Solicitation Amendment W15QKN26QA0480001 SF 30.pdf
PDF 4 MB Posted
- Attached to
- Industrial Vacuum System (and ancillary pumps)
- Solicitation number
- W15QKN26QA048
About this file
This is an Amendment of Solicitation/Modification of Contract (SF 30) for a wind-tunnel upgrade industrial vacuum system project. The amendment number is 0001, effective March 9, 2026, issued by WSGK ACC-PICA (Picatinny Arsenal, New Jersey) and administered by the U.S. Army. The contracting officer is Charlotte A. Sylvain, and the original solicitation number is W15QKN26QA048, dated March 2, 2026. The amendment updates the Statement of Work, modifies contract line items, and provides responses to industry questions received regarding the procurement.
The amendment clarifies the scope of work for purchasing an industrial vacuum system configuration in one of two options: Configuration A comprises a single 2,400 cubic-foot steel sphere vessel capable of handling pressures under 350 PSIG at 800 degrees Fahrenheit, a vacuum pump achieving ultimate vacuum pressure of less than 13.8 Mbar, a pump exhaust silencer reducing noise below 70 dB, and a vacuum booster. Configuration B specifies two 2,400 cubic-foot steel cylindrical vessels instead of one sphere, with identical pump, silencer, and booster requirements. Delivery is required within 12 months of award to the Wind Tunnel Facility at Picatinny Arsenal, New Jersey, with F.O.B. destination terms and contractor payment method. The contractor must provide a Certificate of Conformance documenting compliance with all commercial requirements and specifications. The evaluation is on a pass/fail technical acceptability basis followed by lowest price selection among acceptable proposals, with proposals submitted in two volumes (Technical Quote and Price Quote). The amendment also adds Attachment 0006 containing questions and answers dated March 10, 2026, and modifies packaging, marking, and transportation requirements consistent with commercial standards and military specifications including MIL-STD-129 bar coding and ISPM 15 heat-treated wood packaging materials requirements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Continuation of Supplies or Services and Prices/Costs
The miscellaneous text for the following CLIN(s) / SLIN(s) / ELIN(s) were added:
000201 Miscellaneous Text:
SLIN 000201 is Not Separately Priced.
The following CLIN(s) / SLIN(s) / ELIN(s) were added:
Item Supplies / Services Quant ity
Unit Unit Price Amount
00020
Exhibit A001 - DD1423_A001_Certificate of Conformance
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO CHANGED BY
Product/Service Real Property Personal Property Equipment Type Vacuum System (and ancillary pumps)
INFORMATION FROM TO CHANGED
BY
Product /Service
Real Property
Personal Property
Equipment Type
Industrial Vacuum System (and auxiliary pumps)
Continuation of Description
W15QKN26QA0480001
Miscellaneous text in this section has been modified to:
Statement of Work
For
Wind-tunnel upgrade (Industrial Vacuum System)
1.0 Background:
The Combat Capabilities Development Command - Armaments Center (DEVCOM-AC), Munitions Engineering & Technology Center (METC), Fuze and Precision Armaments Directorate (FPAD), Aeroballistics Division at Picatinny Arsenal has a requirement to upgrade the wind tunnel. The scope of this effort is to purchase a vacuum system to support the upgrade.
2.0 Requirements:
The contractor shall deliver a vacuum system configuration, of either A B below:or
Configuration A:
Quantity of (1) Steel Sphere vessel with total internal volume 2,400 cubic feet. Vacuum pressure vessel must handle processing < 350 PSIG (pressure after 2nd throat diffuser) of 100% air at 800 degrees Fahrenheit. (temp without after-cooler) (CAUTION: pump temp ranges from 40 - 110 degrees Fahrenheit, must lower exhaust air temp < 100 degrees Fahrenheit using a cooler) Suitable for outdoor location.
Quantity of (1) Vacuum Pump capable of achieving ultimate vacuum pressure of <13.8 Mbar or <10 Torr. Operating ambient temperature range 40 - 110 degrees Fahrenheit. Capable of pulling vacuum from (1) Steel Sphere vessel with a total volume roughly 2,400 cubic feet or 18,000-gallon pressure vessel.
Quantity of (1) Pump Exhaust Silencer capable of reducing noise level with silencer < 70 dB during operation cycle, inclusive of all necessary hardware and connections suitable for side and rear exhaust mounting.
Quantity of (1) Vacuum Booster capable of supercharging (1) vacuum pump to increase the flow (CFM) and achieve a deeper vacuum. Capable of creating faster pumping speeds and deeper vacuum levels.
Any commercial manuals associated with the overall system deliverable.
Configuration B:
Quantity of (2) Steel Cylindrical horizontal or vertical vessels with total internal volume 2,400 cubic feet. Example: (2) 1,200 cubic feet vessels. Vacuum pressure vessel must handle processing < 350 PSIG (pressure after 2nd throat diffuser) of 100% air at 800 degrees Fahrenheit. (temp without after-cooler) (CAUTION: pump temp ranges from 40 - 110 degrees Fahrenheit, must lower exhaust air temp < 100 degrees Fahrenheit using a cooler) Suitable for outdoor location.
Quantity of (1) Vacuum Pump capable of achieving ultimate vacuum pressure of <13.8 Mbar or <10 Torr. Operating ambient temperature range 40 - 110 degrees Fahrenheit. Capable of pulling vacuum from two (2) Steel Cylindrical vessels with a total volume roughly 2,400 cubic feet or an 18,000-gallon pressure vessel.
Quantity of (1) Pump Exhaust Silencer capable of reducing noise level with silencer < 70 dB during operation cycle inclusive of all necessary hardware and connections suitable for side and rear exhaust mounting.
Quantity of (1) Vacuum Booster capable of supercharging (1) vacuum pump to enhance performance, increase the flow (CFM) and achieve a deeper vacuum. Capable of achieving faster pumping speeds and deeper vacuum levels.
Any commercial manuals associated with the overall system deliverable.
3.0 Delivery Schedule:
Delivery shall be within 12 months after date of award. F.O.B. terms are destination. Delivery shall be made to the Wind tunnel facility (location disclosed after award). Deliveries shall be made to the following address:
Wind Tunnel Facility
FCDD-ACM-FA
ATTN: TBD
Picatinny Arsenal, NJ 07806-5000
The contractor shall work with the Government to schedule a delivery time window/slot.
4.0 Delivery Requirements:
For delivery of each requirement listed above, the contractor shall send a certificate of conformance (CoC) indicating compliance with all commercial requirements and item specifications. (see CDRL A001 - DI-MISC 80678).
5.0 Security
5.1 Security Classification: The highest security classification for this effort is UNCLASSIFIED.
5.2 The following security provisions apply:
Export Control Laws/International Traffic in Arms Regulation. DFARS Clause 252.225-7048, Export-Controlled Item applies to this effort. All documents determined to contain export controlled technical data will be marked with the following notice: Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.
5.3 Public Release of Information.
An OPSEC review is required prior to all public releases. All government information intended for public release by a contractor will undergo a government OPSEC review prior to release.
6.0 Technical Point of Contact/WAWF approval
Approval Official in WAWF: TBD
Continuation of Packaging and Marking
Miscellaneous text in this section has been modified to:
PACKING AND MARKING REQUIREMENTS
ITEM NOMENCLATURE: Wind Tunnel Upgrade
1. No Bar Codes Required.
COMMERCIAL PACKAGING REQUIREMENTS
1. Packaging - Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.
1.1 Cleanliness - Items shall be free of dirt and other contaminants which would contribute to the deterioration of the item or which would require cleaning by the customer prior to use.
Coatings and preservatives applied to the item for protection are not considered contaminants.
1.2 Preservation - Items susceptible to corrosion or deterioration shall be provided protection such as preservative coatings, volatile corrosion inhibitors, desiccants, water-proof and/or water-vapor-proof barriers.
1.3 Cushioning - Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, critical material) or which could cause physical damage to other items, shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration and prevent damage during handling and shipment.
2. Unit package
2.1 Unit Package - A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling. The outermost component of the unit package shall be a container such as a sealed bag, carton or box.
2.2 Unit Package Quantity - Unless otherwise specified, the unit package quantity shall be one each part, set, assembly, kit, etc.
3. Intermediate Package
3.1 Intermediate Packaging - The use of intermediate packaging is required whenever one or more of the following conditions exist:
a. The quantity is over one (1) gross of the same national stock number.
b. Use enhances handling and inventorying.
c. The exterior surface of the unit pack is a barrier bag.
d. The unit pack is less than 64 cubic inches.
e. The weight of the unit pack is less than five (5) pounds and no dimension is over twelve
(12) inches. Intermediate container shall be limited to a maximum of 100 unit packs, a net load of 40 pounds, or a maximum volume of 1.5 cubic feet, whichever occurs first.
4. Packing
4.1 Unit packages and intermediate packages not meeting the requirements for a shipping container shall be packed in shipping containers. All shipping containers shall be the most cost effective and shall be of the minimum cube to contain and protect the items.
4.2 Shipping Containers - The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stacking at least ten feet high, and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.
5. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred commercial expendable pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
6. Marking
All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, Date 18 February 2014 including bar coding. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. NOTE: Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see https://www.acq.osd.mil/log for the current DoD /sci/.AIT.html/DoD_Suppliers_Passive_RFID_Info_Guide_v15update.pdf Suppliers' Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the unit load.
7. Hazardous Materials
7.1 A hazardous material is defined as a substance which has been determined by the Department of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Title 49 CFR and other applicable modal regulations effective at the time of shipment.) Ammunition and explosives (Hazard Class 1) are special cases and must be properly hazard classified and registered with the competent authority of the United States (Department of Transportation).
7.2 Packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
a. International Air Transport: International Civil Aviation Organization (ICAO) Technical Instructions for the Safe Transport of Dangerous Goods by Air
b. International Vessel Transport: International Maritime Dangerous Goods Code (IMDG)
c. Domestic Transport: Code of Federal Regulations (CFR) Title 49
d. Military Air Transport: Joint Service Regulation AFMAN24-204/TM38-250/NAVSUP PUB 505
/MCO P4030.19/DLAM 4145.3.
7.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the regulations of the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
W15QKN26QA0480001
https://www.acq.osd.mil/log/sci/.AIT.html/DoD_Suppliers_Passive_RFID_Info_Guide_v15update.pdf https://www.acq.osd.mil/log/sci/.AIT.html/DoD_Suppliers_Passive_RFID_Info_Guide_v15update.pdf
7.4 A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside a waterproof sealed pouch attached to the outside of the package.
8. Wood Packaging Materials - Heat Treatment and Marking of Wood Packaging Materials:
In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 continuous minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.
9. Quality Assurance -The contractor is responsible for establishing a quality system. Full consideration to examinations, inspections, and tests will be given to ensure the acceptability of the commercial package.
TRANSPORTATION REQUIREMENTS
1. Nomenclature of item(s) being procured.
Wind-Tunnel Upgrade, Vacuum System
2. Number of items being procured and the delivery schedule:
Delivery shall be within twelve (12) months after date of award. Delivery shall be a vacuum system configuration, of either A or B. Please see the SOW for all required deliverables.
3. Destination of delivered items:
Wind Tunnel Facility FCDD-ACM-FA
ATTN: TBD
Picatinny Arsenal, NJ 07806-5000
4. Estimated weight of the item in its shipping container: Greater than 200 pounds but less than 2,500 pounds.
5. Identify security classification of the material to be shipped: Secret and Unclassified.
6. Identify the DOT container marking (Proper Shipping Name and Identification Number) and the hazard classification: Non-Hazardous (Identification Number and Proper Shipping Name not required.
7. Appropriate Transportation Security Category for Arms, Ammunition or Explosives (AA&E) as categorized in DoD 5100.76-M: Item is not AA&E.
8. Government Furnished Property (GFP): No GFP Provided.
Continuation of Deliveries or Performance
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were added:
000201
INFORMATION VALUE
FoB Point Destination Payment Method Contractor
List of Contract Documents, Exhibits, or Attachments
The attachments table has changed from:
Identifi er
Document Name
Document Description Reference Identifier
Date Line Item
Page N umbers
Docum ent Type
Provid ed Under Separa te Cover
A DD1423_A001 Contract Data Requirements List
(CDRL)
20 Jan
Attach ment
No
0001 Attachment
Contract Quality Requirements 20 Jan
Attach ment
No
0002 Attachment
HQ AMC-LEVEL PROTEST
PROGRAM
20 Jan
Attach ment
No
0003 Attachment
FCDD AC 3002f FORM 20 Jan
Attach ment
No
0004 Attachment
Disclosure of Lobbying Activities 20 Jan
Attach ment
No
0005 Attachment
Additional Solicitation and Contract Requirements
20 Jan
Attach ment
No
To:
Identifi er
Document Name
Document Description Reference Identifier
Date Line Item
Page N umbers
Docum ent Type
Provid ed Under Separa te Cover
A DD1423_A001 Contract Data Requirements List
(CDRL)
20 Jan
0002 3 Exhibit No
0001 Attachment
Contract Quality Requirements 20 Jan
1 Attach ment
No
0002 Attachment
HQ AMC-LEVEL PROTEST
PROGRAM
20 Jan
1 Attach ment
No
0003 Attachment
FCDD AC 3002f FORM 20 Jan
2 Attach ment
No
0004 Attachment
Disclosure of Lobbying Activities 20 Jan
2 Attach ment
No
0005 Attachment
Additional Solicitation and Contract Requirements
20 Jan
1 Attach ment
No
0006 Attachment
Question and Answers_05March2026
10 Mar
2 Attach ment
No
The following contract documents were added:
Attachment 0006
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
Attachment 0006 2
Miscellaneous text in this section has been modified to:
See Section J attachments.
Addendum to 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services
Miscellaneous text in this section has been modified to:
Basis for Award:
The Government intends to award a single contract/purchase order to the responsive and responsible offeror that submits the lowest priced proposal that meets all the minimum technical requirements specified in the solicitation. Proposals will be evaluated in two separate volumes:
Volume I - Technical Quote and Volume II - Price Quote. The Government will first evaluate proposals for technical acceptability on a pass/fail (acceptable/unacceptable) basis. Only those proposals deemed technically acceptable will have their price volumes considered. The technically acceptable offeror with the lowest evaluated total price will be selected for award.
Discussions: The Government intends to evaluate quotes and make an award decision without discussions with offerors. Therefore, the initial quote should contain the offeror's best terms.
The Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary.
The following are the definitions that shall be used for evaluation of response received:
ADJECTIVAL
RATING
DEFINITION
ACCEPTABLE Proposal clearly meets the minimum requirements of the solicitation.
UNACCEPTABLE Proposal does not clearly meet the minimum requirements of the solicitation.
The proposals will be evaluated acceptable/unacceptable based on the criteria established in this solicitation as follows.
Factor One (1) Technical:
In order to achieve an acceptable rating for the technical factor the offeror's response must clearly meet the Scope of Work (SOW):
Factor Two (2) Price:
The total evaluated price shall be the total amount proposed on line item 0001 determined by summing the price proposed on each line item.
An offeror shall propose on line item 0001 to be considered for award. Unit pricing shall be listed with the extended cost for each item. Line item 0002, CDRLs, are not separately priced.
Adequate competition is anticipated for this purchase order. However, if only one offer is received, the Government reserves the right to request other than certified cost or pricing data in accordance with FAR 15.403-3.
Price/Cost Inconsistencies: A proposal is presumed to represent an offeror's best effort to respond to the solicitation. Each initial proposal should contain the offeror's best terms for award for this purchase order. Any inconsistencies in performance or price should be explained in the proposal. Any significant inconsistencies, if unexplained, raise a fundamental issue of the offeror's understanding of the nature and scope of work required and its financial ability to perform the contract, and may be grounds for rejection of the proposal.
| IDCode: J |
| Page: 1 |
| Pages: 12 |
| AmendNo: 0001 |
| EffDate: 09 MAR 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W15QKN |
| AdmCode: |
| IssuedBy: W6QK ACC-PICA |
KO CONTRACTING OFFICE, BUILDING 10 PHIPPS RD
PICATINNY ARSENAL, NJ 07806-5000
UNITED STATES
ROSEANNE HOOVEN, EMAIL: ROSEANNE.HOOVEN2.CIV@ARMY.MIL TELEPHONE: (520) 669-8573
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W15QKN26QA048 |
| SolDate: 02 MAR 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The Government is amending this solicitation to provide responses to the questions received from industry. |
| ContNameTitle: |
| CoNameTitle: CHARLOTTE A. SYLVAIN |
| ContDate: |
| CODate: 11 MAR 2026 |