Attachment_0004___Data_Item_Description_Index.docx

DOCX document 2 MB Posted

Attached to
M739A1 Point Detonating/Delay (PD/DLY) Fuze
Solicitation number
W15QKN25R0002
Issued by

About this file

These documents are a series of Data Item Descriptions (DIDs) related to the M739A1 Point Detonating/Delay (PD/DLY) Fuze procurement under solicitation W15QKN25R0002. The fuze is used by the US Army, USMC, and SOCOM for training and tactical operations, designed for 105mm and 155mm bursting artillery projectiles. Key DIDs include requirements for Quality Program Plans, Acceptance Test Reports, Configuration Management Plans, Critical Characteristics Control Plans, and Performance Oriented Packaging testing documentation.

The M739A1 PD/DLY Fuze features a one-piece solid aluminum body with a standard 2-inch threaded base, incorporating five modular subassemblies. Its Impact Delay Module provides fuze initiation delay of 3-6 milliseconds after passing through a target, with no explosive components within the module. The fuze is anodized green for Explosive Ordnance Disposal (EOD) identification purposes. The associated DIDs outline comprehensive technical, quality, testing, and packaging requirements for the fuze's procurement, emphasizing detailed documentation of manufacturing processes, quality control, testing procedures, and packaging specifications.

View the file

Other files

File Type Posted
Attachment 0012 - Certificate of Destruction.docx DOCX document
W15QKN25R0002-0002.pdf PDF
Attachment_0008___NonDisclosure_NonUseAgreement__NDA_.docx DOCX document
W15QKN25R0002-0001.pdf PDF
Attachment_0008___NonDisclosure_NonUseAgreement__NDA_.docx DOCX document
Attachment_0008___NonDisclosure_NonUseAgreement__NDA_.docx DOCX document
W15QKN25R0002.pdf PDF
Exhibit_A___CDRLS_A001_to_A023_Signed_RFP.pdf PDF
Attachment_0007___SF_LLL_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_0013___Past_Performance_Letter_and_Questionnaire.docx DOCX document
Attachment_0005___HCSDS_Index__Multiple_HCSDS__M739A1_Fuze.docx DOCX document
Attachment_0003___Additional_Solicitation_Contract_Requirements.docx DOCX document
Attachment_0008___NonDisclosure_NonUseAgreement__NDA_.docx DOCX document
Attachment_0010___AMSTA_AR_Form_1350_TechDataReqQuestionnaire.docx DOCX document
Attachment_0012___Certificate_of_Destruction.docx DOCX document
Attachment_0001___Technical_Data_Package_Info_for_M739A1_PD_DLY_Fuze_RFP.docx DOCX document
Attachment_0009___DD_2345_Militarily_Critical_Technical_Data_Agreement_Form.pdf PDF
Attachment_0002___Contract_Quality_Addendum__M739A1_Fuze_.docx DOCX document
Attachment_0011___Price_Matrix.xlsx XLSX spreadsheet
Attachment_0006___Form_3002_Clearance_of_Tech_Information.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION (DID) INDEX

For M739A1 PD/DLY Fuze

W15QKN-25-R-0002

CDRL

Number

DID

Number

DID Title
DID Document

A001

DI-QCIC-81891
Acceptance Test Report (ATR)

A002

DI-QCIC-81722
Quality Program Plan (QPP)
A003
DI-MISC-82386
Certification Data Report
A004
DI-MISC-80043B
Ammunition Data Card (ADC)
A005
DI-QCIC-81960
Measurement System Evaluation (MSE) – Measurement and Inspection

Equipment System Design Documentation for Acceptance of Product

A006
DI-SESS-80255B
Failure Summary and Analysis Report

A007 A008

DI-NDTI-80809B
Test/Inspection Report
A009
DI-SESS-80858D
Supplier’s Configuration Management Plan
A010
DI-MGMT-80004A
Management Plan
A011
DI-MGMT-81986
Critical Characteristics Control Plan (CCCP)
A012
DI-SAFT-80970A
Critical Safety Item, Characteristic and Critical Defect Report
A013
DI-MGMT-81996
Critical Plan Of Action (CPOA)
A014
DI-MGMT-81978
Acceptance Description Sheets (ADS)
A015
DI-MGMT-80934C
Operations Security (OPSEC) Plan
A016
DI-SESS-80639E
Engineering Change Proposal (ECP)
A017
DI-SESS-80640E
Request For Variance (RFV)
A018
DI-SESS-80642E
Notice Of Revision (NOR)
A019
DI-STDZ-80000C
Data Item Descriptions (DIDs)
A020
DI-SAFT-81563
Accident/ Incident Report
A021
DI-MISC-80508B
Technical Report–Study/Services
A022
DI-PACK-81059C
Performance Oriented Packaging (POP) Test Report
A023
DI-ADMN-81250C
Meeting Minutes

image3.emf

DI-MISC-82386.pdf

DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.

DATA ITEM DESCRIPTION

Title: CERTIFICATION DATA REPORT

Number: DI-MISC-82386 Approval Date: 20220712

AMSC Number: N10332 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: MISC-2022-003

Applicable Forms: N/A

Use/Relationship: The Certification Data Report is required to verify that specific qualifications have been obtained, tests have been performed, parts/assemblies/equipment/systems have been installed, tested, inspected and are ready for operation; that personnel have specific qualifications to perform assignments/operations/inspections; or to certify identicalness, interchangeability, compatibility, reliability, or completeness of documentation being prepared or reviewed by a contractor. The technical effort involved will be the result of equipment, procurement, or contract requirements.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by specific and discrete task requirements as delineated in the contract.

This DID supersedes DI-MISC-80678.

Requirements:

1. Reference Documents: N/A

2. Format. The report shall be typewritten in narrative format. Contractor’s format is acceptable.

3. Content: The report shall contain the contract number and data item sequence number, and shall contain a statement that specifically identifies the purpose and applicability of this certification.

4. Technical Content: The technical content shall be in accordance with the appendix entitled

“Certification Data/Report Technical Content Requirements,” contained in the applicable military specification as stated in the DD Form 1423, Contract Data Requirements List. The technical content shall be as specified on the DD Form 1423, Contract Data Requirements List and the contract requirements.

5. Certification of Completion. Certification that tests have been performed, inspections made, parts/assemblies/equipments/systems have been installed, tested, inspected, and are ready for operation, or that specific qualifications have been obtained shall provide objective evidence in support of the certification. Objective evidence may include such items as spectrographs, radiographs, material sampling, analysis, inspection and testing reports, or any other necessary documentation.

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:10Z Check the source to verify that this is the current version before use.

DI-MISC-82386

6. Certification of Personnel. Certifications that personnel have specific qualifications shall be supported by licenses, permits, tests, statements of competency, or other documentation. The specific capabilities to perform an assignment, inspection, or other operations shall be stated in the certification.

7. Certification of Compliance. Certification of compliance to specific specification requirements shall be a statement to the effect that the contractor has complied.

8. Supplemental Information. Additional specific material, drawings, sketches, photographs, etc., in support of these certifications shall be as defined in the DD Form 1423 and the contract requirements.

9. Signature. The Certification Report shall contain the signature of the contractor's authorized representative. Electronic signatures are acceptable.

End of DI-MISC-82386

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:10Z image4.emf

DI-MISC-80043B.pdf

Title: Ammunition Data Card (ADC)

Number: DI-MISC-80043B Approved Date: 20090623

AMSC Number: A9073 Limitation:

DTIC Applicable: GIDEP Application:

Office of Primary Responsibility: A/AR

Applicable Forms:

Use/relationship: The Ammunition Data Card is a record that documents essential historical information pertaining to the build of a production component lot or an end item lot of ammunition, explosive material or a serially numbered guided missile which contains all required data pertaining to each lot of the item. The Ammunition Data Card is used to provide traceability of explosive and non explosive end items, assemblies, sub-assemblies and component parts as mandated by contract requirements.

a. The data contained in this DID is required by MIL-STD-1168

‘Ammunition Lot Numbering and Ammunition Data Card’.

b. This DID supersedes DI-MISC-80043A which is no longer applicable.

1. Reference documents. The applicable issue of documents cited herein, including their approval dates, and dates of any applicable amendments, notices and revisions shall be as cited in the current issue of the DODISS at the time of the solicitation; or, for non DODISS-listed documents, as stated herein.

2. Preparation and Format. Manufacturer’s Identification

Symbols used in lot numbering must be registered per MIL-HDBK-

1461 ‘Ammunition Manufacturers and Their Symbols’. Ammunition

Data Cards shall be prepared in the World-Wide Ammunition Data

Repository Program (WARP) in accordance with the requirements of

MIL-STD-1168 and the on-line WARP User’s Manual.

3. End of DI-MISC-80043B.

DISTRIBUTION STATEMENT A. Approved for Public Release;

Distribution is Unlimited.

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:12Z image5.emf

DI-QCIC-81960.pdf

DI-QCIC-81960

Title: MEASUREMENT SYSTEM EVALUATION (MSE) – MEASUREMENT AND INSPECTION

EQUIPMENT SYSTEM DESIGN DOCUMENTATION FOR ACCEPTANCE OF PRODUCT

Number: DI-QCIC-81960 Approval Date: 25 February 2014 ASMC Number: 9461 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: No Office of Primary Responsibility: (AR) , RDAR-EIQ-SE Applicable Forms: N/A

Use/relationship: The Measurement and Inspection Equipment System Design documentation for Acceptance of Product describes the Acceptance Inspection Equipment (AIE), Automated AIE (AAIE), and various measurement systems, used to meet the inspection and test requirements to deliver units and other end products that conform to contract, specification, QAP and drawing requirements. This documentation is used to evaluate the acceptability of these designs to meet contract requirements.

a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific requirement delineated in the contract.

b. This DID is applicable to all AIE as required by the contract.

Requirements:

1. Reference Documents. The applicable documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as cited in contract documentation.

2. Format. Contractor’s format is acceptable.

3. Content. An AIE package shall include the following (as applicable).

3.1 Cover Sheet. Cover sheet information includes the following:

a. Prime contractor name, address, and contact information.

b. Contract number.

c. Nomenclature of item(s) being produced under contract.

d. Applicable drawing(s), specifications and Quality Assurance Provisions (QAPs).

e. Date and revision of “New” or “Revised” documentation.

f. Sub-component or assembly (if applicable).

g. Subcontractor(s) name, address, and contact information (if applicable).

3.2 Measuring and Inspection Equipment System Design Documentation. Measuring and inspection equipment system design documentation covers a variety of measurement systems and equipment used to evaluate acceptability of units to meet requirements. See ISO 9000 paragraph 3.8.2, Inspection and 3.10.4, Measuring Equipment.

3.3 Master List / Matrix. A detailed Master List or Matrix cross references each characteristic and its inspection requirement from the applicable drawings, specifications and QAPs with the proposed inspection methods and equipment. The Master List or Matrix information includes the following:

a. Drawing, specification or QAP number with revision and date of item being inspected.

b. Amendments, Engineering Change Proposals (ECPs), Notices of Revision (NORs), etc.

c. Specification or QAP paragraph number.

d. Drawing, specification, or QAP characteristic letter/number, description, and inspection requirement.

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:14Z

e. Inspection method with AIE identification with description, revision, and date.

f. Clearly indicate any revisions from previous submission(s).

3.4 Go-No Go/Functional Gages. Gage information includes the following:

a. Gage drawing number (design identification) with revision and date.

b. Drawings showing gage dimensions with tolerances.

c. Drawings showing gage material with surface finish and hardness of contacting gage elements.

d. Associated inspection procedures and theory of operation (as required, see ISO 10012).

3.5 Standard Measurement Equipment (SME). SME information includes the following:

a. Manufacturer, model, resolution, and accuracy.

b. Associated inspection procedures and theory of operation (as required, see ISO 10012).

3.6 Special Inspection Equipment/Methods. It includes Coordinate Measuring Machines (CMM), Tool Control (TC), Non-Destructive Testing (NDT), Automated Acceptance Inspection Equipment (AAIE), Destructive, Environmental, and Functional Test Equipment. It also includes inspection equipment that is not commercially available along with the corresponding design drawings.

a. Coordinate Measuring Machine (CMM). CMM information includes the following per ASME

B89.4.10360.2-2008:

i. Establishment of the geometry (Datums) and inspection process of the desired characteristic by the CMM. Include the number and location of probe hits to establish geometry (Datums) and any axis necessary to adequately inspect the feature.

ii. Environmental conditions and limits which may influence measurements.

iii. Operating procedures including machine start/warm up cycles, probing system qualification, probe cleaning, and probe calibrations.

iv. Periodic reverification tests in accordance with the user's specification and manufacturer’s procedures including repeatability of point coordinates and length measurement and repeatability.

v. Interim checks between periodic reverifications.

vi. Procedure for checking the CMM immediately after a significant event which could impact CMM performance.

b. Tool Control (TC). Tool Control information includes the following:

i. Measurements of form tools (punches, dies, molds, etc.) and correlation data between tool dimension and component dimension.

ii. Inspection frequency and gages used to measure the form tooling.

iii. Process control parameters that affect the component dimension.

iv. Procedures for tool control inspection including out of tolerance tool control dimension procedures, corrective action plans, and segregation of product since last successful inspection.

c. Non-Destructive Testing (NDT). NDT information includes the following:

i. Written procedures for the qualification and certification of NDT personnel and the certification records for each inspector, as described in NAS410 (NAS Certification & Qualification of NDT Personnel), ANSI/ASNT-CP-189 (ASNT Standard for Qualification and Certification of NDT Personnel), or SNT-TC-1A (Recommended

Practice for Personnel Qualification and Certification in NDT), and additional procedures identified by the Government.

ii. Records for other certification standards shall identify the applicable standard and confirm the levels of qualification of individuals responsible for acceptance of product to be consistent with those defined in the standard.

iii. The design documentation, specific application techniques, and operating procedures in accordance with ASTM E 543 (Standard Specification for Agencies Performing Nondestructive Testing) and the applicable nationally recognized standard practice(s) specific to the NDT method(s) employed on the contract, such as ASTM E-1742 (Standard Practice for Radiographic Examination) and SAE-AMS- STD-2154 (Inspection, Ultrasonic, Wrought Metals, Process For).

iv. Documentation on application techniques shall identify the applicable standard(s) utilized.

d. Automated Acceptance Inspection Equipment (AAIE) & Complex Designs. For AIE designs that are complex in nature, (e.g., open set-up, computer controlled, numerically controlled, multistation, and acceptance inspection equipment which is part of an integrated production and assembly system) the following information is to be provided:

i. Concept designs (MIL-A-70625A, p. 3, paragraph 3.2.1) includes:

(1) Sketches of the inspecting elements.

(2) Theory of operation including mechanical, electrical, and unique software operating conditions with associated logic flow diagrams.

(3) Description of the calibration and verification programs and standards.

(4) Description of all fail-safe measures that lead to rejection of Unit Under Test

(UUT).

(5) A proposed test plan to qualify the accuracy of inspection and correctness of accept or reject decisions and resultant actions.

(6) Manufacturer, model, resolution, and accuracy of any commercial device to be incorporated in the design.

(7) A method for verifying the integrity of the code (e.g., checksum or cyclic redundancy check).

ii. Detailed proposed designs (MIL-A-70625A, p. 4, paragraph 3.2.2) include:

a. After concept approval and before any fabrication:

(1) Drawings of the inspecting elements.

(2) Proposed system operation including mechanical, electrical, and unique software operating conditions with associated logic flow diagrams. Drawings of the calibration or verification standards.

(3) The computer test program to include software version, software design parameters, and flow charts showing acceptance/rejection settings and computer generated test stimuli (as differentiated from computer controlled standard test equipment stimuli).

(4) Schematic or block diagram of test and measuring circuits where applicable.

(5) Layout or block diagram showing overall equipment arrangement and interconnection, including the Unit Under Test (UUT).

(6) Details of adapters, cables, holding fixtures and like items as applicable.

b. Before performing the test to qualify the AIE:

(1) Setup, calibration, operation, and verification instructions.

(2) The final test plan.

(3) Computer test program, acceptance/rejection settings and a flow diagram.

(4) Detailed operating instructions indicating application of the AIE and the acceptance/rejection settings.

(5) The calibration program for each item of computer controlled test equipment and a sample printout of an actual test and calibration.

(6) A printout of the work instructions which are displayed for the operator.

iii. Final designs (MIL-A-70625A, p. 6, paragraph 3.2.5) include:

(1) Results of the test including data generated, printout of test results (when normally generated), unique software test results, and calibration results.

(2) Design depicting the equipment as it was tested.

(3) Setup, calibration, operation, and verification procedures

(4) Calibration and verification records.

e. Destructive, Environmental, and Functional Test Equipment. For Destructive, Environmental, and Functional (DEF) test equipment, the following information is to be provided:

i. Proposed AIE designs include:

(1) Theory of operation.

(2) Detailed drawings or sketches of the inspecting and testing elements and sufficient detail for supporting elements to facilitate evaluation for adequacy.

(3) Manufacturer, model, resolution, and accuracy of any commercial device to be incorporated in the design along with any modifications in design or use.

(4) Description of the calibration and verification programs and standards.

(5) A proposed test plan to qualify the accuracy of inspection and correctness of accept or reject decisions and resultant actions (as required).

(6) Setup, calibration, operation, and verification procedures and parameters.

(7) Settings, test conditions, calculations, and verification.

(8) Calibration and verification records.

ii. When DEF test equipment consists of AAIE or complex Designs, AIE design submissions shall include the requirements of paragraph 3.6.d above.

f. Measurement Systems Analysis (MSA). MSA is any of a number of specialized methods useful for studying a measurement system and its properties (ASTM E2782, paragraph 3.1.7).

There are several basic properties of measurement systems that are widely recognized among practitioners. These are repeatability, reproducibility, linearity, bias, stability, consistency, and resolution (ASTM E2782, paragraph 5.4). An MSA is to include these properties, as applicable.

End of DI-QCIC-81960 image6.emf

DI-SESS-80255B.pdf

Title: FAILURE SUMMARY AND ANALYSIS REPORT

Number: DI-SESS-80255B Approval Date: 20191015

AMSC Number: N10166 Limitation: N/A

DTIC Applicable: Yes GIDEP Applicable: Yes http://www.dtic.mil/dtic/submit http://www.gidep.org/data/submit.htm

Preparing Activity: AS

Project Number: SESS-2019-063

Use/relationship: The Failure Summary and Analysis Report presents a summary of the individual failures that occur prior to and during the reporting period and describes the analysis and corrective actions performed. This report is used to evaluate the contractor’s failure reporting, analysis, and corrective action efforts in accordance with the solicitation.

This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract.

This DID supersedes DI-SESS-80255A.

1. Reference Documents. None

2. Format. The Failure Summary and Analysis Report shall be in contractor’s format.

3. Content. The report shall summarize the results of the contractor’s Failure Reporting, Analysis, and Corrective Action System (FRACAS) implementation required by the statement of work, and shall include a cumulative tabulation of failure data. Failures that occurred during the latest report period shall be identified by suitable notation. The report shall include the following elements at a minimum:

3.1 Failure number

3.2 Failure analysis number

3.3 Failure date

3.4 Name of engineer responsible for failure analysis

3.5 Failed part name

3.6 Failed part number (e.g. national stock number (NSN), logistics control number, work unit code)

3.7 Manufacturer of failed part

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:16Z http://www.dtic.mil/dtic/submit http://www.gidep.org/data/submit.htm

DI-SESS-80255B

3.8 Subassembly name and number

3.9 Major assembly name and number

3.10 Equipment name and serial number

3.11 Failed part’s accumulated test or field operational life data

3.12 Test or mission being performed when the failure occurred

3.13 Test or mission mode of operation and environmental and use conditions when the failure occurred

3.14 Failure symptoms and description of detection or diagnosis methods (e.g. Built In Test)

3.15 Failure effects (e.g. none, degradation, abort)

3.16 Repair action (e.g. remove/replace)

3.17 Failure mode description

3.18 Description of engineering analysis method employed in failure analysis

3.19 Failure mechanism/cause of failure

3.20 Contributing factors, including multiple factor interactions, or secondary effects of the failure

3.21 Categorization of failure (e.g. equipment design, equipment manufacturing workmanship, part design, part manufacturing workmanship, software errors, unverified, intermittent, non-relevant)

3.22 Information on previous corrective actions for the same part or failure mode.

Corrective action required to mitigate the failure mode, including:

3.22.1 Identification of the failure mode

3.22.2 The recommended process or process control changes, when the failure cause was due to workmanship defects

3.22.3 Proposals for retrofit of all equipment already delivered or assembled, including recommended effectivity, in accordance with the contract

DI-SESS-80255B

3.22.4 Disposition of all defective material and material rendered obsolete because of any necessary redesign, to assure their exclusion from production items

3.22.5 Identification of previous functional and environmental qualification tests, if any, invalidated by the corrective action changes and a recommendation of those tests that should be repeated, in accordance with the terms of the contract, to demonstrate the corrective action’s effectiveness

3.22.6 Effect on operational and diagnostic software programs and plan for changes, if necessary

3.23 Corrective action status

3.24 The recommended fix effectiveness factor (FEF) to be applied to the failure mode based on the proposed corrective action

3.25 Rationale for any open failure analyses past the contract-specified closeout time

3.26 Severity criticality ranking of the failure modes. The severity classification categories are:

3.26.1 Category I - Catastrophic - A failure which may cause death or system loss (i.e., aircraft, tank, missile, ship)

3.26.2 Category II - Critical - A failure which may cause severe injury, major property damage, or major system damage resulting in mission loss.

3.26.3. Category III - Marginal - A failure that may cause minor injury, minor property damage, or minor system damage which will result in delay or loss of availability or mission degradation.

3.26.4 Category IV - Minor - A failure not serious enough to cause injury, property or system damage, but which results in unscheduled maintenance or repair.

End of DI-SESS-80255B image7.emf

DI-NDTI-80809B.pdf

DATA ITEM DESCRIPTION I Form Approved OMB No.0704.0188

1.nTLE 2.IOENTIFICATIONNUMBER

TEST/ INSPECTION REPORT DI-NM’I-80809B

L OESCRIPTlOtVPURPOSE

3.1 The testl inspection report is used to document testl inspection results, findings, and analyses that will enable the government or contracting agency to evaluate compliance with system requirements, performance objectives, specifications, and test linspection plans.

1.APPROVALDATE 5.OFFICEOFPRIMARYRESPONSIBILITY(OPB) Ea.DTICAPPLICABLE 6b.CWIEP AppliCable

(YVMMOD)

F/AFMC-DCJP

970124

,.APPLlCAT\0NflNTER7iElAT10NSH1P

7.1 This data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement

I as delineated in the contract.

I

7.2 This DID is applicable to engineering (developmental ), preliminary qualification, qualification, and acceptance testing.

7.3 This DID supersedes DI-NDTI-80809A and DI-MISC-80653

1.APPROVALLIMITATION 9a.APPLICABLEFORMS 9b.AMSCNUMBER

F7231

10,PREPARATIONlNSTRUCnONS

10.1 Format. Contractor format is acceptable.

paragraph 10.2 and its subparagraphs in a manner understanding

10.2 CQnL!aL. The test/inspection report shall

applicable.

Organize the information required by that facilitates presentation and contain the following information, as

10. 2.1 Cove. and tile uaae. The following information shall appear on the outside front :over and title page:

a. Report date.

b. Report number (contractor or government)

Contractor’ s name, address, and commercia 1 and government entity code.

Contract number and contract line item number or sequence number (if applicable)

e. ‘fvpe of test/inspection (for example. first article acceptance test, aualitv con formanc-e-inspection, d-evelopmental test-, qualification test, f Identification of item tested/inspected.

9. Date or period of test/inspection.

h. Name and address of requiring government activity.

i. Security classification, downgrading and declassifying environmental Lest) .“ information, if applicable.

(Continued on page 2 )

1.DIS77UBUTIONSTATEMEW

DISTRIBUTION STATEMRNT A : APPROVED FOR PUBLIC RELBASE; DISTRIBUTION IS UNLIMITED.

ID Form 1664,APR 89 PreviOLIsedtliomwe obsdem. Page 1 of & Pages 39123

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:17Z

DI-NDTI-80809B

Block 10, Preparation Instructions (continued)

10.2.2 ~. The table of contents shall identify the following:

a. The title and starting page of each major section, paragraph, and apPendix of the report.

b. The page, identifying number, and title of each illustration (for example; figure, table, photograph, chart, and drawing)

10 .2.3 -ductim. The introduction shall include the following information:

10.2 .3.1 obyectlve W. The specific test/ inspection objective (s) as specified in the contract tasking document.

10. 2.3.2 L.temls) tes~. Complete identification of the item(s) testedl inspected including the following:

a. Nomenclature.

b. National stock number.

Model number, part number t and serial number :: Type of item (for example, prototype, production item, laboratory model )

e. Serial or lot number.

f. Applicable engineering changes

9. Production item specification, if applicable.

h. Date of manufacture.

10.2 .3.3 Complete inspection requirements correlated to contractual

Required testl inspection parameters :: Performance requirements, acceptance or environmental criteria.

10.2.4 ~. Complete test/inspection report identification of the testl requirements including the compliance limits, and summary including the

a. A brief discussion of the significant test/inspection results, ObSerVati Qns, conclusions, and recommendations covered in greater detail elsewhere in the report.

b. Proposed corrective actions and schedules for failures or problems encountered.

c. Identification of deviations, departures, or limitations encountered, referenced to the contract requirements.

d. Tables, graphs, illustrations, or charts as appropriate to simplify the summary data.

10.2.5 ~. Complete identification of all documents referenced in the test finspection report including the following, as applicable:

a. Prior testf inspection reports on the same item.

b. Test /inspection plans and procedure documents

c. Prior certifications of compliance.

d. Contractor’ s file designation where test/ inspection records are maintained.

e. Input parameters used.

The applicable issue of the documents cited therein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

Page 2 of 4 Pages Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:17Z

10.2.6 ~. The body of the testlinspection report shall be as follows :

10 .2.6.1 KzZL_ + de.tlflca~.

Complete identification of each item of test equipment used in the testlinspection including the following:

a.

b.

c.

d.

e.

f.

9.

10. 2.6.2

Nomenclature.

Model number.

Serial number.

Manufacturer.

Calibration status.

Accuracy data.

Comments, if applicable.

Testlinmection kuhtv mstd.b&mn and set–w. Complete description of the physical set-up used in conducting the test/inspection to include the following:

a. Location or orientation of the item.

b. Location. orientation, or settinm of test equipment and instrumentation.

c. Location, orientation, or settings of sensors and probes

d. Location or orientation of interconnections, cables, and hoop-ups.

e. Electrical power, pneumatic, fluidic, and hydraulic requirements.

Drawings, illustrations, and photographs maY be used for clarification.

10 .2.6.3 wrocedur~. Complete description of the procedures used in conducting the test/inspection to include the following:

a. Item selection and inspection that verified suitability for test/ inspection.

b. Summarized sequence of testing/inspection steps, including a description of how the item was operated during the test/inspection, and any control conditions imposed.

10 .2.6.4 A copy of all testlinspection results and analysis to include the following:

10.2.6 .4.1 ~. The actual recorded data (for example, log book entries, oscillographs, instrument readings, plotter graphs) If the recorded data is extensive, provide it in an appendix.

10. 2.6.4.2 Test/ insQec!iion resu. Identification of all testlinspection results to include the following:

a. Matrices comparing results achieved against test/inspection objectives or requirements

b. A discussion of these matrices as to their significance, and how they compare to any prior testlinspections.

Calculation examples.

;; Discussion of anomalies, deviations, discrepancies, or failures, including their impact, causes, and proposed corrective actions The discussion shall address discrepancies between design requirements and the tested/inspected Configuration.

10. 2.6.5 Conclusicxls Test/ inspection conclusions distinguished between objective and subjective to include the following:

a. The effectiveness of the testlinspection procedures in measuring item performance.

Page 3 of 4 PagesSource: http://assist.dla.mil -- Downloaded: 2025-04-15T19:17Z

b. The success or failure of the item to meet required test/inspection objectives.

c. The need for repeat, additional, or alternative tests linspections.

d. The need for item redesign or further development.

e. The need for improved test/inspection procedures, techniques, or facilities.

f. The adequacy and completeness of the test/inspection requirements.

10.2 .6.6 Recommendations appropriate to the test/inspection results and conclusions including the following:

a b.

c.

d.

e.

f.

9.

h.

Acceptability of the item tested/inspected (pass or fail) Additional testing/inspection required. ,.

Redesign required.

Problem resolution.

Test/inspection procedure or facility improvements Disposition of items tested/inspected.

Documentation changes required.

Testing/ inspection improvements

10.2.7 The following certifications shall be included, .as

applicable:

10.2 .7.1 A statement that the testlinspection was performed in accordance with applicable testlinspection plans and procedures, and that the results are true and accurate. The authentication shall include the signature of the contractor personnel that performed the test(s) /inspection(s) , a contractor representative authorized to make such certification, and any government witnesses

10.2 .7.2 A statement identifying those requirements not tested/inspected or measured that were previously validated.

Include identification of the data and method employed for such validation (for example, prior test/inspection, analytical verification, equivalent item, and so on) The authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness.

10.2 .7.3 A statement that the item tested/ inspected either passed or failed item acceptability requirements This authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness

10.2.8 Appendices shall be used to append detailed

test/inspection daia, drawings, photographs , or other documentation too voluminous to include in the main body of the report This includes referenced documentation not previously provided by the government, and test/ inspection reports from any associated test/inspection activity that may have performed some of the testing/inspecting requirements.

Page 4 of 4 Pages Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:17Z image8.emf

DI-SESS-80858D.pdf

Title: SUPPLIER’S CONFIGURATION MANAGEMENT PLAN

Number: DI-SESS-80858D Approval Date: 20200211

AMSC Number: N10144 Limitation: N/A

Preparing Activity: NM Project Number: SESS-2020-007

Use/relationship: The Supplier’s Configuration Management (CM) Plan describes the organization, procedures, and controls of the Supplier’s CM program. The principle use is to provide the

Government a basis for review, evaluation, and monitoring of the CM program and associated proposed components.

a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in EIA-649-1 and the principles of EIA-649 (Copies of these standards are available online at www.sae.org or from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 [inside USA and Canada] or 724-776-4970 [outside

USA]).

b. This DID supersedes DI-SESS-80858C.

1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the

2. Format. The Supplier’s CM plan shall be prepared in Supplier format.

3. Content. The Supplier’s CM plan shall identify the Supplier’s processes and procedures for:

a. Configuration management and planning over the lifecycle of a product.

b. Configuration identification throughout the product lifecycle.

c. Configuration change management involves controlling and documenting the product and its product configuration information to the product’s end of life.

d. Configuration status accounting involves recording and reporting of information needed to trace and manage configuration of a product.

e. Verification and audits to ensure consistency of product information are established and maintained in the execution of the total configuration, including hardware, software, and firmware.

End of DI-SESS-80858D

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:20Z http://www.sae.org/ image9.emf

DI-MGMT-80004A.pdf

Title: Management Plan

Number: DI-MGMT-80004A Approval Date: 30 OCT 2006 AMSC Number: 7621 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: The management plan describes the contractor’s organization, assignment of functions, duties, and responsibilities, management procedures and policies, and reporting requirements for the conduct of contractually-imposed tasks, projects, or programs.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID may be applied in any contract or program phase where the contract management is under the direction and control of the contractor.

Requirements:

1. Reference documents. None.

2. Format. The plan shall be in a format that the contractor devises and conforms to the

a. Identification. The plan shall be identified with the preparing office or contractors title, the identifying numbers or designation of the Contract/Procurement Request, the identify and/or nomenclature of the system/component/program/project, the security classification and the Government activity issuing the controlling contract.

b. Descriptive material. As may be needed to clarify or explain matters in the text, the plan may include descriptive material, sketches, drawings, photographs, tables, forms, graphs, worksheets, charts, etc.

c. Page size. The plan may be typewritten or printed on standard size paper, e.g., 8 ½ x 11 inches or metric A4. The pages shall be sequentially numbered and security bound together. As necessary, graphic material may be one-way fold-outs. All attachments shall be identified and referenced in the text. Each section and paragraph shall be numbered.

d. Table of contents and index. Plans of more than 30 pages in length shall contain a

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:23Z

h. delivery procedures

DI-MGMT-80004A

table of contents. Plans more than 120 pages in length shall also include an Index.

e. Legibility. The document shall be legible and reproducible.

3.1 General. The Management Plan shall consist of the organizational structure, the assignment of functions, duties, and responsibilities, the procedures and policies and the reporting requirements that are established for the initiation, monitoring, control, completion, test and verification, and reporting of contractual tasks, projects, and programs.

3.2 Specific contents. The Management Plan shall cover the organizational structure, program management methodology, personnel, security, and the reports as described herein. Other subjects to be included are as follows:

a. design control

b. reliability

c. configuration control

d. standardization

e. quality assurance

f. provisioning

g. control of Government property

i. tests

j. certifications

k. packaging

l. shipping

m. other

3.3 Organizational structure. The plan shall present an organizational chart and supporting narrative portraying the contractor’s business (corporate) structure. It shall describe the functional relationships and responsibilities among the organizational elements that will participate in the accomplishment of the contractual commitments.

3.4 Program management. The plan shall present an organizational chart and supporting narrative describing the management office the contractor establishes to manage the contractual commitments. The plan shall define the direct lines of control, responsibilities, functional relationships, and authority between the management office and the contractor’s other organizational elements. The plan shall also describe all interfaces between the contractor and the Government and between the contractor and other contractors which are necessary and pertinent to the accomplishment of contractual tasks, projects and programs.

3.5 Methodology.

a. The plan include a narrative description of the technical approach or methods the contractor will employ to accomplish contractual tasks, projects, and programs, including, as applicable, development, tests, manufacture, construction, formulation, installation, logistics support, training, maintenance documentation, and configuration controls.

b. The plan shall include a milestone chart graphically depicting the schedule of events associated with accomplishing each contractual commitment.

3.6 Personnel.

a. The plan shall list the personnel staffing of the contractor’s management office that directs the contractual tasks, projects, and programs and assist in completing the contract. The listing shall include the education, training, skills, experience, and security clearance that personnel require to fill each such position and shall state the identity, background, and work experience of the personnel assigned to fill these positions.

b. The plan shall also describe the staffing required for proper accomplishment of each contractual task by skill type, skill level, number of personnel, and security clearance. When submitted as part of a proposal, the plan shall state how many such personnel are currently available and how many new hires are required to staff fully to accomplish each task as scheduled.

3.7 Security.

a. Provide a Standard Practice Procedure (SPP) which fully describes the security program, safeguards emergency procedures to be established to the protection of Government-furnished and contractor-developed classified materials prepared In conjunction with the project. The SPP shall be prepared in accordance with guidelines contained in the Industrial Security Manual, Purchase Description, and such additional requirements as may be stipulated by the cognizant security compliance organization. The SPP shall require approval by the Government.

b. Develop a comprehensive security accreditation plan to demonstrate how the computer security requirements stipulated in the PD, as applicable, have been accounted for in the system design, and how satisfaction of each requirement will be explicitly demonstrated in the test program. This plan shall also identify any specific support equipment or software to be provided for demonstration of design compliance and/or system compliance with the planned security requirements. The plan shall require approval by the Government prior to implementation.

c. Reports. The plan shall describe the management methods the contractor will employ to ensure meeting all preparations, format, and submittal requirements established by the CDRL (DD Form 1423) for data to be delivered to the Government.

4. END OF DI-MGMT-80004A

DATA ITEM DESCRIPTION

Requirements:

image10.emf

DI-MGMT-81986.pdf

Title: CRITICAL CHARACTERISTICS CONTROL PLAN (CCCP)

Number: DI-MGMT-81986 Approval Date: 20150714

AMSC Number: N9563 Limitation:

Preparing Activity: SH Project Number: MGMT-2015-005

Use/relationship: The Critical Characteristics Control Plan (CCCP) forms a part of the

Contractor’s quality system and describes how the Contractor and all subcontractors will prevent the creation or occurrence of a critical non-conformance (defect), but in the event of its occurrence, assure its detection and control.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the

1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as cited in the current issue of the DODISS at the time of the solicitation; or, for non

DODISS-listed documents, as stated herein.

2. Format. The plan shall be in the Contractor’s format.

3. Content. The plan shall include a cover sheet specifying the following:

a. Contractor’s title

b. Contract number.

c. Revision and date.

d. Nomenclature of the system/component/program/project, the security classification, and the distribution restrictions.

e. Government activity issuing the controlling contract.

3.1 Table of contents. The plan shall contain a table of contents.

3.2 Index. The plan shall include an index.

3.3 Descriptive material. The plan shall include any descriptive material needed to provide comprehensibility of the content such as sketches, drawings, photographs, tables, forms, graphs, worksheets, charts, etc.

Source: http://assist.dla.mil -- Downloaded: 2025-04-15T19:24Z

DI-MGMT-81986

3.4 Key manufacturing processes. The plan shall identify those aspects of the manufacturing process that can influence the creation of a critical non-conformance including the production process, work instructions/procedures, process controls, mistake proofing, inspection systems (Acceptance Inspection Equipment (AIE), Automated Acceptance Inspection Equipment (AAIE)), materials, material handling, personnel, training, and the quality management system (calibration, corrective/preventive action, control of non-conforming product, and supply chain management).

3.4.1 The plan shall list all of the critical characteristics, the location/facility which produces the material affected by each critical characteristic, and the associated document(s) identifying the requirement (specification and revision, quality assurance arovision (QAP) number, drawing and revision).

3.4.2 The plan shall contain the critical characteristics management structure and roles/responsibilities including:

a. An organization chart addressing the critical characteristics control structure.

b. Personnel performing Quality Assurance (QA) inspections and verification inspections.

c. Relevant QA inspection validation.

d. Material Review Board (MRB) authority.

e. Access/disposition to critical non-conformances, accountability, and traceability.

f. Work stop authority.

g. Restart authority.

h. Notification to Government authority.

3.4.3 The plan shall contain the program management structure and roles/responsibilities including:

a. An organization chart with supporting narrative describing the management office the Contractor establishes to manage the contractual commitments.

b. The direct lines of control, responsibilities, functional relationships, and authority between the management office and the Contractor’s other organizational elements.

c. All interfaces between the Contractor and the Government and between the Contractor and other Contractors which are necessary and pertinent to the accomplishment of contractual tasks, projects, and programs.

3.4.4 The plan shall identify all appropriate critical process documents including:

a. Manufacturing processes and procedures.

b. Work instructions/procedures.

c. Handling instructions.

d. Process controls.

e. Inspection systems and procedures.

f. Accountability/traceability of non-conforming materials documentation.

g. Quality records maintaining an audit trail.

3.4.5 The plan shall contain detailed information about preventing critical non-conformances in the production process and it shall describe how the process is robust with high capability and effective controls including:

a. Process description.

b. Detailed flow chart including Inputs, Outputs, and Key Process

Parameters.

c. How key process parameters are identified, defined, and controlled.

d. Failure Modes analysis methodology.

e. Fail-safe methods, mistake proofing techniques, and assurance that the process is not bypassed.

f. Process control tools.

g. Feedback or in-process inspections.

h. Material handling.

i. Identification of Failure Modes and frequency of occurrence.

j. Method to assess that the system is robust, capable, and under control

(process prove-out; recent, relevant production data, SPC, etc.).

3.4.6 The plan shall contain the schedule for routinely assessing reliability and effectiveness including:

a. Frequency of verification (SPC, process capability, and audit schedules).

b. Monitoring appropriate metrics and reactions to trends.

c. Identification of actions to ensure process is reliable and effective.

d. Frequency for assessing the reliability and effectiveness of the production processes.

3.4.7 The plan shall contain a description of the inspection/verification system, equipment, and detailed information about preventing critical non-conformance escapes including:

a. Contractor’s process to verify that the design of the inspection/verification system is robust, capable, and effective to ensure that non-conformances are identified and correctly dispositioned.

b. Material handling and accountability of non-conforming material.

c. Methodology of inspection utilized (AIE, AAIE, visual, acceptance based on process control, etc.).

d. Identification of MIL-STD-1916 VL VII validation system or alternate proposed method.

e. Personnel involved in inspection and their required qualifications.

f. Throughput of inspections utilized (AIE, AAIE, visual inspections, etc.).

3.4.8 The plan shall identify any proposed referee gages and associated processes to include re-introduction of conforming material into the production process and maximum rates and quantities permitted for referee gages.

3.4.9 The plan shall include a detailed flow chart including Inputs, Outputs, and

Key Process Parameters and the following:

a. Failure Modes of the inspection system.

b. Fail-safe methods, mistake proofing techniques and assurance that the inspection system is not bypassed.

3.4.10 The plan shall include calculations, documentation, and identification of the reliability and effectiveness of the inspection system including:

a. Formula, methodology, or industry standard used to determine the inspection system reliability.

b. The results of the demonstrated reliability based on the verification/validation for each inspection system.

3.4.11 The plan shall identify the schedule for routinely assessing reliability and effectiveness including:

a. Frequency and method of routine verification (when and how many times defect masters/salters are run through and/or audit schedules).

b. Quantification of inspection system error rates.

3.4.12 The plan shall address actions to be taken if the inspection system accepts a defect master/salter (constituting a failure of the inspection system) which would require the following actions:

a. Segregate all material since the last successful verification.

b. Investigate and implement corrective action to the inspection system.

c. Verify suspect material does not contain any critical non-conformances.

d. Update the inspection system’s error rate and overall escape risk calculation.

3.4.13 The plan shall detail test procedure(s) designed to demonstrate the error rate

(reliability) of the inspection system and they shall also include:

a. Identification of sufficient test quantities/samples sizes to assure minimum 90% statistical confidence.

b. A schedule to routinely monitor the non-conformance and inspection system error rates to assure they do not exceed maximum rates allowed.

3.5 Escape Risk Calculation. The plan shall contain non-conformance rates for each individual critical characteristic entering the inspection systems, the error rate of the inspection equipment associated with each characteristic, individual characteristic escape risks, and summative escape risk.

3.6 The plan shall contain procedures to address the necessary actions to be taken if a critical non-conformance is found anywhere in the production process and shall include:

a. How a non-conformance will be identified and segregated.

b. A list of all personnel/positions responsible for identifying, segregating, and maintaining accountability/traceability for the critical non-conformances.

c. Identification of all appropriate documentation, including records for disposition/accountability for tracking a critical non-conformance.

d. Identification of personnel/persons responsible for, and records documenting the immediate shutdown of the operation that produced the non-conforming component/assembly, and if applicable, any other operations incorporating suspect product.

3.7 The plan shall contain the process for immediately notifying the Government per the

Contract Data Requirements List (CDRL) including the identification of personnel responsible for reporting critical non-conformances to the Government.

3.8 The plan shall describe the process…

This is the start of the file's text. The full file is on GovTribe.