This document outlines quality assurance requirements for a federal contract to produce Receiver Radio Firing Devices, Nonelectric Blasting Cap Actuating M17A1. Key requirements include contractor testing of first article samples and submission of a test report. Automated acceptance inspection equipment must meet reliability standards, and measurement system analysis is required. Critical characteristics are defined, with critical nonconformances subject to specific controls. The contractor must submit inspection documentation and gain approval for inspection equipment and processes. Additional details cover areas such as destructive testing, use of military standards, and government-furnished test support equipment.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT ADDENDUM
QUALITY ASSURANCE REQUIREMENTS
ARDEC 367 REQ Selection #1.
GOVERNMENT PROCUREMENT QA ACTIONS: INSPECTION
Government Procurement Quality Assurance (PQA) actions will be accomplished by the Government Quality Assurance Representative (QAR) at:
Contractor's Facility
ARDEC 367 REQ Selection #2.
GOVERNMENT PROCUREMENT QA ACTIONS: ACCEPTANCE
Acceptance of supplies will be at: Contractor's Plant
The Government's acceptance of FATR (if required) will be at: Destination
ARDEC 367 REQ Selection #12.
REWORK AND REPAIR OF NONCONFORMING MATERIAL
a. Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality
Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
c. Repair procedures shall be documented by the Contractor and submitted on a Request for Variance, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for
Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
e. The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
ARDEC 367 REQ Selection #13.
QUALITY POST AWARD
Post Award Conference (definition) - A first meeting of key
Contractor/Government players. This conference is to assure a clear and mutual understanding of the contract between the Government and contractor. The Post Award conference includes discussions on contract terms, conditions and requirements, line items and sequence of events needed for successful execution of the subject contract effort.
The contractor shall host a post award conference/meeting at the contractor’s facility to include contractor and government contracting, management, quality assurance and technical personnel no later than 30 calendar days after contract award. The contractor shall participate with the government to arrange a schedule and agenda for the post award conference prior to the meeting. The contractor shall provide the government with minutes of the post award meeting (DI-ADMN-81250B).
ARDEC 367 REQ Selection #14.
MEASUREMENT SYSTEM EVALUATION (MSE)
(a) Definitions. This paragraph defines specific terms utilized throughout the rest of the addendum and in the accompanying Contract Data
Requirements List (CDRL) and Data Item Description (DID) (DI-QCIC-81960).
This aids in clarifying the MSE requirements to Government and contractor personnel.
(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).
(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.
(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.
(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:
(i) Standard Test Equipment. Multi-usage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.
(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.
(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes
Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and
Liquid Penetrant.
(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for
MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.
(b) Scope. This addendum establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this addendum establishes requirements for the preparation, submission, and approval of AIE documentation.
(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO
10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIE’s ability to test, verify, and/or measure the applicable characteristics or parameters (see
DI-QCIC-81960).
(d) AIE Designs & Government Furnished Gages. AIE designs are of two types
– Government designs (see d.1) and contractor designs (see d.2). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.
(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.
(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME Y14.43 and may include commercial inspection equipment. [“Commercial inspection equipment” is defined as shown in paragraph a.4 above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage
Tolerancing Policy shall be in accordance with ASME Y14.43, “Absolute
Tolerancing (Pessimistic Tolerancing).”
(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.
(e) AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with (DI-QCIC-81960) in the applicable Contract
Data Requirements List (CDRL – DD Form 1423). In addition, the contractor shall adhere to the following requirements:
(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.
(2) Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in English.
(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the Technical Data
Package (TDP).
(4) AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.
(f) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the
Government for approval in accordance with (IAW) the CDRL (DI-QCIC-81960).
AIE for Minor characteristic inspections shall be submitted to the
Government for approval IAW CDRL (DI-QCIC-81960) and as required below:
☐ (1) Listed Minor (characteristics displayed on specifications and/or drawings
☐ (2) Government selected list (as attached or as provided herein)
☐ (3) Not submitted
(g) Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per the TDP shall utilize inspection equipment with a minimum demonstrated reliability of
99.8% at a 90% confidence level to detect non-conforming material unless otherwise specified below.
(1) Reliability of 99.8% at a 90% Confidence Level for Critical/Special
Characteristics
(2) Reliability of 99.8% at a 90% Confidence Level for Major
Characteristics
(3) For inspection of major and minor characteristics where contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval. If the Minor characteristic is not listed in paragraph f.2 or not required for submittal in paragraph f.3, then the AAIE requirements (e.g., verification, calibration, prove-out, etc.) of the inspection shall still be performed.
(4) All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance Inspection Equipment
Design, Testing and Approval of). Furthermore, the contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for the VL-VII “sampling plan” per MIL-STD-1916 paragraph 4.4, verification standards and frequency of use shall require Government approval prior to use.
(5) If the AAIE accepts a critical characteristic “reject” standard the contractor shall notify the Government and act in accordance with paragraph f of the Critical Characteristic Control Addendum. In addition, if the AAIE accepts a major and/or minor characteristic “reject” standard the contractor shall act in accordance with paragraph 8.3 of ISO 10012 or paragraph 5.2.3 of ANSI/NCSL Z540.3.
(6) All AAIE shall be required to pass a Government-approved Acceptance
(Prove-Out) Test. The contractor shall conduct this test per the approved test plan and shall submit a test analysis report for approval. See applicable CDRL (DI-QCIC-81960). This test shall be performed at the contractor’s facilities who’s manufacturing system has had the AAIE fully integrated and calibrated as per paragraph (j) of this addendum. The contractor shall allow Government personnel access to this facility and unobstructed monitoring of this test.
(7) The contractor shall notify the Government prior to a modification and/or relocation of the Government-approved AAIE. The modified AAIE designs shall be submitted for approval. The modified and/or relocated
AAIE shall require submission of the acceptance test plan (prove-out) and results for review and approval prior to use. The modified and/or relocated AAIE shall be in accordance with paragraphs (g)(1) – (g)(6).
(h) Measurement System Analysis (MSA). The contractor is responsible to ensure all AIE is, at a minimum, stable, repeatable, and reproducible for all characteristics. Refer to ASTM E2782 and/or AIAG MSA for guidance. The contractor shall provide objective evidence, including the MSA assessment plan, associated data, and analysis, which demonstrates the AIE is, at a minimum, stable, repeatable, and reproducible for the following characteristics (MSA CDRL):
SPECIFICATION PARAGRAPH NO. DRAWING CHARACTERISTIC
11753725 304 11753902 Acceptance Test
11753725 305 11753903 Acceptance Test
11753725 301 11754360 Acceptance Test
11753725 301 11754365 Acceptance Test
11753725 303 11754368 Acceptance Test
11753725 303 11754372 Acceptance Test
11753725 302 11754376 Acceptance Test
Approval of submitted MSA(s) must be granted before the corresponding AIE can be used or continue to be used for acceptance of product. If at any time following approval of the AIE and MSA the AIE is disapproved, then the MSA shall be disapproved. After the resubmitted AIE is approved, the
MSA shall be conducted on the approved AIE and resubmitted for approval.
(i) Robust AIE System. The contractor shall ensure the AIE and its use is not negatively affected by any manufacturing/inspection environmental stimuli including, but not limited to production rate, noise, temperature, humidity, and vibration.
(j) AIE Calibration and Verification. The calibration system shall be in accordance with ISO 10012 or ANSI/NCSL Z540.3. All AIE shall be subjected to scheduled calibration intervals to ensure that the equipment will accept only conforming product and reject all non-conforming product for the duration of the approved calibration period. AIE shall be subjected to periodic verification to ensure that the equipment will continue to accept and reject product with the same consistency as it did at the time of its previous calibration.
(k) Nondestructive Testing (NDT). Contractor shall submit detailed plans for qualifying and certifying NDT personnel and plans for qualification and ongoing use of NDT methods used for inspecting product. If re-qualification of NDT personnel and/or NDT methods is required, then the applicable plans shall be submitted.
(1) Personnel performing NDT examinations shall be qualified and certified in accordance with the standard practices prescribed by NAS 410 (NAS
Certification & Qualification of NDT Personnel), ANSI/ASNT-CP-189 (ASNT
Standard for Qualification and Certification of NDT Personnel), or SNT-TC-
1A (Recommended Practice for Personnel Qualification and Certification in
NDT), and additional procedures that may be identified by the Government.
Acceptance of product using NDT shall be performed by personnel at a level of qualification consistent with that defined in the applicable standard.
(2) The NDT method(s) shall be applied in accordance with ASTM E 543
(Standard Specification for Agencies Performing Nondestructive Testing) and the current nationally recognized standard practices appropriate to the NDT method(s) employed, such as ASTM E-1742 (Standard Practice for
Radiographic Examination) and SAE-AMS-STD-2154 (Inspection, Ultrasonic, Wrought Metals, Process For). Each application technique shall identify the standard(s) utilized. Non-destructive testing includes, but is not limited to, the following types of testing: Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.
(l) Contractor Alternate Inspection Method(s), Modifications and/or
Relocation of AIE (Non-Automated) After Government Approval. If the contractor proposes an alternate inspection method and/or modifies the AIE design(s) affecting hardware, software, or procedures after Government approval the intended change(s) shall be submitted to and approved by the
Government prior to implementation. If an AIE is relocated and the relocation risks the integrity of the inspection system, notify the
Government to determine information needed to assess impact to AIE. See
CDRL (DI-QCIC-81960).
(m) Responsibility for AIE Package Submittal. The contractor shall submit the AIE design documentation package within contractual timeframes per
CDRL (DI-QCIC-81960). The Government will provide approval or disapproval within the timeframe specified in the CDRL. Disapproval of the AIE package will require re-submittal and subsequent Government review in accordance with the CDRL requirements. The AIE package and any required prove-outs must be approved prior to First Article (FA) (if required) or production start-up if FA is not required.
(n) Government’s Right to Disapprove AIE. The Government reserves the right to revoke approval of any AIE that is not satisfying the required acceptance criteria at any time during the performance of this contract.
See CDRL (DI-QCIC-81960).
(o) Navy Furnished Gages. When gages are listed in paragraph o.9 below, the Navy Special Interface Gage (NSIG) Requirement paragraphs o.1 – o.8 shall be satisfied.
(1) The NSIG(s) are provided for verification of selected interface dimensions and do not constitute sole acceptance criteria of production items or relieve the contractor of meeting all drawing/specification requirements under the contract.
(2) The contractor is responsible for contacting the Naval Surface Warfare
Center (NSWC), Corona Division at least 45 days prior to FAT (if required) or production, for the delivery of NSIG(s).
(3) NSIG(s) will be forwarded to the contractor for joint use by the
Government and the contractor. Government furnished NSIG(s) shall not be used by the contractor(s) or subcontractor(s) as in-process or working gage(s).
(4) For production items that fail to be accepted by the applicable
NSIG(s), an alternate inspection method may be submitted for approval.
(5) The contractor may substitute contractor designed and built AIE for the NSIG(s) noted in paragraph (o.9) below. However, the designs require
Government (Navy) approval and the contractor AIE hardware requires
Government (Navy) certification. AIE designs shall be submitted in accordance with CDRL (DI-QCIC-81960).
(6) The Government (Navy) shall not be responsible for discrepancies or delays in production items resulting through misuse, damage or excessive wear to the NSIG(s).
(7) Calibration and repair of the NSIG(s) shall only be performed as authorized by the NSWC Corona Division. Repair is at no cost to the contractor unless repair is required due to damage to the gages resulting from contractor fault or negligence. Damaged, worn, or otherwise unserviceable NSIG(s) shall be brought to the immediate attention of the
CAO and NSWC Corona Division. The contractor shall not make any adjustments, alterations or add permanent markings to NSIG(s) hardware unless specified by the NSIG operating instructions or authorized by the
NSWC Corona Division.
(8) Within 45 calendar days after final acceptance of all production items, the NSIG(s) shall be shipped to NSWC Corona Division, ATTN:
Receiving Officer, Bldg 575, Gage Laboratory, 1999 Fourth St., Norco, CA
92860-1915. The following shipping and marking specifications are applicable:
(i) Shipping, MIL-STD-2073, "DOD Standard Practice for Military Packaging"
(ii) Marking, MIL-STD-129, "Marking for Shipment and Storage".
(9) The following NSIG(s) shall be provided and are mandatory for use except as noted by paragraph (o.5) above.
DRAWING REV CHARACTERISTIC NSIG # QTY DIMENSIONS WEIGHT VALUE
N/A N/A N/A N/A N/A N/A N/A N/A
ARDEC 367 REQ Selection #17. GOVERNMENT FURNISHED AMMUNITION
a. Ammunition has been programmed to support contractual test requirements as follows:
(1) Explosive: PBX9407
(2) National Stock Number: 1376-02-076-8649
(3) Department of Defense Identification Code: N/A
b. Requests for all ammunition shall be submitted electronically to the contract specialist on DD Form 1348 no later than 90 days prior to desired delivery dates. The completed request may be submitted via electronic mail to the Contracting Officer, and usarmy.detroit.tacom.mbx.ilsc-mca@mail.mil.
c. The contractor shall be responsible for reporting on the status of ammunition expenditures throughout the life of the contract as follows:
(1) Every 90 days after the initial receipt of government furnished ammunition, the contractor shall provide an ammunition consumption report in accordance with (IAW) DID OT-16-10003 attached in Section J, attachment title “Government Furnished Ammunition Request” to the Contracting
Officer.
(2) No later than 30 days after completion of the contract, the contractor shall report to the Contracting Officer on the remaining ammunition IAW
DID OT-16-10003. The contractor shall request disposition instructions for the remaining ammunition. The contractor shall execute the disposition instructions and provide confirmation to the Contracting Officer.
d. The contractor shall furnish a copy of the above ammunition reports and disposition requests to the cognizant Defense Contract Management Agency
(DCMA) Quality Assurance Representative (QAR) and to the Government
Furnished Material/Management Control Activity (GFM/MCA), at usarmy.detroit.tacom.mbx.ilsc-mca@mail.mil.
ARDEC 367 REQ Selection #20.
FIRST ARTICLE TEST (CONTRACTOR TESTING)
a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance
Provisions (QAPs) and all drawings listed in the Technical Data Package.
b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor
(including subcontractors) using the technical data package applicable to this procurement.
c. The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test
Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First
Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
e. A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The
First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to individuals indicated in CDRL (A006).
f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the
Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the
Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
ARDEC 367 REQ Selection #22.
.) DESTRUCTIVE TESTING
a. All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
b. Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the Contract Schedule.
c. All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
d. The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or in-process testing, unless specifically authorized by the Contracting Officer.
e. The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
ARDEC 367 REQ Selection #25.
USE OF MIL-STD 1916
a. The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD
1916, DOD Preferred Methods of Acceptance of Product. The Verification
Level (VL) shall be:
VL __IV__ for major characteristics and
VL __II for minor characteristics.
b. MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
ARDEC 367 REQ Selection #29.
CRITICAL CHARACTERISTICS (SIX SIGMA)
a. The contractor’s processes shall be designed with the objective of preventing the creation or occurrence of nonconforming critical characteristics (see paragraphs d & e). The contractor shall establish, document and maintain a product specific, critical characteristics control
(CCC) plan that shall be submitted to and approved by the Procuring
Contracting Officer (PCO) IAW DD Form 1423 and (DI-MGMT-80004A*Tailored).
The CCC plan shall include or reference all procedures, work and handling instructions and process controls relating to any critical characteristics. Mistake Proofing techniques of the material handling and inspection systems shall be a part of the CCC Plan. Guidance for developing this plan and submitting Critical Plans of Action (CPOA)
(paragraph g) can be found at http://www.pica.army.mil/PicatinnyPublic/organizations/ardec/orgchart/qual ity.html.
b. The contractor shall assure its critical processes are robust in design, capable and under control, with the objective of not generating any critical non-conformances. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its critical processes to prevent generating critical non-conformances as identified in the CCC Plan.
c. An inspection and verification system shall be employed that will verify the robustness of all critical processes.
The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its inspection and verification system to detect and prevent critical non-conformance escapes as identified in the CCC Plan. The Government expects that a contractor will allow zero critical escapes. To demonstrate its critical escape risk the contractor will utilize the non-conformance escape risk goal provided below.
(1) Unless otherwise specified immediately below, the calculated critical non-conformance escape risk is 1 in a million (.000001) items delivered.
Or: Alternate calculated Critical Non-conformance Escape risk (fill-in -1-
): Unless otherwise approved by the PCO, the non-conformance escape risk is the sum of the individual characteristic escape rates. The probability of escape for a single characteristic shall be calculated by multiplying the non-conformance rate(s) entering the inspection system(s) by the error rate of the inspection system(s). These escape rates are then summed and shall not exceed the tolerable critical non-conformance escape risk.
(2) Within 45 days after award, the contractor can elect to submit a phased-in approach on how the nonconformance escape risk will be achieved over a period of time not to exceed 180 days from the date of first article approval, or from initiation of production when first article is not required. Submission will require approval by the
Government and is subject to a technical review and analysis. Allowance for a phased-in approach will then become a part of the contract.
Disapproval of the contractor’s submission does not relieve the contractor of its obligation to comply with the terms of this addendum.
(3) Based on the maximum error rate defined for the inspection system, the contractor shall develop a test procedure to demonstrate the error rate.
As part of the test plan the contractor shall include sufficient test quantities to assure 90% statistical confidence in the resultant rates unless otherwise approved by the PCO. Once established, the contractor shall have a documented schedule to routinely monitor the non-conformance http://www.pica.army.mil/PicatinnyPublic/organizations/ardec/orgchart/quality.html http://www.pica.army.mil/PicatinnyPublic/organizations/ardec/orgchart/quality.html and inspection system error rates to assure they do not exceed the maximum rates allotted.
d. As a result of previous practices, the government’s technical data may refer to “Critical I”, “Critical II”, and
“Special” characteristics. The use of the term "critical characteristics" within this addendum includes Critical I, Critical
II and Special characteristics and the use of the term "critical nonconformances" includes those nonconformances pertaining to Critical I, Critical II and Special characteristics. Unless otherwise stated in
Section C, these characteristics shall be subject to all requirements of this addendum.
e. In addition to critical characteristics defined in the government’s technical data (drawings, specifications, etc.), the contractor shall also identify and document in their contractor developed technical data all known material, component, subassembly and assembly characteristics whose non-conformances would likely result in hazardous or unsafe conditions for individuals using, maintaining or depending upon the product. All additional critical characteristics identified by the contractor shall comply with the critical characteristic requirements of the technical data package, supplemented herein. The Critical Item Characteristic List (CICL) review process shall be included in the CCC Plan. The contractor's additional critical characteristics shall be classified in accordance with guidance located at http://www.pica.army.mil/PicatinnyPublic/organizations/ardec/orgchart/qual ity.shtml and shall be submitted to and approved by the PCO prior to production (DI-MGMT-80004A*Tailored).
f. In the event that a critical non-conformance is found anywhere in the production process, the contractor, as part of its CCC Plan, shall have procedures in place to ensure:
(1) The non-conformance is positively identified and segregated to ensure that nonconforming product does not inadvertently remain in or reenter the production process. This control shall be accomplished without affecting or impairing subsequent non-conformance analysis. Final disposition of non-conforming product shall be documented and audited for traceability.
(2) The operation that produced the non-conforming component or assembly and any other operations incorporating suspect components or assemblies are immediately stopped. (See para h. for exceptions)
(3) The government (PCO) is immediately notified of the critical non-conformance (electronic mail) (DI-SAFT-80970A).
(4) Any suspect material is identified, segregated and suspended from any further processing and shipment.
(5) An investigation is conducted to determine the root cause of the non-conformance and the required corrective actions. An evaluation shall also be conducted with regard to suspect material to ensure that no additional critical non-conformances are present. A report of this investigation shall be submitted to the government (DI-SAFT-80970A). The use of the DID report shall not delay notification to the government as required in f(3) above.
(6) A request to restart manufacturing or to use any suspect material associated with the critical nonconformance is submitted to the government
(DI-SAFT-80970A). Restart of production shall not occur until authorized by the PCO, unless previously addressed in the approved CCC Plan. The
Government will respond to a restart request within 3 working days. All objective evidence of the investigations to date shall be available for review at the time of restart. Suspect material shall not be used without
PCO approval.
(7) The procuring activity reserves the right to refuse acceptance of any suspect material until the root cause or reasonably likely cause of the critical non-conformance has been identified, corrective action has been fully implemented and sufficient evidence has been provided to exclude non-conforming material from the conforming population.
g. The contractor may develop alternative plans and provisions, collectively referred to as a Critical Plan of Action
(CPOA), relative to government or contractor identified critical characteristics. All CPOAs are independent and shall be evaluated by the government for this contract. The CPOA and any subsequent revisions submitted IAW DD Form 1423 and (DI-MGMT-80004A*Tailored) require PCO approval prior to implementation. Unless otherwise specified at time of approval, contractor shall review and evaluate CPOAs for currency and process improvements at least on an annual basis and submit results to the
PCO. Unless otherwise approved by the PCO, each critical characteristic shall require a separate CPOA. If the CPOA includes other documents by reference they shall be submitted upon request. Guidance for the development of a CPOA can be found in the referenced guidance located at paragraph a of this addendum.
h. The contractor may continue production with an approved CPOA provided that the critical non-conformance is consistent with the failure mode(s) and rates established in the CPOA. Failure to meet all CPOA requirements will require the contractor to revert back to paragraph f requirements.
i. If a critical non-conformance is discovered beyond its designated inspection point and prior to Government acceptance the contractor shall take actions specified in paragraph f above. If a critical non-conformance is discovered after Government acceptance the Government has the right to invoke the requirements of paragraph f with respect to the contractor’s remaining production under this contract.
ARDEC 367 REQ Selection #32.
AMMUNITION DATA CARDS (ADC)
Detailed requirements and guidance for the preparation of Ammunition Data
Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-STD-1168, (DI-MISC-80043A) and the Worldwide Ammunition-data Repository Program
(WARP) online user's manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-STD-1168 and the WARP user’s manual. Information provided in paragraphs 6.7 through 6.16 of MIL-
STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall."
(a) The contractor shall develop and submit ADCs in accordance with the requirements of this addendum, MIL-STD-1168, and the user's manual located on the WARP database. The WARP application is accessed through the
Munitions History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(b) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-
1168 and WARP requirements.
(c) Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.
End Item Component Listing:
Drawing Number Nomenclature
11753900 Receiver, Radio, Firing Device: Non-Electric Blasting
Cap Actuating
(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and
WARP requirements.
Drawing Number from paragraph (c) above N/A, components as follows:
Component
N/A N/A
(e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not considered an end item or major component, the component lot number may be constructed through contractor lot number convention.
(f) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.
(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user's manual provides information on the level of detail required.
(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.
ARDEC 367 REQ Selection #36. GOVERNMENT FURNISHED TEST SUPPORT
EQUIPMENT
The Government will furnish the equipment, as listed in paragraph a below, to support First Article, Reliability, and/or Acceptance Tests. The cost of shipping the equipment to the Contractor's plant and return to the issuing agency, will be borne by the Government; except that the cost of preservation, packaging, and packing for return shipment shall be borne by the Contractor.
a. Government Furnished Test Support Equipment
(1) 11754394
(i) Item Nomenclature: M17A1/M85A1 RF Board Tester
(ii) National Stock Number: N/A
(iii) Quantity: 2
(iv) Cost Each: $35,000
(v) Unit of Issue: EA
(2) 11754300
(i) Item Nomenclature: M17A1/M85A1 Receiver Controller Board Tester
(ii) National Stock Number: N/A
(iii) Quantity: 2
(iv) Cost Each: $30,000
(3) 11754387
(i) Item Nomenclature: M17A1/M85A1 Fire Board Tester
(ii) National Stock Number: N/A
(iii) Quantity: 2
(iv) Cost Each: $40,000
(4) 11753224
(i) Item Nomenclature: Code Generator, MK152 MOD 0
(ii) National Stock Number: N/A
(iii) Quantity: 3
(iv) Cost Each: $15,000
(5) 11752884
(i) Item Nomenclature: Antenna, Transmitter
(ii) National Stock Number: 5895-01-449-6487
(iii) Quantity: 1
(iv) Cost Each: $500
(6) 11753072
(i) Item Nomenclature: MK26 MOD 0 Transmitter
(ii) National Stock Number: 1290-01-470-7028
(iii) Quantity: 1
(iv) Cost Each: $7500
(7) 11754051
(i) Item Nomenclature: Fire Pulse Adapter
(ii) National Stock Number: N/A
(iii) Quantity: 3
(iv) Cost Each: $500
b. Estimated Weight: 113 pounds.
c. Cube: 30 cu. ft.
d. Items to be furnished by the Government shall be ordered from the
Contracting Officer at Army Contracting Command New Jersey, Maneuver Ammo
Close Combat Systems, Bldg. 10, Picatinny Arsenal, NJ 07806-5000, ATTN:
ACC-NJ-MC, not later than thirty (30) days prior to the desired delivery date.
e. The above items will be furnished on a loan basis and are intended for joint usage by the Contractor and the Government Representative to accomplish basic testing on this contract. The loaned items shall not be modified or altered in any manner, and shall be maintained and returned in as good condition as when loaned; fair wear and tear expected.
f. When weapons are furnished, the Contractor shall take extraordinary precautions in safeguarding the items from theft or unauthorized use, and shall comply with physical security standards for sensitive items when required for the weapons by other provision of this contract. The
Contractor shall also be responsible for cleaning and oiling the weapons at specified intervals and at the end of each day's firing, and for properly caring for the weapons when not in use.
g. The Contractor shall, within thirty (30) calendar days after Government acceptance of all items on this contract, provide an inventory list of all remaining Government furnished equipment to the Contracting Officer.
Within forty-five (45) days after receipt of the inventory list, the
Contracting Officer will provide the Contractor with disposition instructions.
h. The above items shall be preserved, packaged, and packed by the
Contractor at the Contractor's expense, in a manner to ensure safe arrival at the issuing agency, utilizing the same or equivalent container as originally provided.
i. The foregoing requirements are in addition to any requirements placed upon the Contractor by the applicable Government Property clause in
Section I of this contract.
END OF CONTRACT ADDENDUM, QUALITY ASSURANCE REQUIREMENTS.