Questions and Answers 8 RFP W15QKN-21-R-0034.pdf

PDF 163 KB Posted

Attached to
M121 120mm Carrier Mounted and M120A1 120mm Ground Mounted Mortar Systems
Solicitation number
W15QKN21R0034
Issued by

About this file

This document contains questions and answers related to solicitation number W15QKN-21-R-0034 for the manufacturing, production, inspection, storage, staging and shipment of M121 120mm Carrier Mounted Mortar Systems and M120A1 120mm Ground Mounted Mortar Systems. The U.S. Army Contracting Command - New Jersey is seeking to award a single Firm-Fixed Price Indefinite Delivery Indefinite Quantity contract with a total estimated ceiling of $49.2M over five one-year ordering periods to manufacture and deliver mortar systems and associated items. The questions and answers provide clarification on the inspection of Government Furnished Property, packaging requirements for items, and updates to applicable packaging specifications and drawings.

View the file

Other files

File Type Posted
W15QKN21R0034-0003.pdf PDF
Questions and Answers 11 RFP W15QKN-21-R-0034.pdf PDF
Questions and Answers 10 RFP W15QKN-21-R-0034.pdf PDF
Questions and Answers 10 MWS RFP W15QKN-21-R-0034.docx DOCX document
Questions and Answers 9 RFP W15QKN-21-R-0034.pdf PDF
Questions and Answers 7 RFP W15QKN-21-R-0034.pdf PDF
Attachment 0001 Price Matrix - 23SEP2021.xlsx XLSX spreadsheet
W15QKN21R0034-0002.pdf PDF
Question and Answers 6 RFP W15QKN-21-R-0034.pdf PDF
W15QKN21R0034-0001.pdf PDF
Questions and Answers 5 RFP W15QKN-21-R-0034.pdf PDF
Questions and Answers 4 RFP W15QKN-21-R-0034.pdf PDF
Questions and Answers 3 RFP W15QKN-21-R-0034.pdf PDF
Attachment 0008 - Past Performance Questionnaire_Rev 1.docx DOCX document
Questions and Answers 2 RFP W15QKN-21-R-0034.pdf PDF
Questions and Answers 1 MWS RFP W15QKN-21-R-0034.docx DOCX document
CDRL A004- Report_Production or Delivery Problem(s) SOW Risk Assessment.pdf PDF
CDRL A018- Accident Incident Report.pdf PDF
CDRL A005-Suppliers Configuration Management Plan.pdf PDF
Attachment 0004 - AMSTA-AR Form 1350 Technical Data Request Questionnaire.pdf PDF
Attachment 0006 - Certificate of Destruction.DOC DOC document
CDRL A006-Engineering Change Proposal (ECP).pdf PDF
CDRL A011- Production Status Report.pdf PDF
CDRL A019- Failure Summary and Analysis Report.pdf PDF
Attachment 0010- Live Fire Testing Government Furnished Property (GFP) List.docx DOCX document
CDRL A010- Integrated Program Mgmt Data and Analysis Report (IPMDAR).pdf PDF
CDRL A002-Status of GFP Report.pdf PDF
CDRL A026- Critical Item Characteristic List (CICL).pdf PDF
CDRL A013- Test Inspection Report (Rework).pdf PDF
CDRL A007-Notice of Revision (NOR).pdf PDF
CDRL A016- Measurement System Evaluation (MSE).pdf PDF
Attachment 0002 - NonDisclosureNonUseAgreement.docx DOCX document
CDRL A020- Safety Assessment Report (SAR).pdf PDF
CDRL A021- Record of Meeting.pdf PDF
CDRL A017- Certification Data Report.pdf PDF
Attachment 0001 120mm MWS Price Matrix.xlsx XLSX spreadsheet
Attachment 0003 - DD2345 Military Critical Technical Data Agreement.pdf PDF
CDRL A012- Test Inspection Report.pdf PDF
Attachment 0011 - Demilitarized Items.docx DOCX document
Attachment 0005 - AMSTA AR Form 3002 Clearance of Technical Information for Public Release.pdf PDF
CDRL A008-Specification Change Notice.pdf PDF
CDRL A001-Quality Deficiency Report (QDR).pdf PDF
CDRL A023- Technical Report - Study-Services.pdf PDF
Attachment 0008 - Past Performance Questionnaire.docx DOCX document
CDRL A025- Critical Plan of Action (CPOA).pdf PDF
CDRL A009-Request for Variance (RFV).pdf PDF
CDRL A015- Quality Program Plan (QPP).pdf PDF
Attachment 0009- Mortar Weapon Systems Parts.docx DOCX document
CDRL A024- Critical Characteristics Control Plan (CCCP).pdf PDF
W15QKN21R0034.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #8 submitted in response to RFP W15QKN-21-R-0034

54. With regards to the GFP for both M120A1 and M121 Mortar Systems (CLINs 0001 thru 0014 and 0046-0056), Section C of the solicitation states “Obtain as GFP, inspect, and kit all BII; DS Tools; Sight Unit, M67; and AAL items for kind, count and condition prior to assembling into complete weapon systems, components, and spares.” We have the following question:

We would like USG to clarify the intention of the term “inspection” as it related to kinds, count, and condition prior to assembly. For example, the M120A1 BII Kit will be provided as GFP.

Once the BII is received by the awardee, is it the intention for the awardee to inspect each component of the BII per the drawing and QAP prior to use? Or is the intention of word “inspect” simply visual count and condition? Will AIE/MSE be required for GFP items?

A: Inspection associated with GFP items provided to the Offeror is a kind, count, and condition inspection. AIE/MSE will not be required for inspection of GFP items.

55. With regards to packaging, will the BII, DS and AAL items being supplied as GFP already be packaged IAW their respective SPIs? Or will GFP need to be repackaged after kind, count, and condition verification?

A: BII, DS Tool Kits, and AAL items supplied as GFP for System CLINs (0001-0014) will already be packaged IAW respective SPIs. System Level SPIs require packaging of some GFP items into larger system packaging.

The Offeror is required to package individual BII and DS Tool items supplied as GFP for Kitting CLINS (0051-0056) accord to the kit SPIs.

56. With regards to packaging, request USG advise how the M1101/M1102 Trailer will be packaged when shipped to the awardee as GFP? Will the item be in a wood crate? We need this information in order to estimate labor hours for unpacking and storing this item.

A: The M1101/M1102 Trailer will not be in packaging. It will be in a ready-to-move condition.

57. With regards to 12901012 QAP, STM-1 on Page 5 of 5 states “First Article Sample shall be subjected to Government firing or simulation testing.” There is no instruction in MIL-DLT- 13931 for testing the Blast Attenuation Assembly and the solicitation is also silent on testing.

Request that USG please confirm if fire testing is required on 12901012, BAD and if yes, please provide information on whether the contractor or USG will complete the testing. If contractor, please provide further information on testing requirement.

A: Live fire testing is not required for the Blast Attenuation Device. USG will update the QAP to reflect the requirement.

58. Question #22 USG Answer states “ The Blast Attenuation Device (BAD), 12901012, is to be included in the packaging for the overall M121 Mortar System, 12900890.”

New Question #1:

Drawing No. 12900890 is for the 120mm Light Mortar M121, Carrier MountedAssembly. Per USG answer to question #22 SPI AM12900890 will only be inclusive of Drawing Nos. 12901012, 9356182, 12901195, 12901000, and 12901321.

Attachment 0009/ Table 2 is for the M121 120mm Carrier Mounted MortarSystem, BII, DS Tool Kits, and AAL. Is there a separate SPI for the M121 System that is inclusive of packaging details for all items listed on Table 2 of Attachment 0009 that can be provided to offerors; i.e the following items are also not referenced on SPI for 12900890:

Required M121 AAL (GFP) Shotgunner muff (Peltor) http://209.200.67.149/aosafety.com/sh ooters/p roducts/pas_05.htm x Model 97011-

00000 Black

N/A

Combat Arms Earplug x

Medium/Regular x 370-1031 6515-01-576-

Medium: 4 per system

Large x 370-1032 6515-01-576-

Large: 1 per system

M45A1 Boresight with Equipment x 10549221

(COAI)

1240-00-152-

1 per 2

M2 Compass x 10547166 1290-00-930-

1 per 2

Plotting Board, M16 x 13014357

(COAI)

1220-01-548-

1 per 2

M3 Borescope x 11584701 6650-01-063-

1 per 12

Dial Bore Gage x 12901228 5280-01-560-

1 per 12

M2A2 Aiming Circle x 11785090 6675-01-067-

1 per 1

Without an accurate description of how the System is package together, it seems to be impossible for potential new offerors to accurately cost CLINs 0008-0014 which could give an unfair advantage to the incumbent.

A. An updated SPI was previously uploaded as L21K1026 NOR 1 CMO APPROVED_SPI for M121 Mortar System that adds the BAD to the included items in the M121 System outer box and updates the outer box size. BII and DS Tools are already part of the M121 http://209.200.67.149/aosafety.com/shooters/products/pas_05.htm http://209.200.67.149/aosafety.com/shooters/products/pas_05.htm http://209.200.67.149/aosafety.com/shooters/products/pas_05.htm http://209.200.67.149/aosafety.com/shooters/products/pas_05.htm

SPI (note 4) and are packaged with the system. The AAL items are not contained in the M121 System outer box, but are required to be shipped with the M121 System in their own box or boxes.

New Question #2:

Drawing No. 12901293 is for the 120mm Light Mortar, M120A1, TowedAssembly. Drawing No. 12901293 Assembly is only inclusive of Drawing Nos. 9356182, 12901195, 12901000, and 12901321.

Tables 1 and 2 of SPI AM12901293 does not include the following items listed on Attachment 0009/ Table 1:

120mm Mortar Stowage Kit (MSK) M326

13016345, 13016184, and 13016183

2590-01-551-7979

M1101 Cargo Trailer or M1102 Cargo Trailer x 12450002 2330-01-387-5443

2330-01-387-5426

Required M120A1 AAL (GFP) Shotgunner muff (Peltor) http://209.200.67.149/aosafety.com/ shooters/products/pas_05.htm http://209.200.67.149/aosafety.com/ shooters/p http://209.200.67.149/aosafety.com/ shooters/products/pas_05.htm > rod ucts/pas_05.htm http://209.200.67.149/aosafety.com/ shooters/products/pas_05.htm > x

Model 97011- 00000 Black

N/A

Combat Arms Earplug x

Medium/Regular x 370-1031 6515-01-576-8861

Large x 370-1032 6515-01-576-8869

M45A1 Boresight with Equipment x 10549221

(COAI)

1240-00-152-3512

M2 Compass x 10547166 1290-00-930-4260

Plotting Board, M16 x 13014357

(COAI)

1220-01-548-9063

M3 Borescope x 11584701 6650-01-063-0035

Dial Bore Gage x 12901228 5280-01-560-1762

M2A2 Aiming Circle x 11785090 6675-01-067-0687

Is there a separate SPI for the M120A1 System that is inclusive of packaging details for all items listed on Table 1 of Attachment 0009? Do the GFP items need to be repackaged/ labeled? How do all items of the System get packaged together? We understand that the 120mm MSK gets assembled onto the Cargo Trailer, but there are no details for how the other GFP items are packaged as a system. Without an accurate description of how the system is package together, it seems to be impossible for potential new offerors to accurately cost CLINs 0001-0007 which could give an unfair advantage to the incumbent.

A. The AAL items are not contained in the M120A1 System outer box, but are shipped with the M120A1 System in their own box or boxes. The AAL items will be received as GFP and packaged IAW their respective SPIs. BII and DS Tools are part of the M120A1 SPI (note 2) and are required to be packaged with the system.