BRKR 212008 RFI Responses 001.pdf

PDF 43 KB Posted

Attached to
Renovate Building 410 Federal contract opportunity
Solicitation number
W50S6M-24-B-0001
Issued by
Department of the Army Alabama Army National Guard

About this file

This document is a set of responses to a Request for Information (RFI) related to the renovation of Building 410. The key points are:

The fire alarm system and requirement for a Qualified Fire Protection Engineer (QFPE) are not required for this project. The mass notification system design must be supervised by a registered professional engineer or NICET Level IV certified engineering technologist with a minimum of 4 years' relevant experience. The speaker array supporting structure must be designed by a registered professional structural engineer.

The federal contract opportunity is for the renovation of Building 410 for the 117th Air Refueling Wing. The project scope includes demolition, relocation of existing equipment, installation of new electrical systems, and underground utility work. The contract is a firm fixed-price award between $500,000 and $1,000,000. It is a 100% small business set-aside with a NAICS code of 236220 and a small business size standard of $45,000,000.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEAY, SEAY & LITCHFIELD, P.C.

1115 S. COURT ST. MONTGOMERY, AL 36104

(334) 263-5162

MAIL@SSLARCH.COM

WWW.SSLARCH.COM

MONTGOMERY DOTHAN AUBURN HUNTSVILLE

ITEM NO. 1: Question: Please confirm that the Fire Alarm System (attachment - J and A for Brand Name-Sole Source - bldg. 410- Monaco Fire Alarm Redacted) is not required per notes in the Pre-Bid presentation document, dated Mar.21, 2024.

Response: Confirmed. Monaco transceiver is not required as the project scope does not include a fire alarm system and no connection to base fire department is required.

ITEM NO. 2: Please confirm that the requirement for QFPE is no longer required as well.

Response: Confirmed. Qualified fire protection engineer is not a requirement of this project refer to Addendum No. 2. See below requirements for mass notification system design personnel from part 3-2.1 of UFC 4-021-01. Mass notification system designer shall meet these minimum criteria. Submit designer qualifications for approval.

3-2.1 Designer Qualifications. The wide area MNS shall be designed under the supervision of a registered professional engineer with a minimum of 4 years’ current work experience in fire protection, electrical, and communication-electronics engineering areas specific to wide area MNS. Alternately, the wide area MNS may be designed by an engineering technologist verified by the National Institute for Certification in Engineering Technologies (NICET) as certified at Level IV in low voltage electronic-communications systems or Level IV in fire alarm systems, plus this engineering technologist shall possess a minimum of 4 years’ current work experience specific to wide area MNS communications-electronics. Alternately, the wide area MNS may be designed by an engineering technologist that possesses a minimum of 10 years’ documented current work experience specific to wide area MNS communications-electronics. The speaker array supporting structure shall be designed by a registered professional structural engineer to resist all environmental loads, including site-specific wind and seismic forces. The individual’s name, signature, and professional engineer number or NICET certification number (when applicable) shall be included on all final design documents.

END OF RFI RESPONSES

RFI RESPONSES 001

DATE: 8 April 2024

TO: CMSgt. William Hall

FROM: David Donovan, AIA, LEED AP PROJECT NAME: Renovate Building 410

PROJECT NUMBER: 19059 / BRKR212008