BRKR212008 Type B3 Specifications 01-25-24 SIGNED.pdf
PDF 3 MB Posted
- Attached to
- Renovate Building 410 Federal contract opportunity
- Solicitation number
- W50S6M-24-B-0001
About this file
This solicitation is for renovation services for Building 410 at Sumpter Smith Joint National Guard Base in Birmingham, Alabama. The project includes selective demolition of interior walls, ceilings, flooring and building systems; new gypsum wall assemblies; relocation of HVAC equipment from another building; and all new electrical, plumbing and telecommunications systems. The work must be completed within 270 calendar days from notice to proceed. The contract value is estimated between $500,000 and $1,000,000. The NAICS code is 236220 for commercial and institutional building construction. The small business size standard is $45 million. This is a 100% small business set-aside. Award will be made to the responsible bidder offering the most advantageous price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF-1419 signed.pdf | ||
| BRKR 212008 RFI Responses 002.pdf | ||
| SF-30 Amendment Document.pdf | ||
| BRKR 212008 RFI Responses 001.pdf | ||
| BRKR212008 - ADDENDUM NO 2 SIGNED.pdf | ||
| Site visit attendees.pdf | ||
| PreBid bldg 410.pptx | PPTX presentation | |
| J and A for Brand Name-Sole Source - bldg 410- Monaco Fire Alarm_Redacted.pdf | ||
| J and A for Brand Name-Sole Source - bldg 410- Kreiger Door.pdf | ||
| J and A for Brand Name-Sole Source - Bdlg 410 - Advantor.pdf | ||
| BRKR212008 Type B3 Drawings SIGNED.pdf | ||
| BRKR212008 - ADDENDUM NO 1 SIGNED.pdf | ||
| SF-30 Amendment 0001.pdf | ||
| J and A for Brand Name-Sole Source - bldg 410- Stanley Best Locks SV_Redacted.pdf | ||
| W50S6M-24-B-0001.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Type B-3 Submittal – Project Specifications
Renovate Building 410 117th Air Refueling Wing
Birmingham IAP, Air National Guard Base Birmingham, AL
Project Number BRKR212008
Submitted to
Alabama Air National Guard May 2023
Seay, Seay, & Litchfield, PC
Renovate Building 410 BRKR212008 /19059 May 2023 Sumpter Smith Joint National Guard Base
Type B3 (100%) Submittal
TABLE OF CONTENTS 1
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING
REQUIREMENTS
00 0100 TABLE OF CONTENTS 3
00 0102 PROJECT INFORMATION AND SUMMARY 7
DIVISION 01 - GENERAL REQUIREMENTS
01 0450 CUTTING AND PATCHING 5
01 0500 FIELD ENGINEERING 3
01 2000 PRICE AND PAYMENT PROCEDURES 4
01 3000 ADMINISTRATIVE REQUIREMENTS 9
01 3001 SUBMITTALS
- AF FORM 66 SUBMITTAL REGISTER
01 3553 SECURITY PROCEDURES 2
01 4000 QUALITY REQUIREMENTS 7
01 4100 REGULATORY REQUIREMENTS 3
01 4217 DEFINITIONS AND STANDARDS 3
01 5000 TEMPORARY FACILITIES AND CONTROLS 3
01 5100 TEMPORARY UTILITIES 3
01 5460 SAFETY AND HEALTH 5
01 5500 VEHICULAR ACCESS AND PARKING 3
01 5719 TEMPORARY ENVIRONMENTAL CONTROLS 4
01 6000 PRODUCT REQUIREMENTS 7
01 6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS 6
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 14
01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 9
01 7800 CLOSEOUT SUBMITTALS 7
01 7900 DEMONSTRATION AND TRAINING 5
DIVISION 02 - EXISTING CONDITIONS
02 4100 SELECTIVE DEMOLITION 6
DIVISION 03 - EXISTING CONDITIONS
CONCRETE
03 3000 CAST-IN-PLACE CONCRETE 21
03 5416 HYDRAULIC CEMENT UNDERLAYMENT 6
DIVISION 05 - METALS
05 5000 METAL FABRICATIONS 7
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 1000 ROUGH CARPENTRY 5
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 2100 THERMAL INSULATION 4
07 9005 JOINT SEALERS 11
TABLE OF CONTENTS 2
DIVISION 08 - OPENINGS
08 1113 HOLLOW METAL DOORS AND FRAMES 12
08 3481 SECURITY RATED AND SOUND CONTROL DOOR ASSEMBLIES 11
08 7100 DOOR HARDWARE 21
08 9100 LOUVERS 5
DIVISION 09 - FINISHES
09 0561 COMMON WORK RESULTS FOR FLOORING PREPARATION 9
09 2116 GYPSUM BOARD ASSEMBLIES 10
09 3000 TILING 12
09 5100 ACOUSTICAL CEILINGS 7
09 6500 RESILIENT BASE 4
09 6813 TILE CARPETING 5
09 9113 EXTERIOR PAINTING 8
09 9123 INTERIOR PAINTING 12
DIVISION 10 - SPECIALTIES
10 1400 SIGNAGE 5
10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 8
10 4400 FIRE PROTECTION SPECIALTIES 3
DIVISION 22 - PLUMBING
22 0000 PLUMBING, GENERAL PURPOSE 43
DIVISION 23 – HVAC
23 0300.20 BASIC MECHANICAL MATERIALS AND METHODS 4
23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 18
23 0700 THERMAL INSULATION FOR MECHANICAL SYSTEMS 28
23 0900 INSTRUMENTATION AND CONTROL FOR HVAC 41
23 0923.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC 21
23 3000 HVAC AIR DISTRIBUTION 19
23 8100 DECENTRALIZED UNITARY HVAC EQUIPMENT 12
DIVISION 26 - ELECTRICAL
26 0100 ELECTRICAL 47
DIVISION 27 – COMMUNICATIONS
27 0526 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 9
27 1100 COMMUNICATIONS EQUIPMENT ROOM FITTINGS 6
27 1300 COMMUNICATIONS BACKBONE CABLING 13
27 1500 COMMUNICATIONS HORIZONTAL CABLING 14
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 3177 INTERIOR MASS NOTIFICATION SYSTEM 30
TABLE OF CONTENTS 3
DIVISION 31 - EARTHWORK
31 0010 SITE PROTECTION 4
31 0200 TEMPORARY EROSION AND SEDIMENT CONTROL 12
31 1001 SITE CLEARING 5
31 2210 EARTHWORK 13
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 9223 SODDING 5
DIVISION 33 - UTILITIES
33 1117 OUTSIDE WATER SYSTEM 7
33 3112 SANITARY SEWERAGE 6
33 7350 SITE NATURAL-GAS DISTRIBUTION 3
APPENDIX A
TECHNICAL SPECIFICATIONS FOR CONSTRUCTION AND MANAGEMENT OF SENSITIVE
COMPARTMENTED INFORMATION FACILITIES (ICD TECH SPECS FOR ICD / ICS 705).
Renovate Building 410 BRKR212008 / 19059 May 2023
Sumpter Smith Joint National Guard Base Type B3 (100%) Submittal
Birmingham, AL
PROJECT INFORMATION AND SUMMARY 000102 - 1
SECTION 000102 - PROJECT INFORMATION AND SUMMARY
PART 1 GENERAL
1.01 PROJECT IDENTIFICATION
A. Project Name: Renovate Building 410, Air National Guard (ANG) Base at Dannelly
Field, Montgomery, AL.
B. Government Project Number: BRKR212008
C. Architect's Project Number: 19059
D. The Owner, hereinafter referred to as the Government: Alabama Air National Guard.
E. Owner's Representatives:
1. Contracting Officer: Major Jeff Farmer
2. Contracting Specialist: MSgt. Butch Edwards
3. Contracting Officer Representative: Lt. Col. Scott Vandenberghe, Base Civil
Engineer
4. Alternate Contracting Officer Representative: Lt. Matthew Chandler, Deputy Base
Civil Engineer
1.02 CONTRACT DURATION
A. 270 calendar days from notice to proceed to Beneficial Occupancy. The listed duration shall include completion of all punch list activities identified at the project final inspection. The Government intends to occupy the building upon Beneficial
Occupancy.
1.03 PROJECT DESCRIPTION
A. Project scope includes renovation of the existing building 410 into a secure working area. The proposed project includes, but is not limited to, the following:
1. Selective demolition of existing interior walls, ceilings, flooring elements, and building systems as indicated on the drawings and as required to facilitate the proposed new facility layout
2. Space configuration and new gypsum wall board assemblies to accomplish the proposed new facility layout and meet ICD 705 security standards.
Birmingham, AL
PROJECT INFORMATION AND SUMMARY 000102 - 2
3. Major building systems include:
a. Relocation of existing split system air handlers from building 204 to service the renovated facility.
b. Relocation of existing gas fired emergency generator and automatic transfer switch from building 204 to service the renovated facility.
c. All new electrical systems including new lighting, receptacles, service panels, and power distribution panels as indicated on the drawings.
d. New mass notification systems equipment and devices.
4. Underground utility work will include all building necessary power, sanitary, gas, water, and telecommunications infrastructure. Coordination will be required with existing utilities to maintain operation through and around the site and will include power, sanitary, gas, water, and data.
B. Antiterrorism and Building Standoff Requirements:
1. The project site and building structural, architectural, electrical and mechanical systems have been designed to meet the prescribed levels of protection against terrorist attacks in accordance with the Department of Defense (DoD) Unified
Facilities Criteria (UFC) 4-010-01 DoD Minimum Antiterrorism Standards for
Buildings.
C. Special Access Program Facilities (SAPF)
1. The project contains SAPF areas. These facilities are designed and shall be constructed in accordance with ICD 705-1 and IC Tech Spec for ICD/ICS 705
Technical Specifications for Construction and Management of Sensitive
Compartmented Information Facilities. These manuals establish physical and automated security design and construction standards for governing the construction, protection, and security of SAPF. Refer to the drawings and specifications for related scope of work including, but not limited to, physical construction of perimeter walls, floors, and ceilings ; Intrusion Detection System
(IDS) and Closed Circuit Television (CCTV) System. The Contractor shall fully familiarize himself with relevant requirements and provide the necessary information and instruction to all subcontractors, installers, and suppliers.
D. Intrusion Detection System (IDS) and CCTV:
1. The Secure Storage room is designed to be equipped with an ICD 705 compliant
Instruction Detection System and CCTV.
Birmingham, AL
PROJECT INFORMATION AND SUMMARY 000102 - 3
2. The IDS system must be fully compatible with the existing USAF approved Advantor IDS Annunciator located in the 117th SFS BDOC.
3. As part of the base bid, the contractor is responsible for engaging Advantor Systems Cooperation (which is a sole source security system) for the procurement (purchase) and installation of the IDS and CCTV systems. Refer to limited source justification included in the solicitation documents furnished by the Government.
4. The base bid shall include all plant, labor, and materials to provide all collateral support as required by Advantor (in addition to collateral support indicated in the contract documents) for installation of a fully operational IDS and CCTV systems as defined by Advantor System Corporation.
E. Sustainability Design and Energy Conservation:
1. The project has not been registered with USGBC and is not intended to be registered. The project is not intended to achieve any level of LEED certification or any other sustainability certifications; however, in accordance with ANGETL 15-01-01, the project is intended to be "LEED Meritable" and incorporate sustainable design principles and criteria to the maximum extent possible.
2. In keeping with ANGETL 15-01-01 Contractor shall give preference to sustainable products and materials with higher levels of sustainability including but not limited to materials extracted and manufactured within 500 miles of the project site, materials manufactured using higher levels of recycled content, materials meeting VOC limitations, etc.
3. Where applicable, minimum thresholds for sustainability criteria are established within the technical specifications. Where not specifically indicated, the Contractor shall give preference to and provide materials that contribute the most to the project's sustainability goal.
4. Contractor shall provide "LEED Submittals" for all products, materials, and systems indicating a product or material's sustainable attributes for review and approval by the Government; however, input of LEED documentation into the USGBC's LEED online system will be not required. Similarly, LEED credit templates documenting the projects LEED performance will not be required.
F. Building Systems Commissioning:
1. Refer to specification section 01 9113 - General Commissioning Requirements, and other individual specifications sections for Contractor's responsibilities related to Building Systems Commissioning.
Birmingham, AL
PROJECT INFORMATION AND SUMMARY 000102 - 4
G. Government Furnished Furniture, furnishings and Equipment (FF&E):
1. Contractor's base bid shall include rough-ins for plumbing, mechanical, and electrical; including installation and final connection of all items indicated on the drawings as Government Furnished Contractor Installed (GFCI).
H. Contractor's Qualified Fire Protection Engineer (QFPE) Services
1. The Contractor shall employ a Qualified Fire Protection Engineer (QFPE) meeting the requirements of UFC 3-600-01.
2. The QFPE shall review, sign, and certify all fire protection and life safety systems including; but, not limited to fire alarm, mass notification, and sprinkler systems included within the proposed project.
3. All shop drawing / calculations / material submittals for applicable life safety systems must be reviewed and stamped by the Contractor’ QFPE in accordance with section 9-6.3 of UFC 3-600-01.
4. Waterflow testing shall be performed under the direction of the Contractor’s QFPE in accordance with section 9-6.4 of UFC 3-600-01. Waterflow testing shall be performed by the Contractor in order to develop required hydraulic calculations.
Use of waterflow testing performed by the Architect during design cannot be utilized by the Contractor for preparation of project submittals.
5. During Construction the Contractor’s QFPE must visit the site in intervals/quantities required to certify that the system has been installed in accordance with the project requirements. At a minimum, the QFPE shall attend/witness the above ceiling inspection and attend/witness final acceptance testing for all fire protection and life safety systems. Additional site inspections are at the discretion of the Contractor’s QFPE. The Contractor’s QFPE shall certify, in writing, that the system has been installed in accordance with project requirements.
The Contractor’s QFPR certification shall be in writing, on company letterhead, and include the QFPE’s registration stamp.
1.04 PERMITS, FEES AND NOTICES
A. Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses, and inspections necessary for proper execution and completion of the Work which are customarily secured after award of the Construction Contract and which are in effect on the date of receipt of bids.
1. City of Birmingham Building Permit will not be required.
Birmingham, AL
PROJECT INFORMATION AND SUMMARY 000102 - 5
B. The Contractor shall comply with and give notices required by all laws, ordinances, rules, regulations, and lawful orders of public authorities applicable to performance of the Work.
1.05 USE OF SITE AND MISC. REQUIREMENTS
A. The space available to the contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is as per the Government's approval.
1. Other areas are off limits to all construction personnel.
B. Access to site will be limited; obtain Government's approval of proposed routes of access.
C. Keep existing sidewalks, roads, parking lots and drives on site clear and available at all times. Promptly remove mud, dirt, debris, etc. from sidewalks, streets, and public right-of-way during construction as it occurs.
D. Storage areas on site are very minimal and will be limited to materials that are to be immediately used in the progress of the work. If additional storage is required, then
Contractor shall secure and be responsible to pay for such off site storage in a fully bonded and insured facility acceptable to the Government, with all items clearly identified as being assigned to this project.
1. Contractor will be limited to the areas included within the project limits shown on the civil drawings.
E. Provide secure temporary barricades, fencing, etc. as required to separate the public from construction operations. Compliant safety and/or warning signage is to be provided as well in conjunction with fencing and barricades.
1. Site safety and security is the General Contractor's responsibility. Fencing shall be provided as deemed necessary to protect the site from theft and damage and to prevent access to the site by the public. A fence along the project limits is anticipated at a minimum. However, exact location/extents of fencing is at the discretion of the Contractor.
F. Construction operations are not to affect any of the ongoing operations throughout the site and/or adjacent sites. Construction equipment is not to be attached to, or swing over existing buildings to remain, public areas, occupied buildings or parking lots, right-of-ways, etc.
Birmingham, AL
PROJECT INFORMATION AND SUMMARY 000102 - 6
G. Comply with the Government's security requirements - refer to specification section 01
3553.
H. The contractor shall provide all testing, inspections, and similar services; these services also include those specified to be performed by an independent agency.
1.06 UTILITY OUTAGES AND SHUTDOWN
A. All electrical and communication shut downs shall be performed on a non-working day for the Government(Saturday, Sunday, Monday, or Holidays) unless specifically approved by the base Contracting Officer Representative.
B. Limit shutdown of utility services to 8 hours at a time, arranged at least 72 hours in advance with the Government.
C. Prevent accidental disruption of utility services to other facilities.
1.07 PHASING OF WORK
A. The work of this project shall be completed in one phase. However, the Contractor shall coordinate the work as required to ensure all existing roadways and facilities adjacent to the project site remain open and accessible for use by the Government.
1.08 WORK SEQUENCE
A. Coordinate construction schedule and operations with Contracting Officer
Representative.
1. Submit proposed construction schedule to the Government for review as outlined in the Government's solicitation requirements.
1.09 PROJECT CONSULTANTS
A. The Architect, hereinafter referred to as Architect: Seay Seay & Litchfield P.C..
1. Address: 1115 South Court Street.
2. City, State, Zip: Montgomery AL 36104.
3. Phone/Fax: 334-263-5162 334-263-5170.
4. Project Manager: Wed R Osmer, AIA, LEED AP
5. Prinicipals-in-Charge: Wes R. Osmer, AIA, LEED AP
B. Architect's Consultants:
Birmingham, AL
PROJECT INFORMATION AND SUMMARY 000102 - 7
1. Civil Engineering:
a. Professional Engineering Consultants
b. Address: 822 South McDonough St..
c. City, State, Zip: Montgomery, AL, 36104.
d. Phone: 334-262-7307
e. Contact: Steve Green - Pat Moseley
2. Plumbing, Mechanical & Fire Suppression Engineering:
a. Peterson Engineering, Inc.
b. Address: 75 South F Street
c. City, State, Zip: Pensacola, FL 32502
d. Phone: 850-434-0513
e. Contact: Steve Johnson, P.E.
3. Electrical Engineering:
a. Gunn & Associates, PC / Consulting Engineering
b. Address: 3102 Highway 14
c. City, State, Zip: Millbrook, AL 36054
d. Phone: 334-285-1273
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
This page intentionally left blank
Birmingham, AL
CUTTING AND PATCHING 010450 - 1
SECTION 010450 - CUTTING AND PATCHING
1. GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including Requirements of the
Government's Solicitation and other Division-1 Specification Sections, apply to this
Section.
1.02 SUMMARY
A. This Section specifies administrative and procedural requirements for cutting and patching.
B. Refer to other Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work.
1. Requirements of this Section apply to mechanical and electrical installations.
Refer to Divisions 21, 22, 23, 26 & 27 Sections for other requirements and limitations applicable to cutting and patching mechanical and electrical installations.
1.03 SUBMITTALS
A. Cutting and Patching Proposal: Where approval of procedures and/or phasing for cutting and patching is required before proceeding, submit a proposal describing procedures well in advance of the time cutting and patching will be performed and request approval to proceed. Include the following information, as applicable, in the proposal:
B. Describe the extent of cutting and patching required and how it is to be performed;
indicate why it cannot be avoided.
C. Describe anticipated results in terms of changes to existing construction; include changes to structural elements and operating components as well as changes in the building's appearance and other significant visual elements.
D. List products to be used and firms or entities that will perform Work.
E. Indicate dates when cutting and patching is to be performed.
F. List utilities that will be disturbed or affected, including those that will be relocated and those that will be temporarily out-of-service. Indicate how long service will be disrupted.
Birmingham, AL
CUTTING AND PATCHING 010450 - 2
G. Where cutting and patching involves addition of reinforcement to structural elements, submit details and engineering calculations to show how reinforcement is integrated with the original structure.
H. Approval by the Contracting Officer to proceed with cutting and patching does not waive the Contracting Officer's right to later require complete removal and replacement of a part of the Work found to be unsatisfactory.
1.04 QUALITY ASSURANCE
A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would reduce their load-carrying capacity or load-deflection ratio.
B. Obtain approval of the cutting and patching proposal before cutting and patching the following structural elements:
1. Foundation construction.
2. Bearing and retaining walls.
3. Structural concrete.
4. Structural steel.
5. Lintels.
6. Timber and primary wood framing.
7. Structural decking.
8. Stair systems.
9. Miscellaneous structural metals.
10. Exterior curtain wall construction.
11. Equipment supports.
12. Piping, ductwork, vessels and equipment.
13. Structural systems of special construction in Division-13.
C. Operational and Safety Limitations: Do not cut and patch operating elements or safety related components in a manner that would result in reducing their capacity to perform as intended, or result in increased maintenance, or decreased operational life or safety.
Birmingham, AL
CUTTING AND PATCHING 010450 - 3
1. Obtain approval of the cutting and patching proposal before cutting and patching the following operating elements or safety related systems:
a. Primary operational systems and equipment.
b. Membranes and flashings.
c. Fire protection systems.
d. Communication systems.
e. Electrical wiring systems.
PART 2 PRODUCTS
2.01 MATERIALS
A. Use materials that are identical to existing materials. If identical materials are not available or cannot be used where exposed surfaces are involved, use materials that match existing adjacent surfaces to the fullest extent possible with regard to visual effect. Use materials whose installed performance will equal or surpass that of existing materials.
PART 3 EXECUTION
3.01 INSPECTION
A. Before cutting existing surfaces, examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed. Take corrective action before proceeding, if unsafe or unsatisfactory conditions are encountered.
1. Before proceeding, meet at the site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.
3.02 PREPARATION
A. Temporary Support: Provide temporary support of Work to be cut.
B. Protection: Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of the Project that might be exposed during cutting and patching operations.
C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
Birmingham, AL
CUTTING AND PATCHING 010450 - 4
D. Take all precautions necessary to avoid cutting existing pipe, conduit or ductwork serving the building, but scheduled to be removed or relocated until provisions have been made to bypass them.
3.03 PERFORMANCE
A. General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.
1. Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.
B. Cutting: Cut existing construction using methods least likely to damage elements to be retained or adjoining construction. Where possible review proposed procedures with the original installer; comply with the original installer's recommendations.
1. In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots neatly to size required with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
2. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.
3. Cut through concrete and masonry using a cutting machine such as a carborundum saw or diamond core drill.
4. Comply with requirements of applicable Sections of Division-2 where cutting and patching requires excavating and backfilling.
5. By-pass utility services such as pipe or conduit, before cutting, where services are shown or required to be removed, relocated or abandoned. Cut-off pipe or conduit in walls or partitions to be removed. Cap, valve or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting.
C. Patching: Patch with durable seams that are as invisible as possible. Comply with specified tolerances.
1. Where feasible, inspect and test patched areas to demonstrate integrity of the installation.
Birmingham, AL
CUTTING AND PATCHING 010450 - 5
2. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.
3. Where removal of walls or partitions extends one finished area into another, patch and repair floor and wall surfaces in the new space to provide an even surface of uniform color and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary to achieve uniform color and appearance.
a. Where patching occurs in a smooth painted surface, extend final paint coat over entire unbroken containing the patch, after the patched area has received primer and second coat.
4. Patch, repair or rehang existing ceilings as necessary to provide an even plane surface of uniform appearance.
3.04 CLEANING
A. Thoroughly clean areas and spaces where cutting and patching is performed or used as access. Remove completely paint, mortar, oils, putty and items of similar nature.
Thoroughly clean piping, conduit and similar features before painting or other finishing is applied. Restore damaged pipe covering to its original condition.
Birmingham, AL
FIELD ENGINEERING 010500 - 1
SECTION 010500 - FIELD ENGINEERING
1. GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Requirements of the
Government's Solicitation and other Division-1 Specification Sections, apply to this
Section.
1.02 SUMMARY
A. General: This Section specifies administrative and procedural requirements for field engineering services, including, but not necessarily limited to, the following:
1. Land Survey Work.
1.03 SUBMITTALS
A. Certificates: Submit a certificate signed by the Land Surveyor or Professional Engineer certifying that the location and elevation of improvements comply with the Contract
Documents.
B. Project Record Documents: Submit a record of Work performed and record survey data as required under provisions of Sections "Submittals" and "Project Closeout".
1.04 QUALITY ASSURANCE
A. Surveyor: Engage a Registered Land Surveyor registered in the State where the project is located, to perform land surveying services required.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.01 EXAMINATION
A. The Government will identify existing control points and property line corner stakes.
B. Verify layout information shown on the Drawings, in relation to the property survey and existing benchmarks before proceeding to layout the Work. Locate and protect existing benchmarks and control points. Preserve permanent reference points during construction.
Birmingham, AL
FIELD ENGINEERING 010500 - 2
1. Do not change or relocate benchmarks or control points without prior written approval. Promptly report lost or destroyed reference points, or requirements to relocate reference points because of necessary changes in grades or locations.
2. Promptly replace lost or destroyed project control points. Base replacements on the original survey control points.
C. Establish and maintain a minimum of one permanent benchmark on the site, referenced to data established by survey control points.
1. Record benchmark locations, with horizontal and vertical data, on Project Record
Documents.
D. Existing utilities and equipment: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction.
1. Prior to construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer and water service piping.
2. The Government requires a dig permit to be submitted for and approved prior to drilling or digging that might impact underground utilities. Coordinate with
Contracting Officer Representative in advance of activities requiring an approved dig permit. Submit permit application to Base Civil Engineering a minimum of one week prior to scheduled start of activities requiring a dig permit.
3.02 PERFORMANCE
A. Working from lines and levels established by the property survey, establish benchmarks and markers to set lines and levels at each story of construction and elsewhere as needed to properly locate each element of the Project. Calculate and measure required dimensions within indicated or recognized tolerances. Do not scale Drawings to determine dimensions.
1. Advise entities engaged in construction activities, of marked lines and levels provided for their use.
2. As construction proceeds, check every major element for line, level and plumb.
B. Surveyor's Log: Maintain a surveyor's log of control and other survey Work. Make this log available for reference.
Birmingham, AL
FIELD ENGINEERING 010500 - 3
1. Record deviations from required lines and levels, and advise the Contracting
Officer when deviations that exceed indicated or recognized tolerances are detected. On Project Record Drawings, record deviations that are accepted and not corrected.
C. Site Improvements: Locate and lay out site improvements, including pavements, stakes for grading, fill and topsoil placement, utility slopes and invert elevations by instrumentation and similar appropriate means.
D. Building Lines and Levels: Locate and lay out batter boards for structures, building foundations, column grids and locations, floor levels and control lines and levels required for mechanical and electrical Work.
E. Existing Utilities: Verify locations of all utilities prior to commencing. Furnish information necessary to adjust, move or relocate existing structures, utility poles, lines, services or other appurtenances located in, or affected by construction. Coordinate with local authorities having jurisdiction with construction.
END OF SECTION 01050
Birmingham, AL
PRICE AND PAYMENT PROCEDURES 012000 - 1
SECTION 012000 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedures for preparation and submittal of applications for progress payments.
B. Documentation of changes in Contract Price and Contract Time.
C. Procedures for preparation and submittal of application for final payment.
1.02 RELATED REQUIREMENTS
1.03 SCHEDULE OF VALUES
A. Form to be used: Government's Approved Form.
B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to the Government for approval.
C. Format: Utilize the Table of Contents of this Project Manual. Identify each line item with number and title of the specification section. Identify site mobilization, bonds and insurance, and material versus labor costs .
1. Provide seperate line items for material and labor for each item of work.
2. Provide separate line items for each direct general contractor's cost for general conditions including:
a. Bonds
b. Insurance
c. Superintendent
3. Break larger items of work down into line items not exceeding $50,000 in value unless specifically approved by the Government.
D. Revise schedule to list approved Change Orders, with each Application For Payment.
1. Change Orders should be listed as separate line items included at the end of the schedule of values.
2. When a Change Order includes mutiple items of work, each item of work shall be listed as a separate line item with the approximate percentage complete for each scope of work listed.
Birmingham, AL
PRICE AND PAYMENT PROCEDURES 012000 - 2
E. Submit schedule of values within the timeframe outlined in the General Conditions of the Contract for Construction.
1.04 APPLICATIONS FOR PROGRESS PAYMENTS
A. Comply with all requirements of the General Conditions of the Contract for
Construction. Additional requirements/explanations are listed below.
B. Use Government's Approved Form .
C. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to the Government for approval.
D. Use data from approved Schedule of Values. Provide dollar value in each column for each line item for portion of work performed and for stored products.
1. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of work.
E. Include the following with the application:
1. Transmittal letter as specified for submittals in Section 013000.
2. Construction progress schedule, revised and current as specified in Section
013000.
3. Current construction photographs specified in Section 013000.
1.05 STORED MATERIALS:
A. Off-site stored materials must be authorized for consideration in the awarded contract and be approved by the Contracting Officer if the Contactor anticipates requesting payment for off-site stored materials prior to the materials being delivered to the project site and and/or placed into operation/construction.
B. The following will be required prior to approval of payment for off-site stored materials:
1. Bill of lading for materials.
2. Documentation that the materials have been titled to the Contractor and will be used exclusively in the performance of the Contract.
3. Evidence of insurance for the facility storing the materials reflecting 100% total replacement value coverage.
Birmingham, AL
PRICE AND PAYMENT PROCEDURES 012000 - 3
4. Photographs of the materials being stored.
C. The Contracting Officer must verify and approve of off-site stored materials prior to approval of payment. Approval of off-site storage (item A above) will not guarantee approval of payment for off-site stored materials. Payment of off-site stored materials will be at the discretion of the Contracting Officer pending verification of the materials being stored and review of required documentation (item B above) offered by the
Contractor with the application for payment.
1.06 MODIFICATION PROCEDURES
A. Comply with all requirements of the General Conditions of the Contractor for
Construction.
B. Computation of Change in Contract Amount: As specified in the Agreement and
Conditions of the Contract.
C. Do not proceed with work associated with a modification prior to final execution of modification by Contracting Officer.
D. Following execution of modification by the Contracting Officer, promptly:
1. Revised application of payment forms to record each authorized modification as a separate line item and adjust the Contract Price.
2. Revise progress schedules to reflect and change in Contract Time.
3. Enter changes in Project Record Documents.
1.07 APPLICATION FOR FINAL PAYMENT
A. Comply with all requirements of the General Conditions of the Contractor for
Construction.
B. Application for Final Payment will not be considered until the following have been accomplished:
1. All closeout procedures specified in Section 017000.
2. All stipulated requirements stated in the General Conditions of the Contract for
Construction. .
Birmingham, AL
PRICE AND PAYMENT PROCEDURES 012000 - 4
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 1
SECTION 013000 - ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Preconstruction meeting.
B. Progress meetings.
C. Construction progress schedule.
D. Progress photographs.
E. Coordination drawings.
1.02 RELATED REQUIREMENTS
A. Section 01 7000 - Execution and Closeout Requirements
B. Section 01 7800 - Closeout Submittals
1.03 CONTRACTOR'S PROJECT ADMINISTRATION REQUIREMENTS
A. Contractor's Project Manager: Responsible for overall project coordination.
B. Make the following types of submittals to Contracting Officer Representative through the Project Coordinator:
1. Requests for Interpretation .
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Correction Punch List and Final Correction Punch List for Beneficial Occupancy.
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 2
11. Closeout submittals.
C. The Contractor shall provide project manager with minimum of five years experience on projects of similar size, scope, complexity, and cost. Project manager must be a full time employee of the General Contractor. Prior to construction the Contractor shall submit a resume of the project manager to the Government for approval.
1.04 CONSTRUCTION SUPERINTENDENT
A. The General Contractor shall designate a project superintendent to be on site and in charge of the work for the duration of the project.
B. The Superintendent shall have experience in supervising and executing a minimum of 5 projects of similar scope, size, and complexity.
C. Submit proposed superintendent's resume to the Government for approval prior to commencing on-site activities.
D. Superintendent shall be equipped with a cellular device capable of:
1. Placing and receiving local and long-distance phone calls
2. Viewing and responding to electronic mail communication.
3. Connecting personal computer to the internet via a mobile hotspot application.
E. The Superintendent shall also be equipped with a personal computer that can access the internet for the purposes of project correspondence and accessing the project
"Newforma" project management software/platform.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Contractor will schedule a meeting after notice to proceed.
B. Attendance Required:
1. Contracting Officer Representative
2. Architect.
3. Contractor.
4. All major sub contractors and suppliers.
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 3
5. Contracting Officer.
C. Agenda:
1. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
2. Designation of personnel representing the parties to Contract and .
3. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
4. Scheduling.
5. Use of "Newforma" online web application for RFI, submittals, etc... Refer to section 01 3001 for additional information.
D. Architect will record minutes and distribute copies after meeting to participants, with copies to Architect, Contracting Officer Representative(s), Contracting Officer, participants, and those affected by decisions made.
3.02 PROGRESS MEETINGS
A. Contractor shall make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
B. Attendance Required: Job superintendent, Contractor's Project Manager, Contractor's
Quality Control Supervisor, Contracting Officer, Contracting Officer Representative(s), Architect, and major Subcontractors/Suppliers when necessary/requested by the
Government Contractor.
1. A minimum of bi-weekly meetings should be anticipated. More frequent meetings will be scheduled as dictated by the progress and quality of work observed ongoing at the project site. Contractor’s project superintendent and project manager shall attend all progress meetings in person.
2. Additionally, if a third-party project management approach is utilized by the
General Contractor, both the third-party project manager and a representative of the General Contractor who is authorized to make decisions regarding project scope, cost, and time shall also be in attendance, in person, at a minimum of one progress meeting each month.
C. Agenda:
1. Review minutes of previous meetings.
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 4
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Review of modifications to project record documents documenting changes made on site since previous progress meeting.
12. Other business relating to work.
D. Architect will record minutes and distribute copies after meeting to participants, with copies to Architect, Contracting Officer Representative(s), Contracting Officer, and
Contractor. Contractor will be responsible for distributing minutes to suppliers/SubContractor and those affected by decisions made.
3.03 CONSTRUCTION PROGRESS SCHEDULE
A. Submit proposed project schedule as outlined in the Contract Documents.
B. General Requirements:
1. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Beneficial Occupancy to date of Final Completion.
2. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. Comply with the following:
a. Activity Duration: Define activities so no activity is longer than twenty days, unless specifically allowed by the Government.
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 5
b. Procurement Activities: Include procurement process activities for long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.
c. Submittal Review Time: Include review and resubmittal times indicated in
Division 1 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule.
d. Startup and Testing Time: Include not less than seven days for startup and testing.
e. Beneficial Occupancy: Indicate completion in advance of date established for
Beneficial Occupancy, and allow time for the Government's administrative procedures necessary for certification of Beneficial Occupancy.
3. Constraints: Include constraints and work restrictions indicated in the Contract
Documents and as follows in schedule, and show how the sequence of the Work is affected.
a. Phasing: Arrange list of activities on schedule by phase.
b. Work by the Government: Include a separate activity for each portion of the
Work performed by the Government.
c. Products Ordered in Advance: Include a separate activity for each product.
Include delivery date indicated in Division 1 Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date.
d. Government-Furnished Products: Include a separate activity for each product.
Include delivery date indicated in Division 1 Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date.
e. Work Restrictions: Show the effect of the following items on the schedule:
1) Coordination with existing construction.
2) Limitations of continued occupancies.
3) Uninterruptible services.
4) Partial occupancy before Beneficial Occupancy.
5) Use of premises restrictions.
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 6
6) Provisions for future construction.
7) Seasonal variations.
8) Environmental control.
4. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, review inspections by review agencies, Beneficial Occupancy, and Final Completion.
5. Cost Correlation: At the head of schedule, provide a cost correlation line, indicating planned and actual costs. On the line, show dollar volume of the Work performed as of dates used for preparation of payment requests.
a. Refer to Division 1 Section "Payment Procedures" for cost reporting and payment procedures.
6. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using fragnets to demonstrate the effect of the proposed change on the overall project schedule.
C. Gantt-Chart Schedule:
1. Submit a comprehensive, fully developed, horizontal Gantt-chart-type, Contractor's Construction Schedule within thirty days of date established fromthe
Notice to Proceed . Base schedule on the Preliminary Construction Schedule and whatever updating and feedback was received since the start of Project.
2. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.
a. For construction activities that require 3 months or longer to complete, indicate an estimated completion percentage in ten percent increments within time bar.
D. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.
1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 7
2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.
3. As the Work progresses, indicate Actual Completion percentage for each activity.
E. Distribution: Distribute copies of approved schedule to the Government, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.
1. Post copies in Project meeting rooms and temporary field offices.
2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.
F. Conflicts in the Contract Documents: Where conflicts occur in the contract documents the more expensive option shall be included for the contractor's pricing purposes unless otherwise clarified in writing by the Government. Prior to execution of the work the
Government shall be consulted of all options, and a decision will be rendered by the
Government.
3.04 REPORTS
A. Daily Construction Reports: Prepare a daily construction report and email to all required parties by noon of the following work day, recording the following information concerning events at Project site:
1. List of subcontractors at Project site.
2. List of separate contractors at Project site.
3. Approximate count of personnel at Project site.
4. High and low temperatures and general weather conditions.
5. Accidents.
6. Meetings and significant decisions.
7. Unusual events (refer to special reports).
8. Stoppages, delays, shortages, and losses.
9. Orders and requests of authorities having jurisdiction.
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 8
10. Applicable photographs, noting location and condition.
3.05 PRE-CONSTRUCTION PHOTOGRAPHS
A. Before starting construction, take one hundred color photographs and digital video recording of Project site and affected right-of-ways and surrounding properties and interior existing photos of affected areas from different vantage points, as directed by the Government. Show existing conditions adjacent to property.
3.06 PROGRESS PHOTOGRAPHS
A. Submit photographs with each application for payment, taken not more than 3 days prior to submission of application for payment.
B. Photography Type: Digital; electronic files.
C. Provide photographs of construction throughout progress of Work produced by an experienced photographer, who can also be an employee of the contractor, acceptable to the Government.
D. In addition to periodic, recurring views, take photographs of each of the following events:
1. Completion of site clearing.
2. Excavations in progress.
3. Foundations in progress and upon completion.
4. Structural framing in progress and upon completion.
5. Enclosure of building, upon completion.
6. Final completion, minimum of ten (10) photos.
E. Views:
1. Provide non-aerial photographs from four cardinal views at each specified time, until date of Beneficial Occupancy.
2. Consult with the Government for instructions on views required.
3. Provide factual presentation.
4. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion.
Birmingham, AL
ADMINISTRATIVE REQUIREMENTS 013000 - 9
F. Digital Photographs: 24 bit color, minimum resolution of 1600 by 1200 ("2 megapixel"), in JPG format; provide files unaltered by photo editing software.
1. Delivery Medium: Via Newforma.
2. File Naming: Include project identification, date and time of view, and view identification.
3.07 SUBMITTALS
A. See section 01 3001 - Submittals.
Birmingham, AL
SUBMITTALS 013001 - 1
SECTION 013001 - SUBMITTALS
PART I - GENERAL
1.01 SUMMARY
A. Section Includes:
1. Preparing and processing of submittals for review and action.
2. Preparing and processing of informational submittals.
B. Submit the following for the Contracting Officer's review and action:
1. Shop drawings.
2. Structural design information required by the contract documents.
3. Product data.
4. Samples.
5. Submittals indicated as "for approval."
6. Submittals for which procedures are not defined elsewhere.
7. Submittal register.
C. Submit the following as informational submittals:
1. Certificates.
2. Coordination drawings.
3. Reports.
4. Qualification statements for manufacturers/installers.
5. Submittals indicated as "for information only."
D. Specific submittals required are described in individual sections.
E. Related Sections: The following are specified elsewhere in Division 1:
1. Product submittals:
a. Product option submittals.
Birmingham, AL
SUBMITTALS 013001 - 2
b. Requests for substitution.
c. Operating and maintenance data.
d. Warranties.
e. Maintenance materials and tools.
2. Contract closeout submittals:
a. Equipment and systems demonstration reports.
b. Request for determination of Beneficial Occupancy.
c. Certificate of occupancy.
d. Project record documents.
e. Bonds.
1.02 DEFINITIONS
A. Shop Drawings: See General Conditions.
1. Shop drawings also include:
a. Product data specifically prepared for this project.
b. Shop or plant inspection and test reports, when made on specific materials, products, or systems to be used in the work.
B. Product Data: See General Conditions.
1. Product data submittals also include:
a. Performance curves, when issued by the manufacturer for…
This is the start of the file's text. The full file is on GovTribe.