ARCHITECTURAL WOOD CASEWORK 7

06 8316 FIBERGLASS REINFORCED PANELING 4

DIVISION 07 – THERMAL & MOISTURE PROTECTION

070100 SPECIAL PROJECT ROOFING WARRANTY 3

07 2100 THERMAL INSULATION 6

07 2119 SPRAY FOAM INSULATION 6

07 2500 WEATHER BARRIERS 16

07 4113 METAL ROOF PANELS 14

07 4213 RIBBED METAL WALL PANELS 10

07 4293 METAL SOFFIT PANELS 8

07 4800 CONTINUOUS INSULATION CHANNELS 9

07 6200 SHEET METAL FLASHING AND TRIM 7

07 6500 WALL FLASHING 8

07 7100 ROOF SPECIALTIES 10

07 9005 JOINT SEALERS 12

DIVISION 08 – OPENINGS

08 1113 HOLLOW METAL DOORS AND FRAMES 15

08 1416 FLUSH WOOD DOORS 6

08 3100 ACCESS DOORS AND PANELS 4

08 3459 WEAPONS VAULT DOOR 6

08 3600 SECTIONAL OVERHEAD DOORS 4

08 4113 ALUMINUM-FRAMED ENTRANCES 9

08 4413 GLAZED ALUMINUM CURTAIN WALLS 11

08 5200 BLAST RESISTANT ALUMINUM WINDOW SYSTEMS 15

08 7100 DOOR HARDWARE 18

08 8000 GLAZING 7

TABLE OF CONTENTS 00 0100 - 3

VOLUME II

DIVISION 09 – FINISHES

09 0561 COMMON WORK RESULTS FOR FLOORING PREPARATION 8

09 2116 GYPSUM BOARD ASSEMBLIES 10

09 3000 TILING 12

09 5100 ACOUSTICAL CEILINGS 8

09 6500 RESILIENT BASE 5

09 6519 RESILIENT TILE FLOORING 10

09 6813 TILE CARPETING 5

09 9113 EXTERIOR PAINTING 8

09 9123 INTERIOR PAINTING 13

DIVISIONS 10 – SPECIALTIES

10 1400 SIGNAGE 5

10 2113 STAINLESS STEELTOILET COMPARTMENTS 8

10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 10

10 4400 FIRE PROTECTION SPECIALTIES 3

10 8500 SPECIALTIES 2

DIVISION 11 – EQUIPMENT

11 3013 RESIDENTIAL APPLIANCES 3

DIVISION 12 – FURNISHINGS

12 2115 OPERABLE MESH SHADES 9

12 3600 COUNTERTOPS AND WINDOW SILLS 5

12 4813 ENTRANCE FLOOR MATS AND FRAMES 3

12 9313 BICYCLE RACKS 3

DIVISION 21 – FIRE SUPPRESSION SYSTEMS

21 0513 COMMON MOTOR REQUIREMENTS FOR FIRE SUPPRESSION EQUIPMENT 3

21 0517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 6

21 0518 ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING 3

21 0523 GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING 8

21 0529 HANGERS AND SUPPORTS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 9

21 0553 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 5

21 1119 FIRE DEPARTMENT CONNECTIONS 4

21 1313 WET-PIPE SPRINKLER SYSTEMS 22

TABLE OF CONTENTS 00 0100 - 4

DIVISION 22 – PLUMBING

22 0510 BASIC MECHANICAL REQUIREMENTS 5

22 0511 BASIC MECHANICAL MATERIALS AND METHODS 9

22 0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 3

22 0517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 6

22 0518 ESCUTCHEONS FOR PLUMBING PIPING 3

22 0519 METERS AND GAGES FOR PLUMBING PIPING 10

22 0523.12 BALL VALVES FOR PLUMBING PIPING 13

22 0523.14 CHECK VALVES FOR PLUMBING PIPING 11

22 0523.15 GATE VALVES FOR PLUMBING PIPING 7

22 0529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 15

22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 7

22 0719 PLUMBING PIPING INSULATION 24

22 0800 COMMISSIONING OF PLUMBING 6

22 1116 DOMESTIC WATER PIPING 17

22 1119 DOMESTIC WATER PIPING SPECIALTIES 15

22 1123.21 INLINE, DOMESTIC-WATER PUMPS 8

22 1123 FACILITY NATURAL-GAS PIPING 24

22 1316 SANITARY WASTE AND VENT PIPING 14

22 1319.13 SANITARY DRAINS 3

22 1319 SANITARY WASTE PIPING SPECIALTIES 7

22 3400 FUEL-FIRED, DOMESTIC-WATER HEATERS 20

22 4213.13 COMMERCIAL WATER CLOSETS 5

22 4213.16 COMMERCIAL URINALS 6

22 4216.13 COMMERCIAL LAVATORIES 8

22 4216.16 COMMERCIAL SINKS 9

22 4223 COMMERCIAL SHOWERS 4

22 4500 EMERGENCY PLUMBING FIXTURES 5

22 4716 PRESSURE WATER COOLERS 5

TABLE OF CONTENTS 00 0100 - 5

VOLUME III

DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING

23 0510 BASIC MECHANICAL REQUIREMENTS 5

23 0511 BASIC MECHANICAL MATERIALS AND METHODS 9

23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 3

23 0517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 7

23 0518 ESCUTCHEONS FOR HVAC PIPING 3

23 0519 METERS AND GAGES FOR HVAC PIPING 9

23 0523.11 GLOBE VALVES FOR HVAC PIPING 5

23 0523.12 BALL VALVES FOR HVAC PIPING 11

23 0523.13 BUTTERFLY VALVES FOR HVAC PIPING 5

23 0523.15 GATE VALVES FOR HVAC PIPING 6

23 0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13

23 0533 HEAT TRACING FOR HVAC PIPING - NEED FROM MASTERSPEC 5

23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 8

23 0593 TESTING, ADJUSTING, AND BALANCING 8

23 0713 DUCT INSULATION 25

23 0719 HVAC PIPING INSULATION 22

23 0800 COMMISSIONING OF HVAC 3

23 0923 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC 57

23 0993.11 SEQUENCE OF OPERATIONS FOR HVAC DDC 35

23 2113 HYDRONIC PIPING 14

23 2116 HYDRONIC PIPING SPECIALTIES 7

23 2123 HYDRONIC PUMPS 13

23 2300 REFRIGERANT PIPING 14

23 2513 WATER TREATMENT FOR CLOSED-LOOP HYDRONIC SYSTEMS 6

23 3113 METAL DUCTS 25

23 3300 DUCT ACCESSORIES 6

23 3600 AIR TERMINAL UNITS 6

23 3713 AIR OUTLETS AND INLETS 6

23 5216 CONDENSING BOILERS 9

23 7313.13 INDOOR, BASIC AIR-HANDLING UNITS 13

23 8126 SPLIT SYSTEM AIR CONDITIONERS 6

23 8239.19 WALL AND CEILING UNIT HEATERS 3

DIVISION 26 – ELECTRICAL

26 0513 MEDIUM VOLTAGE CABLES 6

26 0518 BASIC ELECTRICAL MATERIALS AND METHODS 9

26 0519 CONDUCTORS AND CABLES 4

26 0526 GROUNDING AND BONDING 5

26 0533 RACEWAYS AND BOXES 6

26 1219 LIQUID-FILLED, MEDIUM VOLTAGE TRANSFORMERS 6

26 2416 PANELBOARDS 6

26 2726 WIRING DEVICES 5

26 2813 FUSES 2

26 2816 DISCONNECT SWITCHES 3

26 5100 INTERIOR LIGHTING 9

26 5600 EXTERIOR LIGHTING 7

TABLE OF CONTENTS 00 0100 - 6

DIVISION 27 – COMMUNICATIONS

27 0525 COMMUNICATIONS AND DATA-PROCESSING EQUIPMENT 15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

26 3111 FIRE ALARM AND MASS NOTIFICATION 31

DIVISION 31 – EARTHWORK

31 0010 SITE PROTECTION 4

31 0200 TEMPORARY EROSION AND SEDIMENT CONTROL 11

31 1001 SITE CLEARING 4

31 2210 EARTHWORK 13

- GEOTECHNICAL REPORT 50

31 3116 TERMITE CONTROL 3

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 0116 COLD MILLING (PLANNING) OF EXISTING BITUMINOUS PAVEMENTS 3

32 1217 ASPHALT CONCRETE PAVING 4

32 1314 CEMENT CONCRETE PAVING 14

32 1720 PAVEMENT JOINT SEALANTS 5

32 1900 SIDEWALKS 3

32 3113 CHAIN LINK FENCING 4

32 3136 SECURITY BOLLARDS 3

32 3313 SITE BICYCLE RACKS 6

32 9219 SEEDING 5

DIVISION 33 – UTILITIES

33 1117 OUTSIDE WATER SYSTEM 7

33 3112 SANITARY SEWERAGE 7

33 4112 STORM DRAINAGE 7

33 7350 SITE NATURAL-GAS DISTRIBUTION 3

COMMON WORK RESULTS FOR FLOORING

PREPARATION

090561 - 1

SECTION 090561 - COMMON WORK RESULTS FOR FLOORING PREPARATION

PART 1 GENERAL

1.01 SECTION INCLUDES

A. This section applies to floors identified in Contract Documents that are receiving the following types of floor coverings: All specified testing will be provided by the contractor.

1. Resilient tile and sheet.

2. Carpet tile.

3. Thin-set ceramic tile and stone tile.

4. All other floor finishes as sepcified in individual sections.

B. Preparation of new concrete floor slabs for installation of floor coverings.

C. Testing of concrete floor slabs for moisture and alkalinity (pH).

D. Remediation of concrete floor slabs due to unsatisfactory moisture or alkalinity (pH) conditions.

1. Contractor shall perform all specified remediation of concrete floor slabs. If such remediation is indicated by testing agency's report and is due to a condition not under Contractor's control or could not have been predicted by examination prior to entering into the contract, a contract modification will be issued.

1.02 RELATED REQUIREMENTS

A. Section 014000 - Quality Requirements: Additional requirements relating to testing agencies and testing.

1.03 REFERENCE STANDARDS

A. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient

Flooring; 2021.

B. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of

Concrete Subfloor Using Anhydrous Calcium Chloride; 2016a.

C. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete

Floor Slabs Using in situ Probes; 2019a.

090561 - 2

1.04 ADMINISTRATIVE REQUIREMENTS

A. Coordinate scheduling of cleaning and testing, so that preliminary cleaning has been completed for at least 24 hours prior to testing.

1.05 SUBMITTALS

A. Testing Agency's Report:

1. Description of areas tested; include floor plans and photographs if helpful.

2. Summary of conditions encountered.

3. Moisture and alkalinity (pH) test reports.

4. Copies of specified test methods.

5. Recommendations for remediation of unsatisfactory surfaces.

6. Submit report to the Architect.

7. Submit report not more than two business days after conclusion of testing.

1.06 QUALITY ASSURANCE

A. Moisture and alkalinity (pH) testing shall be performed by an independent testing agency employed and paid by Contractor.

B. Testing Agency Qualifications: Independent testing agency experienced in the types of testing specified.

1. Submit evidence of experience consisting of at least 3 test reports of the type required, with project Owner's project contact information.

1.07 FIELD CONDITIONS

A. Maintain ambient temperature in spaces where concrete testing is being performed, and for at least 48 hours prior to testing, at not less than 65 degrees F (18 degrees C) or more than 85 degrees F (30 degrees C).

B. Maintain relative humidity in spaces where concrete testing is being performed, and for at least 48 hours prior to testing, at not less than 40 percent and not more than 60 percent.

090561 - 3

PART 2 PRODUCTS

PART 3 EXECUTION

3.01 CONCRETE SLAB PREPARATION

A. PROPER SURFACE PREPARATION INCLUDES THE FOLLOWING:

1. Removal of existing floor coatings

2. Decontamination of the concrete surface

3. Creation of surface profile

4. Repair of surface irregularities

B. DECONTAMINATION OF THE CONCRETE SURFACE

1. Decontamination of the concrete surface requires the removal of oils, grease, wax, fatty acids and other contaminants, and may be accomplished by the use of detergent scrubbing with a heavy duty cleaner/degreaser, low pressure water cleaning (less than 5,000 psi), steam cleaning, or chemical cleaning. The success of these methods is dependent upon the depth of penetration of the contaminant;

which is completely dependent upon the contaminant’s viscosity, the concrete’s permeability and the duration of exposure. Special care should be taken when preparing concrete at an "in use" facility for repair, replacement or an initial floor topping.

2. Test concrete substrate for moisture vapor emission using test methods recommended by manufacturer of flooring system being installed.

C. CREATION OF SURFACE PROFILE

090561 - 4

1. A. Creation of surface profile can be accomplished by a number of methods each utilizing a selection of tools, equipment and materials to accomplish the intended purpose, (See METHODS OF SURFACE PREPARATION below). Selection is dependent upon the type of surface to be prepared and the type of system to be installed. In addition, floors, trenches each have their own particular requirements.

The type and thickness of the selected flooring system also plays an important role in the selection process. Regardless of the method selected or tools employed, the contractor must provide a surface that will accept the application of flooring products and allow the mechanical bond of the flooring system securely to the concrete. The type of service the structure will be subjected to, will also help to define the degree of profile required. The surface profile is the measure of the average distance from the peaks of the surface to the valleys as seen through a cross sectional view of the surface of the concrete.

2. This dimension is defined pictorially and through physical samples in the ICRI

Technical Guideline No 03732, and is expressed as a Concrete Surface Profile number (CSP 1-9).

3. Methods of Surface Preparation

a. Depending upon conditions of the concrete one or more methods of surface preparation may be required. It is common for decontamination to precede mechanical preparation, and if necessary a second decontamination to follow.

b. The preferred methods for creation of a surface profile, including the removal of dirt, dust, laitance and curing compounds, is steel shotblasting, abrasive

(sand) blasting or scarifying. The steel shotblasting or vacuum blasting process is commonly referenced by equipment brand names, such as, Blastrac, Vacu-Blast, Shot-Blast, etc. Vertical and overhead surfaces, such as cove base, wall, and ceiling surfaces shall be prepared utilizing methods of grinding, scarifying, abrasive (sand) blasting, needle scaling, or vertical steel shotblasting. The following table provides a guide for the degree of surface profile required for the coating or overlay to be applied and the preparation methods used to generate each profile. Provide written instruction from manufacturer to the Government regarding profile requirements and recommended method for achieving profile.

Application Profile Preparation

Sealers 0-3 mils Detergent scrub Low-pressure Water

Acid Etching (not recommended)

Grinding

Thin Film 4-10 mils Grinding Abrasive Blast Steel

090561 - 5

Shot Blast

High Build 10-40 mils Abrasive Blast Steel Shot Blast

Scarifying

Self-Leveling 50 mils-1/8 inch Abrasive Blast Steel Shot Blast

Scarifying Needle Scaling

Polymer

Overlay

1/8-1/4 inch Abrasive Blast Steel Shot Blast

Scarifying Needle Scaling

Scabbling Flame Blasting

Milling/rotomilling

4. Other surface preparation methods are mentioned in ADDITONAL SURFACE

PREPARATION REFERENCES.

D. REPAIR OF SURFACE IRREGULARITIES

1. Repair of surface irregularities including bugholes, spalls, cracks, deteriorated joints, slopes, areas near transition zones, such as around drains, floor boxes, doorways, etc. must be repaired prior to the placement of the flooring system and/or the system must be designed to off-set the thickness of the irregularities.

For bugholes and other minor surface irregularities, fill using materials recommended by manufacturer of flooring system. For treatment of cracks and joints refer to the section below entitled “Crack Isolation”.

E. CRACK ISOLATION

1. The performance of elastomeric products, requires a relatively uniform dry film thickness to resist drying shrinkage and thermal movement of the concrete, while maintaining a seamless bridge or seal over the concrete. Therefore it is critical that all mortar splatter, protrusions, ridges, penetrations, or sharp projections in the surface of the concrete, be ground smooth or otherwise made smooth, in addition to the normal surface preparation outlined above.

2. Prior to application of an elastomeric system, control/contraction joints, construction joints, and cracks should be sealed with the selected system flexible sealant as recommended by manufacturer of flooring system. This coating should extend a minimum of 6” on either side of the joint or crack. The entire surface area should then receive the specified crack isolation system. Isolation and/or expansion joints should be detailed in accordance with the floor system manufacturer’s recommendations.

090561 - 6

3. General Polymer systems can be applied to a variety of substrates if the substrate is properly prepared. Preparation of surfaces other than concrete or steel, such as wood, concrete block, brick, quarry tile, glazed tile, cement terrazzo, vinyl composition tile, plastics and existing polymer systems, can be accomplished to receive bonded polymer sealers, coatings, or toppings. For questions regarding a substrate other than concrete or steel, or a condition not mentioned in this guideline, contact the product Technical Service Department prior to starting the project. For steel surfaces, refer to Guideline Instructions for Surface Preparation of Structural Steel, Form G-2.Repair of surface irregularities including bugholes, spalls, cracks, deteriorated joints, slopes, areas near transition zones, such as around drains, floor boxes, doorways, etc. must be repaired prior to the placement of the flooring system and/or the system must be designed to off-set the thickness of the irregularities.

F. ADDITIONAL SURFACE PREPARATION REFERENCES

1. Important and relevant information on surface preparation of concrete is available by referencing the following codes, standards, and guidelines.

a. SSPC The Society for Protective Coatings, 40 24th Street, 6th Floor, Pittsburgh, Pa. 15222-4643, (412) 281-2331.

1) SSPC-SP 13 Surface Preparation of Concrete

2) SSPC-TU 2/NACE 6G197 Design, Installation, and Maintenance of

Coating Systems for Concrete Used in Secondary Containment

b. ICRI International Concrete Repair Institute, 38800 Country Club Drive

Farmington Hills, MI 48331, (248) 848-3809

c. Technical Guideline No.03732, “Selecting and Specifying Concrete Surface

1) Preparation for Sealers, Coatings, and Polymer Overlays”. Includes visual standards to act as a guide in defining acceptable surface profiles for the application of industrial coatings and polymer floor toppings.

2) Technical Guideline No.03730, “Guide for Surface Preparation for the

Repair of Deteriorated Concrete Resulting from Reinforcing Steel

Corrosion”.

d. ASTM American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959, (610) 832-9585

1) ASTM D 4258 “Practice for Surface Cleaning Concrete for Coating”

090561 - 7

2) ASTM D 4260 “Standard Practice for Acid Etching Concrete”

3) ASTM D 4261 “Practice for Surface Cleaning Unit Masonry for Coating”

4) ASTM D 4262 “Test Method for pH of Chemically Cleaned or Etched

Concrete Surfaces”The performance of elastomeric products, requires a relatively uniform dry film thickness to resist drying shrinkage and thermal movement of the concrete, while maintaining a seamless bridge or seal over the concrete. Therefore it is critical that all mortar splatter, protrusions, ridges, penetrations, or sharp projections in the surface of the concrete, be ground smooth or otherwise made smooth, in addition to the normal surface preparation outlined above.

3.02 MOISTURE VAPOR EMISSION TESTING

A. Where the floor covering manufacturer's requirements conflict with either the referenced test method or this specification, comply with the manufacturer's requirements.

B. Where this specification conflicts with the referenced test method, comply with the requirements of this section.

C. Test in accordance with ASTM F1869 and as follows.

D. Plastic sheet test and mat bond test may not be substituted for the specified ASTM test method, as those methods do not quantify the moisture content sufficiently.

E. In the event that test values exceed floor covering manufacturer's limits, perform remediation as indicated. In the absence of manufacturer limits, perform remediation if test values exceed 3 pounds per 1000 square feet (1.4 kg per 93 square meters) per 24 hours.

F. Report: Report the information required by the test method.

3.03 INTERNAL RELATIVE HUMIDITY TESTING

A. Where the floor covering manufacturer's requirements conflict with either the referenced test method or this specification, comply with the manufacturer's requirements.

B. Where this specification conflicts with the referenced test method, comply with the requirements of this section.

C. Test in accordance with ASTM F2170 Procedure A and as follows.

090561 - 8

D. Testing with electrical impedance or resistance apparatus may not be substituted for the specified ASTM test method, as the values determined are not comparable to the

ASTM test values and do not quantify the moisture content sufficiently.

E. In the event that test values exceed floor covering manufacturer's limits, perform remediation as indicated. In the absence of manufacturer limits, perform remediation if any test value exceeds 75 percent relative humidity.

F. Report: Report the information required by the test method.

3.04 ALKALINITY TESTING

A. Where the floor covering manufacturer's requirements conflict with either the referenced test method or this specification, comply with the manufacturer's requirements.

B. The following procedure is the equivalent of that described in ASTM F710, repeated here for the Contractor's convenience.

C. Use a wide range alkalinity (pH) test paper, its associated chart, and distilled or deionized water.

D. Place several drops of water on a clean surface of concrete, forming a puddle approximately 1 inch (25 mm) in diameter. Allow the puddle to set for approximately

60 seconds, then dip the alkalinity (pH) test paper into the water, remove it, and compare immediately to chart to determine alkalinity (pH) reading.

E. In the event that test values exceed floor covering manufacturer's limits, perform remediation as indicated. In the absence of manufacturer limits, perform remediation if alkalinity (pH) test value is over 10.

END OF SECTION

GYPSUM BOARD ASSEMBLIES 092116 - 1

SECTION 092116 - GYPSUM BOARD ASSEMBLIES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Performance criteria for gypsum board assemblies.

B. Metal stud wall framing.

C. Metal channel ceiling framing.

D. Cementitious backing board.

E. Gypsum wallboard.

F. Non-acoutical joint treatment and accessories.

G. Acoustical wall and ceiling board.

H. Acoustical Joint Sealant

I. Acoustical Putty

J. Mold resistant gypsum wallboard

K. Materials included in this section shall meet the requirements for LEED for New

Construction points for the following Sections:

1. EQ Credit 4 - Low-Emitting Materials

2. MR Credt 4 - Recycled Content

3. MR Credit 5 - Regional Materials

4. The contractor is expected to understand the LEED requirements for these sections and include all applicable overhead in their base bid for the necessary documentation to achieve the above listed credits.

1.02 RELATED REQUIREMENTS

A. Section 01 3514.01 - LEED Credit Summary

B. Section 01 6000 - Product Requirements

C. Section 01 6116 - Volatile Organic Compound (VOC) Content Restrictions

D. Section 054000 - Cold-Formed Metal Framing: Exterior wind-load-bearing metal stud framing.

GYPSUM BOARD ASSEMBLIES 092116 - 2

E. Section 061000 - Rough Carpentry: Wood blocking product and execution requirements.

F. Section 072100 - Thermal Insulation : Batt insulation.

G. Section 09 3000 - Tiling

H. Section 078400 - Firestopping: Top-of-wall assemblies at fire rated walls.

I. Section 079200 - Joint Sealants: Sealing acoustical gaps in construction other than gypsum board or plaster work.

1.03 REFERENCE STANDARDS

A. ANSI A108.11 - American National Standard Specifications for Interior Installation of

Cementitious Backer Units; 2018.

B. ASTM C473 - Standard Test Methods for Physical Testing of Gypsum Panel Products.

C. ASTM C475/C475M - Standard Specification for Joint Compound and Joint Tape for

Finishing Gypsum Board; 2017.

D. ASTM C645 - Standard Specification for Nonstructural Steel Framing Members; 2018.

E. ASTM C754 - Standard Specification for Installation of Steel Framing Members to

Receive Screw-Attached Gypsum Panel Products; 2020.

F. ASTM C840 - Standard Specification for Application and Finishing of Gypsum Board;

2020.

G. ASTM C 919 - Standard Practice for use of Sealants in Acoustical Applications.

H. ASTM C1047 - Standard Specification for Accessories For Gypsum Wallboard and

Gypsum Veneer Base; 2019.

I. ASTM C1288 - Standard Specification for Discrete Non-Asbestos Fiber-Cement

Interior Substrate Sheets; 2017.

J. ASTM C1396/C1396M - Standard Specification for Gypsum Board; 2017.

K. ASTM D3273 - Standard Test Method for Resistance to Growth of Mold on the

Surface of Interior Coatings in an Environmental Chamber; 2016.

L. ASTM E90 - Standard Test Method for Laboratory Measurement of Airborne Sound

Transmission Loss of Building Partitions and Elements; 2009 (Reapproved 2016).

M. ASTM E413 - Classification for Rating Sound Insulation; 2016.

GYPSUM BOARD ASSEMBLIES 092116 - 3

N. GA-216 - Application and Finishing of Gypsum Panel Products; 2018.

O. GA-600 - Fire Resistance and Sound Control Design Manual, 22nd edition; 2018.

P. UL (FRD) - Fire Resistance Directory; Current Edition.

1.04 SUBMITTALS

A. See Section 01 3001 - Submittals for Submittal procedures.

B. Shop Drawings: Indicate special details associated with fireproofing and acoustic seals .

C. Product Data: Provide data on metal framing, gypsum board, accessories, and joint finishing system.

D. Test Reports: For stud framing products that do not comply with ASTM C645 or

ASTM C754, provide independent laboratory reports showing maximum stud heights at required spacings and deflections.

E. Sustainability Submittals, Product data for LEEDCompliance:

1. MR Credit 4 - Recycled Content

a. For products having recycled content, provide documentation indicating percentages by weight of postconsumer and pre-consumer recycled content.

1) Include statement indicating costs (sell price for each product having recycled content)

2) Include the total weight of products provided

2. MR Credit 5: Regional Materials: For all materials in this specification indicated to achieve this credit, submit following:

a. Indicate location of manufacturing facility; indicate distance between manufacturing and the project site.

b. Indicate location of extraction, harvesting, and recovery; indicate distance between extraction, harvesting, ad recovery and the project site.

3. For products having Biologically Based Products, documentation indicating percentages of Biologically-Based Products

4. For products containing VOCs, documentation (material safety data sheets

(MSDS), third-party certificates, or test reports) showing printed statement of

VOC content.

GYPSUM BOARD ASSEMBLIES 092116 - 4

5. VOC Content Limitations: For the specified products, submit documentation of conformance with Specification Section 01 6116 – Volatile Organic Compound

(VOC) Content Restrictions.

1.05 QUALITY ASSURANCE

A. Installer Qualifications: Company specializing in performing gypsum board installation and finishing , with minimum 5 years of experience .

B. Copies of Documents at Site: Maintain at the project site a copy of each referenced document that prescribes execution requirements.

1.06 MOCK UP

A. Provide mock up per Section 01 4000.

1.07 SUSTAINABILITY REQUIREMENTS

A. Contractor shall endeavor to provide materials with a high recycled content:

1. See Part 2 of this specification section for specific recycled content thresholds, if applicable.

B. Contractor shall give preference to products extracted and / or manufacturered within

500 miles of the project meeting the requirements of LEED MR Credit 5.

C. Contractor shall endeavor to provide materials with lowest possible VOC content.

PART 2 PRODUCTS

2.01 GYPSUM BOARD ASSEMBLIES

A. Provide completed assemblies complying with ASTM C840 and GA-216.

B. Interior Partitions : Provide completed assemblies with the following characteristics:

1. Acoustic Attenuation: [Noise Isolation Class (NIC) of 30 minimum].

2.02 METAL FRAMING MATERIALS ( for interior partitions, refer to drawings for width & height)

A. Non-Loadbearing Framing System Components: ASTM C645; galvanized sheet steel, of size and properties necessary to comply with ASTM C754 for the spacing indicated, with maximum deflection of wall framing of L/120 at 5 psf (L/120 at 240 Pa).

1. Studs: "C" shaped with flat or formed webs with knurled faces.

2. Furring: Hat-shaped sections, minimum depth of 7/8 inch (22 mm).

GYPSUM BOARD ASSEMBLIES 092116 - 5

3. Resilient Furring Channels: Single or double leg configuration; 1/2 inch (12 mm) channel depth.

a. Products:

1) Same manufacturer as other framing materials.

B. Ceiling Hangers: Type and size as specified in ASTM C754 for spacing required.

C. Partition Head to Structure Connections: Provide mechanical anchorage devices that accommodate deflection using slotted holes, screws and anti-friction bushings, preventing rotation of studs while maintaining structural performance of partition.

1. Structural Performance: Maintain lateral load resistance and vertical movement capacity required by applicable code, when evaluated in accordance with AISI

S100-12.

D. LEED Requirements

1. Recycled Content:

a. All steel products provided under this specification must meet or exceed the following recycled content thresholds. Submit product data substantiating recycled content as outlined in part 1.04 above.

1) Minimum post-consumer recycled content = 58%

2) Minimum pre-consumer recycled content = 8%

2. Regional Materials: All steel products provided under this specification should be extracted, harvested, and manufactured within 500 miles of the project site. Submit product data substantiating extraction, harvesting, and manufacturing locations as outlined in part 1.04 above. Products not meeting this requirement will not be considered.

2.03 BOARD MATERIALS

A. Gypsum Wallboard: Paper-faced gypsum panels as defined in ASTM C1396/C1396M;

sizes to minimize joints in place; ends square cut.

1. Application: Use for vertical surfaces and ceilings, unless otherwise indicated.

2. At Assemblies Indicated with Fire-Rating: Use type required by indicated tested assembly; if no tested assembly is indicated, use Type X board, UL or WH listed.

3. Thickness:

GYPSUM BOARD ASSEMBLIES 092116 - 6

a. Vertical Surfaces: 5/8 inch (16 mm) .

b. Ceilings: 5/8 inch (16 mm).

c. Multi-Layer Assemblies: Thicknesses as indicated on drawings.

4. Mold Resistant Paper Faced Products:

a. Resists mold growth per ASTM G21 with a score of 0.

b. Resists the growth of mold per ASTM D3273 with a score of 0.

c. Less than 5% water absorption per ASTM C473.

5. Biobased Content: For Gypsum Products: Minimum Biobased Content per USDA:

94%

B. Backing Board For Wet Areas: One of the following products:

1. Application: Surfaces behind tiling in areas including all areas shown on drawings to receive tiling as specified in Section 09 3000 Tiling. .

2. Mold Resistance: Score of 10, when tested in accordance with ASTM D3273.

3. ASTM Cement-Based Board: Non-gypsum-based, cementitious board complying with ASTM C1288.

a. Thickness: 5/8" (16mm).

C. LEED Requirements

1. Recycled Content: (applicable to see gypsum board products)

a. Gypsum products provided under this specification must meet or exceed the following recycled content thresholds. Submit product data substantiating recycled content as outlined in part 1.04 above.

1) Minimum post-consumer recycled content = 90%

2) Minimum pre-consumer recycled content = 4%

2. Regional Materials: All gypsum products provided under this specification should be extracted, harvested, and manufactured within 500 miles of the project site.

Submit product data substantiating extraction, harvesting, and manufacturing locations as outlined in part 1.04 above. Products not meeting this requirement will not be considered.

GYPSUM BOARD ASSEMBLIES 092116 - 7

2.04 ACCESSORIES

A. Acoustic Insulation: As specified in Section 072100. Provide in full height of all interior metal stud partitions. Match insulation thickness to depth of metal stud member.

B. Finishing Accessories: ASTM C1047, galvanized steel , unless noted otherwise.

1. Types: As detailed or required for finished appearance.

2. Special Shapes: In addition to conventional corner bead and control joints, provide U-bead at exposed panel edges.

C. Joint Materials: ASTM C475/C475M and as recommended by gypsum board manufacturer for project conditions.

1. Paper Tape: 2 inch (50 mm) wide, creased paper tape for joints and corners, except as otherwise indicated.

2. Ready-mixed vinyl-based joint compound.

D. Screws for Fastening of Gypsum Panel Products to Cold-Formed Steel Studs Less than

0.033 inch (0.84 mm) in Thickness and Wood Members: ASTM C1002; self-piercing tapping screws, corrosion resistant.

E. Screws for Fastening of Gypsum Panel Products to Steel Members from 0.033 to 0.112 inch (0.84 to 2.84 mm) in Thickness: ASTM C954; steel drill screws, corrosion resistant.

F. Anchorage to Substrate: Tie wire, nails, screws, and other metal supports, of type and size to suit application; to rigidly secure materials in place.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that project conditions are appropriate for work of this section to commence.

3.02 FRAMING INSTALLATION

A. Metal Framing: Install in accordance with ASTM C754 and manufacturer's instructions.

B. Suspended Ceilings and Soffits: Space framing and furring members as indicated.

GYPSUM BOARD ASSEMBLIES 092116 - 8

1. Laterally brace entire suspension system.

C. Studs: Space studs at 16 inches on center (at 406 mm on center).

1. Extend partition framing to structure in all locations .

2. Partitions Terminating at Structure: Attach extended leg top runner to structure, maintain clearance between top of studs and structure, and brace both flanges of studs with continuous bridging.

D. Openings: Reinforce openings as required for weight of doors or operable panels, using not less than double studs at jambs.

E. Standard Wall Furring: Install at concrete and masonry walls scheduled to receive gypsum board, not more than 4 inches (100 mm) from floor and ceiling lines and abutting walls. Secure in place on alternate channel flanges at maximum 24 inches (600

mm) on center.

1. Orientation: Horizontal.

F. Acoustic Furring: Install resilient channels at maximum 24 inches (600 mm) on center.

Locate joints over framing members.

G. Blocking: Install wood blocking for support of:

1. Framed openings.

2. Wall mounted cabinets.

3. Plumbing fixtures.

4. Toilet partitions.

5. Toilet accessories.

6. Wall mounted door hardware.

7. In all locations noted elsewhere

8. As required for the secure installation of any product to be attached to metal /stud gypsum partitions or ceilings

3.03 ACOUSTIC ACCESSORIES INSTALLATION

A. Acoustic Insulation: Place tightly within spaces, around cut openings, behind and around electrical and mechanical items within partitions, and tight to items passing through partitions.

GYPSUM BOARD ASSEMBLIES 092116 - 9

B. Refer to 07 2000.

3.04 BOARD INSTALLATION

A. Comply with ASTM C840, GA-216, and manufacturer's instructions. Install to minimize butt end joints, especially in highly visible locations.

B. Single-Layer Non-Rated: Install gypsum board in most economical direction, with ends and edges occurring over firm bearing.

1. Exception: Tapered edges to receive joint treatment at right angles to framing.

C. Double-Layer Non-Rated: Use gypsum board for first layer, placed parallel to framing or furring members, with ends and edges occurring over firm bearing. Use glass mat faced gypsum board at exterior walls and at other locations as indicated. Place second layer perpendicular to framing or furring members. Offset joints of second layer from joints of first layer.

D. Cementitious Backing Board: Install over steel framing members where indicated, in accordance with ANSI A108.11 and manufacturer's instructions.

E. Installation on Metal Framing: Use screws for attachment of gypsum board .

3.05 INSTALLATION OF TRIM AND ACCESSORIES

A. Control Joints: Place control joints consistent with lines of building spaces and as indicated.

1. Not more than 30 feet (10 meters) apart on walls and ceilings over 50 feet (16 meters) long.

B. Corner Beads: Install at external corners, using longest practical lengths.

C. Edge Trim: Install at locations where gypsum board abuts dissimilar materials.

3.06 JOINT TREATMENT

A. Paper Faced Gypsum Board: Use paper joint tape, bedded with ready-mixed vinyl-based joint compound and finished with ready-mixed vinyl-based joint compound.

B. Finish gypsum board in accordance with levels defined in ASTM C840, as follows:

1. Level 4: Walls and ceilings to receive paint finish or wall coverings, unless otherwise indicated.

2. Level 1: Wall areas above finished ceilings, whether or not accessible in the completed construction.

GYPSUM BOARD ASSEMBLIES 092116 - 10

C. Tape, fill, and sand exposed joints, edges, and corners to produce smooth surface ready to receive finishes.

1. Feather coats of joint compound so that camber is maximum 1/32 inch (0.8 mm).

2. Taping, filling, and sanding is not required at surfaces behind fixed cabinetry .

3. Taping, filling and sanding is not required at base layer of double layer applications.

3.07 TOLERANCES

A. Maximum Variation of Finished Gypsum Board Surface from True Flatness: 1/8 inch in 10 feet (3 mm in 3 m) in any direction.

TILING 093000 - 1

SECTION 093000 - TILING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Tile for floor applications.

B. Tile for wall applications.

C. Tile accessories.

D. Materials included in this section shall achieve LEED for New Construction v2009 points for the following credits:

1. MR Credit 4 Recycled Content (30%)

2. IEQ Credit 4.1 Low-Emitting Materials-Adhesives and Sealants

3. IEQ Credit 4.3 Low-Emitting Materials-Flooring Systems

4. The contractor is expected to understand the LEED documentation requirements for these credits and include all applicable overhead in their base bid for the necessary documentation to achieve the above listed credits.

1.02 RELATED REQUIREMENTS

A. Section 01 3514.01 - LEED Credit Summary.

B. Section 079200 - Joint Sealants: Sealing joints between tile work and adjacent construction and fixtures.

C. Section 092116 - Gypsum Board Assemblies: For Cementitious backer board for tiling applications.

D. Section 09 2116 - Gypsum Board Assemblies: Installation of tile backer board.

E. Section 01 6116 - Volatile Organic Compound (VOC) restrictions

F. Section 22 4000 - Plumbing Fixtures:

1.03 REFERENCE STANDARDS

A. ANSI A108/A118/A136.1 - American National Standard Specifications for the

Installation of Ceramic Tile (Compendium).; 2017.

B. ANSI A108.1a - American National Standard Specifications for Installation of Ceramic

Tile in the Wet-Set Method, with Portland Cement Mortar; 2017.

TILING 093000 - 2

C. ANSI A108.1b - Installation of Ceramic Tile on a Cured Portland Cement Mortar

Setting Bed with Dry-Set, Modified Dry-Set, or Improved Modified Dry-Set Cement

Mortar; 2023.

D. ANSI A108.1c - Contractor's Option: Installation of Ceramic Tile in the Wet-Set

Method with Portland Cement Mortar or Installation of Ceramic Tile on a Cured

Portland Cement Mortar Setting Bed with Dry-Set, Modified Dry-Set, or Improved

Modified Dry-Set Cement Mortar; 2023.

E. ANSI A108.4 - American National Standard Specifications for Installation of Ceramic

Tile with Organic Adhesive or Water Cleanable Tile-Setting Epoxy Adhesive; 2023.

F. ANSI A108.5 - Setting of Ceramic Tile with Dry-Set Cement Mortar, Modified Dry-

Set Cement Mortar, EGP (Exterior Glue Plywood) Modified Dry-Set Cement Mortar, or Improved Modified Dry-Set Cement Mortar; 2023.

G. ANSI A108.6 - American National Standard Specifications for Installation of Ceramic

Tile with Chemical Resistant, Water Cleanable Tile-Setting and -Grout Epoxy; 2023.

H. ANSI A108.8 - American National Standard Specifications for Installation of Ceramic

Tile with Chemical Resistant Furan Resin Mortar and Grout; 1999 (Reaffirmed 2019).

I. ANSI A108.9 - American National Standard Specifications for Installation of Ceramic

Tile with Modified Epoxy Emulsion Mortar/Grout; 2023.

J. ANSI A108.10 - American National Standard Specifications for Installation of Grout in

Tilework; 2017 (Reaffirmed 2022).

K. ANSI A108.12 - Installation of Ceramic Tile with EGP (Exterior Glue Plywood)

Modified Dry-Set Mortar; 2023.

L. ANSI A108.13 - American National Standard for Installation of Load Bearing, Bonded, Waterproof Membranes for Thin-Set Ceramic Tile and Dimension Stone; 2005

(Reaffirmed 2016).

M. ANSI A108.19 - American National Standard Specifications for Interior Installation of

Gauged Porcelain Tiles and Gauged Porcelain Tile Panels/Slabs by the Thin-Bed

Method Bonded with Modified Dry-Set Cement Mortar or Improved Modified Dry-Set

Cement Mortar; 2020.

N. ANSI A118.3 - American National Standard Specifications for Chemical Resistant, Water Cleanable Tile-Setting and -Grouting Epoxy and Water Cleanable Tile-Setting

Epoxy Adhesive; 2013 (Revised).

TILING 093000 - 3

O. ANSI A118.4 - American National Standard Specifications for Modified Dry-Set

Cement Mortar; 2012 (Revised).

P. ANSI A118.10 - American National Standard Specifications for Load Bearing, Bonded, Waterproof Membranes For Thin-Set Ceramic Tile And Dimension Stone Installation;

2014.

Q. TCNA (HB) - Handbook for Ceramic, Glass, and Stone Tile Installation; 2021.

1.04 ADMINISTRATIVE REQUIREMENTS

A. Preinstallation Meeting: Convene a preinstallation meeting one week before starting work of this section; require attendance by all affected installers.

1.05 SUBMITTALS

A. See Section 01 3001 - Submittals for Submittal procedures.

B. Product Data: Provide manufacturers' data sheets on tile, mortar, grout, and accessories.

Include instructions for using grouts and adhesives.

C. Maintenance Data: Include recommended cleaning methods, cleaning materials, and stain removal methods.

D. Samples: Mount tile (with specified mortar) and apply specified grout on plywood panels.

1. 24x24 for each tile type specified, illustrating patterns. Sample shall be numbered and receive written approval by the Government prior to proceeding.

E. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.

1. See Section 016000 - Product Requirements, for additional provisions.

2. Extra Tile: 1 percent of each size, color, and surface finish combination .

F. LEED Submittals:

1. Product data for Materials and Resources Credit 4: For products having recycled content, documentation indicating percentages by weight of postconsumer and pre-consumer recycled content.

a. Include statement indicating costs (sell price for each product having recycled content

b. Total weight of products provided.

TILING 093000 - 4

2. Product Data for Credit 4.1 Low-Emitting Materials-Adhesives and Sealants: For

Adhesives, including printed statement of VOC content.

3. Product Data for Credit 4.3 Low-Emitting Materials-Flooring Systems:

a. For hard surface flooring, documentation indicating compliance with

FloorScore standard as shown with testing by an independent third-party.

b. Tile setting adhesives and grout, documentation indicating compliance with

South Coast Air Quality Management District (SCAQMD).

1.06 QUALITY ASSURANCE

A. Maintain one copy of and ANSI A108/A118/A136.1 and TCNA (HB) on site.

B. Manufacturer Qualifications: Company specializing in manufacturing the types of products specified in this section, with minimum five years of documented experience.

C. Installer Qualifications: Company specializing in performing tile installation, with minimum of five years of documented experience.

1.07 MOCK-UP

A. See Section 014000 - Quality Requirements, for general requirements for mock-up.

B. Construct tile mock-up, utilizing approved samples incorporating all components specified for the location. Receive written approval by the Government and prior to proceeding.

1. Minimum size of mock-up is 100 S.F. and should include transitions of patterns/colors as selected by the Government.

2. Approved mock-up may remain as part of the Work.

1.08 DELIVERY, STORAGE, AND HANDLING

A. Protect adhesives from freezing or overheating in accordance with manufacturer's instructions.

1.09 FIELD CONDITIONS

A. Maintain ambient and substrate temperature of 50 degrees F (10 degrees C) during installation of mortar materials.

1.10 SUSTAINABILITY REQUIREMENTS

A. Contractor shall endeavor to provide materials with the lowest possible VOC content.

TILING 093000 - 5

B. Contractor shall endeavor to provide materials with a high recycled content:

1. See Part 2 of this specification section for specific recycled content thresholds, if applicable.

PART 2 PRODUCTS

2.01 TILE

A. Refer to drawings for types, sizes, configuration, and colors.

1. Substitutions: See Section 016000 - Product Requirements.

2. LEED Requirements

a. Recycled Materials: Ceramic products provided under this specification must meet or exceed the following recycled content thresholds. Submit product data substantiating recycled content as outlined in part 1.05 above.

1) Minimum pre-consumer recycled content = 44%

2.02 TRIM AND ACCESSORIES

A. Tile Trim: Matching Out & In Corners shapes in sizes coordinated with field tile. Refer to drawings.

1. Applications: Refer to drawings for details of metal trim. All metal trim to be stainlesss steel type.

2. Floor to Wall Joints: Cove base in color(s) indicated on the drawings. Field cut top of cove bases at conditions where wall tile is installed above cove base.

3. Top of Tile: Bullnosed pieces in color(s) indicated on the drawings.

B. Non-Ceramic Trim: Satin brass anodized extruded aluminum , style and dimensions as indicated on drawings , for setting using tile mortar or adhesive.

2.03 SETTING MATERIALS

A. Latex-Portland Cement Mortar Bond Coat: ANSI A118.4, ANSI A118.15

1. Product Properties:

a. ANSI A118.15, 7.2.5, 28 Day Cure Porcelain Tile Tear Strength: 475-575 psi

(3.3-4.0 MPa)

b. ANSI A118.15, 7.2.4, Shear Bond Porcelain Tile Water Immersion: 250-300 psi (1.7- 2.4 MPa)

TILING 093000 - 6

c. ANSI A118.15, 7.2.7, 28 Day Heat Aging Tile Shear Strength: 600-700 psi

(4.1-4.8 MPa)

d. ANSI A118.11, 4.1.2, 28 Day Cure Quarry Tile to Plywood Shear Bond:

250-300 psi (1.7-2.1 MPa)

e. ISO 13007-2, 4.4.2, 28 Day Cure Tensile Adhesive Strength: 1.8 - 2.6 MPa

(261-377 psi)

f. ISO 13007-2, 4.4.3, 7 Day Cure 21 Day Water Immersion Tensile Adhesive

Strength: 1.3-1.5 MPa (174-221 psi)

g. ISO 13007-2, 4.4.4, 14 Day Cure 14 Day Heat Age Tensile Adhesive

Strength: 2.4-3.0 MPa (345-438 psi)

h. ISO 13007-2, 4.4.5, 7 Day Cure, 21 Day Water Immersion 25 Freeze/Thaw

Cycle Tensile Adhesive Strength: 2-1.7 MPa (171-247 psi)

i. ISO 13007-2, 4.1, Open Time after 30 Minutes: 1.3-1.9 MPa (190-283 psi)

j. ISO 13007-2, 4.2, Slip: 0.5 mm (0.02 inches)

k. ISO 13007-2, 4.5, Transverse Deformation: 3.2-3.6 mm (0.13 - 0.14 inches)

l. Provide product meeting or exceeding applicable VOC content limitations of

LEED IEQ Credit 4.

2.04 MORTAR MATERIALS

A. Mortar Bed Materials: Portland cement, sandand water.

B. Mortar Bond Coat Materials:

1. Polymer Modified Portland Cement Base: ANSI A118.11, ANSI A118.15, ANSI

A118.4.

C. Must be recommended by manufacturer for specific use and acceptable with other specified products prior to ordering of material. Submit written recommendation for approval by the Government.

D. Provide product meeting or exceeding applicable VOC content limitations of LEED

IEQ Credit 4.

2.05 GROUTS

A. Epoxy Grout: ANSI A118.3 chemical resistant and water-cleanable epoxy grout.

TILING 093000 - 7

1. Product Properties:

a. ANSI A118.3 E5.1, Water Cleanability: Water Cleanable at 80 Minutes

b. ANSI A118.3 E5.2, Initial Set Service Strength: > 2 hours< 24 hours

c. ANSI A118.3 E5.3, Shrinkage: 0.10%

d. ANSI A118.3 E 5.4, Vertical Joint Sag: Pass

e. ANSI A118.3 E5.5, Quarry/Quarry Bond Strength: 1100 psi (7.6 MPa)tile failure

f. ANSI A118.3 E5.6, Compressive Strength: 3800 psi (26.2 MPa) 7 days.

g. ANSI A118.3 E5.7, Tensile Strength: 1100 psi (7.6 MPa) 7 days.

h. ANSI A118.3 E5.8, Thermal Shock: 900 psi (6.2 MPa)

i. ISO 13007-4, 4.4, Abrasion Resistance: 48 mm3

j. ISO 13007-4, 4,1,3, Flexural Strength Under Standard Conditions: 35.9 MPa

k. ISO 13007-4, 4.1.4, Compressive Strength Under Standard Conditions: 57.8

MPa

l. ISO 13007-4, 4.3, Shrinkage: 1.05 mm/m

m. ISO 13007-4, 4.2, Water Absorption after 240 min: 0.032 gm

n. Chemical Resistance as follows:

TILING 093000 - 8

o. Provide product meeting or exceeding applicable VOC content limitations of

LEED IEQ Credit 4.

2.06 ACCESSORY MATERIALS

A. Crack Suppression Membrane (at all floors unless specified to receive waterproofing membrane). Specifically designed for bonding to substrate. Trowel applied flexible fiber- mesh-reinforced waterproofing and crack - isolation membrane. Install at all locations to receive hard tile where cracks exist. Verify compatability with adjacent materials. Follow manufacturers recommended techniques in reference to application and number of coats.

B. Waterproofing Membrane Provide waterproof membrane at all restroom and janitor room floors and wet walls to a height of 6 feet and extending on perpenidular tiled walls for six feet horizontally. Provide waterproofing membrane all all shower wall applications : Specifically designed for bonding to cementitious substrate under thick mortar bed or thin-set tile; complying with ANSI A118.10 and ANSI A118.12.

TILING 093000 - 9

1. Type: Fluid-applied.

2. Material Properties:

a. ANSI A118.10 (4.1), Fungus Resistance: Pass

b. ANSI A118.10 (4.2) Seam Strength: > 95 lbs/inch width (>166.4 N/cm width)

c. ANSI A118.10 (4.3) Breaking Strength: 2400 lbs/in2 (16.5 MPa)

d. ANSI A118.10 (4.4) Dimensional Stability: No Change

e. ANSI A118.10 (4.5) Waterproofness: Pass

f. ANSI A118.10 (5.6) Shear Strength: 280 psi (1.9 MPa)

g. ANSI A118.10 (6); ASTM C627; TCA Rating, System Performance: Cycles

1-14 “Extra Heavy”

h. Fed Spec. TT-C_00555 (Mod.), Water Permeance: Excellent

i. ASTM E96-80…