Solicitation Amendment 0002

View the file

Other files

File Type Posted
Question_21.pdf PDF
Questions_17-20.pdf PDF
Questions_12-16.pdf PDF
Questions_5-11.pdf PDF
W15QKN-19-R-0003_Amendment_0003.pdf PDF
Questions_1-4.pdf PDF
W15QKN-19-R-0003_Amendment_0001.pdf PDF
W15QKN-19-R-0003.pdf PDF
Attachment_0006_-_SF-LLL_-_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_0001_-_Price_Matrix.xlsx XLSX spreadsheet
Attachment_0003_-_AMSTA-AR_1350_-_Technical_Data_Request_Questionnaire.pdf PDF
Exhibit_A_-_DD1423_-_Contract_Data_Requirements_List_(CDRLs).pdf PDF
Attachment_0005_-_DD441_-_DoD_Security_Agreement.pdf PDF
Attachment_0010_-_Production-Delivery_Tracking_Template.xlsx XLSX spreadsheet
Attachment_0008_-_DD2357_-_Hazardous_Component_Safety_Data_Statements_(HCSDS).pdf PDF
Attachment_0015_-_Certificate_of_Destruction.doc DOC document
Attachment_0002_-_DD2345_-_Militarily_Critical_Technical_Data_Agreement_Template.pdf PDF
Attachment_0011_-_Contract_Quality_Requirements.docx DOCX document
Attachment_0009_-_GFM_Product_Quality_Template.xlsx XLSX spreadsheet
Attachment_0014_-_Scheduled_Government_Furnished_Property.pdf PDF
Attachment_0007_-_INME-PIC-IM_Form_3002_-_Clearance_of_Technical_Information_for_Public_Release.pdf PDF
Attachment_0004_-_Non-Disclosure_and_Non-Use_Agreement.pdf PDF
Attachment_0012_-_Additional_Solicitation_and_Contract_Requirements.docx DOCX document
Attachment_0013_-_Past_Performance_Questionnaire.doc DOC document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2019APR02

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

MEGAN CAHILL

EMAIL: MEGAN.E.CAHILL.CIV@MAIL.MIL

W15QKN-19-R-0003

2019MAR19

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 17

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MEGAN CAHILL

Buyer Office Symbol/Telephone Number: ACC-NJ-CA/(973)724-9040

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0002 to Solicitation W15QKN-19-R-0003 is to:

1) Modify Section B FAT delivery dates as follows in order to allow sufficient time for production and Lot Acceptance Testing (LAT) after receipt of USG FAT approval/disapproval:

CLIN 0001AA M931 FAT delivery date from 31-DEC-2021 to 30-NOV-2021

CLIN 0003AA M933A1 FAT delivery date from 30-SEP-2021 to 31-AUG-2021

2) Modify FAR 52.211-8, Time of Delivery, in Section F as follows in order to allow sufficient time for production and Lot Acceptance

Testing (LAT) after receipt of USG FAT approval/disapproval:

From: "The first delivery of an Option production quantity is required to be delivered no sooner than 30 days after FAT approval, or 60 days after Option exercise if FAT is not required."

To: "The first delivery of an Option production quantity is required to be deliver no sooner than 60 days after FAT approval, or 60 days after Option exercise if FAT is not required."

3) Modify Section H to include additional LAT information.

4) Modify Section L to remove paragraph L.1.4.

5) All other terms and conditions remain unchanged.

*** END OF NARRATIVE A0005 ***

2 17

W15QKN-19-R-0003

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 M931 FRPC - FAT

Mfr CAGE: 00000

Mfr Part Number: 13047988

0001AA M931 (FRPC) - FIRST ARTICLE TEST 1 EA $ $ ________________________________ ______________ __________________

COMMODITY NAME: M931 FRPC - FAT

CLIN CONTRACT TYPE:

Firm Fixed Price

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 60

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 0 31-DEC-2021

002 1 30-NOV-2021

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

0003 M933A1 HE - FAT

Mfr CAGE: 00000

Mfr Part Number: 13047974

0003AA M933A1 (HE) - FIRST ARTICLE TEST 1 EA $ $ ________________________________ ______________ __________________

COMMODITY NAME: M933A1 HE - FAT

CLIN CONTRACT TYPE:

Firm Fixed Price

3 17

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 60

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 0 30-SEP-2021

002 1 31-AUG-2021

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

4 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

F-1 CHANGED 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

* The required delivery schedule for the base award quantity is provided in Section B. The delivery dates are based on First

Article Test approval.

* Options 1-4:

Any First Article Testing shall be IAW Section J Attachment 0011, Contract Quality Requirements - First Article Test (Government

Testing and Contractor Testing).

The first delivery of an Option production quantity is required to be delivered no sooner than 60 days after FAT approval, or 60 days after Option exercise if FAT is not required. Production is anticipated to be required at a rate of 15,000 units per month.

* Early deliveries are acceptable upon notification to the PCO at no additional cost to the Government. However it is incumbent upon the Contractor to monitor GFM quantities to support the required delivery schedule per Section B of the contract.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractor's date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

5 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

SUBMISSION OF PRODUCTION LOT SAMPLES (GOVERNMENT TESTING)_________________________________________________________

(a) A lot acceptance test sample is required to be submitted by the Contractor from each production lot tendered to the Government for acceptance. This sample shall consist of: Ballistic test samples as required by the Technical Data Package (TDP). The sample units shall be delivered by the Contractor Free on Board (FOB) Origin and shipped to the test facility identified below on a Government Bill of

Lading for the following tests:

TEST: Ballistic Lot Acceptance Testing

REQUIREMENTS: As required by TDP

SAMPLE: As required by TDP

TEST FACILITY:

(W61P4X) SR W04X USA Yuma Proving Ground

AMMO Storage and Issue Section

3294 Aberdeen and Firing Front Road

Yuma, AZ 85365-9104

(b) The sample units shall be randomly selected from the entire lot by or in the presence of the Government Quality Assurance

Representative. Unless otherwise specified, the sample units are considered to be destructively tested and are in addition to the units deliverable under the contract.

(c) Prior to selection of the sample units, the lot shall have been inspected to and meet all other requirements of the contract. A sample shall not be submitted from a lot rejected for nonconformance to the detailed requirements of the specifications) and drawing(s) unless authorized by the Contracting Officer.

(d) Unless authorized by the Contracting Officer, the lot from which the samples are drawn shall not be shipped until official notification has been provided by the Contracting Officer that the tested units have satisfactorily met the established requirements.

Final acceptance of the lot shall not proceed until such notification has been provided.

(e) If the production lot sample contains samples for ballistic testing, the test samples shall be identified as such on the outer packs and the applicable Ballistic Test Request (BTR) number shall be stenciled on all outer packs and included on all shipping documents.

(f) The Contracting Officer shall by written notice to the Contractor within 30 days after receipt of the sample units by the government, approve, disapprove, or conditionally approve the lot acceptance sample.

(g) If the production lot sample fails to meet applicable requirements, the Contractor may be required at the option of the Government, to submit an additional production lot test sample for test. When notified by the Government to submit an additional production lot test sample, the Contractor shall at no additional cost to the Government make any necessary changes, modifications, or repairs and select another sample for testing. The additional test sample shall be furnished to the Government under the terms and conditions and within the time specified in the notification. The Government shall take action on this test sample within the time limit specified in paragraph g above. All costs associated with the additional testing shall be borne by the Contractor.

(h) If a ballistic test sample fails to meet contractual performance or functional requirements, the Contractor shall reimburse the

Government for transportation costs associated with the failing sample, including the cost of transportation protective service and transportation security requirements when such security is required by other provision of this contract.

An exception to this requirement for reimbursement of Government transportation costs will occur if the Government determines that the functional test samples failed to meet contractual performance requirements through no fault of the contractor.

(i) If the Contractor fails to deliver any production lot test sample(s) for test within the time or times specified, or if the

Contracting Officer disapproves any production lot test sample(s), the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract. Therefore, this contract may be subject to termination for default. Failure of the

Government in such an event to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.

(j) In the event the Contracting Officer does not approve, conditionally approve, or disapprove the production lot test sample(s) within the time specified in paragraph f above, the Contracting Officer shall equitably adjust the delivery or performance dates, or the contract price, or both, and any other contractual provision affected by such delay in accordance with the procedures provided in the

Changes clause. Failure to agree to any adjustment shall be a dispute concerning a question of the fact within the meaning of the clause of this contract entitled Disputes.

6 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE H0002 ***

7 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L. PROPOSAL SUBMISSION:

L.1. Introduction: This section contains general proposal submission instructions as well as specific proposal requirements for the

120mm M931 FRPC and M933A1/M934A1 HE, and variants thereof, Mortar Cartridges LAP.

L.1.1. General. The proposal shall be presented in sufficient detail to allow Government evaluation of response to the requirements of the solicitation. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.1.2. Offerors are responsible to inquire with the PCO and/or Contract Specialist to assure that the proposal submitted has in fact been received by the PCO and/or Contract Specialist. This must be done by the date/time set in the solicitation for "receipt of offers."

L.1.3. No multiple, alternate, or additional proposals will be accepted. If an Offeror submits more than one proposal, all proposals will be returned without evaluation since the Government would have no basis upon which to determine which of the proposals the Offeror desired to have evaluated.

L.2. Proposal Instructions:

L.2.1. General:

L.2.1.1. Offerors shall provide information by addressing each Factor/Subfactor in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the Offeror's capability to support the proposed response to the evaluation criteria. Proposals that do not contain the information requested in the solicitation risk being determined unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2.1.2. The proposal must not merely repeat the solicitation requirements, but rather must provide convincing evidence in support of conclusive statements of how contract requirements will be met.

L.2.1.3. The Government intends to award without discussions (see FAR 52.215-1). Proposals that do not contain the information requested in this solicitation risk being determined Unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2.1.4. Alternate Proposals: Alternate proposals will not be accepted.

L.2.1.5. Proposals shall be valid for 180 days from the closing of the solicitation.

L.2.2. All questions concerning this procurement, either technical or contractual, must be submitted in writing to the Contracting

Officer. No direct discussion between the technical representative and a prospective Offeror shall be conducted. Questions and proposals shall be submitted to the following point of contact:

Army Contracting Command - New Jersey

ACC-NJ-CA, Bldg. 10

ATTN: Megan Cahill; Telephone: 973-724-9040

Picatinny Arsenal, NJ 07806-5000

Email: megan.e.cahill.civ@mail.mil

Alternate Point of Contact (POC):

Army Contracting Command - New Jersey

ACC-NJ-CA, Bldg. 10

ATTN: Jaclyn D'Olivo; Telephone: 973-724-4109

Picatinny Arsenal, NJ 07806-5000

Email: jaclyn.m.dolivo.civ@mail.mil

*Please note that electronic email proposal submissions will not be accepted.

L.2.3. The proposal shall consist of the following:

L.2.3.1. Each proposal shall be submitted in the English language and consist of and include all of the following:

a. One (1) signed and completed paper copy of the attached Standard Form 33 (SF 33) and continuation sheets (Sections A through M) signed by a person authorized to enter into the proposed contract on behalf of the Offeror. Acknowledgment of all

8 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices in the

CLINs/Pricing Matrices included as an attachment in Section J, any fill-ins required, such as Contract Data Requirements List

(CDRL): DD Form 1423 with Blocks 17 and 18 completed if required, and Certifications and Representations in Section K.

Offerors are directed to thoroughly read the solicitation and fill in the required information in the appropriate solicitation clauses. For any fill-ins that are not applicable, the Offeror must acknowledge by indicating "N/A". The proposal must also include computation for the use of Government Property, if applicable.

b. Original and 4 paper copies and 8 electronic Compact Disk (CD) copies of the proposal volumes (including oral presentation slides), as reflected in L.3., shall be compiled using the Microsoft (MS) Office for Windows suite of applications, submitted on a single-write CD-ROM to prevent accidental erasure of the data therein, formatted for a MS

Windows compatible computer. The Price Factor shall be contained on a separate CD from non-price Factors. Price breakdown, when applicable, will include MS Excel spreadsheets with formulae intact. The Integrated Master Schedule (IMS) and Process

Flow Diagram must be delivered in hard copy in addition to the Portable Document Format (PDF). CD copy must mirror the submitted hard copies. If the CD copy and hard copy differ, the CD copy supplied for each Factor will be used for the evaluation. Each CD must be clearly marked with Offeror's Name and Solicitation Number.

c. Representations through System for Award Management (SAM). The purpose of electronic Representations and Certifications

(Reps/Certs) is to provide all Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As a requirement under the 120mm M931 FRPC and M933A1 / M934A1 HE, and variants thereof, Mortar Cartridges LAP solicitation, all

Offerors must submit Reps/Certs data into SAM at https://www.sam.gov/ and provide one (1) hard copy. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal.

L.2.3.2. Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR 52.219-9, Alternate II. This plan shall be incorporated into any resultant contract in reference to this solicitation.

L.3. FORMAT FOR PROPOSALS

L.3.1. The Offeror's proposal shall be submitted in several volumes based on the Factors as set forth below and all information specific to each Factor shall be confined to that volume. Each proposal including the Oral Presentation Slides and the Integrated

Master Schedule (IMS) and Process Flow Diagram pdfs must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating. Information provided shall be specific to each Factor. Only slides that are briefed during the Oral Presentation will be reviewed and considered part of the technical proposal.

Page limitation for each Volume is as follows:

Volume I: Technical Factor (Slides)___________

a. A maximum of 35 slides under Subfactor 1, not inclusive of the IMS (which will be in pdf format and be no larger than 11x17 printed)

b. A maximum of 15 slides under Subfactor 2

c. A maximum of 30 slides under Subfactor 3, not inclusive of the Process Flow Diagram (which will be in pdf format and be no larger than 11x17 printed)

d. A maximum of 35 slides under Subfactor 4, not inclusive of the IMS (which will be in pdf format and be no larger than 11x17 printed for oral presentation)

Volume II: Price Factor (Written Proposal - no page limit)____________

Volume III: Past Performance Factor (Written Proposal - no page limit)_____________

Volume IV: Small Business Participation (Written Proposal - 10 page limit)____________

L.3.2. Oral Presentations:

a. Offerors will be required to give an oral presentation of up to three (3) hours and have one (1) hour for questions/answer section to the Governments SSEB for the Technical Factor, inclusive of all subfactors, using PowerPoint. The total allotted time is four (4) hours. The oral presentation shall not encompass past performance, price, or small business participation. At the conclusion of each Offeror's presentation, the Government personnel will briefly caucus to ascertain if any clarifications of the

Offeror's presentation are required. If the Government determines there is a need for clarifications, the written request for clarification will be presented to the Offeror. The Offeror will respond in writing with the appropriate answer that directly addresses the question asked by the Government. The oral presentation session and written questions will be evaluated for purposes of award. Information from the Contractor's proposal, oral presentation slides, and written questions may be incorporated to any resultant contract and become additional contract requirements.

9 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

b. The planned oral presentations will NOT be recorded/videotaped and no listening devices or cell phones will be allowed to be turned on during the presentations.

c. The Offeror's key personnel who will perform or personally direct the work being described should conduct their relevant portions of the presentations. Key personnel include project managers, task leaders, and other in-house staff of the Offeror.

The names of presenters shall be listed on the Title Slide for each Technical Subfactor.

L.3.2.1. The oral presentation will be evaluated for purposes of award. The oral presentation will not constitute discussions, as defined in FAR 15.306(d), nor will it obligate the Government to conduct discussions or to solicit or entertain any proposal revisions.

L.3.2.2. Process and Facilities:

L.3.2.2.1. The PCO will schedule the oral presentations and will notify each Offeror of the date, time and location of its oral presentation after the Government receives the offers in response to this solicitation. The order in which Offerors will make their presentations will be determined by the drawing of lots by the PCO. Oral presentations will be scheduled no sooner than five working days after closing date of the solicitation. Each Offeror will be notified, in writing with acknowledgement requested, of the scheduled date and time for the presentations. The Government reserves the right to reschedule presentations at the sole discretion of the PCO. Once notified of the scheduled presentation date and time, each Offeror shall complete the presentation at that scheduled date and time.

L.3.2.2.2. The facilities available for use by Offerors are limited to a conference room and overhead images (slides) via electronic projection. The Government will provide all facilities.

L.3.2.2.3. The oral presentations must be made in person at Picatinny Arsenal, NJ.

L.3.2.3. Submission Media and Format:

L.3.2.3.1. The Offeror shall submit, by the closing date/time in the solicitation, its set of eight (8) oral presentation

CDs (with the maximum of 115 slides) in a CD format and four (4) paper hardcopies to the Government in a sealed package with its offer. The Government will provide a Windows compatible computer and a projector for the Offeror's use during the oral presentation. The Offeror may not use or submit any other media or documents, samples, prototypes, etc. **Please note - self-extracting ".exe" files will not be accepted.

L.3.2.3.2. At the scheduled presentation time, the PCO will review the ground rules of the oral presentation with the

Offeror. Immediately before the presentation, the PCO will give the Offerors the previously provided overhead images

(slides) in a CD format for the Offeror to use during the presentation. Each Offeror will be required to only use this set of CDs that was submitted with the Offerors proposal. No other material or revisions to the slides or hardcopies will be permitted.

L.3.2.3.3. Content and substance of the presentation is stressed. Each Offeror can use overhead images (slides) to document the key points of its presentation. The contents of the overhead images (slides) in CD format, and thus their corresponding paper hardcopies, must be legible and must conform to the following specifications:

*Size: 8.5 inches by 11 inches

*Font Size: minimum 18

*Color: black and white or color is permitted

*Graphics: permitted

*Company name or logo required on each slide

*Sequentially numbered

*Maximum of 8 bullets per slide

*Hardcopies: one (1) slide per page, single-sided

**Please note: The IMS and Process Flow Diagram may be PDF format embedded onto a slide. The 11 x 17 paper copies of the IMS slides and Process Flow Diagram slide will be provided to the presenters and Government for reference during the presentation.

L.3.3. For written proposals, each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents shall be created using the Table of Contents feature in MS Word. MS Word (.doc) files shall use the following page setup parameters:

Margins - Top, Bottom, Left, Right - 1"

Gutter - 0"

From Edge - Header, Footer - 0.5"

10 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Page Size, Width - 8.5"

Page Size, Height - 11"

L.3.3.1. Length:

L.3.3.1.1. Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will be returned to the

Offeror and will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the solicitation, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, indices, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8.5 inches in width by 11 inches in length; foldout pages depicting such items as sketches, factory floor layouts, etc. may be used, with each fold counted as one page. The font size used shall not be less than 10 point.

L.3.3.1.2. Price Volume. The Offeror's Price Matrix and any documentation that is based on or includes mathematical ____________ calculations (e.g., calculations for rental value of Government property in the Offeror's possession, calculations where there is the appearance of unbalanced pricing, etc.) shall be submitted in electronic, executable format utilizing

Microsoft Excel. Any additional information necessary to explain the proposed pricing that does not contain mathematical calculations may be submitted in Adobe, Microsoft Word or Microsoft Excel format.

L.3.3.1.3. Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the _______________________________

PCO no later than fifteen (15) days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.

L.3.3.1.4. The Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal. Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and Subfactors required in Section M of the solicitation.

L.3.3.1.5. File Packaging. All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 ______________ or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. **Please note Self extracting .exe files will not be accepted.

L.4. SPECIFIC PROPOSAL INSTRUCTIONS

Offerors are responsible for including sufficient details (i.e. drawings, test data) to permit a complete and accurate evaluation strictly from a technical standpoint. The Technical oral presentation slides shall have a separate index, which contains narrative titles, which are cross-referenced to the applicable solicitation requirement. This index shall not count against the page limitation for the oral presentation. All information and data provided shall be specific to the 120mm M931 FRPC and M933A1 and M934A1 HE, and variants thereof, Mortar Cartridges LAP, except for the area of Past Performance. In the response to the solicitation, the Offeror must address the following Factors and Subfactors:

L.4.1. Volume I - FACTOR 1: TECHNICAL ______________________________

L.4.1.1. Subfactor 1: Quality Assurance and Safety Critical Characteristics Plan _______________________________________________________________________

The Offeror shall provide a description of the Quality Assurance and Safety Critical Characterisitcs Plan to meet the Quality

Assurance requirements as defined in the solicitation. The Offeror shall describe in detail the plan that is to be used for the 120mm M931 FRPC and M933A1 and M934A1 HE, and variants thereof, Mortar Cartridges LAP. The Offeror shall provide as a minimum in their plan:

a. Identification of the process to control each Safety Critical Characteristic during LAP, including equipment directly involved in fabrication, assembly, inspection and test of each safety critical characteristic.

b. Demonstrate a process to control Safety Critical Characteristics at the subcontract level.

c. Identification of the Quality Management System and whether or not it is certified to, compliant with, or exceeds the requirements of ISO 9001:2015, or an equivalent quality program acceptable to the Government.

d. Description and demonstration of the Quality Assurance Plan for the load, assemble, pack, test, and inspection. Also describe the process that will be used to flow down all quality requirements and ability to manage subcontractors and suppliers.

e. Identification of inspection, prevention, and control of key parameters that could result in loss of performance, test

11 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

failures, or reduced reliability (e.g., frequency of inspection, Process Control/SPC methods, and inventory management).

f. Identification and demonstration of equipment and processess to perform radiographic inspection of the high explosive pour.

L.4.1.2. Subfactor 2: 120mm FRPC/HE FAT Production and Schedule ______________________________________________________

The Offeror shall describe a capability plan for the 120mm FRPC/HE FAT and production with the assumption GFM is immediately available at contract award (inclusive of a separate Integrated Master Schedule [IMS] for the 120mm FRPC/HE FAT and production). This separate IMS can be submitted in a separate pdf file which will not count against the slide page limit. The

Offeror shall submit a plan that meets and/or exceeds the solicitation requirements. The Offeror must demonstrate how the proposed plan supports a low-risk approach for the delivery schedule.

L.4.1.3. Subfactor 3: Manufacturing Plan _______________________________

The Offeror shall describe a detailed Manufacturing Plan for the load, assemble, pack, and testing of the 120mm M931 FRPC and

M933A1 and M934A1 HE, and variants thereof, Mortar Cartridges LAP, to meet the requirements of the solicitation. A list of GFM is provided at Section H. The description shall be for the complete cartridge, including subassemblies. This Plan shall include a description of the essential manufacturing facilities and equipment, including melt pour capability for all of the above. The Manufacturing Plan must be realistic and supportable. Proposals will address, as a minimum, the following:

a. Provide a complete Process Flow Diagram of the proposed assembly line, including test, inspection, and build. This separate Process Flow Diagram can be submitted in a separate pdf file which will not count against the slide page limit.

b. Identification of essential manufacturing and test facilities, equipment and tooling. Indicate which of the facilities and equipment are not currently owned or leased by the Offeror and indicate plans for obtaining the facilities and equipment.

The Offeror must demonstrate how the proposed facilities, equipment, and tooling supports a low risk approach to the solicitation requirements.

c. Identify the storage capability, specific to the solicitation requirements, of GFM and finished product awaiting acceptance.

d. A listing of the proposed sub-contractors for fiber containers, metal containers, obturators, wirebound boxes, pallets, body bushing, vent tubes, booster pellets, prop charge supports, and any other Contractor Furnished Material (CFM), and their involvement in the 120mm M931 FRPC and M933A1 and M934A1 HE, and variants thereof, Mortar Cartridges LAP.

e. Identify the procedure for melt pour of the high explosive and demonstrate a proposed explosive reuse plan, to include kettle scrap and riser scrap, to reduce and/or re-use explosive to lower potential waste of the GFM product.

f. A listing of the proposed sub-contractors and their involvedment in the load, assemble, pack, and testing of the 120mm

M931 FRPC and M933A1/M934A1 HE, and variants thereof, Mortar Cartridges.

L.4.1.4. Subfactor 4: Management Plan ____________________________

The Offeror shall describe a Management Plan with details on how the Offerors proposed 120mm M931 FRPC and M933A1 and M934A1

HE, and variants thereof, Mortar Cartridges LAP will meet the solicitation requirements. As a minimum this shall include:

a. A comprehensive Integrated Master Schedule (IMS) demonstrating the ability to achieve a successful FAT. The completeness of the critical path showing the logical schedule and duration of events from contract award through completion of the base period, inclusive of qualification, testing and solicitation requirements.

b. An organizational chart which identifies key positions and redundancies to include specialized inspection personnel and their demonstrated skills and experience relevant to this acquisition.

L.4.2. Volume II - FACTOR 2: PRICE ___________________________

L.4.2.1. The Offerors shall submit pricing in the Excel Pricing Matrix provided in Section J as Attachment 0001 for all priced

CLINs, including all quantity ranges, when applicable. The proposed price for production CLINs shall be inclusive of all fabricating, testing, inspection, packaging and delivery of the solicited item. Each Offeror must propose a firm-fixed-price for FAT. Failure to provide a price for FAT may result in the offer not being considered for award. The Offeror is not to propose separate prices for LAT testing. Lot Acceptance Test (LAT) testing will be included and made part of the unit price of the 120mm M931 FRPC and M933A1/M934A1 HE, and variants thereof, Mortar Cartridges LAP.

First Article Test: The Contractor is responsible for meeting all FAT requirements IAW this solicitation.

12 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.4.2.2. IAW FAR 45.202(a), the Government shall consider any potentially unfair competitive advantage that may result from an

Offeror using Government property. To eliminate the competitive advantage, a rental equivalent evaluation factor shall be added to each offer which is predicated on the use of Government property. Offerors shall propose the per unit value of Government property for each CLIN/quantity range in accordance with FAR 52.245-9, Use and Charges, in the Price Matrix attachment to the solicitation. Offerors shall provide detailed calculations demonstrating how the per unit rental value was derived and documentation supporting the rental charges in sufficient detail to permit verification of the rental charges and evaluation of the per unit rental value. To calculate the rental values, Offerors shall use the stated quantity for CLINs with a single quantity and the maximum quantity within each quantity range for CLINS with multiple quantity ranges.

L.4.2.3. Unbalanced Pricing. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or ___________________ more line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The greatest risks associated with unbalanced pricing occur when (a) Startup work, mobilization, first articles, or first article testing are separate line items; (b) Base quantities and option quantities are separate line items; or (c) The evaluated price is the aggregate of estimated quantities to be ordered under separate line items of an indefinite-delivery contract. Offerors shall provide documentation, including data, calculations and supporting rationale, for any apparent unbalanced pricing which will be used to determine if the proposed prices are balanced.

L.4.3. Volume III - FACTOR 3: PAST PERFORMANCE _______________________________________

L.4.3.1. Offerors shall identify pertinent past history, which indicates that similar efforts of equal or greater complexity have been performed using the Offeror's existing plant capability and demonstrate satisfaction of customer requirements.

L.4.3.2. Offerors shall submit a list of all recent Government contracts (prime and major subcontracts) in performance or awarded to the Offeror and any of its major subcontractors within the past three (3) years, or awarded earlier than three (3) years ago, but for which deliveries/performance occurred or were scheduled to occur within the past three (3) years, which are relevant to the effort required by the solicitation. Data concerning the prime Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Offerors are reminded that both independent data and data provided by the Offerors in their proposals may be used to evaluate the Offerors past performance. The Government plans to rely on existing documentation from Federal databases to the maximum extent practicable. Sources of existing information available to the Government include, but are not limited to, PPIRS, FAPIIS, and Electronic Subcontract Reporting System (eSRS). The

Government may use past performance information obtained from sources other than those identified by the Offeror. The burden of providing thorough and complete past performance information remains with the Offerors. Proposals that do not contain the information requested by this paragraph may result in rejection or receipt of a high performance risk evaluation by the

Government. This volume shall be organized into the following sections:

(1) Section 1 - Contract Descriptions. This section shall include the following information in the following format: __________________________________

(a) Contractor/Subcontractor place of performance, Commercial and Government Entity (CAGE) Code and Data Universal

Numbering System (DUNS) Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and POC within the prime contractor organization (name, current address, e-mail address, and telephone number).

PLEASE NOTE: While an Offeror may submit past performance information on relevant efforts where they performed as a major subcontractor, the Government does not have privity with subcontracts and therefore, may not be able to obtain qualitative information.

(b) Government contracting activity, and current address, Procuring Contracting Officer's name, e-mail address, and telephone number.

(c) Government's technical representative/Contracting Officer Representative (COR), current e-mail address, and telephone number.

(d) Government contract administration activity and the Administrative Contracting Officer's name, current e-mail address, and telephone number.

(e) Government contract administration activity's Pre-Award Monitor's name, current e-mail address, and telephone number.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase

Agreements, also include Delivery Order Numbers.

(g) Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Materials (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).

(h) Awarded price/cost.

(i) Final or projected final price/cost.

13 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(j) Original delivery schedule, including dates of start and completion of work.

(k) Final or projected final delivery schedule, including dates of start and completion of work.

(2) Section 2 - Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 ________________________ describing the objectives achieved and detailing how the effort is relevant to the requirements of the solicitation.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All

Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The

Offerors shall also provide a copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to Government Furnished

Equipment (GFE) component failures, and number and nature of failures attributable to the Offerors delivered product.

(3) Section 3 - Subcontracts. Offerors shall provide an outline of how the effort required by the solicitation will be _________________________ assigned for performance within the Offeror's corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government SOW subparagraph number. This includes all major subcontractors who will be providing critical hardware/services or whose subcontract is for more than 25% of the total proposed price.

(4) Section 4 - New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers ___________________________________ and employees. However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.

(5) Past Performance Questionnaire. For all contracts identified in Section 1, Past Performance Questionnaires must be _______________________________ completed and submitted (Section J). The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Officer within thirty (30) calendar days of the release of the solicitation, to

("mailto:jaclyn.m.dolivo.civ@mail.mil " ). The Offeror shall also e-mail to the Contracting Officer a list of all the POCs who were sent a questionnaire. The Government must receive this list within thirty (30) calendar days after release of the solicitation. The POC List shall be submitted in MS Word for Windows Table Format to include the following fields:

Solicitation Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone

Number; POC E-Mail Address; Date E-Mailed to POC (month/day).

L.4.4. Volume IV - FACTOR 4: SMALL BUSINESS PARTICIPATION __________________________________________________

L.4.4.1. The Small Business Participation Factor Volume is comprised of a single chapter. Offerors are responsible for including sufficient detail to permit a complete evaluation. Any information provided as part of the Small Business

Participation Factor Volume may be used to correlate the evaluation of the other proposal volumes.

L.4.4.2. This provision applies to every Offeror (U.S. and non-U.S.), regardless of size status or locations of working facilities or headquarters. For proposal preparation purposes, the Offeror's Small Business Participation proposals shall be consistent with any subcontracting references/identification contained elsewhere in any other Factor Volume. Percentages are calculated using proposed total contract price as calculated IAW L.4.2. This price becomes the denominator and includes first-tier subcontractors only. For the purpose of evaluating Small Business Participation, the total contract price is determined by multiplying the unit price for a single 120mm M931 FRPC from Option 2, range 8,000-35,000 times 963,728, which is the estimated maximum number of 120mm M931 FRPC, and multiplying the unit price for a single 120mm M933A1 / M934A1 HE from Option

2, range 8,000-15,000 times 237,800, which is the estimated maximum number of 120mm M933A1 / M934A1 HE to be purchased on this contract, and adding both totals. Offerors shall also explain their rationale as to why the percentage of SB participation being utilized for this effort is appropriate for their company. Offerors shall describe their approach and efforts undertaken to utilize SB. SB targets will be incorporated into any resulting prime contract and contractors will be required to report SB participation.

L.4.4.3. All Offerors, including Offerors who are themselves U.S. small business concerns based on the NAICS code assigned to this requirement, are to identify the extent to which U.S. small business concerns will be utilized as first-tier subcontractors in the performance of this proposed contract. U.S. small business concerns are defined (1) in FAR 2.101 and

14 17

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) by the criteria and size standards in FAR 19.102 for the applicable NAICS code. U.S. small business concerns include SBs, SDBs, WOSBs, HUBZone SBs, VOSBs, and SDVOSBs.

L.4.4.4. If the Offeror (to include any U.S. small business concerns who are proposing as part of a joint venture or teaming arrangement) is itself a U.S. small business concern, the Offeror's own participation as a SB, SDB, WOSB, HUBZone SB, VOSB, or

SDVOSB will also be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.