W15QKN-20-R-0021_0003.pdf
PDF 37 KB Posted
- Attached to
- M17A1 RAMS Federal contract opportunity
- Solicitation number
- W15QKN-20-R-0021
About this file
This document is a request for proposal (RFP) for the production and delivery of the Receiver Radio Firing Device, Nonelectric Blasting Cap Actuating M17A1 and the Trainer, Receiver, Radio Firing Device, Non-explosive M85A1. The United States Army Office of the Project Manager for Close Combat Systems is seeking proposals for these products, with responses due by April 15, 2020. Offerors must submit proposals electronically through the DOD SAFE website. The RFP requires proposals in five volumes addressing technical factors, price, past performance, small business participation, and solicitation documents. Proposals will be evaluated based on these factors. The RFP includes pricing terms for production and first article testing line items over five potential ordering periods.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0003 2020MAR25
W15QKN
ARMY CONTRACTING COMMAND - NJ
PICATINNY ARSENAL, NJ 07806-5000
MICHAEL DUFFY
EMAIL: MICHAEL.J.DUFFY74.CIV@MAIL.MIL
W15QKN-20-R-0021
2020FEB07
X
X 2020APR15 02:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 11
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MICHAEL DUFFY
Buyer Office Symbol/Telephone Number: CCNJ-ET/(973)724-6627
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of this Amendment 0003 to Solicitation W15QKN-20-R-0021 is to accomplish the following:
1. Extend the proposal due date from 1 April 2020 to 15 April 2020 NLT 1400 EST.
2. To ensure health and safety of all parties during the COVID-19 Emergency, paper and CD ROM copies of the proposal are no longer accepted. Interested parties should submit electronic copies via the DOD SAFE website for secure file drop off. The DOD SAFE website can be accessed at https://safe.apps.mil .
Use of DOD SAFE for non-CAC enabled (guest) accounts is by invitation only. Prior to proposal submission, Contractors MUST contact the
Contract Specialist at michael.j.duffy74.civ@mail.mil to create a DOD Safe Drop Off Request not more than 14 days prior to planned submission date. Once created, the drop off request will contain instructions on submission in DOD Safe and is valid for 14 days.
Reference the RFP in the Subject Line of all submissions. DOD Safe allows up to 25 files per package and a maximum size of 8 GB.
Compressed (ZIP) files may be used. Files are available for download for 7 days. For all technical questions regarding DOD SAFE, please review the site's FAQ or contact the site help desk.
Changes were made to Section L to remove references to paper and CD copies.
All other terms and conditions of the solicitation remain the same and unchanged.
*** END OF NARRATIVE A0005 ***
2 11
W15QKN-20-R-0021
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Section L. PROPOSAL SUBMISSION:______________________________
L.1 INTRODUCTION
This section contains general proposal submissions instructions as well as specific proposal requirements for the RAMS M17A1 and M85A1 effort.
L.1.1 General. The proposal shall be presented in sufficient detail to allow Government evaluation of response to the requirements of the RFP. The Government will not assume the Offeror possesses any capability, understanding, or commitment that is not clearly specified in the proposal.
L.2 PROPOSAL INSTRUCTIONS:__________________________
L.2.1 General:
L.2.1.1 Offerors shall provide information by addressing each Factor/Subfactor in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the
Offerors capability to support the proposed response to the evaluation criteria. Proposals that do not contain the information requested in the solicitation risk being determined unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
L.2.1.2 The proposal must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met.
L.2.1.3 The Government reserves the right to award without discussions (see FAR 52.215-1).
L.2.1.4 Alternate Proposals: Alternate proposals will not be accepted.
L.2.1.5 Proposals shall be valid for a period of 180 days.
L.2.1.6 The Government does not assume the duty to search for data to cure problems it finds in proposals. The burden of proving acceptability remains with the Offerors.
L.2.2 All questions concerning this procurement, either technical or contractual must be submitted in writing to the Contracting
Officer. No direct discussion between the technical representative and a prospective Offeror shall be conducted. Questions and proposals shall be submitted to the following point of contact:
Army Contracting Command New Jersey
ACC-NJ, Bldg.10
ATTN: Rebecca L. Markell
Telephone: (973) 724-3181
Picatinny Arsenal, NJ 07806-5000
E-mail: rebecca.l.markell.civ@mail.mil
Please note that electronic e-mail proposal submissions shall not be accepted.
L.2.3 The proposal shall consist of the following:
L.2.3.1 Each proposal shall be submitted in the English language and consist of and include all of the following:
a. One (1) signed and completed copy of the attached Standard Form 33 (SF 33) and continuation sheets (Sections A through M) signed by a person authorized to enter into the proposed contract on behalf of the Offeror. Evidence of this individuals authorization to act as such representative of the firm under the guidelines of FAR 4.102 Contractors Signature shall accompany the signed SF 33. Acknowledgment of all amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices in the
CLINs/Pricing Matrices in Section B, any fill-ins required, such as Contract Data Requirements List: DD Form 1423 with Blocks 17 and 18 completed if required, and Certifications and Representations in Section K. Offerors are directed to thoroughly read the solicitation and fill in the required information in the appropriate solicitation clauses. For any fill-ins that are not applicable, the Offeror must acknowledge by indicating N/A. The proposal must also include computation for the use of Government Property, if applicable.
b. One Original copy of the proposal volumes, as reflected in D.3., shall be compiled using the Microsoft Office for Windows suite of applications and formatted for an MS Windows compatible computer. Price breakdown, when applicable, will include MS Excel spreadsheets with formulae intact. Alternatively, files may be provided in Portable Document Format (.pdf).
3 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
c. Representations through System for Award Management. The purpose of electronic Representations and Certifications is to provide all
Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As arequirement under the RAMS M17A1 and M85A1 solicitation, all Offerors must submit Reps/Certs data into the System for Award Management (SAM) at https://www.sam.gov/ and provide one
(1) hard copy and one (1) electronic copy (on CD) submitted as an .XPS file. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal.
L.2.3.2 Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR
52.219-9, alternate II. This plan shall be incorporated into any resultant contract in reference to the RFP.
L.3 FORMAT FOR PROPOSALS_________________________
L.3.1 The Offerors proposal shall be submitted in severable volumes based on the Factors as set forth below and all information specific to each Factor shall be confined to that volume. Each proposal must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating.
Information provided shall be specific to each Factor.
Page limitation for each Volume is as follows:
Volume I: Technical Factor (Maximum of 165 pages)
Volume II: Price Factor (No page limit)
Volume III: Past Performance Factor (No page limit)
Volume IV: Small Business Participation Factor (No page limit)
L.3.2 Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Contents feature in MS Word. MS Word (.doc).
L.3.3 Length:
L.3.3.1 Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will be returned to the Offeror and will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the RFP, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, indices, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8-
1/2 inches in width by 11 inches in length; foldout pages depicting such items as sketches, factory floor layouts, etc. may be used, with each fold counted as one additional page. The font used shall not be less than 10 point.
L.3.3.2 Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the PCO no later than fifteen (15) days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.
L.3.3.3 The Offeror is responsible for including sufficient details to permit a complete andaccurate evaluation of the proposal.
Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and Subfactors required in Section M of the
RFP.
L.3.3.4 File Packaging - All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. Please note Self extracting .exe files will not be accepted.
L.4 SPECIFIC PROPOSAL INSTRUCTIONS___________________________________
Offerors are responsible for including sufficient details (i.e. drawings, test data) to permit a complete and accurate evaluation strictly from a technical standpoint. The Technical Volume(s) shall have a separate index, which contains narrative titles that are cross-referenced to both the applicable Statement of Work (SOW) paragraph and page number. This index shall not count against the page limitation for the Technical Volume. The narrative discussions shall also be related to the applicable SOW paragraph by placing the appropriate SOW number at the beginning of the discussion text. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. The Offerors shall provide detailed narrative discussions that address both the SOW and the Contract Data Requirements List (CDRLs) of the solicitation. All information and data provided shall be specific to the RAMS M17A1 and M85A1, components and assemblies, except for the area of Past Performance. In the response to the
Request for Proposal, the Offerors must address the following Factors and Subfactors:
L.4.1 Volume I FACTOR 1: TECHNICAL_____________________________________
4 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L. 4.1.1 Subfactor 1: Manufacturing Plan_________________________________________
The Offerors shall provide its detailed Manufacturing Plan that delineates all the necessary aspects of manufacturing (inspection, assembly and testing) to meet the requirements of the solicitation. The Offerors Manufacturing Plan shall provide a description of the essential manufacturing facilities, equipment, processes and process controls to produce the M17A1 and M85A1 receivers and requirements contained in the SOW. At a minimum, the Offerors shall provide the following:
a) A detailed manufacturing plan depicting its processes to include inspection, testing, final assembly, explosive loading and packaging and proposed controls/process maps to provide traceability of components during the production process. This includes, but is not limited to: supply chain ordering, incoming inspection, manufacturing, in-process inspection, testing, packaging, marking, and shipment.
b) The Offeror shall provide and identify a detailed description of its necessary manufacturing and test facilities, tooling, equipment for manufacturing, testing and inspections equipment that are in place to achieve the solicitation requirements. If the Offeror does not currently possess the required capabilities or adequate resources, then the proposal must demonstrate a realistic plan to obtain the required capabilities and resources to meet the solicitation requirements.
c) The Offeror shall describe in detail and provide evidence of their capability, and/or capacity to manufacture, assemble, and test
Printed Wiring Boards (PWB) to include high voltage circuits, and Electronic Safing & Arming circuits. Also, the Offerors capabilities and experience on troubleshooting PWBs for electro-mechanical assemblies/subassemblies. The Offeror shall provide a listing of subassemblies and operations that will be outsourced and the proposed sub-contractors and their involvement in manufacturing, inspection, assembly, and testing of all
PWBs.
d) The Offeror shall provide evidence of their knowledge on the loading, assembly, and packing of explosive items. The offeror shall describe their capability and or capacity to handle and store explosive material/items including the availability of an existing approved Safety Site plan or the offerors plans to obtain Safety Site plan approval. If the Offeror does not currently possess the required explosive loading and handling capabilities, the offeror shall identify its plans to obtain or partner with supplier(s) that possesses the capability to meet the solicitation requirements.
e) The Offeror shall provide a detailed description and evidence of their Material/Parts Obsolescence program to identify single point failures for materials and suppliers, including efforts to mitigate these risks and prevent material non-availability.
f) The Offeror shall provide a detailed description of its Configuration Management System including: (1) the system of developing, processing, and implementing engineering changes, variances to drawings and specifications; (2) the process to identify, control, audit, and track hardware configurations; (3) details on how Configuration Management requirements will be flowed down, managed, and controlled at the subcontractor level.
L.4.1.2 Subfactor 2: Quality Plan_________________________________
The Offeror shall provide a description of its Quality Management System that will be used to address the Quality requirements as defined in the solicitation. At a minimum the Offeror shall provide the following:
a) Documented evidence that the Offerors quality system complies with the requirements of the solicitation. The quality program shall describe the interrelations of the Offerors quality program to the organization and associated processes to include the flow down of quality requirements to its suppliers at the subcontract level. Description of in-coming supplies and materials inspection plan/procedures to ensure supplies and materials to be utilized in production conform to the drawings and specifications.
b) The Offeror shall provide a detailed description of its processes for the identification, tracking, and control of Key
Characteristics in technical data package and a description of the mechanisms and processes through which the Offeror flows down and verifies contractual quality requirements from engineering to the production floor and to their subcontractors.
c) The Offeror shall provide evidence to demonstrate that they are certified to the latest guidance ISO 9001-2015 or its equivalence.
The Offeror shall discuss how it intends to convey these requirements to its suppliers and its formal follow-up process to ensure that pertinent information is received, understood, and appropriately implemented in a timely basis, as well as identification of any initiatives used to minimize quality problems.
d) A detailed description of the processes and procedures for identification, control, correction, and resolution of deficiencies found in components, assemblies and end items. The Offerors methodology for resolving product deficiencies or test failures to include process and requirements for which failure analysis, identification of root cause, and implementation of corrective actions would occur.
e) The offeror shall provide detailed description of their Metrology Laboratory and the ability to select the appropriate inspection equipment along with any pre-selected inspection equipment (AIE and/or AAIE). The Offeror provided a description of the proposed calibration system and standards for inspection equipment.
5 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
f) The Offeror shall provide a clear description of the steps for preparation and execution of FAT, LAT and PCA.
L.4.1.3 Subfactor 3: Management Plan____________________________________
The Offeror shall provide its detailed Management Plan proposed for production of the RAMS M17A1 and M85A1, which delineates how the
Offeror will manage the program to meet the requirements of the solicitation. At a minimum, the Offeror shall provide the following:
a) The Offeror shall provide details for planning, establishing and implementing all processes the Offeror intends to use to execute the program and control technical, cost and schedule risk. The Management Plan shall described their processes and methods used to mitigate, monitor and track all risks to ensure program milestones and delivery schedules are met Define and describe the integration of all the diverse tasks and milestones that the Offeror must successfully complete along with the requisite resources.
b) The Offeror shall provide a detailed Integrated Master Schedule (IMS) for the RAMS M17A1 and M85A1 production. The IMS shall clearly illustrate the interdependence of all activities, events, supporting tasks, and milestones, as well as demonstrate how they are supportable and achievable. The program schedule shall include details for contract execution, data item submissions and approvals, Physical Configuration Audit timeline, First Article Test, production, and other associated required activities. The IMS shall present the production and delivery schedule to include: detailed tasks, durations, critical paths, and testing.
c) The Offeror's shall provide details of the company organizational structure for the purposes of accomplishing the requirements of the contract including:
i. The various functional components of the Offerors organization structure and clearly defined responsibilities of the various organizational components.
ii. The Offerors personnel, a listing of their skills and experience level relevant to this acquisition, engineering staff, production managers, technicians, quality managers and support staff supply chain.
iii. Evidence of the training and recertification process for skilled technicians electronic assemblers and manufacturing personnel.
L.4.2 Volume II FACTOR 2: PRICE__________________________________
L.4.2.1 The Offeror shall submit pricing in Section B for all priced Contract Line Item Numbers (CLIN)s, including all quantity ranges, when applicable. The proposed price for production CLINS shall be inclusive of all fabricating, testing, inspection, packaging and delivery of the solicited item. Each Offeror must propose a FFP for FAT CLINS for all ordering periods. Failure to provide a price for
FAT may result in the offer not being considered for award.
Delivery Orders will be issued in accordance with the procedures for Future Delivery Orders as stated in Section H of the solicitation.
L.4.2.2 In accordance with FAR 45.202(a), the Government shall consider any potentially unfair competitive advantage that may result from an Offeror using Government property. The total evaluated price will be adjusted to include a rental equivalent factor for each item of such property calculated in accordance with FAR 52.245-9.
The following quantities shall be used to calculate the amount of rent that would otherwise be charged in accordance with FAR 52.245-9 , Use and Charges:
| CLIN | Item Description | Quantity |
| 0001 | Year 1 M17A1 Production | 210 |
| 0002 | M17A1 FAT | 1 |
| 0003 | M85A1 Production | 75 |
| 0004 | M85A1 FAT | 1 |
| 0005 | Year 2 M17A1 Production | 210 |
| 0006 | M17A1 FAT | 1 |
| 0007 | M85A1 Production | 75 |
| 0008 | M85A1 FAT | 1 |
| 0009 | Year 3 M17A1 Production | 210 |
| 0010 | M17A1 FAT | 1 |
| 0011 | M85A1 Production | 75 |
| 0012 | M85A1 FAT | 1 |
6 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
| 0013 | Year 4 M17A1 Production | 210 |
| 0014 | M17A1 FAT | 1 |
| 0015 | M85A1 Production | 75 |
| 0016 | M85A1 FAT | 1 |
| 0017 | Year 5 M17A1 Production | 210 |
| 0018 | M17A1 FAT | 1 |
| 0019 | M85A1 Production | 75 |
| 0020 | M85A1 FAT | 1 |
L.4.2.3 Any HUBZone Small Business Concern shall provide documented proof of HUBZone certification with its proposal submission.
L.4.2.4 Unbalanced Pricing. If the Offerors unit prices appear unbalanced when comparing them from ordering period to ordering period, the Offeror shall provide documentation, including calculations and supporting rationale, explaining the apparent unbalanced pricing.
L.4.3 Volume III FACTOR 3: PAST PERFORMANCE
L.4.3.1 Offerors shall identify pertinent past history, which indicates that similar efforts of equal or greater complexity have been performed using the Offeror's existing plant capability or other capability, as well as demonstrated satisfaction of customer requirements.
L.4.3.2 Offerors shall submit a list of all recent Federal Government contracts (prime and major subcontracts) in performance or awarded to the Offeror and any of its major subcontractors within the past three (3) years, or awarded earlier than three (3) years ago, but for which deliveries/performance occurred or were scheduled to occur within the past three (3) years, which are relevant to the effort required by the solicitation. Data concerning the prime Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Offerors are reminded that both independent data and data provided by the Offerors in their proposals may be used to evaluate the Offerors past performance. The Government plans to rely on existing documentation from Federal databases to the maximum extent practicable. Sources of existing information available to the Government include, but are not limited to, Past Performance
Information and Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), and Electronic
Subcontract Reporting System (eSRS). The Government may use past performance information obtained from sources other than those identified by the Offeror. The Government reserves the right to use or not use past performance information submitted by the Offeror based on whether or not adequate recorded past performance information is available in its Federal databases. Since the Government may not necessarily interview any or all of the sources provided by the Offerors, it is incumbent upon the Offeror to explain the relevance of the data provided. The burden of providing thorough and complete past performance information remains with the Offerors. Proposals that do not contain the information requested by this paragraph may result in rejection or receipt of a high performance risk evaluation by the Government. This volume shall be organized into the following sections:
(1) Section 1 Contract Descriptions. This section shall include the following information in the following format:
(a) Contractor/Subcontractor place of performance, Commercial and Government Entity (CAGE) Code and Data Universal Numbering System
(DUNS) Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers). PLEASE NOTE: While an Offeror may submit past performance information on relevant efforts where they performed as a major subcontractor, the Government does not have privity with subcontracts and therefore, may not be able to obtain qualitative information.
(b) Government contracting activity, and current address, Procuring Contracting Officer's name, e-mail address, telephone and fax numbers.
(c) Governments technical representative/COR, and current e-mail address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative Contracting Officer's name, and current e-mail address, telephone and fax numbers.
(e) Government contract administration activity's Pre-Award Monitor's name and current e-mail address, telephone and fax numbers.
(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, also include Delivery Order Numbers.
(g) Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Materials (T&M), etc.) In the case of
Indefinite Delivery contracts, indicatespecific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.)).
(h) Awarded price/cost.
(i) Final or projected final price/cost.
(j) Original delivery schedule, including dates of start and completion of work.
(k) Final or projected final, delivery schedule, including dates of start and completion of work.
(2) Section 2 - Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section L describing the objectives achieved and detailing how the effort is relevant to the requirements of the solicitation.
7 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for
Waiver shall be addressed with respect to causes and corrective actions. The Offerors shall also provide a copy of any Cure Notices or
Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the Offerors delivered product.
(3) Section 3 Subcontracts. Offerors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the Offerors corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government SOW subparagraph number. This includes all major subcontractors who will be providing critical hardware/services or whose subcontract is for more than 25% of the total proposed price.
(4) Section 4 New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees.
However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.
(5) Past Performance Questionnaire. For all contracts identified in Section 1, Past Performance Questionnaires must be completed and submitted (APPENDIX D). The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the
Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Officer within thirty (30) calendar days of the release of the RFP, to evangelina.c.tillyros.civ@mail.mil. The Offeror shall also e-mail to the ContractingOfficer a list of all the POCs who were sent a questionnaire. The Government must receive this list within thirty (30) calendar days after release of the RFP. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation
Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-Mail
Address; Date E-Mailed to POC (month/day).
L.4.4 Volume IV FACTOR 4: SMALL BUSINESS PARTICIPATION________________________________________________________
L.4.4.1 The Small Business Participation Factor Volume is comprised of a single chapter. Offerors are responsible for including sufficient detail to permit a complete evaluation. Any information provided as part of the Small Business Participation Factor Volume may be used to correlate the evaluation of the other proposal volumes.
L.4.4.2 This provision applies to every Offeror (U.S. and non-U.S.), regardless of size status or locations of working facilities or headquarters. For proposal preparation purposes, the Offeror's Small Business Participation proposals shall be consistent with any subcontracting references/identification contained elsewhere in any other Factor Volume. Percentages are calculated using proposed total contract price as calculated in accordance with D.4.2. This price becomes the denominator and include first-tier subcontractors only.
For the purpose of evaluating Small Business Participation, the maximum quantity of the highest range multiplied by the highest ranges' unit price should be used to determine the price of the CLIN. Offerors shall also explain their rationale as to why the percentage of SB participation being utilized for this effort is appropriate for their company. Offerors shall describe their approach and efforts undertaken to utilize small businesses (SB). SB targets will be incorporated into any resulting prime contract and contractors will be required to report SB participation.
L.4.4.3 All Offerors, including Offerors who are themselves U.S. small business concerns based on the NAICS code assigned to this requirement, are to identify the extent to which U.S. small business concerns will be utilized as first-tier subcontractors in the performance of this proposed contract. U.S. small business concerns are defined (1) in FAR 19.001 and (2) by the criteria and size standards in FAR 19.102 for the applicable NAICS code. U.S. small business concerns include Small Businesses (SBs), Small Disadvantaged
Businesses (SDBs), Woman-Owned Small Businesses (WOSBs), HUBZone Small Businesses (HUBZone SBs), Veteran-Owned Small Businesses (VOSBs), and Service Disabled Veteran-Owned Small Businesses (SDVOSBs).
L.4.4.4 If the Offeror (to include any U.S. small business concerns who are proposing as part of a joint venture or teaming arrangement) is itself a U.S. small business concern, the Offeror's own participation as a SB, SDB, WOSB, HUBZone SB, VOSB, or SDVOSB will also be considered small business participation for the purpose of this evaluation. In this event, the extent of the Offeror participation as a U.S. small business concern shall be detailed in the same manner as subcontracts to first-tier U.S. small business concerns.
L.4.4.5 Small Business Amounts: All Offerors shall address anticipated U.S. small business concern participation and subcontracting based on the total contract dollars proposed by the Offeror.
L.4.4.6 The Offeror shall provide information for small business participation and subcontracting in a table format in accordance with the following example:
8 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
| Small Business Participation Tables (in millions)
| Business Category | $ Cost All Contracts | % of SB Participation | Cost Total SubK |
| Contract Total Price | $48.954 | | |
| SB | $11.75 | 24.00% | $11.75 of $48.954 |
| SDB | $3.26 | 6.65% | $3.26 of $48.954 |
| SDB | $2.69 | 5.50% | $2.69 of $48.954 |
| HBCU/MI | $0.56 | 1.15% | $0.56 of $48.954 |
| WOSB | $1.76 | 3.60% | $1.76 of $48.954 |
| HUBZone SB | $1.22 | 2.50% | $1.22 of $48.954 |
| VOSB | $1.76 | 3.60% | $1.76 of $48.954 |
| SDVOSB | $1.66 | 3.40% | $1.66 of $48.954 |
L.4.4.6.1 Guidance for filling in the above "Small Business Participation" Table:
(a) Include first-tier subcontractors only. Note that members of a joint venture may be considered the Offeror or the first tier subcontractors, depending on the legal form of the joint venture as defined in its agreement document.
(b) If the Offeror is a U.S. small business concern, detail the extent of the Offeror participation as a U.S. small business concern in the same manner as subcontracts to first tier U.S. small business concerns.
(c) Percentages should be rounded to the nearest tenth of a percent.
L.4.4.6.2 Additional Guidance for particular Business Categories:
(a) For "Contract Total Price": Include the Offeror's proposed Total Contract Price on this line.
(b) For SB: Include U.S. small business concerns from all categories (i.e. SB, SDB, WOSB, HUBZone SB, VOSB, SDVOSB and HBCU/MI) in the dollars and percentage on this line. The SDB, WOSB, HUBZone SB, VOSB and SDVOSB are subcategories of SB and the dollars in each of these may not add to match the total dollars in the SB line due to the following: In some cases the same dollars may be reported in more than one block (i.e., a $10,000 subcontract to a Woman-Owned Small Business that is also a Service-Disabled Veteran-Owned Small Business should be entered on four rows: $10,000 under SB, $10,000 under WOSB, $10,000 under VOSB and $10,000 under SDVOSB). Be sure that the dollars are counted in the SB line only once and not four times (e.g. $40,000 representing the same firm participating at $10,000 in differing categories). Note that the SB percentage is not simply a total of the percentages of each SB subcategory and must be calculated separately as shown in the chart.
(c) For HUBZone SB: Include only "SBA certified" HubZone SBs. Note that this is different from some of the state HUB certifications.
(d) The term small disadvantaged business, when used in accordance with FAR 52.219-9, includes Historically Black Colleges and
Universities (HBCU) and Minority Institutions (MI), in addition to small disadvantaged business concerns. The percentages for HBCU and
MI shall be separately identifiable but included in the overall SDB percentage.
L.4.4.7 Small Business List: All Offerors shall provide the names and CAGE codes of small business concerns (including the Offeror if a small business concern) who would participate in accomplishing the proposed contract; the small business classification of each U.S.
small business concern (i.e. SB, SDB, WOSB, HUBZone SB, VOSB and SDVOSB); a short description of the specific services to be provided by each small business concern; and the estimated total dollars for each service or product.
a. This data shall be provided in a table format in accordance with the following example:
| Name of SB Concern | Cage Code | Location | SB Class | Description of Supplies or Services | Total $ (in Millions) |
9 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
| ABC Co. | 123XX | City, USA | SB | Wire | $0.50 |
| DEF Co. | XX123 | City, USA | SB | Plating | $0.75 |
| GHI, Inc. | DD123 | City, USA | SB, WOSB, VOSB | Circuit Cards | $1.20 |
b. If a small business does not have a CAGE code, insert the word "None" in the table above. Note that during the evaluation, the
Government may request that the Offeror submit a letter from the small business affirming the information provided in your proposal.
c. For SB Classifications(s), list all SB classifications that apply to each concern in the table above.
L.4.4.8 If the Offeror IS NOT a U.S. small business concern and must submit a Small Business Subcontracting Plan under the RFP in accordance with FAR 52.219-9, the Small Business Subcontracting Plan shall be consistent with the Offeror's Small Business Participation proposal information provided in response to D.4.4.5 (recognizing that the Small Business Subcontracting Plan percentages will be different in that the percentage calculation denominator is total subcontracting amount as opposed to this Small Business Participation
Factor where the percentage calculation denominator is the Offeror's proposed Contract Price).
L.4.4.9 Compliance with FAR 52.219-9.
L.4.4.9.1 Offerors which are both: (a) other than U.S. small business concerns (as defined by the NAICS code applicable to the RFP), and
(b) have had prior contracts requiring the submission of a Small Business Subcontracting Plan in accordance with FAR 52.219-9 are to:
Provide a description of their performance in complying with the requirements of FAR 52.219-9, including documentation of both their goals and their accomplishment of the goals established under subcontracting plans of prior contracts performed over the past twelve
(12) months (from date of solicitation issuance). This documentation shall include Individual Subcontracting Reports (ISRs/DD Form 294s) which list both goals and accomplishments against individual or master plans. If over the last twelve (12) months from the date of RFP release, the Offeror reported accomplishments against commercial or comprehensive subcontracting plans in lieu of individual or master plans, the Offeror shall submit the plans to document the goals and the Summary Subcontract Reports (SSRs/DD Form 295s) to document the accomplishments. (Note: if the Offeror has not performed a contract over the past twelve (12) months, which included FAR 52.219-9, the
Offeror shall so state).
L.4.4.9.2 Offerors which have had prior contracts requiring a Small Business Subcontracting Plan IAW FAR 52.219-9 and provide the information requested in D.4.4.9.1 above shall not respond to D.4.4.10 below.
L.4.4.9.3 If the reporting entity listed on a subcontracting report is different from the name of the proposing prime, provide an explanation of the legal relationship between the other entity and the proposing prime and a description of how the other entity's small business accomplishments reported are applicable to the current proposal. This explanation should include Business Name, CAGE Code and
DUNS number of the other entity and the proposing prime.
L.4.4.10 Approach to meeting FAR 52.219-8. Offerors which are either U.S. small business concerns, or other than U.S. small business concerns (as defined by the NAICS code applicable to the RFP) having had no prior contracts requiring a Small Business Subcontracting
Plan in accordance with FAR 52.219-9 shall substantiate their proposed approach to meeting the requirement of FAR 52.219-8.
Substantiation may include providing:
(a) A description of the Offeror's performance, over the past twelve (12) months (from date of solicitation issuance), in complying with the requirements of FAR 52.219-8 (Note: if the Offeror has not performed a contract over the past twelve (12) months (from date of solicitation issuance), which included FAR 52.219-8, the Offeror shall so state);
(b) A description and available documentation of any methods or techniques used to promote small business participation;
(c) Any listings of U.S. small business concerns who are subcontracting candidates;
(d) Internal procedures used to monitor small business participation during contract performance; and/or
(e) Any other information substantiating that the Offeror will satisfy the requirements of FAR 52.219-8.
L.4.5 Volume V SOLICITATION, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS/REPRESENTATIONS
L.4.5.1 Each Offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the solicitation. An authorized official of the firm shall sign the SF 33 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission.
Section A through M Fill-ins as required
10 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Section A Standard Form 33 (SF 33), Solicitation, Offer and Award
Section B Supplies or Services and Prices/Costs
Section G Contract Administration Data
Section J Contract Data Requirements List (DD1423) with blocks 17 & 18 completed
Section K Completed Representations, Certifications and Other Statements of Offeror
Small Business Subcontracting Plan shall be submitted in accordance with FAR 52.219-9
*** END OF NARRATIVE L0001 ***
11 11
| SECTION A |
| SECTION L |
File details come from the government source that posted it. Updated .