The document is a comprehensive project manual for the Volusia County Deland IT Restrooms Energy Conservation Measures Project (Project No. PC3627), prepared by Raymond Engineering - Georgia, Inc. for Volusia County. The project involves renovating four existing restroom spaces (two men's and two women's) located at 119 West Indiana Avenue in DeLand, Florida, with the primary objectives of improving ADA accessibility and staff accommodation. The project manual contains detailed specifications for demolition, construction, and restoration, covering multiple technical divisions including architectural, structural, mechanical, electrical, and plumbing systems.

The project manual includes extensive technical specifications for materials, installation procedures, and quality control requirements, suggesting a comprehensive renovation approach. While specific budget details are not explicitly stated, the document indicates a focus on energy conservation measures and modernization of restroom facilities. The project manual provides comprehensive guidance for contractors, including detailed requirements for site preparation, demolition, construction methods, material selections, installation techniques, and post-construction testing and quality assurance. The technical specifications cover everything from concrete and masonry work to electrical systems, plumbing, HVAC, fire suppression, and finish materials, indicating a holistic approach to the restroom renovation project.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

BID AND CONSTRUCT SET

Volusia County Deland IT Restrooms

Energy Conservation Measures Project No. PC3627

Prepared for:

119 West Indiana Avenue Deland, FL32720

February 24, 2025

Prepared By

Raymond Engineering – Georgia, Inc.

9100 Conroy Windermere Road, Suite 200 Windermere, FL 34786

Raymond Project No. ORL1025.014

Volusia County Deland IT Restrooms Energy Conservation Measures Project No. PC3627

TABLE OF CONTENTS 1

SECTION 00 00 10

TABLE OF CONTENTS

SPECIFICATIONS

Division 00 Procurement and Contracting Requirements 00 00 01 Table of Contents

00 01 05 Certification Page

Division 01 General Requirements 01 04 50 Cutting and Patching 01 40 50 Quality Requirements

Division 02 Existing Conditions 02 41 19 Selective Demolition

Division 03 Concrete

03 30 00 Cast-in-Place Concrete

Division 04 Masonry 04 20 00 Unit Masonry

Division 05 Metal 05 40 00 Cold Formed Metal Framing 05 50 00 Metal Fabrications

Division 06 Wood, Plastics, and Composites

06 10 00 Rough Carpentry

Division 07 Thermal and Moisture Protection 07 21 00 Thermal-Acoustical Wall Insulation 07 92 00 Joint Sealants

Division 08 Openings 08 11 19 Stainless Steel Hollow Metal Doors and Frames 08 71 00 Door Hardware

Division 09 Finishes

09 21 16 Gypsum Board Assemblies

09 22 16 Non-Structural Metal Framing 09 30 00 Tiling 09 51 00 Acoustical Ceiling 09 91 20 Interior Painting

Division 10 Specialties 10 14 00 Signage & Artwork 10 21 13 Colid Surface Toilet Compartment 10 28 00 Restroom Accessories

Division 12 Furnishings 12 24 13 Roller Window Shades 12 36 00 Countertops

TABLE OF CONTENTS 2

Division 21 Fire Suppression 21 05 00 Common Work Results for Fire Suppression

21 13 13 Wet-Pipe Sprinkler Systems

Division 22 Plumbing 22 05 00 Common Work Results for Plumbing

22 05 23 General-Duty Valves for Plumbing Piping

22 05 29 Hangers and Supports for Plumbing Piping and Equipment

22 07 19 Plumbing Piping Insulation

22 11 16 Domestic Water Piping

22 11 19 Domestic Water Piping Specialties

22 13 16 Sanitary Waste and Vent Piping

22 13 19 Sanitary Waste Piping Specialties

22 33 00 Electric Domestic Water Heaters

22 42 13.13 Commercial Water Closets

22 42 13.16 Commercial Urinals

22 42 16.13 Commercial Lavatories

22 42 16.16 Commercial Sinks

Division 23 Heating, Ventilation and Air Conditioning (HVAC) 23 05 00 Common Work Results for HVAC

23 31 13 Metal Ducts

23 33 46 Flexible Ducts Rev

23 37 13.13 Air Diffusers

23 37 13.23 Registers and Grilles

Division 26 Electrical

26 05 19 Low-Voltage Electrical Power Conductors and Cables

26 05 29 Hangers and Supports for Electrical Systems

26 09 23 Lighting Control Devices

26 27 26 Wiring Devices

26 27 26.37 Receptacles with Ground-Fault Protective Devices

26 50 00 Lighting

Division 28 Electronic Safety and Security

28 31 11 Digital, Addressable Fire-Alarm System

Division 31 Earthwork

31 10 00 Site Clearing

Certifications page 00 01 05

SECTION 00 01 05

CERTIFICATIONS PAGE

ARCHITECT AND ENGINEERS OF RECORD

Jose R. McCausland, AIA, NCARB, CSI, CDT

Floyd Keels, PE Floyd Keels, PE

Architect of Record Engineer of Record Mechanical, Plumbing

Engineer of Record

Electrical

AR103135 72036 72036

DESIGN TEAM

Jana Willers Andrea Suros

Interior Designer Architect I

Ten Duong, PE Nathan Pollard, AIA, NCARB

Electrical Engineer Architect

Director of Architecture

Devon Silvey Guido X. Salas, RRC, RRO, Assoc. AIA

Project Manager Senior Building Envelope Consultant

Senior Vice President

END OF SECTION

CUTTING & PATCHING 01 04 50-1

SECTION 01 04 50

CUTTING AND PATCHING

PART 1GENERAL

1.01 REQUIREMENT INCLUDED

A. Requirements and limitations for cutting and patching of Work.

1.02 RELATED REQUIREMENTS

A. Section 01 60 00 - Material and Equipment: Substitutions

B. Individual Specifications Sections:

1. Cutting and patching incidental to work of the Section.

2. Advance notification to other Sections of openings required in work of these sections.

3. Limitations on cutting structural members.

4. Do not cut or drill into any prestressed concrete member.

1.03 SUBMITTALS

A. Submit written request in advance of cutting or alteration which affects:

1. Structural integrity of any element of Project.

2. Efficiency, maintenance, or safety of any operational element.

3. Visual qualities of sight-exposed elements.

4. Work of Owner or separate contractor.

B. Include in request:

1. Identification of Project.

2. Location and description of affected work.

3. Necessity for cutting or alteration

4. Description of proposed work and products to be used.

5. Alternatives to cutting and patching.

6. Effect on work of Owner or separate contractor.

7. Written permission of affected separate contractor.

8. Date and time work will be executed.

PART 2PRODUCTS

2.01 MATERIALS

A. Those required for original installation.

B. For any change in material, submit a request for substitution under the provisions of General Conditions.

CUTTING & PATCHING 01 04 50-2

PART 3EXECUTION

3.01 GENERAL

A. Execute cutting, fitting and patching to complete Work, and to:

1. Fit the several parts together, to integrate with other work.

2. Uncover work to install ill-timed work.

3. Remove and replace defective and non-conforming work.

4. Remove samples of installed work for testing.

5. Provide openings in elements of Work for penetrations of mechanical and electrical work.

3.02 INSPECTION

A. Inspect existing conditions, including elements subject to damage or movement during cutting and patching.

B. After uncovering, inspect conditions affecting performance of work.

C. Beginning of cutting or patching means acceptance of existing conditions.

3.03 PREPARATION

A. Provide supports to assure structural integrity of surroundings; devices and methods to protect other portions of Project from damage.

3.04 PERFORMANCE

A. Execute work by methods to avoid damage to other work, and which will provide proper surfaces to receive patching and finishing.

B. Employ original installer to perform cutting and patching sight-exposed surfaces.

C. Cut rigid materials using masonry saw or core drill. Pneumatic tools are not allowed without prior approval.

D. Restore work with new products in accordance with requirements of Contract Documents.

E. Fit work watertight to pipes, sleeves, ducts, conduit and other penetrations through surfaces.

F. At penetrations of fire-rated wall, ceiling, or floor construction, completely seal voids with fire-rated material, full thickness of the construction element.

CUTTING & PATCHING 01 04 50-3

G. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for an assembly, refinish entire unit.

QUALITY REQUIREMENTS 014000 - 1

SECTION 014000

QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspection services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specific quality-assurance and quality-control requirements for individual work results are specified in their respective Specification Sections. Requirements in individual Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and quality-control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Contractor to provide quality-assurance and quality-control services required by Architect, Owner, Construction Manager, or authorities having jurisdiction are not limited by provisions of this Section.

C. Related Requirements:

1. Section 012100 "Allowances" for testing and inspection allowances.

END OF SECTION 014000

SELECTIVE DEMOLITION 024119 - 1

SECTION 024119

SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. The Work of this Section Includes:

1. Demolition and removal of selected portions of exterior or interior of building or structure and site elements.

2. Removal and salvage of existing items for delivery to Owner and removal of existing items for reinstallation.

B. Related Requirements:

1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.

2. Section 015639 "Temporary Tree and Plant Protection" for temporary protection of existing trees and plants that are affected by selective demolition.

3. Section 017300 "Execution" for cutting and patching procedures.

4. Section 013516 "Alteration Project Procedures" for general protection and work procedures for alteration projects.

5. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner as indicated.

C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage; prepare for reuse; and reinstall where indicated.

D. Existing to Remain: Existing items of construction that are not to be removed.

1.3 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

SELECTIVE DEMOLITION 024119 - 2

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.4 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.5 PREINSTALLATION MEETINGS

A. Pre-demolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

3. Review and finalize selective demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

6. Review and finalize protection requirements.

7. Review procedures for noise control and dust control.

8. Review storage, protection, and accounting for items to be removed for salvage or reinstallation.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Statements: For refrigerant recovery technician.

B. Engineering Survey: Submit engineering survey of condition of building.

C. Survey of Existing Conditions: Submit survey.

D. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.

E. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.

2. Temporary interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Use of elevator and stairs.

5. Coordination of Owner's continuing occupancy of portions of existing building and of

Owner's partial occupancy of completed Work.

F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician

SELECTIVE DEMOLITION 024119 - 3

responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed in accordance with EPA regulations. Include name and address of technician and date refrigerant was recovered.

G. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.

1.7 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

1.8 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Universal certified by an EPA-approved certification program.

1.9 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

1. Before selective demolition, Owner will remove the following items:

a. Coordinate with Owner for Items to be removed by Owner.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials:

1. It is not expected that hazardous materials will be encountered in the Work.

a. Hazardous materials will be removed by Owner before start of the Work.

b. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

2. If hazardous materials are present in buildings and structures to be selectively demolished. Verify with Owner if a report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

a. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified.

b. Owner will provide material safety data sheets for hazardous materials that are known to be present in buildings and structures to be selectively

SELECTIVE DEMOLITION 024119 - 4

demolished because of building operations or processes performed there.

E. Historic Areas: Demolition and hauling equipment and other materials to be of sizes that clear surfaces within historic spaces, areas, rooms, and openings, including temporary protection, by 12 inches or more.

F. On-site sale of removed items or materials is not permitted.

1.10 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding.

B. Notify warrantor on completion of selective demolition and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

C. Sustainable Design Requirements for Building Reuse:

1. Maintain the existing building structure, envelope, and interior nonstructural elements of an abandoned or blighted building. Do not demolish such existing construction beyond indicated limits.

2. Maintain the existing building structural systems where indicated to remain. Do not demolish such existing construction beyond indicated limits.

3. Maintain the existing interior ceilings, interior partitions, and/or demountable walls where indicated to remain. Do not demolish such existing construction beyond indicated limits.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

SELECTIVE DEMOLITION 024119 - 5

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Perform or engage a professional engineer to perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.

1. Inventory and record the condition of items to be removed for salvage or reinstallation. Photograph or video conditions that might be misconstrued as damage caused by removal.

2. Photograph or video existing conditions of adjoining construction including finish surfaces, that might be misconstrued as damage caused by selective demolition operations or removal of items for salvage or reinstallation.

3.2 PREPARATION

A. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

B. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."

SELECTIVE DEMOLITION 024119 - 6

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location and cleaned and reinstalled in their original locations after selective demolition operations are complete.

D. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment in accordance with 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 UTILITY SERVICES AND BUILDING SYSTEMS

A. Existing Services/Systems to Remain: Maintain utilities and building systems and equipment to remain and protect against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utilities and building systems serving areas to be selectively demolished.

1. Owner will arrange to shut off indicated utilities when requested by Contractor.

2. Arrange to shut off utilities with utility companies.

3. If disconnection of utilities and building systems will affect adjacent occupied parts of the building, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to those parts of the building.

4. Demolish and remove existing building systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment and components.

5. Abandon existing building systems, equipment, and components indicated on Drawings to be abandoned in place.

a. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

b. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

6. Remove and reinstall/salvage existing building systems, equipment, and components indicated on drawings to be removed and reinstalled or removed and salvaged:

a. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment and components; when

SELECTIVE DEMOLITION 024119 - 7

appropriate, reinstall, reconnect, and make equipment operational.

b. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and components and deliver to Owner.

3.4 SALVAGE/REINSTALL

A. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area [on-site][off-site][designated by

Owner][indicated on Drawings].

5. Protect items from damage during transport and storage.

B. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

3.5 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level.

Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain fire watch during and for at least 3-6hr after flame-cutting operations.

6. Maintain adequate ventilation when using cutting torches.

7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

8. Remove structural framing members and lower to ground by method suitable to

SELECTIVE DEMOLITION 024119 - 8

avoid free fall and to prevent ground impact or dust generation.

9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.

2. Use water mist and other suitable methods to limit the spread of dust and dirt.

Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.

C. Work in Historic Areas: Selective demolition may be performed only in areas of Project that are not designated as historic

3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Concrete:

1. Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.

2. Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.

B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.

C. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.

D. Resilient Floor Coverings: Remove floor coverings and adhesive in accordance with recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings

E. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing so that building interior remains watertight and weathertight.

3.7 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-

SELECTIVE DEMOLITION 024119 - 9

approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

B. Burning: Do not burn demolished materials.

3.8 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

3.9 SELECTIVE DEMOLITION SCHEDULE

A. Remove: as shown on drawings.

B. Remove and Salvage as shown on drawings and specifications

C. Remove and Reinstall as shown on drawings and specifications

D. Existing to Remain as shown on drawings and specifications

END OF SECTION 024119

CAST-IN-PLACE CONCRETE 03 30 00-1

SECTION 03 30 00

CAST IN PLACE CONCRETE

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Work includes labor, materials, appliances, tools, equipment, facilities, transportation, and services necessary for and incidental to performing operations in connection with furnishing, delivery and installation of the work of this Section, meeting current building codes and manufacturer's latest printed instructions, complete as shown on the drawings and/or specified herein.

1.02 REFERENCE STANDARDS

A. ACI 117 - Standard Specifications for Tolerances for Concrete Construction and Materials;

2010 (Reapproved 2015).

B. ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and

Mass Concrete; 1991 (Reapproved 2009).

C. ACI 301 - Specifications for Structural Concrete; 2016.

D. ACI 302.1R - Guide to Concrete Floor and Slab Construction; 2015.

E. ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete;

2000 (Reapproved 2009).

F. ACI 305R - Guide to Hot Weather Concreting; 2010.

G. ACI 306R - Guide to Cold Weather Concreting; 2016.

H. ACI 308R - Guide to External Curing of Concrete; 2016.

I. ACI 318 - Building Code Requirements for Structural Concrete and Commentary; 2014

(Errata 2017).

J. ACI 347R - Guide to Formwork for Concrete; 2014.

K. ASTM A615/A615M - Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement; 2016.

L. ASTM A767/A767M - Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement; 2016.

M. ASTM A1064/A1064M - Standard Specification for Carbon-Steel Wire and Welded

Wire Reinforcement, Plain and Deformed, for Concrete; 2017.

N. ASTM C33/C33M - Standard Specification for Concrete Aggregates; 2016, with

Editorial Revision (2016).

O. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical

Concrete Specimens; 2018.

P. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete; 2017a.

Q. ASTM C109/C109M - Standard Test Method for Compressive Strength of Hydraulic

Cement Mortars (Using 2-in. or (50-mm) Cube Specimens); 2016a.

R. ASTM C143/C143M - Standard Test Method for Slump of Hydraulic-Cement Concrete; 2015a.

S. ASTM C150/C150M - Standard Specification for Portland Cement; 2018.

T. ASTM C173/C173M - Standard Test Method for Air Content of Freshly Mixed Concrete by the

Volumetric Method; 2016.

CAST-IN-PLACE CONCRETE 03 30 00-2

U. ASTM C260/C260M - Standard Specification for Air-Entraining Admixtures for Concrete; 2010a (Reapproved 2016).

V. ASTM C309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete; 2011.

W. ASTM C494/C494M - Standard Specification for Chemical Admixtures for Concrete; 2017.

X. ASTM C845/C845M - Standard Specification for Expansive Hydraulic Cement; 2012.

Y. ASTM C1059/C1059M - Standard Specification for Latex Agents for Bonding Fresh to Hardened Concrete; 2013.

Z. ASTM C1315 - Standard Specification for Liquid Membrane-Forming Compounds Having

Special Properties for Curing and Sealing Concrete; 2011.

AA. ASTM D471 - Standard Test Method for Rubber Property--Effect of Liquids; 2016a.

AB. ASTM E154/E154M - Standard Test Methods for Water Vapor Retarders Used in Contact with

Earth Under Concrete Slabs, on Walls, or as Ground Cover; 2008a, with Editorial Revision (2013).

AC. ASTM E1643 - Standard Practice for Selection, Design, Installation and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs; 2011 (Reapproved 2017).

AD. ASTM E1745 - Standard Specification for Plastic Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs; 2017.

AE. COE CRD-C 48 - Method of Test for Water Permeability of Concrete; 1992.

AF. ICRI 310.2R - Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair; 2013.

1.03 SUBMITTALS

A. Product Data: Submit manufacturers' data on manufactured products showing compliance with specified requirements and installation instructions.

1. For curing compounds, provide data on method of removal in the event of incompatibility with floor covering adhesives.

2. For chemical-resistant waterstops, provide data on ASTM D471 test results.

B. Mix Design: Submit proposed concrete mix design.

1. Indicate proposed mix design complies with requirements of ACI 301, Section 4 - Concrete

Mixtures.

2. Indicate proposed mix design complies with requirements of ACI 318, Chapter 5 -

Concrete Quality, Mixing and Placing.

C. Samples: Submit samples of underslab vapor retarder to be used.

D. Manufacturer's Installation Instructions: For concrete accessories, indicate installation procedures and interface required with adjacent construction.

E. MDAD required analysis and documentation

1. 01103S1A through 01103S3E, Deliverables Checklists - Structural

2. 01150S1A through 01157S3E, Deliverables Content - Structural

1.04 QUALITY ASSURANCE

A. Perform work of this section in accordance with ACI 301 and ACI 318.

B. Follow recommendations of ACI 306R when concreting during cold weather.

PART 2 PRODUCTS

CAST-IN-PLACE CONCRETE 03 30 00-3

2.01 FORMWORK

A. Formwork Design and Construction: Comply with guidelines of ACI 347R to provide formwork that will produce concrete complying with tolerances of ACI 117.

B. Form Materials: Contractor's choice of standard products with sufficient strength to withstand hydrostatic head without distortion in excess of permitted tolerances.

1. Form Ties: Cone snap type that will leave no metal within 1-1/2 inches of concrete surface.

2.02 REINFORCEMENT MATERIALS

A. Reinforcing Steel: ASTM A615/A615M, Grade 60 (60,000 psi).

1. Type: Deformed billet-steel bars.

2. Finish: Galvanized in accordance with ASTM A767/A767M, Class I, unless otherwise indicated.

B. Steel Welded Wire Reinforcement (WWR): Galvanized, plain type, ASTM A1064/A1064M.

1. Form: Flat Sheets.

2. WWR Style: 4 x 8-W6 x W10.

C. Reinforcement Accessories:

1. Tie Wire: Annealed, minimum 16 gage, 0.0508 inch.

2. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for adequate support of reinforcement during concrete placement.

2.03 CONCRETE MATERIALS

A. The “Concrete Certification Form” as referenced in Article 610-3.7 of the MDAD Standard

Technical Specification Section P-610, STRUCTURAL PORTLAND CEMENT CONCRETE, as well as the acceptance, sampling and testing requirements of Article 610-3.3, B. Cement: ASTM C150/C150M, Type I - Normal Portland type.

1. Acquire cement for entire project from same source.

C. Blended, Expansive Hydraulic Cement: ASTM C845/C845M, Type K.

D. Fine and Coarse Aggregates: ASTM C33/C33M.

E. Water: Clean and not detrimental to concrete.

2.04 ADMIXTURES

A. Do not use chemicals that will result in soluble chloride ions in excess of 0.1 percent by weight of cement.

B. Shrinkage Reducing Admixture:

2.05 ACCESSORY MATERIALS

A. Under-slab Vapor Retarder: Sheet material complying with ASTM E1745, Class A; stated by manufacturer as suitable for installation in contact with soil or granular fill under concrete slabs.

The use of single ply polyethylene is prohibited.

1. Installation: Comply with ASTM E1643.

2. Accessory Products: Vapor retarder manufacturer's recommended tape, adhesive, mastic, prefabricated boots, etc., for sealing seams and penetrations.

3. Manufacturers:

a. Fortifiber Building Systems Group; Moistop Ultra 15: www.fortifiber.com/#sle., or approved equal.

b. ISI Building Products; Viper VaporCheck II 15-mil (Class A): www.isibp.com/#sle., or approved equal.

http://www.fortifiber.com/ http://www.isibp.com/

CAST-IN-PLACE CONCRETE 03 30 00-4

c. Stego Industries, LLC; 15 mil: www.stegoindustries.com/#sle., or approved equal.

d. W. R. Meadows, Inc; PERMINATOR Class A - 15 mils: www.wrmeadows.com/#sle., or approved equal.

2.06 BONDING AND JOINTING PRODUCTS

A. Latex Bonding Agent: Non-redispersable acrylic latex, complying with ASTM C1059/C1059M, Type II.

1. Manufacturers:

a. a. Euclid Chemical Company; AKKRO-7T: www.euclidchemical.com/#sle., or approved equal.

b. Kaufman Products Inc; SureBond: www.kaufmanproducts.net/#sle., or approved equal.

c. SpecChem, LLC; Strong Bond Acrylic Bonder: www.specchemllc.com/#sle., or approved equal.

d. W. R. Meadows, Inc; ACRY-LOK-: www.wrmeadows.com/#sle., or approved equal.

B. Reglets: Formed steel sheet, galvanized, with temporary filler to prevent concrete intrusion during placement.

1. Size: As indicated on drawings.

2. Size: 1/2 inch throat, 1/2 inch deep.

C. Slab Isolation Joint Filler: 1/2 inch thick, height equal to slab thickness, with removable top section that will form 1/2 inch deep sealant pocket after removal.

D. Dowel Sleeves: Plastic sleeve for smooth, round, steel load-transfer dowels.

2.07 CURING MATERIALS

A. Curing Compound, Non-dissipating: Liquid, membrane-forming, clear, non-yellowing acrylic;

complying with ASTM C309.

1. Vehicle: Water-based.

2. Gloss: Low.

3. Solids by Mass: 15 percent, minimum.

4. VOC Content: OTC compliant.

5. Manufacturers:

a. Dayton Superior Corporation; Cure & Seal 309 J18: www.daytonsuperior.com/#sle., or approved equal.

b. L&M Construction Chemicals, Inc, a subsidiary of Laticrete International, Inc; Dress & Seal WB: www.lmcc.com/#sle., or approved equal.

c. SpecChem, LLC; Cure and Seal WB: www.specchemllc.com/#sle., or approved equal.

d. United Gilsonite Laboratories; DRYLOK Natural Look Sealer: www.ugl.com/#sle., or approved equal.

e. W. R. Meadows, Inc; VOCOMP-20: www.wrmeadows.com/#sle., or approved equal.

2.08 CONCRETE MIX DESIGN

A. Proportioning Normal Weight Concrete: Comply with ACI 211.1 recommendations.

B. Admixtures: Add acceptable admixtures as recommended in ACI 211.1 and at rates recommended or required by manufacturer.

2.09 MIXING

A. Transit Mixers: Comply with ASTM C94/C94M.

http://www.stegoindustries.com/ http://www.wrmeadows.com/ http://www.euclidchemical.com/ http://www.kaufmanproducts.net/ http://www.specchemllc.com/ http://www.wrmeadows.com/ http://www.daytonsuperior.com/ http://www.lmcc.com/ http://www.specchemllc.com/ http://www.ugl.com/ http://www.wrmeadows.com/

CAST-IN-PLACE CONCRETE 03 30 00-5

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify lines, levels, and dimensions before proceeding with work of this section.

3.02 PREPARATION

A. Formwork: Comply with requirements of ACI 301. Design and fabricate forms to support all applied loads until concrete is cured, and for easy removal without damage to concrete.

B. Coordinate placement of embedded items with erection of concrete formwork and placement of form accessories.

C. Prepare existing concrete surfaces to be repaired according to ICRI 310.2R.

D. Where new concrete is to be bonded to previously placed concrete, prepare existing surface by cleaning and applying bonding agent in according to bonding agent manufacturer's instructions.

1. Use latex bonding agent only for non-load-bearing applications.

E. In locations where new concrete is doweled to existing work, drill holes in existing concrete, insert steel dowels and pack solid with non-shrink grout.

F. Interior Slabs on Grade: Install vapor retarder under interior slabs on grade. Lap joints minimum 6 inches. Seal joints, seams and penetrations watertight with manufacturer's recommended products and follow manufacturer's written instructions. Repair damaged vapor retarder before covering.

1. Granular Fill Over Vapor Retarder: Cover vapor retarder with compactible granular fill as indicated on the drawings. Do not use sand.

3.03 INSTALLING REINFORCEMENT AND OTHER EMBEDDED ITEMS

A. Comply with requirements of ACI 301. Clean reinforcement of loose rust and mill scale, and accurately position, support, and secure in place to achieve not less than minimum concrete coverage required for protection.

B. Install welded wire reinforcement in maximum possible lengths, and offset end laps in both directions. Splice laps with tie wire.

3.04 PLACING CONCRETE

A. Place concrete in accordance with ACI 304R.

B. Place concrete for floor slabs in accordance with ACI 302.1R.

C. Notify Architect not less than 24 hours prior to commencement of placement operations.

D. Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken.

E. Ensure reinforcement, inserts, waterstops, embedded parts, and formed construction joint devices will not be disturbed during concrete placement.

F. Finish floors level and flat, unless otherwise indicated, within the tolerances specified below.

3.05 SLAB JOINTING

A. Locate joints as indicated on the drawings.

B. Anchor joint fillers and devices to prevent movement during concrete placement.

C. Isolation Joints: Use preformed joint filler with removable top section for joint sealant, total height equal to thickness of slab, set flush with top of slab.

CAST-IN-PLACE CONCRETE 03 30 00-6

3.06 FLOOR FLATNESS AND LEVELNESS TOLERANCES

A. An independent testing agency, as specified in Section 01 41 00, will inspect finished slabs for conformance to specified tolerances.

B. Maximum Variation of Surface Flatness:

1. Concrete Floors: 1/4 inch in 10 feet.

C. Correct the slab surface if tolerances are less than specified.

D. Correct defects by grinding or by removal and replacement of the defective work. Areas requiring corrective work will be identified. Re-measure corrected areas by the same process.

3.07 CONCRETE FINISHING

A. Repair surface defects, including tie holes, immediately after removing formwork.

B. Concrete Slabs: Finish to requirements of ACI 302.1R, and as follows:

1. Surfaces to Receive Thin Floor Coverings: "Steel trowel" as described in ACI 302.1R;

thin floor coverings include carpeting, resilient flooring, seamless flooring, resinous matrix terrazzo, thin set quarry tile, and thin set ceramic tile.

2. Other Surfaces to Be Left Exposed: Trowel as described in ACI 302.1R, minimizing burnish marks and other appearance defects.

D.In areas with floor drains, maintain floor elevation at walls; pitch surfaces uniformly to drains at 1:100 nominal.

3.08 CURING AND PROTECTION

A. Comply with requirements of ACI 308R. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.

B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.

1. Normal concrete: Not less than seven days.

C. Surfaces Not in Contact with Forms:

1. Initial Curing: Start as soon as free water has disappeared and before surface is dry.

Keep continuously moist for not less than three days by saturated burlap.

a. Saturated Burlap: Saturate burlap-polyethylene and place burlap-side down over floor slab areas, lapping ends and sides; maintain in place.

2. Final Curing: Begin after initial curing but before surface is dry.

a. Curing Compound: Apply in two coats at right angles, using application rate recommended by manufacturer.

3.09 FIELD QUALITY CONTROL

A. An independent testing agency will perform field quality control tests, as specified in Section

01 41 00 – Project Testing Laboratory Services.

B. Provide free access to concrete operations at project site and cooperate with appointed firm.

C. Submit proposed mix design of each class of concrete to inspection and testing firm for review prior to commencement of concrete operations.

D. Tests of concrete and concrete materials may be performed at any time to ensure conformance with specified requirements.

E. Compressive Strength Tests: ASTM C39/C39M, for each test, mold and cure three concrete test cylinders. Obtain test samples for every 100 cubic yards or less of each class of concrete placed.

F. Take one additional test cylinder during cold weather concreting, cured on job site under same conditions as concrete it represents.

CAST-IN-PLACE CONCRETE 03 30 00-7

G. Perform one slump test for each set of test cylinders taken, following procedures of

ASTM C143/C143M.

3.10 DEFECTIVE CONCRETE

A. Test Results: The testing agency shall report test results in writing to Architect and Contractor within 24 hours of test.

B. Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements.

C. Repair or replacement of defective concrete will be determined by the Architect. The cost of additional testing shall be borne by Contractor when defective concrete is identified.

D. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of Architect for each individual area.

3.11 PROTECTION

A. Do not permit traffic over unprotected concrete floor surface until fully cured.

END OF SECTION

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C143/C143M

UNIT MASONRY 04 20 00-1

SECTION 04 20 00

UNIT MASONRY

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Work includes labor, materials, appliances, tools, equipment, facilities, transportation, and services necessary for and incidental to performing operations in connection with furnishing, delivery and installation of the work of this Section, meeting current building codes and manufacturer's latest printed instructions, complete as shown on the drawings and/or specified herein.

1.02 REFERENCE STANDARDS

A. In addition to the requirements of DGM Section 010900, REFERENCES, all masonry work shall comply with applicable ACI codes and standards

1. ACI 530, Building Code Requirements for Masonry Structures

2. ACI 530.1, Specification for Masonry Structures

3. ASTM C270, Mortar for Unit Masonry

4. IMIAWC (HW) Recommended Practices and Guide Specifications for Hot

Weather Masonry Construction B. TMS 402/602 - Building Code Requirements and Specification for Masonry Structures; 2016.

C. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and

Steel Hardware; 2016a.

D. ASTM A641/A641M - Standard Specification for Zinc-Coated (Galvanized) Carbon Steel

Wire; 2009a (Reapproved 2014).

E. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2017.

F. ASTM A1064/A1064M - Standard Specification for Carbon-Steel Wire and Welded

Wire Reinforcement, Plain and Deformed, for Concrete; 2017.

G. ASTM C90 - Standard Specification for Loadbearing Concrete Masonry Units; 2016a.

H. ASTM C91/C91M - Standard Specification for Masonry Cement; 2012.

I. ASTM C129 - Standard Specification for Nonloadbearing Concrete Masonry Units; 2017.

J. ASTM C140/C140M - Standard Test Methods of Sampling and Testing Concrete Masonry Units and Related Units; 2017a.

K. ASTM C144 - Standard Specification for Aggregate for Masonry Mortar; 2017.

L. ASTM C150/C150M - Standard Specification for Portland Cement; 2018.

M. ASTM C207 - Standard Specification for Hydrated Lime for Masonry Purposes; 2006

(Reapproved 2011).

N. ASTM C270 - Standard Specification for Mortar for Unit Masonry; 2014a.

O. ASTM C387/C387M - Standard Specification for Packaged, Dry, Combined Materials for

Concrete and High Strength Mortar; 2015.

P. ASTM C404 - Standard Specification for Aggregates for Masonry Grout; 2011.

Q. ASTM C476 - Standard Specification for Grout for Masonry; 2018.

R. ASTM C780 - Standard Test Method for Preconstruction and Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry; 2017.

UNIT MASONRY 04 20 00-2

S. ASTM C1072 - Standard Test Method for Measurement of Masonry Flexural Bond Strength; 2013, with Editorial Revision (2014).

T. ASTM C1314 - Standard Test Method for Compressive Strength of Masonry Prisms; 2016.

U. UL (FRD) - Fire Resistance Directory; Current Edition.

1.03 ADMINISTRATIVE REQUIREMENTS

A. Preinstallation Meeting: Convene a preinstallation meeting one week before starting work of this section; require attendance by all relevant installers.

1.04 SUBMITTALS

A. Product Data: Provide data for masonry units, fabricated wire reinforcement, mortar, and masonry accessories.

B. Manufacturer's Certificate: Certify that masonry units meet or exceed specified requirements.

1.05 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section with minimum three years of documented experience.

B. Installer Qualifications: Company specializing in performing work of the type specified and with at least three years of documented experience.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Deliver, handle, and store masonry units by means that will prevent mechanical damage and contamination by other materials.

PART 2 PRODUCTS

2.01 CONCRETE MASONRY UNITS

A. Concrete Block: Comply with referenced standards and as follows:

1. Size: Standard units with nominal face dimensions of 16 by 8 inches and nominal depths as indicated on the drawings for specific locations.

2. Non-Loadbearing Units: ASTM C129.

a. Hollow block, as indicated.

2.02 MORTAR AND GROUT MATERIALS

A. Masonry Cement: ASTM C91/C91M, Type N.

B. Portland Cement: ASTM C150/C150M, Type I; color as required to produce approved color sample.

C. Hydrated Lime: ASTM C207, Type S.

D. Mortar Aggregate: ASTM C144.

E. Grout Aggregate: ASTM C404.

F. Water: Clean and potable.

G. Packaged Dry Material for Mortar for Unit Masonry: Premixed Portland cement, hydrated lime, and sand; complying with ASTM C387/C387M and capable of producing mortar of the specified strength in accordance with ASTM C270 with the addition of water only.

1. Type: Type N.

UNIT MASONRY 04 20 00-3

2.03 MASONRY JOINT REINFORCEMENT

A. Manufacturers:

1. Blok-Lok Limited: www.blok-lok.com., or approved equal.

2. Hohmann & Barnard, Inc: www.h-b.com/sle., or approved equal.

3. WIRE-BOND: www.wirebond.com., or approved equal.

B. Single Wythe Joint Reinforcement: Truss or ladder type; ASTM A1064/A1064M steel wire, mill galvanized to ASTM A641/A641M, Class 3; 0.1483 inch side rods with 0.1483 inch cross rods;

width as required to provide not more than 1 inch and not less than 1/2 inch of mortar coverage on each exposure.

C. Flexible Anchors: 2-piece anchors that permit differential movement between masonry and building frame, sized to provide not more than 1 inch and not less than 1/2 inch of mortar coverage from masonry face.

2.04 MORTAR AND GROUT MIXES

A. Mortar for Unit Masonry: ASTM C270, using the Proportion Specification.

1. Interior, non-loadbearing masonry: Type O.

B. Grout: ASTM C476; consistency required to fill completely volumes…