About this file

Questions and answers

View the file

Other files

File Type Posted
Question_21.pdf PDF
Questions_17-20.pdf PDF
Questions_12-16.pdf PDF
W15QKN-19-R-0003_Amendment_0003.pdf PDF
W15QKN-19-R-0003_Amendment_0002.pdf PDF
Questions_1-4.pdf PDF
W15QKN-19-R-0003_Amendment_0001.pdf PDF
W15QKN-19-R-0003.pdf PDF
Attachment_0006_-_SF-LLL_-_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_0001_-_Price_Matrix.xlsx XLSX spreadsheet
Attachment_0003_-_AMSTA-AR_1350_-_Technical_Data_Request_Questionnaire.pdf PDF
Exhibit_A_-_DD1423_-_Contract_Data_Requirements_List_(CDRLs).pdf PDF
Attachment_0005_-_DD441_-_DoD_Security_Agreement.pdf PDF
Attachment_0010_-_Production-Delivery_Tracking_Template.xlsx XLSX spreadsheet
Attachment_0008_-_DD2357_-_Hazardous_Component_Safety_Data_Statements_(HCSDS).pdf PDF
Attachment_0015_-_Certificate_of_Destruction.doc DOC document
Attachment_0002_-_DD2345_-_Militarily_Critical_Technical_Data_Agreement_Template.pdf PDF
Attachment_0011_-_Contract_Quality_Requirements.docx DOCX document
Attachment_0009_-_GFM_Product_Quality_Template.xlsx XLSX spreadsheet
Attachment_0014_-_Scheduled_Government_Furnished_Property.pdf PDF
Attachment_0007_-_INME-PIC-IM_Form_3002_-_Clearance_of_Technical_Information_for_Public_Release.pdf PDF
Attachment_0004_-_Non-Disclosure_and_Non-Use_Agreement.pdf PDF
Attachment_0012_-_Additional_Solicitation_and_Contract_Requirements.docx DOCX document
Attachment_0013_-_Past_Performance_Questionnaire.doc DOC document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q5: We request an extension to the due date of the proposal.

A5: The solicitation proposal due date has been extended to 17 May 2019 and is reflected in Amendment 0003.

Q6: Could you please provide the assigned weighted percentage for each quantity range to calculate total evaluated price?

A6: The assigned weighted percentages will not be provided as part of this solicitation.

Q7: Please provide following ECP/NOR:

NOR R16K2017

NOR MI‐P1692R2A1

NOR R17S2004

ECP MI‐M9934A4

ECP R17S2024

ECP R17K2008

A7: Please see respective responses as follows:

R16K2017 – ECP and NORs have been added to the files section of this notice.

MI‐P1692R2A1 – The affected updated drawing (12987995) has been added to the files section of this notice.

R17S2004 – ECP and NORs have been added to the files section of this notice.

MI‐M9934A4 – Could not be identified and therefore no action has been taken.

R17S2024 – NOR has been added to the files section of this notice.

R17K2008 – The changes within the ECP are already contained within the TDP uploaded in the files section of this notice.

Q8: Reference Solicitation

a. Section L, Instructions, Conditions, and notices to offerors, paragraph L.2.3.1 (page 72) requires Blocks 17 and 18 of Contract Data Requirements List (CDRL): DD Form 1423 be completed if required

b. Exhibit A ‐ DD1423 – Contract Data Requirements List (CDRLs)

Question: Reference (b) cited above does not have Blocks 17 and 18. Please Clarify.

A8: When utilized, Blocks 17 and 18 are “Price Group” and “Estimated Total Price,” however they are not applicable to this effort as this Solicitation is FFP with Not Separately Priced CDRLs. In this case, per Section L, paragraph L.2.3.1. completion of the aforementioned blocks is not required.

Q9: Reference Solicitation, Section L, Instructions, Conditions, and notices to offerors, paragraph L.3.2.3.3 (page 73) requires a minimum Font Size of 18.

Question: Please verify that graphics (such as illustrations, charts and tables) are not subject to the font size restriction provided legibility is maintained.

A9: The minimum Font Size of 18, as specified at L.3.2.3.3., is applicable only to the contents of the overhead images (slides) and their corresponding paper hardcopies. For written proposals, including foldout pages (graphics, illustrations, charts, tables), per L.3.3.1.1., the font size used shall not be less than 10 point.

Q10: Reference Solicitation, Attachment 0012, Additional Solicitation and Contract Requirements.

Question: Does the requirements of DA Pam 385‐64 explosive safety standards apply in its entirety, or just to Explosive Material Handling section of the DA Pam 385‐64?

A10: Yes, DA Pam 385‐64 explosive safety standards applies in its entirety.

Q11: Reference Solicitation, Amendment 1

a) ECP R18J2027 ‐ Clarification of applicability – Drawing Rev E/Rev F

i. Per TDPL and as received ‐ Drawing 12983039, Rev E

ii. Per ECP ‐ Drawing 12983039, Rev F

b) ECP R18J2027, NOR 1 of 1 (Drawing 12983039, Rev F)

i. Block 12 – BGN 205‐241 ‐ Clarification of “BGN”; should this be BHN?

c) Request Attachments 16, 17, and 18

i. MOD 0001 incorporated Attachment 19, 20, and 21; FBO reflects Attachment 1‐15 only

A11:

a) In accordance with ECP R18J2027, Rev F applies.

b) There was a typo on the NOR when approved, however the drawing has the correct nomenclature of “BHN.”

c) Attachments 0016‐0018 (TDPs P18C10 – M931, P18C11 – M933A1, and P18C12 – M934A1), dated 20 March 2019, are located in the files section of the FBO notice.

i. As stated in Amendment 0001 narrative, Attachments 0019‐0021 (ECPs R18J2027, R18K2033, and R18Q2053), dated 26 March 2019, are also located in the files section of the FBO notice.

File details come from the government source that posted it.