DRAFT~_DI-ADMN-81505_Post_Award_Conf_5-9-19.pdf

Data Item Description PDF 109 KB Posted

Attached to
Law Enforcement Professional (LEP) Program
Solicitation number
W15QKN-18-R-1059
Issued by

About this file

DRAFT~ DI-ADMN-81505 Post Award Conf

View the file

Other versions and copies of DI-ADMN-81505

File Revision Posted Attached to
DID DI-ADMN-81505.pdf Revision not stated HAB TESTING
A04e DI-ADMN-81505 Report Record of Meeting.pdf Revision not stated Shock Engineering
Exhibit CDRL B002_DI_ADMN_81505 Contractor Provided Meeting Minutes.pdf Revision not stated SOFTWARE MAINTENANCE OF FIELDED TRAINING DEVICES (SWMFTS)
Exhibit CDRL B002_DI_ADMN_81505 Contractor Provided Meeting Minutes.docx Revision not stated SOFTWARE MAINTENANCE OF FIELDED TRAINING DEVICES (SWMFTS)
Exhibit CDRL B002_DI_ADMN_81505 Contractor Provided Meeting Minutes.docx Revision not stated SOFTWARE MAINTENANCE OF FIELDED TRAINING DEVICES (SWMFTS)
09 DID_DI-ADMN-81505_MeetingMinutes.pdf Revision not stated ENGINEERING SERVICES (SHOCK)
A002 TO1 (DI-ADMN-81505) Report Record of Meeting Minutes.pdf Revision not stated Ammunition Industrial Base (IB) Engineering Support Services For the Project Director Joint Services
DI-ADMN-81505.PDF Revision not stated Radio and Equipment Upgrade
DI-ADMN-81505 - A002 - A004 - A005 - A008.pdf Revision not stated Thruster Shock Analysis and Testing Services
DID_DI_ADMN_81505_MeetingMinutes.pdf Revision not stated SHOCK ENGINEERING SERVICES
A002_HEEWJ__DI-ADMN-81505_Presentation_Meeting_Minutes.PDF Revision not stated N00421-18-R-0009 High Endurance Electronic Warfare Jet (HEEWJ) Capabilities
DI-ADMN-81505.pdf Revision not stated Inline Chillers and Auto Hydraulic Hose Reels
DI-ADMN-81505.pdf Revision not stated Upgrade of the WPAFB E911 System for 88 SFS
DI-ADMN-81505.pdf Revision not stated Tech Refresh of the WPAFB E911 System for the Base Fire Dept.
DI-ADMN-81505-Meeting_Minutes.pdf Revision not stated Relocation of Air Traffic Control Tower (ATCT) at Duke Field, FL
DIDforCDRLA004(DI-ADMN-81505).pdf Revision not stated MiDAESS Industry Day Briefings - 18-19 Feb 09
Show all 16

Who attaches DI-ADMN-81505

Other files

File Type Posted
DRAFT~_DI-QCIC-81722_QCP_RH_5-9-19.pdf PDF
DRAFT~_DI-MGMT-80934_OPSEC_RC_5-9-19.pdf PDF
DRAFT~_DI-MGMT-81468_Qtr_Exp_Rev_5-9-19.pdf PDF
DRAFT~_DI-MGMT-80790_Transition_Plan-In_5-9-19.pdf PDF
IDIQ_PWS_(14May19)_Draft.pdf PDF
DRAFT~_DI-MGMT-81945-Transition_Plan-Out_5-9-19.pdf PDF
DRAFT~_DI-MGMT-80368A_Monthly_Status_Report_5-9-19.pdf PDF
Draft_Task_Order_PWS_(14_May19).pdf PDF
DRAFT~_DI-MGMT-81991_Final_Program_Overview_5-9-19.pdf PDF
DRAFT~_DI-MGMT-80004A_Mgmt_Plan_5-9-19.pdf PDF
DRAFT~_DI-MGMT-81928_Semi-annual_Review_Briefing_5-9-19.pdf PDF
DRAFT~_DI-FNCL-80331A_Monthly_Invoice_Report_5-9-19.pdf PDF
Draft_Task_Order_PWS_(26Mar19).pdf PDF
LEP_2nd_QA's_-4-23-19.pdf PDF
Draft_IDIQ_PWS_(2May19).pdf PDF
Revised_Draft_LM_released_-_Clean_4-18-19.pdf PDF
Past_Performance_Information_Sheet_PASTPERFSEC1.xlsx XLSX spreadsheet
LEP_Q&A_Responses_4-18-19.pdf PDF
DRAFT_Task_Order_PWS_1-31-19.pdf PDF
Subfactor_1_Business_License_V2_1-30-19.xlsx XLSX spreadsheet
DRAFT_IDIQ_PWS_(1-31-19).pdf PDF
Attachment_2_-Past_Performance_Information_Sheet_PASTPERFSEC1_(002).xls XLS spreadsheet
Subfactor_2_MC-_Experience_V2_1-30-19.xlsx XLSX spreadsheet
Draft_L&M_released.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A001
title: Report, Record of Meeting/Minutes
sub: Post Award Conference Meeting
auth: DI-ADMN-81505
ref: PWS C.31
req_ofc: USACIDC/G2(CIOP-LEP)
dd250: DD
appcode: N/A
dist: B
freq: SEE BLK 16
asof: SEE BLK 16
firstsub: SEE BLK 16
subsub: SEE BLK 16
addressee1: martin.h.partridge.civ@
draft1:
reg1: 1
repro1:
addressee2: mail.mil
draft2:
reg2:
repro2:
addressee3: frank.d.borelli.civ@
draft3:
reg3: 1
repro3:
addressee4: mail.mil
draft4:
reg4:
repro4:
addressee5: rita.m.heyboer.civ@
draft5:
reg5: 1
repro5:
addressee6: mail.mil
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 3
total_repro: 0
remarks: Blocks 10/11/12/13: The contractor shall host a post award conference within 7 calendar days of award of contract. The contractor shall develop the post award agenda and submit it for review 4 calendar days after contract award. The contractor is responsible to provide the Government with minutes of the meeting within 7 calendar days upon conclusion of the meeting. The Government requires 3 calendar days to review/comment/approve. The contractor shall have 3calendar days to incorporate comments and resubmit. The Contractor shall be responsible for all meeting minutes that shall occur throughout the contract period of performance.

Submission: All submissions shall be submitted electronically to the addressees listed in block 14 in either MS office document compliant or search-able Portable Document Format (PDF) form.

group:
total_price:
prep_name:
line_item: 0006, 1005, 2005, 3005
exhibit: A
xtdp: Off
xtm: Off
othercat: ADMN
system: Law Enforcement Professional (LEP)
ctr_no: W15QKN-19-R-0071
contr: TBD
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 1
app: Adobe Professional 8.0

File details come from the government source that posted it.