BRKR212008 - ADDENDUM NO 2 SIGNED.pdf
PDF 1 MB Posted
- Attached to
- Renovate Building 410 Federal contract opportunity
- Solicitation number
- W50S6M-24-B-0001
About this file
This document is an addendum to drawings and specifications for the Renovate Building 410 project, part of federal contract opportunity W50S6M-24-B-0001. The project involves the renovation of an existing building 410 at the Sumpter Smith Joint National Guard Base in Birmingham, Alabama. Key details include:
The project scope involves selective demolition of existing interior elements and the installation of new building systems, including HVAC, electrical, and mass notification systems. The contract has a performance period of 270 calendar days from notice to proceed to beneficial occupancy. The project is set aside for small businesses, with a NAICS code of 236220 and a size standard of $45 million. The contract will be awarded to the responsible small business bidder whose bid conforms to the invitation and is most advantageous to the government, considering only price and price-related factors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF-1419 signed.pdf | ||
| BRKR 212008 RFI Responses 002.pdf | ||
| SF-30 Amendment Document.pdf | ||
| BRKR 212008 RFI Responses 001.pdf | ||
| Site visit attendees.pdf | ||
| PreBid bldg 410.pptx | PPTX presentation | |
| J and A for Brand Name-Sole Source - bldg 410- Monaco Fire Alarm_Redacted.pdf | ||
| J and A for Brand Name-Sole Source - bldg 410- Kreiger Door.pdf | ||
| BRKR212008 - ADDENDUM NO 1 SIGNED.pdf | ||
| SF-30 Amendment 0001.pdf | ||
| J and A for Brand Name-Sole Source - Bdlg 410 - Advantor.pdf | ||
| BRKR212008 Type B3 Drawings SIGNED.pdf | ||
| J and A for Brand Name-Sole Source - bldg 410- Stanley Best Locks SV_Redacted.pdf | ||
| BRKR212008 Type B3 Specifications 01-25-24 SIGNED.pdf | ||
| W50S6M-24-B-0001.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEAY, SEAY & LITCHFIELD, P.C.
1115 S. COURT ST. MONTGOMERY, AL 36104
(334) 263-5162
MAIL@SSLARCH.COM
WWW.SSLARCH.COM
MONTGOMERY DOTHAN AUBURN HUNTSVILLE
The drawings and specifications for Renovate Building 410, dated May 2023 are amended as follows.
Where there are conflicts between the plans and specifications, previously issued addendum, and this addendum, this addendum shall govern.
Where drawing revisions are included, drawing revisions are indicated within revision clouds.
Where specification sections are modified:
- Added specification text is included as follows: bold italicized text
- Deleted text is indicated as follows: in bold text with a strikethrough.
ITEM NO. 1: Refer to drawings. Delete drawing sheet E1.1 “Electrical Riser & Notes” and replace it with the attached drawing sheet E1.1 with a revised date of 8 April 2024.
ITEM NO. 2: Refer to drawings. Delete drawing sheet E5.1 “Electrical – Floor Plan – Power” and replace it with the attached drawing sheet E5.1 with a revised date of 8 April 2024.
ITEM NO. 3: Refer to specifications. Delete specification section 00 0102 “Project Information and Summary” and replace it with the attached specification section 00 0102 with a revised date of 8 April 2024.
ITEM NO. 4: Refer to specifications. In specification section 28 3177 “Interior Mass Notification System, ” delete paragraph 1.7.2.1 “Mass Notification System Designer” and replace it with the following:
1.7.2.1 Mass Notification System Designer:
The wide area MNS shall be designed under the supervision of a registered professional engineer with a minimum of 4 years’ current work experience in fire protection, electrical, and communication-electronics engineering areas specific to wide area MNS. Alternately, the wide area MNS may be designed by an engineering technologist verified by the National Institute for Certification in Engineering Technologies (NICET) as certified at Level IV in low voltage electronic-communications systems or Level IV in fire alarm systems, plus this engineering technologist shall possess a minimum of 4 years’ current work experience specific to wide area MNS communications-electronics. Alternately, the wide area MNS may be designed by an engineering technologist that possesses a minimum of 10 years’ documented current work experience specific to wide area MNS communications-electronics. The speaker array supporting structure shall be designed by a registered professional structural engineer to resist all environmental loads, including site-specific wind and seismic forces. The individual’s name, signature, and professional
ADDENDUM #: 2
DATE: 8 April 2024
TO: CMSgt. William Hall
FROM: David Donovan, AIA, LEED AP PROJECT NAME: Renovate Building 410
PROJECT NUMBER: 19059 / BRKR212008
MONTGOMERY DOTHAN AUBURN HUNTSVILLE
engineer number or NICET certification number (when applicable) shall be included on all final design documents.
END OF ADDENDUM
SHEET NOTES:
POWER RISER DIAGRAM NOTES:
DETAIL - SERVICE ENTRANCE FAULT CURRENT NAMEPLATE1
E1.1
POWER METERING NOTES:
RISER DIAGRAM POWER DISTRIBUTION - DEMOLITION2
E1.1
POWER RISER DIAGRAM BUILDING 204
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#22-235Tel: 334.285.1273
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an
W
W W
.S S
L A
R C
H .C
O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
R E
N O
V A
T E
B L
D G
S u m p te r S m it h
J o in t
N at io n al G u ar d B as e
B ir m in gh am
A
L
19059 / BRKR212008
MAY 2023
Rev. Description Date
CMB
CMB
05-31-23
E1.1
ELECTRICAL -
RISER & NOTES
HVAC
SERVER
MEN'S
WOMEN'S
MANLOCK
1025 CONFERENCE
3102 Highway 14
Gunn & Associates, P.C.
Consulting Engineers
Millbrook, AL 36054 1200 Providence Park, Suite 200
Birmingham, AL 35242 GA#22-235Tel: 334.285.1273
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an
W
W W
.S S
L A
R C
H .C
O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
R E
N O
V A
T E
B L
D G
S u m p te r S m it h
J o in t
N at io n al G u ar d B as e
B ir m in gh am
A
L
19059 / BRKR212008
MAY 2023
Rev. Description Date
CMB
CMB
05-31-23
E5.1
ELECTRICAL -
FLOOR PLAN -
POWER
SCALE: 1/4"=1'-0"
FLOOR PLAN - ELECTRICAL - POWER1
E5.1
4'
1/4" = 1'-0
0 4 8 FT
GRAPHIC SCALE
SHEET NOTES:
SECURE BOUNDARIES:
Renovate Building 410 BRKR212008 / 19059 May 2023 Sumpter Smith Joint National Guard Base Type B3 (100%) Submittal Birmingham, AL Revised 8 April 2024
PROJECT INFORMATION AND SUMMARY 000102 - 1
SECTION 000102 - PROJECT INFORMATION AND SUMMARY
PART 1 GENERAL
1.01 PROJECT IDENTIFICATION
A. Project Name: Renovate Building 410, Air National Guard (ANG) Base at Dannelly Field, Montgomery, AL.
B. Government Project Number: BRKR212008
C. Architect's Project Number: 19059
D. The Owner, hereinafter referred to as the Government: Alabama Air National Guard.
E. Owner's Representatives:
1. Contracting Officer: Major Jeff Farmer
2. Contracting Specialist: MSgt. Butch Edwards
3. Contracting Officer Representative: Lt. Col. Scott Vandenberghe, Base Civil Engineer
4. Alternate Contracting Officer Representative: Lt. Matthew Chandler, Deputy Base Civil Engineer
1.02 CONTRACT DURATION
A. 270 calendar days from notice to proceed to Beneficial Occupancy. The listed duration shall include completion of all punch list activities identified at the project final inspection. The Government intends to occupy the building upon Beneficial Occupancy.
1.03 PROJECT DESCRIPTION
A. Project scope includes renovation of the existing building 410 into a secure working area. The proposed project includes, but is not limited to, the following:
1. Selective demolition of existing interior walls, ceilings, flooring elements, and building systems as indicated on the drawings and as required to facilitate the proposed new facility layout
2. Space configuration and new gypsum wall board assemblies to accomplish the proposed new facility layout and meet ICD 705 security standards.
Birmingham, AL Revised 8 April 2024
PROJECT INFORMATION AND SUMMARY 000102 - 2
3. Major building systems include:
a. Relocation of existing split system air handlers from building 204 to service the renovated facility.
b. Relocation of existing gas fired emergency generator and automatic transfer switch from building 204 to service the renovated facility.
c. All new electrical systems including new lighting, receptacles, service panels, and power distribution panels as indicated on the drawings.
d. New mass notification systems equipment and devices.
4. Underground utility work will include all building necessary power, sanitary, gas, water, and telecommunications infrastructure. Coordination will be required with existing utilities to maintain operation through and around the site and will include power, sanitary, gas, water, and data.
B. Antiterrorism and Building Standoff Requirements:
1. The project site and building structural, architectural, electrical and mechanical systems have been designed to meet the prescribed levels of protection against terrorist attacks in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.
C. Special Access Program Facilities (SAPF)
1. The project contains SAPF areas. These facilities are designed and shall be constructed in accordance with ICD 705-1 and IC Tech Spec for ICD/ICS 705 Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities. These manuals establish physical and automated security design and construction standards for governing the construction, protection, and security of SAPF. Refer to the drawings and specifications for related scope of work including, but not limited to, physical construction of perimeter walls, floors, and ceilings ; Intrusion Detection System (IDS) and Closed Circuit Television (CCTV) System. The Contractor shall fully familiarize himself with relevant requirements and provide the necessary information and instruction to all subcontractors, installers, and suppliers.
D. Intrusion Detection System (IDS) and CCTV:
1. The Secure Storage room is designed to be equipped with an ICD 705 compliant Instruction Detection System and CCTV.
Birmingham, AL Revised 8 April 2024
PROJECT INFORMATION AND SUMMARY 000102 - 3
2. The IDS system must be fully compatible with the existing USAF approved Advantor IDS Annunciator located in the 117th SFS BDOC.
3. As part of the base bid, the contractor is responsible for engaging Advantor Systems Cooperation (which is a sole source security system) for the procurement (purchase) and installation of the IDS and CCTV systems. Refer to limited source justification included in the solicitation documents furnished by the Government.
4. The base bid shall include all plant, labor, and materials to provide all collateral support as required by Advantor (in addition to collateral support indicated in the contract documents) for installation of a fully operational IDS and CCTV systems as defined by Advantor System Corporation.
E. Sustainability Design and Energy Conservation:
1. The project has not been registered with USGBC and is not intended to be registered. The project is not intended to achieve any level of LEED certification or any other sustainability certifications; however, in accordance with ANGETL 15-01-01, the project is intended to be "LEED Meritable" and incorporate sustainable design principles and criteria to the maximum extent possible.
2. In keeping with ANGETL 15-01-01 Contractor shall give preference to sustainable products and materials with higher levels of sustainability including but not limited to materials extracted and manufactured within 500 miles of the project site, materials manufactured using higher levels of recycled content, materials meeting VOC limitations, etc.
3. Where applicable, minimum thresholds for sustainability criteria are established within the technical specifications. Where not specifically indicated, the Contractor shall give preference to and provide materials that contribute the most to the project's sustainability goal.
4. Contractor shall provide "LEED Submittals" for all products, materials, and systems indicating a product or material's sustainable attributes for review and approval by the Government; however, input of LEED documentation into the USGBC's LEED online system will be not required. Similarly, LEED credit templates documenting the projects LEED performance will not be required.
F. Building Systems Commissioning:
1. Refer to specification section 01 9113 - General Commissioning Requirements, and other individual specifications sections for Contractor's responsibilities related to Building Systems Commissioning.
Birmingham, AL Revised 8 April 2024
PROJECT INFORMATION AND SUMMARY 000102 - 4
G. Government Furnished Furniture, furnishings and Equipment (FF&E):
1. Contractor's base bid shall include rough-ins for plumbing, mechanical, and electrical; including installation and final connection of all items indicated on the drawings as Government Furnished Contractor Installed (GFCI).
H. Contractor's Qualified Fire Protection Engineer (QFPE) Services (Deleted by Addendum No. 2)
1. The Contractor shall employ a Qualified Fire Protection Engineer (QFPE) meeting the requirements of UFC 3-600-01.
2. The QFPE shall review, sign, and certify all fire protection and life safety systems including; but, not limited to fire alarm, mass notification, and sprinkler systems included within the proposed project.
3. All shop drawing / calculations / material submittals for applicable life safety systems must be reviewed and stamped by the Contractor’ QFPE in accordance with section 9-6.3 of UFC 3-600-01.
4. Waterflow testing shall be performed under the direction of the Contractor’s QFPE in accordance with section 9-6.4 of UFC 3-600-01. Waterflow testing shall be performed by the Contractor in order to develop required hydraulic calculations.
Use of waterflow testing performed by the Architect during design cannot be utilized by the Contractor for preparation of project submittals.
5. During Construction the Contractor’s QFPE must visit the site in intervals/quantities required to certify that the system has been installed in accordance with the project requirements. At a minimum, the QFPE shall attend/witness the above ceiling inspection and attend/witness final acceptance testing for all fire protection and life safety systems. Additional site inspections are at the discretion of the Contractor’s QFPE. The Contractor’s QFPE shall certify, in writing, that the system has been installed in accordance with project requirements.
The Contractor’s QFPR certification shall be in writing, on company letterhead, and include the QFPE’s registration stamp.
I. Mass Notification System Designer (Added by Addendum No. 2):
Birmingham, AL Revised 8 April 2024
PROJECT INFORMATION AND SUMMARY 000102 - 5
1. The wide area MNS shall be designed under the supervision of a registered professional engineer with a minimum of 4 years’ current work experience in fire protection, electrical, and communication-electronics engineering areas specific to wide area MNS. Alternately, the wide area MNS may be designed by an engineering technologist verified by the National Institute for Certification in Engineering Technologies (NICET) as certified at Level IV in low voltage electronic-communications systems or Level IV in fire alarm systems, plus this engineering technologist shall possess a minimum of 4 years’ current work experience specific to wide area MNS communications-electronics. Alternately, the wide area MNS may be designed by an engineering technologist that possesses a minimum of 10 years’ documented current work experience specific to wide area MNS communications-electronics. The speaker array supporting structure shall be designed by a registered professional structural engineer to resist all environmental loads, including site-specific wind and seismic forces.
The individual’s name, signature, and professional engineer number or NICET certification number (when applicable) shall be included on all final design documents.
1.04 PERMITS, FEES AND NOTICES
A. Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses, and inspections necessary for proper execution and completion of the Work which are customarily secured after award of the Construction Contract and which are in effect on the date of receipt of bids.
1. City of Birmingham Building Permit will not be required.
B. The Contractor shall comply with and give notices required by all laws, ordinances, rules, regulations, and lawful orders of public authorities applicable to performance of the Work.
1.05 USE OF SITE AND MISC. REQUIREMENTS
A. The space available to the contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is as per the Government's approval.
1. Other areas are off limits to all construction personnel.
B. Access to site will be limited; obtain Government's approval of proposed routes of access.
Birmingham, AL Revised 8 April 2024
PROJECT INFORMATION AND SUMMARY 000102 - 6
C. Keep existing sidewalks, roads, parking lots and drives on site clear and available at all times. Promptly remove mud, dirt, debris, etc. from sidewalks, streets, and public right-of-way during construction as it occurs.
D. Storage areas on site are very minimal and will be limited to materials that are to be immediately used in the progress of the work. If additional storage is required, then Contractor shall secure and be responsible to pay for such off site storage in a fully bonded and insured facility acceptable to the Government, with all items clearly identified as being assigned to this project.
1. Contractor will be limited to the areas included within the project limits shown on the civil drawings.
E. Provide secure temporary barricades, fencing, etc. as required to separate the public from construction operations. Compliant safety and/or warning signage is to be provided as well in conjunction with fencing and barricades.
1. Site safety and security is the General Contractor's responsibility. Fencing shall be provided as deemed necessary to protect the site from theft and damage and to prevent access to the site by the public. A fence along the project limits is anticipated at a minimum. However, exact location/extents of fencing is at the discretion of the Contractor.
F. Construction operations are not to affect any of the ongoing operations throughout the site and/or adjacent sites. Construction equipment is not to be attached to, or swing over existing buildings to remain, public areas, occupied buildings or parking lots, right-of-ways, etc.
G. Comply with the Government's security requirements - refer to specification section 01 3553.
H. The contractor shall provide all testing, inspections, and similar services; these services also include those specified to be performed by an independent agency.
1.06 UTILITY OUTAGES AND SHUTDOWN
A. All electrical and communication shut downs shall be performed on a non-working day for the Government(Saturday, Sunday, Monday, or Holidays) unless specifically approved by the base Contracting Officer Representative.
B. Limit shutdown of utility services to 8 hours at a time, arranged at least 72 hours in advance with the Government.
C. Prevent accidental disruption of utility services to other facilities.
Birmingham, AL Revised 8 April 2024
PROJECT INFORMATION AND SUMMARY 000102 - 7
1.07 PHASING OF WORK
A. The work of this project shall be completed in one phase. However, the Contractor shall coordinate the work as required to ensure all existing roadways and facilities adjacent to the project site remain open and accessible for use by the Government.
1.08 WORK SEQUENCE
A. Coordinate construction schedule and operations with Contracting Officer Representative.
1. Submit proposed construction schedule to the Government for review as outlined in the Government's solicitation requirements.
1.09 PROJECT CONSULTANTS
A. The Architect, hereinafter referred to as Architect: Seay Seay & Litchfield P.C..
1. Address: 1115 South Court Street.
2. City, State, Zip: Montgomery AL 36104.
3. Phone/Fax: 334-263-5162 334-263-5170.
4. Project Manager: Wed R Osmer, AIA, LEED AP
5. Prinicipals-in-Charge: Wes R. Osmer, AIA, LEED AP
B. Architect's Consultants:
1. Civil Engineering:
a. Professional Engineering Consultants
b. Address: 822 South McDonough St..
c. City, State, Zip: Montgomery, AL, 36104.
d. Phone: 334-262-7307
e. Contact: Steve Green - Pat Moseley
2. Plumbing, Mechanical & Fire Suppression Engineering:
a. Peterson Engineering, Inc.
b. Address: 75 South F Street
Birmingham, AL Revised 8 April 2024
PROJECT INFORMATION AND SUMMARY 000102 - 8
c. City, State, Zip: Pensacola, FL 32502
d. Phone: 850-434-0513
e. Contact: Steve Johnson, P.E.
3. Electrical Engineering:
a. Gunn & Associates, PC / Consulting Engineering
b. Address: 3102 Highway 14
c. City, State, Zip: Millbrook, AL 36054
d. Phone: 334-285-1273
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
| Renovate Bldg 410 - Electrical Addendum - Drawings (4-8-24).pdf |
| Sheet E1.1 |
| Sheets and Views |
| E1.1 |
| Sheet E5.1 |
| Sheets and Views |
| E5.1 |
| 2024-04-09T11:21:51-0500 | |
| David Donovan |
File details come from the government source that posted it. Updated .