This Contract Data Requirements List (CDRL) outlines 24 data items required under a solicitation for the production and delivery of the M17A1 Receiver Radio Firing Device and M85A1 Trainer Receiver Radio Firing Device. Key requirements include submission of quality plans, inspection reports, failure analyses, safety assessments, and progress reports. Delivery locations include Picatinny Arsenal and McAlester Army Ammunition Plant. First submissions are due within 60 days of award for quality plans, 45 days prior to testing for test plans, and monthly for progress reports. The Army Contracting Command and various Army Materiel Command offices oversee requirements.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP ____ TM ____ OTHER _____
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Quality Program Plan (QPP)
3. SUBTITLE
Quality Management System and Quality Assurance Program
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81722
5. CONTRACT REFERENCE
SOW Paragraph 3.1.1
6. REQUIRING OFFICE
FCDD-ACE-QMG
7. DD 250 REQ
LT
9. DIST
STATEMENT
D
10. FREQUENCY
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
When Revised Draft Final
Reg Repro
16. REMARKS
Block 12: Contractor shall submit 60 working days after contract award.
Government will respond within 15 working days of original and any required revisions. Unless otherwise specified, contractor shall submit revisions within 10 working days of receipt of Government response.
Block 14: See distribution list.
FCDD-ACM-MG 1
FCDD-ACD-PMA 1
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
FCDD-ACE-QMG 1
ACC-NJ-MC 1
15. TOTAL --------- 8
G. PREPARED BY
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer Signed by: GYMA.NICOLAS.D.1250697780
J. DATE
11/25/2019
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _1_ of _24_ Pages
17. PRICE
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A002
Measurement System Evaluation (MSE)
Acceptance Inspection and Acceptance Test Equipment
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81960
5. CONTRACT REFERENCE
SOW Paragraph 3.1.2
6. REQUIRING OFFICE
FCDD-ACE-QMG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
As Required Draft Final
Block 12: A complete submission is due no later than 60 working days prior to FAT, or production, if FAT is waived. The government will respond within 15 working days of receipt. Revisions are to be submitted within 10 working days of receipt of government response for which the Government shall respond within 10 working days. If documentation was approved on a prior contract with this activity and no changes were made, submit only evidence of most recent prior approvals. If AIE design changes occur after initial approval, submit revised design for approval.
Note: Incomplete submissions shall be considered delinquent.
Block 14: Submit electronically, see distribution list.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _2_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A003
Certification/Data Report
Material Certification
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80678*Tailored
5. CONTRACT REFERENCE
SOW Paragraph 3.1.6
6. REQUIRING OFFICE
FCDD-ACE-QMG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
See Block 16 Draft Final
Block 4: *Do not address paragraph’s 10.2.2, 10.2.3 and 10.4 of DID
Block 12/13: Required submittal only with FA sample and “upon request” for production orders to be clearly stated in the appropriate delivery order.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _3_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A004
Configuration Audit Summary Report and Certification
Physical Configuration Audit (PCA)
DI-SESS-81022D
5. CONTRACT REFERENCE
SOW Paragraph 3.1.7
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Draft Final
Block 12: Submission shall be within 5 working days of completion of Physical Configuration Audit.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _4_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A005
First Article Qualification Test Plan and Procedures
First Article Testing (FAT)
DI-NDTI-81307A
5. CONTRACT REFERENCE
SOW Paragraph 3.1.8
6. REQUIRING OFFICE
FCDD-ACE-QPB
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
Block 12: Contractor shall submit First Article Qualification Test Plan and Procedures for government review recommendation and approval at least 45 working days prior to testing.
Government shall have 15 working days to review and respond to the test plan. The Contractor shall have 10 working days to update based on comments for final review if necessary. Government shall have 5 working days to respond to final submission.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _5_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A006
Test/Inspection Report
First Article Test, Test Report
DI-NDTI-80809B*Tailored
5. CONTRACT REFERENCE
SOW Paragraph 3.1.8
6. REQUIRING OFFICE
FCDD-ACE-QPB
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
*Block 4: Use paragraphs 10.1, 10.2, 10.2.1, 10.2.3.1, 10.2.3.2, 10.2.3.3, 10.2.6, 10.2.6.1, 10.2.6.3, 10.2.6.4, 10.2.6.4.1, 10.2.6.4.2,
10.2.7 and 10.2.7.1 in preparation of Acceptance Test Report as required.
Block 12/13: Contractor shall provide a minimum of ten (10) working days notification to the Government Product Quality Manager listed below prior to Acceptance Test so that the Government may witness.
Report shall be provided electronically in PDF file format and uploaded to the Worldwide Ammunition Repository Program (WARP) Test Report module located on the Munitions History Program website at https://mhp.redstone.army.mil/
Report shall be uploaded into WARP and notification provided to the Government within fifteen (15) working days of completion of LAT.
Provide a Letter of Transmittal using electronic mail as notification that an Acceptance Test Report has been entered into the system to:
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
I. J.
G. PREPARED BY
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _6_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A007
Ammunition Data Card
3. SUBTITLE
Ammunition Data Card
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80043A
5. CONTRACT REFERENCE
SOW Paragraph 3.1.10
6. REQUIRING OFFICE
FCDD-ACE-QPB
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
As Required
13. DATE OF SUBSEQUENT
As Required Draft Final
ADC's shall be prepared IAW MIL-STD-1168B and electronic submission shall be accomplished by accessing the Worldwide Ammunition Data Repository Program (WARP)
*Input a draft card into WARP 30 working days prior to First Article, or production if First Article is not applicable, for approval of technical content.
**Hard copy ADCs shall be generated from WARP and accompany each Lot, and shall be signed & dated by the representative of the Government Agency Responsible for Acceptance (GARA), usually the DCMA QAR.
*** When ballistic tests at Government proving grounds are required, two hard copy ADCs generated and accompany the Lot.
Note: Submission shall commence with the first deliverable lot and continue with each subsequent lot. ADCs shall include procurement acquisition numbers for each applicable RFW, RFD, and ECP listed on the card.
Submit an email Letter of Transmission (LT) notifying the Product Quality Manager identified below when a card has been entered into
WARP.
BLOCK 14: See distribution list.
FCDD-ACE-QPB 1
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _7_ of _24_ Pages
18. ESTIMATED
TOTAL PRICE
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A008
Acceptance Test Plan
Lot Acceptance Test Plan/Reports
DI-QCIC-80553A
5. CONTRACT REFERENCE
SOW Paragraph 3.1.11
6. REQUIRING OFFICE
FCDD-ACE-SS
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
Block 12/13: Submission shall be 45 working days prior to initial test to allow for government review and comments. The government shall respond within 15 working days of submittal. The contractor shall submit revisions within 5 working days of response. The government shall respond within 5 working days of final submittal.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _8_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A009
Test/Inspection Report
Lot Acceptance Test (LAT) Report
DI-NDTI-80809B*Tailored
5. CONTRACT REFERENCE
SOW Paragraph 3.1.11
6. REQUIRING OFFICE
FCDD-ACE-QPB
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
*Block 4: Use paragraphs 10.1, 10.2, 10.2.1, 10.2.3.1, 10.2.3.2, 10.2.3.3, 10.2.6, 10.2.6.1, 10.2.6.3, 10.2.6.4, 10.2.6.4.1, 10.2.6.4.2,
10.2.7 and 10.2.7.1 in preparation of Acceptance Test Report as required.
Block 12/13: Contractor shall provide a minimum of 10 working days notification to the Government Product Quality Manager listed below prior to Acceptance Test so that the Government may witness.
Report shall be provided electronically in PDF file format and uploaded to the Worldwide Ammunition Repository Program (WARP) Test Report module within 15 working days of completion of test located on the Munitions History Program website at https://mhp.redstone.army.mil/
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _9_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
A
C. CATEGORY:
TDP ____ TM ____ OTHER _____
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A010
Management Plan
Critical Characteristics Control Plan (CCCP)
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80004A*Tailored
5. CONTRACT REFERENCE
SOW Paragraph 3.1.12.2
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
Block 4: Disregard DID paragraphs 10.3.6 and 10.3.7. Contractor’s electronic format using Microsoft word or comparable software is acceptable.
Block 9: DISTRIBUTION STATEMENT D: Distribution Authorized to the DOD and U.S. DOD Contractors only; Critical Technology; 2 Sep 2009. Other requests shall be referred to Mr. Nicolas Gyma, 973-724-6038, FCDD-ACM-MG, Bldg 64S, Picatinny Arsenal, NJ. 07806-5000.
Block 10: Contractor shall submit plan covering all Critical Characteristics, if applicable, as required in contract clause reference.
Block 12: Contractor shall submit 40 working days before the start of FAT or production build if FAT is waived. Government will respond within 15 working days of original and any required revisions. Unless otherwise specified, contractor shall submit revisions within 10 working days of receipt of Government response.
Block 13: If the CCC plan changes after initial Government approval, contractor shall resubmit revised plan for Government approval.
FCDD-RLS-SP 2
FCDD-ACE-QPB 1
G. PREPARED
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _10_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A011
Critical Occurrence Notification and Critical Defect Report
3. SUBTITLE
Critical Occurrence Notification Critical Failure Root Cause Investigation & Corrective Action Segregated Material Use and Restart Request
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80970A
5. CONTRACT REFERENCE
SOW Paragraph 3.1.12.3-4
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
13. DATE OF SUBSEQUENT
See Block 16 Draft Final
Block 3:
1. Critical Occurrence Notification (DID Pare 4.1) Block 12/13: Unless otherwise approved by the PCO, notification of the occurrence of a critical defect shall be made to the government distribution list within 24 hours of event, by the most expeditious means available
2. Critical Failure Root Cause Investigation & Corrective Action
Report (DID Para 4.2) Block 12/13: Submission for government review and approval is due fifteen (15) working days after occurrence of non-conformance. The contractor shall respond within ten (10) working days of receipt of government responses. If changes occur after the initial concurrence, submit revisions within five (5) working days of revisions.
3. Segregated Material Use and Restart Request (DID Para 4.3) a.) Segregated Material Use
Block 12/13: The contractor shall submit for approval prior to segregated material use. The contractor shall respond within fifteen
(15) working days of receipt of government responses. If changes occur after the initial concurrence, submit revisions within five (5) working days of revisions b.) Restart Request Blocks 12/13: Contractor shall submit for approval prior to restart operations.
The contractor shall respond within fifteen (15) working days of receipt of government responses. If changes occur after the initial concurrence submit revisions within five (5) working days of the revisions
Block14: Submit electronically, see distribution list.
FCDD-ACE-QMG 1
FCDD-RLS-SP 2
FCDD-ACE-QPB 1
FCDD-ACD-PMA 1
SFAE-AMO-CCS 1
G. PREPARED
Peter Kaslaitis Product Quality Manager
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _11_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A012
Failure Analysis and Corrective Action Report
(FACAR)
3. SUBTITLE
Failure Analysis and Corrective Action Report
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81315B
5. CONTRACT REFERENCE
SOW Paragraph 3.1.13
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
13. DATE OF SUBSEQUENT
As Required Draft Final
Block 12: The contractor shall submit within 30 working days of failure.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
G. PREPARED BY
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _12_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A013
Contractor’s Progress, Status and Management Report
Program Management Documentation
DI-MGMT-80227
5. CONTRACT REFERENCE
SOW Paragraph 3.3.1
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
Monthly
12. DATE OF 1ST SUBMISSION
As Required
14. DISTRIBUTION
a. ADDRESSEE
13. DATE OF SUBSEQUENT
As Required Draft Final
BLOCK 10: The contractor shall submit monthly progress, status, and management reports, which includes production progress reports and schedule, no later than the 14th day of the following month.
BLOCK 14: Submit reports electronically, see distribution list.
FCDD-ACM-MG 1
FCDD-ACE-QMG 1
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
G. PREPARED BY
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _13_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A014
Contractor’s Progress, Status and Management Report
Schedule Planning
DI-MGMT-80227
5. CONTRACT REFERENCE
SOW Paragraph 3.3.4
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
See Block 16
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
Block 10: As required. Notification required if any stoppages or delays impact schedule within 5 working days of event.
Block 12: Submit first submission at time of Post Award conference.
Block 13: Any changes/updates to the schedule will be submitted to the Government.
Block 14: Submit reports electronically, see distribution list.
SFAE-AMO-CCS 1
15. TOTAL --------- 4
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _14_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A015
Conference Agenda
3. SUBTITLE
Post Award Conference Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249B
5. CONTRACT REFERENCE
SOW Paragraph 3.3.6.1 SOW Paragraph 3.3.6.4
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
Post Award Conference Block 12: As required, agenda to be submitted 5 working days prior to conference/meeting. No Government approvals required
Meeting Agenda Block 12: As required, agenda to be provided at least one (1) working day prior to teleconference or meeting.
Block 14: Submit agenda electronically, see distribution list.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
FCDD-ACD-PMA 1
SFAE-AMMO-CCS 1
15. TOTAL --------- 9
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _15_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A016
Conference Minutes
3. SUBTITLE
Post Award Conference Technical Data Package Review Production Readiness Review Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250B
5. CONTRACT REFERENCE
SOW Paragraph 3.3.6.1 SOW Para 3.3.6.2 SOW Para 3.3.6.3 SOW Paragraph 3.3.6.4
6. REQUIRING OFFICE
FCDD-ACE-SS
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
Post Award Conference Block 12: Minutes to be submitted within 5 business days post meeting.
Block 14: Submit reports electronically, see distribution list.
Technical Data Package Review Block 12: Minutes to be submitted within 5 business days post meeting.
Block 14: Submit reports electronically, see distribution list, exclude
SFAE-AMMO-CCS.
Production Readiness Review Block 12: Minutes to be submitted within 5 business days post meeting.
Block 14: Submit reports electronically, see distribution list, exclude
SFAE-AMMO-CCS.
Meeting Minutes Block 12: Minutes to be submitted no later than one (1) Business day post meeting.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
FCDD-ACE-QMG 1
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _16_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A017
Supplier’s Configuration Management Plan
Configuration Management
DI-SESS-80858C
5. CONTRACT REFERENCE
Sow Section 3.3.7
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
13. DATE OF SUBSEQUENT
As Required Draft Final
Block 12: Contractor shall submit 60 working days after contract award.
Government will respond within 15 working days of original and any required revisions. Unless otherwise specified, contractor shall submit revisions within 10 working days of receipt of Government response.
Configuration Management plan shall be part of, 1) the Quality Program Plan, or 2) a separate submission if not included in the QPP.
15. TOTAL --------- 3
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _17_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A018
Engineering Change Proposal (ECP)
Product Baseline Changes
DI-SESS-80639D
5. CONTRACT REFERENCE
SOW Paragraph 3.3.7.1
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
13. DATE OF SUBSEQUENT
See Block 16 Draft Final
Blocks 11-13: The Government will provide a disposition on ECPs within 15 working days of receipt, or within 15 working days of receipt of revised information, whichever is later.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _18_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A019
Request For Variance (RFV)
Product Baseline Changes
DI-SESS-80640D
5. CONTRACT REFERENCE
SOW Paragraph 3.3.7.1
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
13. DATE OF SUBSEQUENT
See Block 16 Draft Final
Blocks 11-13: The Government will respond to RFVs within 15 working days if additional information is required for the review and approval process. If clarification or more information is required from the contractor, the response period will re-start, when the Government is provided with the necessary information. The Government will provide a disposition on RFVs within 15 working days of receipt, or within 15 working days of receipt of revised information, whichever is later.
Block 14: Submit reports electronically, see distribution list.
FCDD-ACM-MG 1
FCDD-ACE-QMG 1
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _19_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A020
Accident / Incident Report
3. SUBTITLE
Accident / Incident Report
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81563
5. CONTRACT REFERENCE
SOW Paragraph 3.4
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
13. DATE OF SUBSEQUENT
As Required Draft Final
Block 12: Submit within 48 hours of accident /incident.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _20_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A021
Safety Assessment Report
Safety Assessment Report
DI-SAFT-80102C
5. CONTRACT REFERENCE
SOW Paragraph 3.5
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
Block 14: Submit reports electronically, see distribution list
FCDD-ACE-QMG 1
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
FCDD-ACD-PMA 1
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _21_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A022
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan
Parts Obsolescence
DI-MGMT-81948
5. CONTRACT REFERENCE
SOW Paragraph 3.6
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block16
14. DISTRIBUTION
a. ADDRESSEE
Final
Block 12: At the time of the initial contractor proposal.
FCDD-ACM-MG 1
FCDD-ACE-QMG 1
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
FCDD-ACD-PMA 1
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _22_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A023
Technical Report - Study/Services
DMSMS – Case Summary
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Paragraph 3.6.1
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
As Required
12. DATE OF 1ST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
Final
Block 12: Forty five (45) working days after each delivery order award.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
FCDD-ACD-PMA 1
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _23_ of _24_ Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer
D. SYSTEM/ITEM
RAMS M17A1/M85A1
E. CONTRACT/PR NO.
W15QKN-20-R-0021
F. CONTRACTOR
A024
Operations Security (OPSEC) Plan
3. SUBTITLE
Operations Security (OPSEC) SOP / Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80934C
5. CONTRACT REFERENCE
SOW Paragraph 3.11.1
6. REQUIRING OFFICE
FCDD-ACM-MG
7. DD 250 REQ
LT
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
90 days ACA
13. DATE OF SUBSEQUENT
See Block 16 Draft Final
Block 12/13: Contractor shall submit the OPSEC plan within 90 calendar days of contract award.
FCDD-ACE-QPB 1
FCDD-RLS-SP 2
Peter Kaslaitis Product Quality Management
H. DATE
09-23-19
I. APPROVED BY
12/9/2019
X NGyma Nicolas Gyma Lead Engineer
DD Form 1423-1, JUN 90 (EG) Previous editions are obsolete Page _24_ of _24_ Pages