New Security Building Federal contract opportunity
Solicitation number
W50S6M24B0002
Issued by
Department of the Army Alabama Army National Guard

About this file

This document is a 100% Type B3 (100%) submittal for the construction of a new Security Building for the 117th Air Refueling Wing in Birmingham, Alabama. The project, number BRKR009063, includes site work, building construction, and utility relocation for a new approximately 9,941 square foot facility. The work is estimated to cost between $5,000,000 - $10,000,000 and is set aside for small businesses under NAICS code 236220 with a size standard of $45,000,000. The award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the Government considering only price and price-related factors. A pre-bid conference will be held on July 18, 2024 at 10:00 am Central Time, and this will be the only site visit opportunity. The project requires various submittals including shop drawings, product data, samples, and qualifications within 21 days of the notice to proceed.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS,

OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

Volume I Specifications for the

A New Security Building at

Birmingham IAP (ANG)

Birmingham, Alabama

Type B3 (100%) Submittal – Volume I

Date: June 2024

Job No: 12072/BRKR 009063

Set No:

TABLE OF CONTENTS 00 0100 - 1

A New Security Building BRKR009063/12207 Type B3 (100%) Submittal 117th Air Refueling Wing, Birmingham, AL June 2024

SECTION 00 0100 – TABLE OF CONTENTS

VOLUME I

DIVISION 00 – PROJECT INFORMATION

00 0100 TABLE OF CONTENTS 6

00 0102 PROJECT INFORMATION AND SUMMARY 8

DIVISION 01 – GENERAL REQUIREMENTS

01 0450 CUTTING AND PATCHING 5

01 0500 FIELD ENGINEERING 3

01 2000 PRICE AND PAYMENT PROCEDURES 4

01 2300 BID OPTIONS 4

01 3000 ADMINISTRATIVE REQUIREMENTS 10

01 3001 SUBMITTALS 7

- SUBMITTAL REGISTER 23

01 3514.01 LEED-NC 2009 CREDIT SUMMARY 8

01 3553 SECURITY PROCEDURES 2

01 4000 QUALITY REQUIREMENTS 7

01 4100 REGULATORY REQUIREMENTS 3

01 4217 DEFINITIONS AND STANDARDS 3

01 5000 TEMPORARY FACILITIES AND CONTROLS 4

01 5100 TEMPORARY UTILITIES 3

01 5213 FIELD OFFICES AND SHEDS 2

01 5460 SAFETY AND HEALTH 5

01 5500 VEHICULAR ACCESS AND PARKING 3

01 5719 TEMPORARY ENVIRONMENTAL CONTROLS 9

01 6000 PRODUCT REQUIREMENTS 9

01 6116 VOLATILE ORGANIC COMPOUND CONTENT RESTRICTIONS 6

01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 9

01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 6

01 7800 CLOSEOUT SUBMITTALS 7

01 7900 DEMONSTRATION AND TRAINING 5

01 9113 GENERAL COMMISSIONING REQUIREMENTS 15

DIVISION 02 – EXISTING CONDITIONS

02 4100 DEMOLITION 5

02 7110 FOUNDATION DRAINAGE SYSTEMS 7

DIVISION 03 – CONCRETE

03 3000 CAST-IN-PLACE CONCRETE 30

DIVISION 04 – MASONRY

04 2000 UNIT MASONRY 15

04 7200 CAST STONE MASONRY 8

TABLE OF CONTENTS 00 0100 - 2

DIVISION 05 – METALS

05 1200 STRUCTURAL STEEL FRAMING 8

05 2100 STEEL JOIST FRAMING 5

05 3100 STEEL DECKING 7

05 4000 COLD-FORMED METAL FRAMING 7

05 4400 COLD-FORMED METAL TRUSSES 7

05 5000 METAL FABRICATIONS 10

05 5213 PIPE AND TUBE RAILINGS 5

DIVISION 06 – WOODS, PLASTICS, AND COMPOSITES

06 1000 ROUGH CARPENTRY 8

06 4100 ARCHITECTURAL WOOD CASEWORK 7

06 8316 FIBERGLASS REINFORCED PANELING 4

DIVISION 07 – THERMAL & MOISTURE PROTECTION

070100 SPECIAL PROJECT ROOFING WARRANTY 3

07 2100 THERMAL INSULATION 6

07 2119 SPRAY FOAM INSULATION 6

07 2500 WEATHER BARRIERS 16

07 4113 METAL ROOF PANELS 14

07 4213 RIBBED METAL WALL PANELS 10

07 4293 METAL SOFFIT PANELS 8

07 4800 CONTINUOUS INSULATION CHANNELS 9

07 6200 SHEET METAL FLASHING AND TRIM 7

07 6500 WALL FLASHING 8

07 7100 ROOF SPECIALTIES 10

07 9005 JOINT SEALERS 12

DIVISION 08 – OPENINGS

08 1113 HOLLOW METAL DOORS AND FRAMES 15

08 1416 FLUSH WOOD DOORS 6

08 3100 ACCESS DOORS AND PANELS 4

08 3459 WEAPONS VAULT DOOR 6

08 3600 SECTIONAL OVERHEAD DOORS 4

08 4113 ALUMINUM-FRAMED ENTRANCES 9

08 4413 GLAZED ALUMINUM CURTAIN WALLS 11

08 5200 BLAST RESISTANT ALUMINUM WINDOW SYSTEMS 15

08 7100 DOOR HARDWARE 18

08 8000 GLAZING 7

TABLE OF CONTENTS 00 0100 - 3

VOLUME II

DIVISION 09 – FINISHES

09 0561 COMMON WORK RESULTS FOR FLOORING PREPARATION 8

09 2116 GYPSUM BOARD ASSEMBLIES 10

09 3000 TILING 12

09 5100 ACOUSTICAL CEILINGS 8

09 6500 RESILIENT BASE 5

09 6519 RESILIENT TILE FLOORING 10

09 6813 TILE CARPETING 5

09 9113 EXTERIOR PAINTING 8

09 9123 INTERIOR PAINTING 13

DIVISIONS 10 – SPECIALTIES

10 1400 SIGNAGE 5

10 2113 STAINLESS STEELTOILET COMPARTMENTS 8

10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 10

10 4400 FIRE PROTECTION SPECIALTIES 3

10 8500 SPECIALTIES 2

DIVISION 11 – EQUIPMENT

11 3013 RESIDENTIAL APPLIANCES 3

DIVISION 12 – FURNISHINGS

12 2115 OPERABLE MESH SHADES 9

12 3600 COUNTERTOPS AND WINDOW SILLS 5

12 4813 ENTRANCE FLOOR MATS AND FRAMES 3

12 9313 BICYCLE RACKS 3

DIVISION 21 – FIRE SUPPRESSION SYSTEMS

21 0513 COMMON MOTOR REQUIREMENTS FOR FIRE SUPPRESSION EQUIPMENT 3

21 0517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 6

21 0518 ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING 3

21 0523 GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING 8

21 0529 HANGERS AND SUPPORTS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 9

21 0553 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT 5

21 1119 FIRE DEPARTMENT CONNECTIONS 4

21 1313 WET-PIPE SPRINKLER SYSTEMS 22

TABLE OF CONTENTS 00 0100 - 4

DIVISION 22 – PLUMBING

22 0510 BASIC MECHANICAL REQUIREMENTS 5

22 0511 BASIC MECHANICAL MATERIALS AND METHODS 9

22 0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 3

22 0517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 6

22 0518 ESCUTCHEONS FOR PLUMBING PIPING 3

22 0519 METERS AND GAGES FOR PLUMBING PIPING 10

22 0523.12 BALL VALVES FOR PLUMBING PIPING 13

22 0523.14 CHECK VALVES FOR PLUMBING PIPING 11

22 0523.15 GATE VALVES FOR PLUMBING PIPING 7

22 0529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 15

22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 7

22 0719 PLUMBING PIPING INSULATION 24

22 0800 COMMISSIONING OF PLUMBING 6

22 1116 DOMESTIC WATER PIPING 17

22 1119 DOMESTIC WATER PIPING SPECIALTIES 15

22 1123.21 INLINE, DOMESTIC-WATER PUMPS 8

22 1123 FACILITY NATURAL-GAS PIPING 24

22 1316 SANITARY WASTE AND VENT PIPING 14

22 1319.13 SANITARY DRAINS 3

22 1319 SANITARY WASTE PIPING SPECIALTIES 7

22 3400 FUEL-FIRED, DOMESTIC-WATER HEATERS 20

22 4213.13 COMMERCIAL WATER CLOSETS 5

22 4213.16 COMMERCIAL URINALS 6

22 4216.13 COMMERCIAL LAVATORIES 8

22 4216.16 COMMERCIAL SINKS 9

22 4223 COMMERCIAL SHOWERS 4

22 4500 EMERGENCY PLUMBING FIXTURES 5

22 4716 PRESSURE WATER COOLERS 5

TABLE OF CONTENTS 00 0100 - 5

VOLUME III

DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING

23 0510 BASIC MECHANICAL REQUIREMENTS 5

23 0511 BASIC MECHANICAL MATERIALS AND METHODS 9

23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 3

23 0517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 7

23 0518 ESCUTCHEONS FOR HVAC PIPING 3

23 0519 METERS AND GAGES FOR HVAC PIPING 9

23 0523.11 GLOBE VALVES FOR HVAC PIPING 5

23 0523.12 BALL VALVES FOR HVAC PIPING 11

23 0523.13 BUTTERFLY VALVES FOR HVAC PIPING 5

23 0523.15 GATE VALVES FOR HVAC PIPING 6

23 0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13

23 0533 HEAT TRACING FOR HVAC PIPING - NEED FROM MASTERSPEC 5

23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 8

23 0593 TESTING, ADJUSTING, AND BALANCING 8

23 0713 DUCT INSULATION 25

23 0719 HVAC PIPING INSULATION 22

23 0800 COMMISSIONING OF HVAC 3

23 0923 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC 57

23 0993.11 SEQUENCE OF OPERATIONS FOR HVAC DDC 35

23 2113 HYDRONIC PIPING 14

23 2116 HYDRONIC PIPING SPECIALTIES 7

23 2123 HYDRONIC PUMPS 13

23 2300 REFRIGERANT PIPING 14

23 2513 WATER TREATMENT FOR CLOSED-LOOP HYDRONIC SYSTEMS 6

23 3113 METAL DUCTS 25

23 3300 DUCT ACCESSORIES 6

23 3600 AIR TERMINAL UNITS 6

23 3713 AIR OUTLETS AND INLETS 6

23 5216 CONDENSING BOILERS 9

23 7313.13 INDOOR, BASIC AIR-HANDLING UNITS 13

23 8126 SPLIT SYSTEM AIR CONDITIONERS 6

23 8239.19 WALL AND CEILING UNIT HEATERS 3

DIVISION 26 – ELECTRICAL

26 0513 MEDIUM VOLTAGE CABLES 6

26 0518 BASIC ELECTRICAL MATERIALS AND METHODS 9

26 0519 CONDUCTORS AND CABLES 4

26 0526 GROUNDING AND BONDING 5

26 0533 RACEWAYS AND BOXES 6

26 1219 LIQUID-FILLED, MEDIUM VOLTAGE TRANSFORMERS 6

26 2416 PANELBOARDS 6

26 2726 WIRING DEVICES 5

26 2813 FUSES 2

26 2816 DISCONNECT SWITCHES 3

26 5100 INTERIOR LIGHTING 9

26 5600 EXTERIOR LIGHTING 7

TABLE OF CONTENTS 00 0100 - 6

DIVISION 27 – COMMUNICATIONS

27 0525 COMMUNICATIONS AND DATA-PROCESSING EQUIPMENT 15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

26 3111 FIRE ALARM AND MASS NOTIFICATION 31

DIVISION 31 – EARTHWORK

31 0010 SITE PROTECTION 4

31 0200 TEMPORARY EROSION AND SEDIMENT CONTROL 11

31 1001 SITE CLEARING 4

31 2210 EARTHWORK 13

- GEOTECHNICAL REPORT 50

31 3116 TERMITE CONTROL 3

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 0116 COLD MILLING (PLANNING) OF EXISTING BITUMINOUS PAVEMENTS 3

32 1217 ASPHALT CONCRETE PAVING 4

32 1314 CEMENT CONCRETE PAVING 14

32 1720 PAVEMENT JOINT SEALANTS 5

32 1900 SIDEWALKS 3

32 3113 CHAIN LINK FENCING 4

32 3136 SECURITY BOLLARDS 3

32 3313 SITE BICYCLE RACKS 6

32 9219 SEEDING 5

DIVISION 33 – UTILITIES

33 1117 OUTSIDE WATER SYSTEM 7

33 3112 SANITARY SEWERAGE 7

33 4112 STORM DRAINAGE 7

33 7350 SITE NATURAL-GAS DISTRIBUTION 3

PROJECT INFORMATION AND SUMMARY 000102 - 1

SECTION 000102 - PROJECT INFORMATION AND SUMMARY

PART 1 GENERAL

1.01 PROJECT IDENTIFICATION

A. Project Name: A New Security & Services Training Facility, 117th Air Refueling Wing, Birmingham IAP, Birmingham, AL.

B. Government Project #BRKR009063

C. Project Number: Architect's Project #12072

D. The Owner, hereinafter referred to as the Government: Alabama Air National Guard.

E. Government's Representatives & Titles:

1. Contracting Officer (KO): Mr. William Kast

2. Contracting Specialist: CMSgt. William Hall

3. Contracting Officer Representative (COR) : Major Jeff Farmer, Base Civil Engineer

1.02 CONTRACT DURATION

A. The Contract Duration shall be 395 calendar days from notice to proceed to final completion. This is inclusive of approximately 30 calendar days for completion of punch list activities following beneficial occupancy, preparation of as-built documents, and submission/approval of all project closeout documentation. The Contractor will be responsible for coordinating punch list activities around the Government's activities following beneficial occupancy.

1.03 PROJECT DESCRIPTION

A. Project scope includes a new facility for the 117th security forces squadron. The proposed project includes, but is not limited to, the following scopes of work as is indicated on the Contract Documents:

1. Demolition:

a. In preparation of new building construction, the project site-work includes, but is not limited to; demolition of existing underground and overhead site utilities, demolition of buildings 205 and 214, and demolition of existing concrete pavement, curbs, gutters and sidewalks.

2. Construction:

PROJECT INFORMATION AND SUMMARY 000102 - 2

a. A new 9,941 (approximate) square foot facility consisting of, but not limited to, the following:

1) Concrete slab on grade construction including building undercut / pad preparation as indicated on the drawings.

2) Load bearing CMU walls supporting premanufactured light gauge steel trusses, metal roof decking, and standing seam metal roof systems.

3) The facility is clad in clay masonry and cast stone matching adjacent base facilities.

4) Steel reinforced aluminum curtain wall window systems meeting the anti-terrorism/force protection requirements of UFC 4-010-01.

5) A mechanical platform consisting of concrete floor over metal decking supported by open web steel joists.

6) Interior painted CMU and gypsum board wall assemblies.

7) Interior finishes include:

(a) Painted concrete masonry unit (CMU) walls.

(b) Carpet and vinyl tile over concrete slabs

(c) Sealed concrete floors

(d) Acoustical tile ceilings.

(e) Hard tile floors and walls in restroom areas.

(f) Plastic laminate faced casework with quartz countertops.

8) Air cooled chillers serving constant volume air handlers with electric heat serving variable air volume terminal boxes.

9) Pre-action type wet pipe sprinklers to be provided from the existing underground base wide water distribution system.

10) Underground electrical service to be served from a nearby ground mounted switch.

11) Project will include installation of telecommunications infrastructure and cabling to support unclassified communications systems network.

Fiberoptic service will be provided from the nearby Communications Building 190 as part of the project.

PROJECT INFORMATION AND SUMMARY 000102 - 3

12) Re-routing of existing utility infrastructure as required to support the proposed construction including domestic water, fire protection water service, power, telecommunications, sanitary sewer, and storm drainage systems.

B. Antiterrorism and Building Standoff Requirements:

1. The project site and building structural, architectural, electrical and mechanical systems have been designed to meet the prescribed levels of protection against terrorist attacks in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.

C. Intrusion Detection System (IDS):

1. Controlled areas are designed to be equipped with Instruction Detection System.

2. The IDS system must be fully compatible with the exiting USAF approved Advantor IDS Annunciator located in the 117th SFS BDOC.

3. Included in the scope of work, ADVANTOR shall relocate and reconfigure the existing Base Defense Operations Center (BDOC) infrastructure into the new BDOC with the proposed facility.

4. As part of the base bid, the contractor is responsible for engaging Advantor Systems Cooperation (which is a sole source security system) for the procurement (purchase) and installation of the IDS, systems per Advantor Systems Corporation's "Proposal" solicited by the Government.

5. The base bid shall include all plant, labor, and materials to provide all collateral support as required by Advantor (in addition to collateral support indicated in the contract documents) for installation of a fully operational IDS systems as defined by Advantor System Corporation.

6. Contractor shall contact the project Contracting Officer regarding FAR Part 51 Authorization of Contractor's procurement of Advantor Systems Corporation materials, equipment and services.

D. Sustainability Design and Energy Conservation:

1. The project design incorporates Sustainability Concepts to achieve optimum resource efficiency, constructability, sustainability, and energy conservation.

2. The project has been designed in accordance with the provisions of the Leadership in Energy and Environmental Design (LEED) program, version 2009.

PROJECT INFORMATION AND SUMMARY 000102 - 4

3. The project has been registered with the USGBC / LEED and is intended to go through Construction Certification. The Design Goal is LEED Silver.

4. The Contractor will be responsible for compiling all information and submitting, via the LEED Online portal, all information required under "Construction Submittals" as required to certify the project upon completion of the work. The Design Team will document and submit all "Design Submittals." The project will submit two submittals to USGBC / LEED for review and approval. The design team will submit a design only package based upon the 100% drawings and specifications. A second "Construction" Submittal will be required to be submitted following completion of construction.

5. Minimum thresholds required for various LEED credits have been incorporated into the project specifications. These minimum thresholds are the minimum thresholds anticipated by the design team to ensure the project meets anticipated LEED Credit requirements. The Contractor shall coordinate product / manufacturer characteristics, give preference to manufacturers / products that exceed minimum thresholds, and ensure the project, as a whole, meets the required minimums needed to achieve the LEED Silver Goal.

6. All costs associated with project management and oversight of the LEED documentation, submission, and certification process shall be included in the Contractor's price.

E. Building Systems Commissioning:

1. Refer to specification section 01 9113 - General Commissioning Requirements, and other individual specifications sections for Contractor's responsibilities related to Building Systems Commissioning.

F. Government Furnished Furniture, furnishings and Equipment (FF&E):

1. Contractor's base bid shall include rough-ins for plumbing, mechanical, and electrical; including installation and final connection of all items indicated on the drawings as Government Furnished Contractor Installed (GFCI).

G. Contractor's Qualified Fire Protection Engineer (QFPE) Services:

1. The Contractor shall employ a Qualified Fire Protection Engineer (QFPE) meeting the requirements of UFC 3-600-01.

2. The QFPE shall review, sign, and certify all fire protection and life safety systems including; but, not limited to fire alarm, mass notification, and sprinkler systems included within the proposed project.

PROJECT INFORMATION AND SUMMARY 000102 - 5

3. All shop drawing / calculations / material submittals for applicable life safety systems must be reviewed and stamped by the Contractor’ QFPE in accordance with section 9-6.3 of UFC 3-600-01.

4. Waterflow testing shall be performed under the direction of the Contractor’s QFPE in accordance with section 9-6.4 of UFC 3-600-01. Waterflow testing shall be performed by the Contractor in order to develop required hydraulic calculations.

Use of waterflow testing performed by the Architect during design cannot be utilized by the Contractor for preparation of project submittals.

5. During Construction the Contractor’s QFPE must visit the site in intervals/quantities required to certify that the system has been installed in accordance with the project requirements. At a minimum, the QFPE shall attend/witness the above ceiling inspection and attend/witness final acceptance testing for all fire protection and life safety systems. Additional site inspections are at the discretion of the Contractor’s QFPE. The Contractor’s QFPE shall certify, in writing, that the system has been installed in accordance with project requirements.

The Contractor’s QFPE certification shall be in writing, on company letterhead, and include the QFPE’s registration stamp.

1.04 PERMITS, FEES AND NOTICES

A. Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses, and inspections necessary for proper execution and completion of the Work which are customarily secured after award of the Construction Contract and which are in effect on the date of receipt of bids.

1. City of Birmingham Building Permit is not required.

B. The Contractor shall comply with and give notices required by all laws, ordinances, rules, regulations, and lawful orders of public authorities applicable to performance of the Work.

1.05 USE OF SITE AND MISC. REQUIREMENTS

A. The space available to the contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is as per the Government's approval.

1. Other areas are off limits to all construction personnel.

B. Access to site will be limited; obtain Government's approval of proposed routes of access.

PROJECT INFORMATION AND SUMMARY 000102 - 6

C. Storage areas on site are very minimal and will be limited to materials that are to be immediately used in the progress of the work. If additional storage is required, then Contractor shall secure and be responsible to pay for such off site storage in a fully bonded and insured facility acceptable to the Government, with all items clearly identified as being assigned to this project.

D. Existing building space may not be used for storage.

E. Provide secure temporary barricades, fencing, etc. as required to separate the public from construction operations. Compliant safety and/or warning signage is to be provided as well in conjunction with fencing and barricades.

F. Construction operations are not to affect any of the ongoing operations thought the site and/or adjacent sites. Construction equipment is not to be attached to, or swing over existing buildings to remain, public areas, occupied buildings or parking lots, right-of-ways, etc.

G. Provide access to and from the site and all facilities effected by the scope of work as required by law and by the Government.

1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signage if exit routes are temporarily altered.

2. Do no obstruct roadways, sidewalks, parking lots, drives, or other public ways without permit.

3. Promptly remove mud, dirt, debris, etc... from sidewalks, streets, and public right-of-way during construction as it occurs.

a. Utilize covered waster receptacles to reduce waste and debris from leaving the project site and adversely effecting the Government's ongoing operations including the aircraft movements on the aircraft apron adjacent to the project site.

4. Coordinate site lay down and storage areas with Government's Operations.

5. Construction operations are not to affect any of the ongoing operations throughout the site and/or adjacent sites. Construction equipment is not to be attached to, or swing over existing buildings to remain, public areas, occupied buildings, parking lots, right-of-ways, etc...

H. Comply with the Government's security requirements. Refer to Specification Section 01 3553.

PROJECT INFORMATION AND SUMMARY 000102 - 7

I. The Contractor shall provide all testing, inspection, and similar services; these services also in close those specified to be performed by an independent agency.

1.06 UTILITY OUTAGES AND SHUTDOWN

A. All electrical and communication shut downs shall be performed on a non-working day for the Government (Saturday, Sunday, Monday, or Holidays) unless specifically approved by the base Civil Engineer.

B. Limit shutdown of utility services to 8 hours at a time, arranged at least 72 hours in advance with the Government.

C. Prevent accidental disruption of utility services to other facilities.

1.07 WORK SEQUENCE

A. Coordinate construction schedule and operations with the Contracting Officer Representative.

B. Coordinate construction activities with the ongoing KC-135 flying mission. Limit utility disruptions. If required utility outages impact adjacent facilties they must be coordinated in advance with the Government and occur over non-UTA weekends.

1.08 PROJECT CONSULTANTS

A. The Architect, hereinafter referred to as Architect: Seay Seay & Litchfield P.C..

1. Address: 1115 South Court Street.

2. City, State, Zip: Montgomery AL 36104.

3. Phone: 334-263-5162.

4. Project Manager: David Donovan, AIA, LEED AP

5. Prinicipals-in-Charge: Wes R. Osmer, AIA, LEED AP

B. Architect's Consultants:

1. Civil Engineering:

Professional Engineering Consultants

822 South McDonough St..

Montgomery, AL, 36104.

Phone: 334-262-7307

PROJECT INFORMATION AND SUMMARY 000102 - 8

Contact: Steve Green - Pat Moseley, PE

2. Structural Engineering:

Blackburn, Daniels, O'Barr

Address: County Road 40 E

Lowndesboro, AL 36752

Phone: 334-265-0206

Contact: Jack Daniels, PE

3. Plumbing, Mechanical & Fire Suppression Engineering:

Whorton Engineering

P.O. Box 5190

25 Summerall Gate Road, Bldg 2102

Anniston, Alabama 36205

Phone: (256)820-9897

Contact: Randy Whorton

4. Electrical Engineering:

McCarter Engineering

828 Avalon Lane

Anniston, AL 36207

Phone: (256) 240-7335

Contact: Stan McCarter

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

CUTTING AND PATCHING 010450 - 1

SECTION 010450 - CUTTING AND PATCHING

1. GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including Requirements of the Government's Solicitation and other Division-1 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This Section specifies administrative and procedural requirements for cutting and patching.

B. Refer to other Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work.

1. Requirements of this Section apply to mechanical and electrical installations.

Refer to Divisions 21, 22, 23, 26 & 27 Sections for other requirements and limitations applicable to cutting and patching mechanical and electrical installations.

1.03 SUBMITTALS

A. Cutting and Patching Proposal: Where approval of procedures and/or phasing for cutting and patching is required before proceeding, submit a proposal describing procedures well in advance of the time cutting and patching will be performed and request approval to proceed. Include the following information, as applicable, in the proposal:

B. Describe the extent of cutting and patching required and how it is to be performed;

indicate why it cannot be avoided.

C. Describe anticipated results in terms of changes to existing construction; include changes to structural elements and operating components as well as changes in the building's appearance and other significant visual elements.

D. List products to be used and firms or entities that will perform Work.

E. Indicate dates when cutting and patching is to be performed.

F. List utilities that will be disturbed or affected, including those that will be relocated and those that will be temporarily out-of-service. Indicate how long service will be disrupted.

CUTTING AND PATCHING 010450 - 2

G. Where cutting and patching involves addition of reinforcement to structural elements, submit details and engineering calculations to show how reinforcement is integrated with the original structure.

H. Approval by the Contracting Officer to proceed with cutting and patching does not waive the Contracting Officer's right to later require complete removal and replacement of a part of the Work found to be unsatisfactory.

1.04 QUALITY ASSURANCE

A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would reduce their load-carrying capacity or load-deflection ratio.

B. Obtain approval of the cutting and patching proposal before cutting and patching the following structural elements:

1. Foundation construction.

2. Bearing and retaining walls.

3. Structural concrete.

4. Structural steel.

5. Lintels.

6. Timber and primary wood framing.

7. Structural decking.

8. Stair systems.

9. Miscellaneous structural metals.

10. Exterior curtain wall construction.

11. Equipment supports.

12. Piping, ductwork, vessels and equipment.

13. Structural systems of special construction in Division-13.

C. Operational and Safety Limitations: Do not cut and patch operating elements or safety related components in a manner that would result in reducing their capacity to perform as intended, or result in increased maintenance, or decreased operational life or safety.

1. Obtain approval of the cutting and patching proposal before cutting and patching the following operating elements or safety related systems:

CUTTING AND PATCHING 010450 - 3

a. Primary operational systems and equipment.

b. Membranes and flashings.

c. Fire protection systems.

d. Communication systems.

e. Electrical wiring systems.

PART 2 PRODUCTS

2.01 MATERIALS

A. Use materials that are identical to existing materials. If identical materials are not available or cannot be used where exposed surfaces are involved, use materials that match existing adjacent surfaces to the fullest extent possible with regard to visual effect. Use materials whose installed performance will equal or surpass that of existing materials.

PART 3 EXECUTION

3.01 INSPECTION

A. Before cutting existing surfaces, examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed. Take corrective action before proceeding, if unsafe or unsatisfactory conditions are encountered.

1. Before proceeding, meet at the site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.

3.02 PREPARATION

A. Temporary Support: Provide temporary support of Work to be cut.

B. Protection: Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of the Project that might be exposed during cutting and patching operations.

C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

D. Take all precautions necessary to avoid cutting existing pipe, conduit or ductwork serving the building, but scheduled to be removed or relocated until provisions have been made to bypass them.

CUTTING AND PATCHING 010450 - 4

3.03 PERFORMANCE

A. General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.

1. Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.

B. Cutting: Cut existing construction using methods least likely to damage elements to be retained or adjoining construction. Where possible review proposed procedures with the original installer; comply with the original installer's recommendations.

1. In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots neatly to size required with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.

3. Cut through concrete and masonry using a cutting machine such as a carborundum saw or diamond core drill.

4. Comply with requirements of applicable Sections of Division-2 where cutting and patching requires excavating and backfilling.

5. By-pass utility services such as pipe or conduit, before cutting, where services are shown or required to be removed, relocated or abandoned. Cut-off pipe or conduit in walls or partitions to be removed. Cap, valve or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting.

C. Patching: Patch with durable seams that are as invisible as possible. Comply with specified tolerances.

1. Where feasible, inspect and test patched areas to demonstrate integrity of the installation.

2. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

CUTTING AND PATCHING 010450 - 5

3. Where removal of walls or partitions extends one finished area into another, patch and repair floor and wall surfaces in the new space to provide an even surface of uniform color and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary to achieve uniform color and appearance.

a. Where patching occurs in a smooth painted surface, extend final paint coat over entire unbroken containing the patch, after the patched area has received primer and second coat.

4. Patch, repair or rehang existing ceilings as necessary to provide an even plane surface of uniform appearance.

3.04 CLEANING

A. Thoroughly clean areas and spaces where cutting and patching is performed or used as access. Remove completely paint, mortar, oils, putty and items of similar nature.

Thoroughly clean piping, conduit and similar features before painting or other finishing is applied. Restore damaged pipe covering to its original condition.

This page intentionally left blank

FIELD ENGINEERING 010500 - 1

SECTION 010500 - FIELD ENGINEERING

1. GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including Requirements of the Government's Solicitation and other Division-1 Specification Sections, apply to this Section.

1.02 SUMMARY

A. General: This Section specifies administrative and procedural requirements for field engineering services, including, but not necessarily limited to, the following:

1. Land Survey Work.

1.03 SUBMITTALS

A. Certificates: Submit a certificate signed by the Land Surveyor or Professional Engineer certifying that the location and elevation of improvements comply with the Contract Documents.

B. Project Record Documents: Submit a record of Work performed and record survey data as required under provisions of Sections "Submittals" and "Project Closeout".

1.04 QUALITY ASSURANCE

A. Surveyor: Engage a Registered Land Surveyor registered in the State where the project is located, to perform land surveying services required.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.01 EXAMINATION

A. The Government will identify existing control points and property line corner stakes.

B. Verify layout information shown on the Drawings, in relation to the property survey and existing benchmarks before proceeding to layout the Work. Locate and protect existing benchmarks and control points. Preserve permanent reference points during construction.

1. Do not change or relocate benchmarks or control points without prior written approval. Promptly report lost or destroyed reference points, or requirements to relocate reference points because of necessary changes in grades or locations.

FIELD ENGINEERING 010500 - 2

2. Promptly replace lost or destroyed project control points. Base replacements on the original survey control points.

C. Establish and maintain a minimum of one permanent benchmark on the site, referenced to data established by survey control points.

1. Record benchmark locations, with horizontal and vertical data, on Project Record Documents.

D. Existing utilities and equipment: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction.

1. Prior to construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer and water service piping.

2. The Government requires a dig permit to be submitted for and approved prior to drilling or digging that might impact underground utilities. Coordinate with Contracting Officer Representative in advance of activities requiring an approved dig permit. Submit permit application to Base Civil Engineering a minimum of one week prior to scheduled start of activities requiring a dig permit.

3.02 PERFORMANCE

A. Working from lines and levels established by the property survey, establish benchmarks and markers to set lines and levels at each story of construction and elsewhere as needed to properly locate each element of the Project. Calculate and measure required dimensions within indicated or recognized tolerances. Do not scale Drawings to determine dimensions.

1. Advise entities engaged in construction activities, of marked lines and levels provided for their use.

2. As construction proceeds, check every major element for line, level and plumb.

B. Surveyor's Log: Maintain a surveyor's log of control and other survey Work. Make this log available for reference.

1. Record deviations from required lines and levels, and advise the Contracting Officer when deviations that exceed indicated or recognized tolerances are detected. On Project Record Drawings, record deviations that are accepted and not corrected.

FIELD ENGINEERING 010500 - 3

C. Site Improvements: Locate and lay out site improvements, including pavements, stakes for grading, fill and topsoil placement, utility slopes and invert elevations by instrumentation and similar appropriate means.

D. Building Lines and Levels: Locate and lay out batter boards for structures, building foundations, column grids and locations, floor levels and control lines and levels required for mechanical and electrical Work.

E. Existing Utilities: Verify locations of all utilities prior to commencing. Furnish information necessary to adjust, move or relocate existing structures, utility poles, lines, services or other appurtenances located in, or affected by construction. Coordinate with local authorities having jurisdiction with construction.

This page intentionally left blank

PRICE AND PAYMENT PROCEDURES 012000 - 1

SECTION 012000 - PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Procedures for preparation and submittal of applications for progress payments.

B. Documentation of changes in Contract Price and Contract Time.

C. Procedures for preparation and submittal of application for final payment.

1.02 RELATED REQUIREMENTS

1.03 SCHEDULE OF VALUES

A. Form to be used: Government's Approved Form.

B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to the Government for approval.

C. Format: Utilize the Table of Contents of this Project Manual. Identify each line item with number and title of the specification section. Identify site mobilization, bonds and insurance, and material versus labor costs .

1. Provide seperate line items for material and labor for each item of work.

2. Provide separate line items for each direct general contractor's cost for general conditions including:

a. Bonds

b. Insurance

c. Superintendent

d. Quality Control Representative

e. On Site Office Cost including rent (if applicable), utilities and supplies.

3. Break larger items of work down into line items not exceeding $50,000 in value unless specifically approved by the Government.

4. Provide separate schedule of values for ech facility included witin the consolidated award.

D. Revise schedule to list approved Change Orders, with each Application For Payment.

PRICE AND PAYMENT PROCEDURES 012000 - 2

1. Change Orders should be listed as separate line items included at the end of the schedule of values.

2. When a Change Order includes mutiple items of work, each item of work shall be listed as a separate line item with the approximate percentage complete for each scope of work listed.

E. Submit schedule of values within the timeframe outlined in the General Conditions of the Contract for Construction.

1.04 APPLICATIONS FOR PROGRESS PAYMENTS

A. Comply with all requirements of the General Conditions of the Contract for Construction. Additional requirements/explanations are listed below.

B. Use Government's Approved Form .

C. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to the Government for approval.

D. Use data from approved Schedule of Values. Provide dollar value in each column for each line item for portion of work performed and for stored products.

1. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of work.

E. Include the following with the application:

1. Transmittal letter as specified for submittals in Section 013000.

2. Construction progress schedule, revised and current as specified in Section 013000.

3. Current construction photographs specified in Section 013000.

1.05 STORED MATERIALS:

A. Off-site stored materials must be authorized for consideration in the awarded contract and be approved by the Contracting Officer if the Contactor anticipates requesting payment for off-site stored materials prior to the materials being delivered to the project site and and/or placed into operation/construction.

B. The following will be required prior to approval of payment for off-site stored materials:

1. Bill of lading for materials.

PRICE AND PAYMENT PROCEDURES 012000 - 3

2. Documentation that the materials have been titled to the Contractor and will be used exclusively in the performance of the Contract.

3. Evidence of insurance for the facility storing the materials reflecting 100% total replacement value coverage.

4. Photographs of the materials being stored.

C. The Contracting Officer must verify and approve of off-site stored materials prior to approval of payment. Approval of off-site storage (item A above) will not guarantee approval of payment for off-site stored materials. Payment of off-site stored materials will be at the discretion of the Contracting Officer pending verification of the materials being stored and review of required documentation (item B above) offered by the Contractor with the application for payment.

1.06 MODIFICATION PROCEDURES

A. Comply with all requirements of the General Conditions of the Contract for Construction.

B. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of the Contract.

C. Do not proceed with work associated with a modification prior to final execution of modification by Contracting Officer.

D. Following execution of modification by the Contracting Officer, promptly:

1. Revised application of payment forms to record each authorized modification as a separate line item and adjust the Contract Price.

2. Revise progress schedules to reflect and change in Contract Time.

3. Enter changes in Project Record Documents.

1.07 APPLICATION FOR FINAL PAYMENT

A. Comply with all requirements of the General Conditions of the Contractor for Construction.

B. Application for Final Payment will not be considered until the following have been accomplished:

1. All closeout procedures specified in Section 017000.

2. All stipulated requirements stated in the General Conditions of the Contract for Construction. .

PRICE AND PAYMENT PROCEDURES 012000 - 4

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

BID OPTIONS 012300 - 1

SECTION 012300 - BID OPTIONS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Description of Bid Options.

B. Procedures for pricing Bid Options

1.02 ACCEPTANCE OF BID OPTIONS

A. Bid Options quoted on Bid Forms will be reviewed and accepted or rejected at the Government's option in accordance with the requirements of the Government's Solicitation and applicable requiremens of the Federal Acquisitions Register. Accepted Bid Options will be identified in the Construction Contract.

B. Coordinate related work and modify surrounding work to integrate the Work of each Bid Option.

1.03 SUMMARY

A. Definition: A Bid Option is an amount proposed by Bidders and stated on the Bid Form for certain construction activities defined in the Bidding Requirements that may be added to the Base Bid amount if the the Government decides to accept a corresponding change in either the amount of construction to be completed, or in the products, materials, equipment, systems or installation methods described in Contract Documents. The Base Bid is all items shown on the the Contract Documents except items to be added back by below schedule of Bid Options.

B. Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary to ensure that Work affected by each accepted Bid Option is complete and fully integrated into the project.

C. Schedule: A "Schedule of Bid Options" is included at the end of this Section.

Specification Sections referenced in the Schedule contain requirements for materials and methods necessary to achieve the Work described under each Alternate Bid Item.

D. Include as part of each Bid Option, miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation whether or not mentioned as part of the Bid Option.

1.04 SCHEDULE OF BID OPTIONS

A. Bid Option No. 1: Security Forces Parking Lot:

BID OPTIONS 012300 - 2

1. This Bid Option shall include all plant, labor, and material for the construction of a new asphalt paved parking area along the South side of "B" street as indicated on the civil drawings. This bid option shall include, but is not limited to, the following scope of work :

a. Installation of new asphalt pavement areas as indicated to be part of bid option on the civl drawings.

b. New concrete curb and gutter at new parking area as indicated to be part of bid option on the civl drawings.

c. Additional cement concrete sidewalks as indicated to be part of bid option on the civil drawings.

d. Associated site grading and subgrade preparation in accordance with applicable project specifications to accomplish the work inidcated as part of the bid option on the civil drawings.

2. If this bid option is not awarded, the existing curb and gutter along the South side of "B" street will remain without change and no parking areas will be provided in this area of the site.

B. Bid Option No. 2: Mechanical Screen Wall:

1. This Bid Option shall include all plant, labor, and material to install a landscape screen wall to conceal mechanical and electrical equipment near the Northwestern corner of the facility. This bid option shall include, but is not limited to, the following scope of work :

a. Installation of a CMU wall with brick cladding and cast stone coping on all sides of the mechanical courtyard as indicated on drawings 1 and 2 on sheet L1.1. Refer to landscaping and civil drawings for height of wall.

b. Installation of chain link fencing covering the top of mechanical courtyard as indicated on drawings 1 and 2 on sheet L1.1.

c. Installation of decorative metal gate as indicated on drawings 2, 3, and 4 on sheet L1.1.

2. If this bid option is not awarded, the base bid shall consist of the lower height CMU/Brick veneer retaining wall with painted steel guardrail depicted on drawing 5/L1.1. Gate depcited on sheet L1.1 will not be required as part of the base bid.

C. Bid Option No. 3: Alternate Roof Configuration:

BID OPTIONS 012300 - 3

1. This Bid Option shall include the alternate roof configuration, alternate roof bearing conditions, and alternate exterior elevations at rooms 129, 133a, 137, 143, and 147 shown on the drawings.

2. Included in the scope of this bid option is all plant, labor, and materials required to raise the roof bearing conditions and install alternate framing and roof configuration in rooms 129, 133a, 137, 143, and 147.

3. If this option is awarded, the Contractor shall provide the roof plan configuration indicated on drawing sheet A2.3A and the structural framing indicated on the bid option roof framing plan in order to provide the exterior elevations indicated on drawing sheet A4.1A.

4. Included in this bid option will be additional roof flashings, additional CMU wall assemblies, additional brick veneer, larger curtain wall assemblies, and alterations to the reflected ceiling plan as indicated on the bid option drawings. If the bid option is not awarded, the base bid shall consist of a consistent 12'-0" high CMU bearing height with roof configuration indicated on drawing sheet A2.3 and structural roof framing indicated on base bid roof framing plan.

D. Bid Option No. 4: Alternate Finish Schedule:

1. This Bid Option shall include upgraded interior finishes in various rooms as indicated on the drawings.

2. Included in the scope of this bid option is all plant, labor, and materials required to:

a. Provide and install Carpet Tile (CPT 1) in lieu of vinyl tile (VCT 1) in all areas indicated in the "Bid Option Floor Finish" column of the room finish schedule on drawing sheet A3.1. Extent of CPT 1 included in this bid option is also indicated on drawing 7/A9.1 "Floor Pattern Plan (Bid Option)."

b. Provide hard tile (HT-2) in lieu of sealed concrete flooring in all areas indicated in the "Bid Option Floor Finish" column of the room finish schedule on drawing sheet A3.1. Extent of HT-2 included in this bid option is also indicated on drawing 7/A9.1 "Floor Pattern Plan (Bid Option)."

c. Provide increased extents of hard tile finishes on walls where indicated on the "Bid Option" Wall finish column of the room finish schedule on drawing sheet A3.1. Extent of hard tile wall finish included in this bid option is also indicated on drawing sheet A6.2 and drawing numbers 6 through 10 on drawing sheet A6.3.

BID OPTIONS 012300 - 4

3. If this bid option is not awarded, the base bid shall include installation of floor finishes included in the "Base Bid Floor Finish" column of the room finish schedule on drawing sheet A3.1. Base bid floor finishes are also indicated on drawing 1/A9.1 "Floor Pattern Plan (Base Bid)."

4. If this bid option is not awarded, the base bid shall also consist of the limited hard tile wall finishes indicated on drawing sheet A6.1 and drawings 1 through 5 on drawing sheet A6.3.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

ADMINISTRATIVE REQUIREMENTS 013000 - 1

SECTION 013000 - ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Preconstruction meeting.

B. Progress meetings.

C. Construction progress schedule.

D. Progress photographs.

E. Coordination drawings.

1.02 RELATED REQUIREMENTS

A. Section 01 7000 - Execution and Closeout Requirements

B. Section 01 7800 - Closeout Submittals

1.03 CONTRACTOR'S PROJECT ADMINISTRATION REQUIREMENTS

A. Contractor's Project Manager: Responsible for overall project coordination.

B. Make the following types of submittals to Contracting Officer Representative through the Project Coordinator:

1. Requests for Interpretation .

2. Requests for substitution.

3. Shop drawings, product data, and samples.

4. Test and inspection reports.

5. Design data.

6. Manufacturer's instructions and field reports.

7. Applications for payment and change order requests.

8. Progress schedules.

9. Coordination drawings.

10. Correction Punch List and Final Correction Punch List for Beneficial Occupancy.

ADMINISTRATIVE REQUIREMENTS 013000 - 2

11. Closeout submittals.

C. The Contractor shall provide project manager with minimum of five years experience on projects of similar size, scope, complexity, and cost. Project manager must be a full time employee of the General Contractor. Prior to construction the Contractor shall submit a resume of the project manager to the Government for approval.

D. In addition to the project manager, the Contractor shall provide a project superintendent who is dedicated, full time, to the project site. The construction superintendent shall have a minimum of five years experience serving as a project superintendent on projects of similar size, scope, complexity and cost. Prior to construction Contractor shall submit a resume of the project manager to the Government for approval.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 PRECONSTRUCTION MEETING

A. Contractor will schedule a meeting after notice to proceed.

B. Attendance Required:

1. Contracting Officer Representative

2. Architect.

3. Contractor.

4. All major sub contractors and suppliers.

5. Contracting Officer.

C. Agenda:

1. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.

2. Designation of personnel representing the parties to Contract and .

3. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

4. Scheduling.

5. Use of "Newforma" online web application for RFI, submittals, etc... Refer to section 01 3001 for additional information.

ADMINISTRATIVE REQUIREMENTS 013000 - 3

D. Architect will record minutes and distribute copies after meeting to participants, with copies to Architect, Contracting Officer…