W15QKN23R5032
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
POST SITE-VISIT AMENDMENT
Solicitation W15QKN-23-R-5032 - Amendment 0001
Red colored text has been removed from the solicitation. Blue colored text will supersede the red text.
The solicitation NAICS has changed:
FROM:
811192
TO:
423850
Paragraph A.1 has been changed:
FROM:
A.1 The instant solicitation is hereby issued for the demolition, new construction, and commissioning of the existing carwash facility with a newly constructed Tactical Vehicle Wash Facility (TVWF) that can accommodate noncommercial passenger vehicles, commercial trucks, and tactical vehicles (to include tracked howitzers and tanks). The site is located at building Bldg. 242 on Picatinny Arsenal, New Jersey. The total contract performance period will be ten years. The base period will include demolition, construction, and commissioning of the TVWF, with the remaining contract performance period being utilized to provide servicing of equipment, supplies for wash operations, and an extended warranty.
TO:
A.1 The instant solicitation is hereby issued for the demolition of an existing wash facility, new construction, and commissioning of a new Tactical Vehicle Wash Facility (TVWF) that can service all types of noncommercial passenger vehicles, commercial trucks, and tactical vehicles which can be accommodated within the existing footprint. The site is located at building Bldg. 242 on Picatinny Arsenal, New Jersey. The total contract performance period will be ten years. The base period will include demolition, construction, and commissioning of the TVWF, with the remaining contract performance period being utilized to provide servicing of equipment, supplies for wash operations, and an extended warranty.
All paragraphs under “Section C – Descriptions and Specifications” have been renumbered to an alpha-numeric designation, with a prefix of “C”.
Paragraph 3.1 has been changed and renumbered:
FROM:
3.1 Capabilities. The TVWF shall be capable of washing and removing road contaminants, fuel, oil, mud debris, and salt from the hulls/bodies, wheels/tracks and frames/undercarriages of military wheeled and tracked tactical vehicles, non-tactical commercial trucks, and non-commercial passenger vans, pick-ups and cars. The system must be large enough to accommodate the M1 Abrams Main Battle Tank, and the M109A6 Paladin self-propelled howitzer with the barrel in the cradle (stowed/travel) position.
TO:
C.3.1 Capabilities. The TVWF shall be capable of washing and removing road contaminants, fuel, oil, mud debris, and salt from the hulls/bodies, wheels/tracks and frames/undercarriages of military wheeled and tracked tactical vehicles, non-tactical commercial trucks, and non-commercial passenger vans, pick-ups and cars which can fit within the existing footprint.
Paragraph 3.1.1 has been changed and renumbered:
FROM:
3.1.1 Wastewater Remediation System. The TVWS must include a wastewater remediation system, which will minim recover/reuse gray water to minimize discharge of solids and other contaminants into the sanitary sewer system.
TO:
C.3.1.1 Wastewater Remediation System. The TVWS must include a wastewater remediation system, which will recover/reuse gray water to minimize discharge of solids and other contaminants into the sanitary sewer system.
Paragraph 3.2 has been changed and renumbered:
FROM:
3.2 Demolition and Construction Phase. The contractor shall provide all plant, supervision, management, quality control, labor, tools, equipment, appliances and materials and perform all work necessary to replace the existing carwash facility (B242) with a new carwash system that can accommodate tactical vehicles. The project shall consist of demolition the existing carwash equipment, structural steel, and the metal engineered building, the installation of a code compliant new Engineered Metal Building Structure, one-step touchless wash system, and complete electrical and plumbing systems.
TO:
C.3.2 Demolition and Construction Phase. The contractor shall provide all plant, supervision, management, quality control, labor, tools, equipment, appliances and materials and perform all work necessary to replace the existing carwash facility (B242) with a new carwash system. The project shall consist of demolition the existing carwash equipment, structural steel, and the metal engineered building, the installation of a code compliant new Engineered Metal Building Structure, one-step touchless wash system, and complete electrical and plumbing systems.
Paragraph 3.6.3.4 has been changed and renumbered:
FROM:
3.6.3.4 Equipment (DIV 11). Provide a complete vehicle wash station to include the following design features:
•Automated Touchless Wash Module/System (with the capabilities described in paragraph 3.1 above).
•Command/Safety Whole-Facility Shutoff.
•Reclaimed water/solids dewatering/conveyer belt system (stainless steel container, absolute bag filter, with micron filtration).
•Oil/hydrocarbon and water separator/skimming system with filtering/decomposition capability.
•Natural gas fired climate control heating modules/units.
•Natural gas fired Steam Cleaning/Pressure washer system/module.
•Proposed TVWS components, identified by manufacturer, within the drawings (i.e. electric, HVAC, plumbing, and, doors).
TO:
C.3.6.3.4 Equipment (DIV 11). Provide a complete vehicle wash station to include the following design features:
•Automated Touchless Wash Module/System (with the capabilities described in paragraph 3.1 above).
•Command/Safety Wash System Shutoff.
•Oil/hydrocarbon and water separator/skimming system with filtering/decomposition capability.
•Natural gas fired climate control heating modules/units.
•Natural gas fired Steam Cleaning/Pressure washer system/module.
•Proposed TVWS components, identified by manufacturer, within the drawings (i.e. electric, HVAC, plumbing, and, doors).
Paragraph 3.6.3.6 has been changed and renumbered:
FROM:
3.6.3.6 Special Construction Provisions (DIV 13). Provide one (1) complete pre-engineered 3-bay metal building, in kind to existing building layout and dimensions (25’ x 60’). Structure shall include galvanized framework and bracing members. Liner panels shall be 22-gauge with AlZn finish. Structure shall include one (1) man door with heavy duty closer, stainless steel kickplate, and 24”x30” tempered lite. Walls shall be 26-gauge and have a Kynar finish. Structure shall provide for a minimum of 14 feet clearance. Columns shall have new anchor pattern to comply with code standards (4 bolts). Roof pitch shall be 0.5:12. Include all trim, gutters and downspouts. Structure roof shall be designed to account for a snow load rating of 35 psf.
TO:
C.3.6.3.5 Special Construction Provisions (DIV 13). Provide one (1) complete pre-engineered 3-bay metal building, in kind to existing building layout and dimensions (25’ x 60’). Structure shall include framework and bracing members, which must be corrosion protected to withstand duty in a high moisture and high humidity environment, with extra protection afforded to structural components that will be subjected to direct water and detergent agent(s) exposure. Wall and roofing systems must be insulated and resistant to high moisture and high humidity environments. Wall and roofing systems must also be able to withstand rapid heating and cooling cycles. All wall systems, insulation, and interior finish must be durable, resistant, and protected from direct water and detergent agent(s) exposure. Structure shall include one (1) man door with heavy duty closer, stainless steel kickplate, and 24”x30” tempered lite. Structure shall provide for a minimum of 14 feet clearance. Columns shall have new anchor pattern to comply with code standards (4 bolts). Roof pitch shall be 0.5:12. Include all trim, gutters and downspouts. Structure roof shall be designed to account for a snow load rating of 35 psf.
Paragraph 3.6.3.7 (Mechanical/Plumbing (DIV 15)) has been renumbered to C.3.6.3.6
Paragraph 3.6.3.8 (Electrical (DIV 16)) has been renumbered to C.3.6.3.7
Paragraph L.6.1.2.3 has been renumbered:
FROM:
L.6.1.2.3 TAB C – SUBFACTOR 3: EQUIPMENT LIST. The Offeror shall submit a complete list of proposed equipment to meet the requirements delineated in PWS paragraph 3.5.3.4, identified by manufacturer, serviceability, maintenance, useful life, and downtime.
The complete TVWS list of proposed equipment shall include the following:
· Automated Touchless Wash System
· Command/Safety Whole-Facility Shutoff
· Reclaimed water/solids dewatering/conveyer belt system (stainless steel container, absolute bag filter, with micron filtration)
· Oil/hydrocarbon and water separator/skimming system with filtering/decomposition capability.
· Natural gas fired climate control heating system (units)
· Natural gas fired Steam Cleaning/Pressure washer system
· Proposed TVWS components, identified by manufacturer, within the drawings (i.e. electric, HVAC, plumbing, and, doors)
TO:
L.6.1.2.3 TAB C – SUBFACTOR 3: EQUIPMENT LIST. The Offeror shall submit a complete list of proposed equipment to meet the requirements delineated in PWS paragraph 3.5.3.4, identified by manufacturer, serviceability, maintenance, useful life, and downtime.
The complete TVWS list of proposed equipment shall include the following:
· Automated Touchless Wash System
· Command/Safety Wash System Shutoff
· Oil/hydrocarbon and water separator/skimming system with filtering/decomposition capability.
· Natural gas fired climate control heating system (units)
· Natural gas fired Steam Cleaning/Pressure washer system
· Proposed TVWS components, identified by manufacturer, within the drawings (i.e. electric, HVAC, plumbing, and, doors)
Paragraph M.3.2 has been changed:
FROM:
M.3.2 SUBFACTOR 2 - DESIGN LAYOUT. The Government will evaluate the offeror’s Tactical Vehicle Wash System (TVWS) complete Drawing Package submitted to meet the requirements identified in the Performance Work Statement (PWS). The complete Drawing Package submitted for the proposed TVWS shall reflect an overall building footprint of the existing building 242 footprint (square footage).
The evaluation includes the following elements:
· Proposed architecture-Professional Engineer (PE) stamped drawings, delineating the revised anchor pattern from 2 to 4 bolts.
· Proposed Engineered Metal Building Structure (EMBS) material type (e.g. steel, galvanized metal, aluminum).
· Location of all TVWS equipment components
· Identification of all applicable construction codes
TO:
M.3.2 SUBFACTOR 2 - DESIGN LAYOUT. The Government will evaluate the offeror’s Tactical Vehicle Wash System (TVWS) complete Drawing Package submitted to meet the requirements identified in the Performance Work Statement (PWS). The complete Drawing Package submitted for the proposed TVWS shall reflect an overall building footprint of the existing building 242 footprint (square footage).
The evaluation includes the following elements:
· Proposed architecture-conceptual drawings, delineating the revised anchor pattern from 2 to 4 bolts.
· Quality and durability of the proposed Engineered Metal Building Structure (EMBS) material type (e.g. steel, galvanized metal, aluminum).
· Accessibility and convenience for the location of all TVWS equipment components
· Identification of all applicable construction codes
Paragraph M.3.3 has been changed:
FROM:
M.3.3 SUBFACTOR 3 - EQUIPMENT LIST. The Government will evaluate the quality of the offeror’s list of proposed equipment to meet the requirements delineated in PWS paragraph 3.2.5, identified by manufacturer, serviceability, maintenance, useful life, and downtime.
The evaluation includes an evaluation of the following equipment:
· Automated Touchless Wash System
· Command/Safety Whole-Facility Shutoff
· Reclaimed water/solids dewatering/conveyer belt system (stainless steel container, absolute bag filter, with micron filtration)
· Oil/hydrocarbon and water separator/skimming system, and the speed/efficiency of filtering/decomposition process.
· Natural gas fired climate control heating system (units)
· Natural gas fired Steam Cleaning/Pressure washer system
· Proposed TVWS components, identified by manufacturer, within the drawings (i.e. electric, HVAC, plumbing, and, doors)
TO:
M.3.3 SUBFACTOR 3 - EQUIPMENT LIST. The Government will evaluate the quality and durability of the offeror’s list of proposed equipment to meet the requirements delineated in PWS paragraph 3.2.5, identified by manufacturer, serviceability, maintenance, useful life, and downtime.
The evaluation includes an evaluation of the following equipment:
· Automated Touchless Wash System
· Command/Safety Wash System Shutoff
· Oil/hydrocarbon and water separator/skimming system, and the speed/efficiency of filtering/decomposition process.
· Natural gas fired climate control heating system (units)
· Natural gas fired Steam Cleaning/Pressure washer system
· Proposed TVWS components, identified by manufacturer, within the drawings (i.e. electric, HVAC, plumbing, and, doors)
(End of Summary of Changes) image1.wmf