ORL1025.014-VOLUSIA_COUNTY_DELAND_IT_RESTROOM_MEP_(1).pdf
PDF 3 MB Posted
- Attached to
- Deland IT Restroom Energy Conservation Measures
- Solicitation number
- 25-B-90LL
- Issued by
- Volusia County, Florida
About this file
The provided document is a comprehensive set of mechanical, plumbing, and electrical engineering design drawings for the DeLand IT Restroom Energy Conservation Measures project located at 119 West Indiana Avenue in DeLand, Florida, prepared by Raymond Engineering Georgia, Inc. The project involves a detailed renovation of existing restroom spaces across two floors, with specific focus on demolition and new installation of mechanical, plumbing, and electrical systems. The drawings include extensive technical specifications for demolition and new work, covering exhaust fans, ductwork, plumbing fixtures, electrical devices, lighting, and power infrastructure, with meticulous details on mounting heights, circuit connections, and equipment specifications.
The design documents indicate a methodical approach to upgrading the facility, with careful consideration of ADA accessibility, energy efficiency, and modern building standards. The project appears to be funded through Volusia County and includes replacement of existing fixtures with new, code-compliant equipment such as water closets, urinals, lavatories, and associated mechanical and electrical systems. The engineering drawings demonstrate attention to current building codes, including ASHRAE 90.1-2019 for insulation and energy efficiency, and include comprehensive notes on installation requirements, safety considerations, and technical specifications for contractors. The drawings are marked as a "Bid and Construction Set" dated February 24, 2025, suggesting the project is planned for near-future implementation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL GENERAL NOTES: MECHANICAL DEMOLITION NOTES:
1. UNLESS NOTED OTHERWISE, EXISTING HVAC
SYSTEMS, EQUIPMENT, AND APPURTENANCES
BELOW GRADE ARE EXISTING TO REMAIN.
2. UNLESS NOTED OTHERWISE, MATERIALS AND
EQUIPMENT SHOWN OR SPECIFIED TO BE
DEMOLISHED MUST BECOME THE PROPERTY OF
THE CONTRACTOR AND MUST BE REMOVED FROM
THE CONSTRUCTION SITE.
3. FOR PHASED CONSTRUCTION, COORDINATE
TEMPORARY HVAC REQUIREMENTS WITH THE
BUILDING OWNER PRIOR TO COMMENCEMENT OF
WORK.
4. FOR HVAC SYSTEMS THAT ARE EXISTING TO
REMAIN, COORDINATE ANY SCHEDULED
DOWNTIME FOR REQUIRED MODIFICATIONS WITH
THE BUILDING OWNER PRIOR TO
COMMENCEMENT OF WORK.
5. WHERE AN EXISTING HVAC SYSTEM SERVES
AREA(S) TO REMAIN OPERATIONAL DURING
CONSTRUCTION BUT DEMOLITION WORK IS
REQUIRED TO PORTIONS OF THE HVAC SYSTEM,
ACCOMMODATIONS MUST BE PROVIDED FOR THE
HVAC SYSTEM TO KEEP THE EXISTING AREA(S)
OPERATIONAL. COORDINATE SUCH AREA(S) WITH
THE BUILDING OWNER PRIOR TO
COMMENCEMENT OF WORK.
6. IF ASBESTOS IS FOUND, STOP WORK
IMMEDIATELY AND NOTIFY OWNER AND GENERAL
CONTRACTOR OWNER FOR ABATEMENT OF
ASBESTOS.
1. INSTALLATION OF HVAC WORK MUST BE COORDINATED WITH
OTHER TRADES BEFORE ANY INSTALLATION IS MADE. PLANS ARE
DIAGRAMMATIC IN NATURE. PROVIDE ALL TRANSITIONS,
ELBOWS, ETC. REQUIRED TO AVOID CONFLICTS WITH OTHER
TRADES AND BUILDING ELEMENTS. EQUIPMENT, PIPING, OR
DUCTWORK INTERFERING WITH OTHER TRADES MUST BE
RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE
OWNER. DO NOT SCALE THE DRAWINGS.
2. THE MECHANICAL EQUIPMENT AND INSTALLATION MUST
CONFORM TO THE CODE REFERENCES TABLE SHOWN HEREIN.
3. AT THE START OF CONSTRUCTION, PREPARE TYPED LISTS OF
EQUIPMENT THAT ARE SUPPLIED REQUIRING ELECTRICAL WORK,
AND SEND LISTS TO THE ELECTRICAL CONTRACTOR FOR REVIEW
AND COORDINATION.
4. WRITTEN DIMENSIONS ON DRAWINGS HAVE PRECEDENCE OVER
SCALED DIMENSIONS.
5. "PROVIDE" IS AN INCLUSIVE TERM USED TO DESCRIBE ASPECTS
OF THE WORK THAT MUST BE ACCOMPLISHED AND IS HEREBY
DEFINED TO REQUIRE TO STORE, FURNISH, INSTALL, MOUNT,
CONNECT, CONTROL AND POWER EQUIPMENT INDICATED, AS
WELL AS ALL APPURTENANCES REQUIRED TO MAKE SYSTEMS
OPERATE AS INDICATED WITHIN THESE DRAWINGS AND
SPECIFICATIONS AND TO FULFILL THE SCOPE OF WORK.
6. COORDINATE MECHANICAL AND ELECTRICAL WORK SUCH THAT
MECHANICAL PIPING, DUCTWORK AND EQUIPMENT IS NOT
LOCATED OVER OR ABOVE ANY ELECTRICAL, COMMUNICATIONS,
OR DATA EQUIPMENT.
7. ALL EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S APPROVED PUBLISHED LITERATURE
(INCLUDING SERVICE CLEARANCE), UNIFIED FACILITIES CRITERIA,
AND INTERNATIONAL BUILDING CODE / INTERNATIONAL
MECHANICAL CODE, WHICHEVER IS MORE STRINGENT.
8. INSTALLATION OF EQUIPMENT MUST PERMIT ACCESSIBILITY FOR
SERVICE AND/OR REPLACEMENT WITHOUT NECESSITATING
REMOVAL OR MODIFICATION TO OTHER PIPING, WIRING, OR
EQUIPMENT.
9. CEILING-MOUNTED EQUIPMENT MUST BE INSTALLED IN SUCH A
MANNER THAT LIGHTS, PIPING, DUCTWORK, ETC., DO NOT BLOCK
ACCESS TO EQUIPMENT AND RELATED ACCESSORIES.
10. COORDINATE WALL, FLOOR, AND ROOF PENETRATIONS WITH
THE GENERAL CONTRACTOR.
11. CAULK WITH SILICONE ALL UNUSED PENETRATION GAPS
BETWEEN WALL, CEILING AND FLOOR OPENINGS, AND HVAC
EQUIPMENT PENETRATIONS MUST MATCH EXISTING OR AS
SHOWN ON MECHANICAL DETAILS. PATCH LARGE GAPS BEFORE
CAULKING IS APPLIED. REFER TO SPECIFICATION SECTION 23 30
00 - HVAC AIR DISTRIBUTION, SUBSECTION 3.6 - PENETRATIONS.
12. SUPPLEMENTAL STEEL MEMBERS REQUIRED TO SUPPORT HVAC
EQUIPMENT FROM MAIN STRUCTURE MUST BE PROVIDED BY THE
HVAC CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE.
REFER TO STRUCTURAL DRAWINGS AND SPECIFICATIONS FOR
CONSTRUCTION TYPES. PROCURE AND INSTALL UPON
APPROVAL FROM CONTRACTING OFFICER. PROVIDE
STRUCTURAL STEEL SUPPORT SUBMITTAL TO ENGINEER OF
RECORD FOR REVIEW.
13. DUCTWORK AIR DISTRIBUTION SYSTEMS MUST BE INSTALLED IN
ACCORDANCE WITH SMACNA STANDARDS AND THE PRESSURE
CLASSIFICATION OF EACH INDIVIDUAL DUCTWORK SYSTEM.
14. VOLUME DAMPERS MUST BE PROVIDED AT EACH NEW MAIN
BRANCH TAKE-OFF AND IN SUCH OTHER LOCATIONS WHERE
REQUIRED TO PROPERLY BALANCE THE SYSTEM. ALL REQUIRED
VOLUME DAMPERS MAY NOT BE SHOWN ON THE PLANS, BUT
MUST BE PROVIDED AT NO ADDITIONAL COST TO THE PROJECT.
15. INSTRUMENT TEST HOLES MUST BE PROVIDED IN AIR
DISTRIBUTION SYSTEMS WHEREVER VOLUME DAMPERS ARE
INSTALLED. HOLES MUST BE SEAL WITH RUBBER OR PLASTIC
TEST HOLE PLUGS.
16. DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
17. SQUARE ELBOWS SHALL ONLY BE USED WHERE SPACE
LIMITATIONS PREVENT USE OF 1.5 RADIUS ELBOW AND ONLY
UPON APPROVAL OF CONTRACTING OFFICER. PROVIDE TURNING
VANES IN ALL SQUARE ELBOWS 45 DEGREES OR GREATER.
TURNING VANES MUST BE SINGLE THICKNESS TYPE WITHOUT
TRAILING EDGE. TURNING VANES LONGER THAN 36 INCHES MUST
BE DOUBLE THICKNESS TYPE.
18. DUCTWORK RUNOUTS TO AIR DISTRIBUTION DEVICES MUST BE
THE SAME DIAMETER AS THE AIR DISTRIBUTION DEVICE INLET
CONNECTION UNLESS OTHERWISE NOTED ON THE DRAWINGS.
DIMENSIONS SHOWN FOR DIFFUSERS AND GRILLES ARE NECK
DIMENSIONS.
19. FLEXIBLE DUCTWORK RUNOUTS FROM BRANCH DUCTS TO AIR
DISTRIBUTION DEVICES MUST NOT EXCEED 5 FEET IN LENGTH.
BENDS IN FLEXIBLE DUCTWORK MUST NOT EXCEED A
MAXIMUM OF 45 DEGREE CHANGE OF DIRECTION AND BE
SUPPORTED SUCH THAT THE BEND RADIUS IS NOT
RESTRICTIVE TO AIR FLOW THROUGH THE DUCT. FLEXIBLE
DUCTWORK MUST NOT BE CRUSHED OR DISTORTED IN ITS
FINAL CONFIGURATION.
20. ROUND DUCTWORK CONNECTIONS BETWEEN MAIN DUCT AND
TERMINAL UNITS MUST BE RIGID DUCT OF THE SAME
DIAMETER AS TERMINAL UNIT INLET CONNECTION UNLESS
OTHERWISE NOTED ON THE DRAWINGS.
21. PROVIDE SHEETMETAL TRANSITIONS AT AIR HANDLING UNITS,
HEAT PUMP UNITS, FANS, AND OTHER SIMILAR HVAC
EQUIPMENT. TRANSITION TO FULL SIZE OF CONNECTION ON
UNIT. FLEXIBLE DUCT CONNECTORS MUST BE USED ON FINAL
CONNECTION TO AIR HANDLING EQUIPMENT, UNLESS NOTED
OTHERWISE.
22. LOUVERED SUPPLY AIR DIFFUSERS MUST BE 4-WAY FLOW
UNLESS OTHERWISE SHOWN BY FLOW ARROWS ON THE
DRAWINGS. LINEAR DIFFUSERS MUST BE ADJUSTABLE 2-WAY
FLOW. PROVIDE BATT INSULATION ON DIFFUSER AND GRILLES
THAT ARE EXPOSED TO CEILING PLENUM.
23. EXACT LOCATION OF CEILING AIR DEVICES MUST BE
DETERMINED BY ARCHITECTURAL REFLECTED CEILING PLAN.
24. SUPPLY, RETURN, AND OUTDOOR AIR DUCTWORK MUST BE
INSULATED TO MEET OR EXCEED ASHRAE 90.1-2019. EXTERIOR
SUPPLY AND RETURN AIR DUCTWORK MUST BE PROVIDED
WITH WEATHER-PROOF COVER.
25. PROVIDE SUPPORTS FOR PIPING AND DUCTWORK IN
ACCORDANCE WITH SPECIFICATIONS.
26. MANUFACTURER NAME AND MODEL NUMBERS ARE BASIS OF
DESIGN AND ARE SHOWN FOR INFORMATION ONLY. REFER TO
SPECIFICATIONS FOR COMPLETE REQUIREMENTS.
27. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS.
HOWEVER, ITEMS SHOWN ON DRAWING BUT NOT IN THE
SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT SCOPE.
IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE
PRECEDENCE OVER SPECIFICATIONS IN CASES WHERE THE
SPECIFICATION HAS OPTIONS.
28. FACTORY PAINTED EQUIPMENT THAT HAS BEEN SCRATCHED
OR MARRED MUST REPAINTED TO MATCH ORIGINAL COLOR.
STEEL EQUIPMENT HANGERS, THREADED RODS, BOLTS, NUTS,
SUPPORTS, AND UNINSULATED BLACK STEEL PIPE EXPOSED
TO SIGHT INSIDE OR OUTSIDE THE BUILDING WHICH ARE NOT
PROVIDED WITH A FACTORY APPLIED PRIME COAT MUST BE
CLEANED OF RUST, GREASE, AND SCALE. AFTER CLEANING
THE HANGERS, SUPPORTS AND PIPE, A FIELD APPLIED PRIME
COAT MUST BE PROVIDED. IN ADDITION, SUCH ITEMS IN
FINISHED SPACES MUST ALSO BE PROVIDED WITH TWO COATS
OF FINISH PAINT IN A COLOR TO MATCH ADJACENT SURFACES
OR AS NOTED; SUCH ITEMS OUTSIDE THE BUILDING MUST
ALSO BE PROVIDED WITH TWO COATS OF BITUMINOUS
ALUMINUM PAINT. INSULATED PIPES OUTSIDE THE BUILDING
MUST BE CLEANED OF RUST, GREASE AND SCALE, AND
PROVIDED WITH A FIELD APPLIED PRIME COAT BEFORE
INSTALLING INSULATION.
29. NOT ALL MECHANICAL ABBREVIATIONS SHOWN WILL BE USED
FOR THIS PROJECT.
R A
Y M
O N
D
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
E
D
O N
T H
IS
D
R A
W
IN
G I
S T
H
IN
T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
F
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
B
D U
P L
IC
A
T E
D I
N P
A R
T O
R I
W
O L
E I
N A
N Y
M A
N N
C
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
Y
N D
T R
A N
S F
E R
E
W
IT
H O
U
E E
X P
R E
S S
W R
IT
T
P
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
M-001
02/24/2025
J. MCCAUSLAND
C. HANNING
K. THOMPSON
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
M E
C H
A N
IC
A
L G
E N
E R
A L N
O T
E S
A N
D D
E S
IG
N
C R
IT
E
R
IA
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
MECHANICAL SHEET INDEX
SHEET NUMBER SHEET NAME
M-001 MECHANICAL GENERAL NOTES AND DESIGN CRITERIA
M-002 MECHANICAL ABBREVIATIONS AND LEGENDS
MD-101 MECHANICAL DEMO GROUND FLOOR PLANS
MD-102 MECHANICAL DEMO SECOND FLOOR PLANS
M-101 MECHANICAL GROUND FLOOR PLANS
M-102 MECHANICAL SECOND FLOOR PLANS
Grand total: 6
2/24/2025
GENERAL MECHANICAL ABBREVIATIONS
@ AT
& AND
AFF ABOVE FINISHED FLOOR
A/C ABOVE CEILING
AC AIR CONDITIONER
AD AUTOMATIC DAMPER
ADJ ADJUSTABLE
AFMS AIRFLOW MEASURING STATION
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
AHU AIR HANDLING UNIT
AMB AMBIENT
AMCA AIR MOVEMENT AND CONTROL ASSOCIATION
ARCH ARCHITECT, ARCHITECTURAL
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING, AND AIR CONDITIONING
ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AUX AUXILIARY
AWS AMERICAN WELDING SOCIETY
AWG AMERICAN WIRE GAUGE
BCU BLOWER COIL UNIT
BD BACKDRAFT DAMPER
BLDG BUILDING
BOD BOTTOM OF DUCT
B/F BELOW FLOOR
B/S BELOW SLAB
BT BUFFER TANK
BTU, BTUH BRITISH THERMAL UNITS, BTUs PER HOUR
CAV CONSTANT AIR VOLUME
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CLG COOLING
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CO2 CARBON DIOXIDE
CONC CONCRETE
CONN CONNECT, CONNECTING, CONNECTION
CONT CONTINUED
COP COEFFICIENT OF PERFORMANCE
COR CONTRACTING OFFICER'S (OWNER'S)
REPRESENTATIVE
CT COOLING TOWER
CU CONDENSING UNIT
D DEPTH
(D) DEMOLISH
DB, Tdb DRY BULB (TEMPERATURE) dBA DECIBELS
DDC DIRECT DIGITAL CONTROLS
DEG. F (°F) DEGREES FAHRENHEIT
DF DESTRATIFICATION FAN
DH DEHUMIDIFIER
DIA DIAMETER
DIV DIVISION
DN DOWN
DP, PD DIFFERENTIAL PRESSURE, PRESSURE DROP
DSCU DUCTLESS SPLIT CONDENSING UNIT
DSHP DUCTLESS SPLIT HEAT PUMP
DSS DUCTLESS SPLIT SYSTEM (INDOOR UNIT)
DWG DRAWING
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
ELEC ELECTRICAL
ET EXPANSION TANK
ESP EXTERNAL STATIC PRESSURE
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EXT EXTERIOR
EXH EXHAUST
EXST, (E) EXISTING
FCU FAN COIL UNIT
FD FIRE DAMPER
FFE FINISHED FLOOR ELEVATION
FLA FULL LOAD AMPS
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FPM FEET PER MINUTE
FSD FIRE SMOKE DAMPER
FT FOOT, FEET
FT WG FEET WATER GAUGE
FV FLUE VENT
GA GAGE
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
H HEIGHT
HGRH HOT GAS REHEAT
HP HEAT PUMP
HR HOUR
HSPF HEATING SEASONAL PERFORMANCE FACTOR
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HX HEAT EXCHANGER
HZ HERTZ
IMC INTERNATIONAL MECHANICAL CODE
IN INCH, INCHES
IN WC INCHES WATER COLUMN
IN WG INCHES WATER GAUGE
IPLV INTEGRATED PART LOAD VALUE
KW KILOWATTS
L LENGTH, LOUVER (WALL)
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LBF/IN2 POUNDS FORCE PER SQUARE INCH
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS
MCA MINIMUM CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MECH MECHANICAL
MFR, MFG MANUFACTURER, MANUFACTURING
MIN MINIMUM
MOCP, MOP MAXIMUM OVER CURRENT PROTECTION
MOD MOTOR OPERATED DAMPER
MSS MANUFACTURER'S STANDARDIZATION SOCIETY
MTD MOUNTED
MUW MAKE-UP WATER (POTABLE/ DOMESTIC)
MVD MANUAL VOLUME DAMPER
NC NOISE CRITERIA
N.C. NORMALLY CLOSED
NO. NUMBER
N.O. NORMALLY OPEN
NPLV NET PART LOAD VALUE
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DAMPER
PD PRESSURE DROP
PH PHASE
PLBG PLUMBING
PPM PARTS PER MILLION
PRV PRESSURE RELIEF VALVE
QTY QUANTITY
RA RETURN AIR
RG RETURN GRILLE
RH RELATIVE HUMIDITY, ROOF HOOD
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RM ROOM
ROG REVERSE OSMOSIS GENERATOR
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SD SMOKE DAMPER, SMOKE DETECTOR
SEER SEASONAL ENERGY EFFICIENCY RATIO
SF SUPPLY FAN
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTOR'S NATIONAL ASSOCIATION
SP STATIC PRESSURE
SS STAINLESS STEEL
TSTAT THERMOSTAT
TEMP TEMPERATURE
TG TRANSFER GRILLE
THA TOTAL HEAT ABSORPTION
THR TOTAL HEAT REJECTION
TP TEMPERATURE/ PRESSURE TEST PORT
TYP TYPICAL
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UMCS UTILITY MONITORING AND CONTROL SYSTEM
V VOLTAGE, VOLTS
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VELO VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VSD VARIABLE SPEED DRIVE
W WATT(S)
W/ WITH
W/O WITHOUT
WB, Twb WET BULB (TEMPERATURE)
WD WIDE, WIDTH
WMS WIRE MESH SCREEN
AIR DISTRIBUTION DEVICE TAGS
DIFFUSER TYPE
A
400 AIRFLOW (CFM), "PLENUM", OR "TRANSFER"
A1
M-501
PLAN NORTH
TRUE
NORTH
DRAWING REFERENCE KEY
REFER TO
DETAIL NUMBER
SHEET NUMBER OF DETAIL
RE:A1/M-501
NORTH ARROW
A
J
SD
SP
F
CO
DUCT SMOKE DETECTOR
CARBON MONOXIDE SENSOR
OVAL OR FLAT OVAL
CONTROL WIRING
STATIC PRESSURE SENSOR
ROUND
FIRESTAT
TEMPERATURE SENSOR
MISCELLANEOUS LEGEND
T
120 VOLT STAND BY POWER JUNCTION
BOX PROVIDED BY THE ELECTRICAL
CONTRACTOR JUNCTION BOX IS
DEDICATED FOR USE BY THE CONTROLS
CONTRACTOR.
VARIABLE FREQUENCY DRIVEVFD
PIPING LEGEND
EXPANSION JOINT
FLEXIBLE CONNECTION
CLEANOUT
WATER METER
FLOOR CLEANOUT
THERMOMETER
PRESSURE REDUCING VALVE
MANUAL AIR VENT
PRESSURE/TEMPERATURE
TAP WITH BALL VALVE
PRESSURE SWITCH
PLUG VALVE
FLOW SWITCH
T&P RELIEF VALVE
AUTOMATIC AIR VENT
PRESSURE GAUGE WITH GAUGE COCK
PS
FS
BUTTERFLY VALVE
STRAINER WITH BLOWDOWN VALVE,
CAP, AND CHAIN
FLOW MEASURING/BALANCING/SHUT-
OFF VALVE
GATE VALVE
CHECK VALVE
BALL VALVE
CONCENTRIC REDUCER
DIRECTION OF FLOW
DIRECTION OF SLOPE DOWN
ECCENTRIC REDUCER
PIPE FLANGE
PIPE CAP
PIPE GUIDE (PG)
PIPE ANCHOR (PA)X
UNION
TEE OUTLET UP
CONDENSATE DRAIN
BRANCH BOTTOM CONNECTION
BRANCH TOP CONNECTION
ELBOW UP
ELBOW DOWN
RISE OR DROP
TEE OUTLET DOWN
M
M
FIRE DAMPER
H
DUCT MOUNTED HUMIDIFIER
EXHAUST AIR DUCT DOWN
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
30"x14"
SQUARE TO ROUND DUCT BRANCH TAKE-OFF
WITH 45 DEGREE BRANCH INLET
FLARED SPIN-IN WITH DAMPER AND
FLEX DUCT (DIFFUSER CONNECTION)
ROUND DUCT BRANCH TAKE-OFF FROM
RECTANGULAR MAIN WITH CONICAL TAP
FLEXIBLE DUCT CONNECTION
FLOW ARROW
DUCT SIZE TRANSITION
RECTANGULAR DUCT BRANCH TAKE-OFF
WITH 45 DEGREE BRANCH INLET
90 DEGREE DUCT ELBOW WITH TURNING VANES
24"Ø
DUCTWORK LEGEND
RETURN AIR DEVICE
ROUND DUCT. DIAMETER INDICATED IN INCHES.
IN-LINE 90 DEGREE RISE/DROP IN
SUPPLY DUCT (RIGHT SIDE IS HIGHER)
IN-LINE 90 DEGREE RISE/DROP IN
SUPPLY DUCT (LEFT SIDE IS HIGHER)
FD
SD
P - PNEUMATIC-ACTUACTED DAMPER
DAMPER TYPE:
M - MOTORIZED DAMPER (ELECTRIC)
VD
SMOKE DAMPER
VOLUME/BALANCING DAMPER
(LABEL MAY BE OMITTED)
BD
BACKDRAFT DAMPER
(COUNTER-BALANCED UNLESS
OTHERWISE NOTED)
RADIUS DUCT ELBOW - ROUND OR
RECTANGULAR (MIN. 1.5 RADIUS UNLESS
OTHERWISE NOTED)
RECTANGULAR DUCT. SIZE INDICATED IN
INCHES, FIRST NUMBER IS SIDE SHOWN.
DASHED LINES INDICATE ACOUSTICAL LINER
SUPPLY AIR DIFFUSER -
FLOW ARROWS INDICATE AIR PATTERN.
NO FLOW ARROWS SHOWN INDICATES
4-WAY PATTERN.
FSD
COMBINATION
FIRE/SMOKE DAMPER
EXHAUST AIR DEVICE
RC REMOTE CONTROLLER (VRF SYSTEM)
SERVICE CLEARANCE
T THERMOSTAT
H HUMIDISTAT
$ START/ STOP SWITCH
TH THERMOSTAT/ HUMIDISTAT
HUMIDITY SENSORH
REFRIGERANT HOT GAS
REFRIGERANT LIQUIDRL
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
REFRIGERANT SUCTIONRS
RHG
CD
CHILLED WATER RETURNCHWR
CHILLED WATER SUPPLYCHWS
CONDENSER WATER RETURNCWR
CONDENSER WATER SUPPLYCWS
DEMOLISHED
CONNECT TO EXISTING
DISCONNECT FROM EXISTING
IN-LINE 90 DEGREE RISE/DROP IN
RETURN DUCT (RIGHT SIDE IS HIGHER)
DUCT SIZE TRANSITION RECTANGULAR TO
ROUND
30"/14" FLAT OVAL DUCT. SIZE INDICATED IN INCHES,
FIRST NUMBER IS SIDE SHOWN
RETURN AIR DUCT UP
SUPPLY OR OUTSIDE AIR DUCT DOWN
SUPPLY OR OUTSIDE AIR DUCT UP
IN-LINE 90 DEGREE RISE/DROP IN
RETURN DUCT (LEFT SIDE IS HIGHER)
IN-LINE 90 DEGREE RISE/DROP IN
EXHAUST DUCT (RIGHT SIDE IS HIGHER)
IN-LINE 90 DEGREE RISE/DROP IN
EXHAUST DUCT (LEFT SIDE IS HIGHER)
DEMOLITION KEY
CONNECTION SIZE
(X"xX" INDICATES RECTANGULAR, X"/X"
INDICATES OVAL, X"Ø INDICATES ROUND)
X"xX"
TYP. OF #
TYPICAL OF QUANTITY INDICATED
DP DIFFERENTIAL PRESSURE SENSOR
FLEXIBLE PIPE CONNECTION
C CARBON DIOXIDE SENSOR
AQ AIR QUALITY SENSOR
SKD
DUCT MOUNTED SMOKE DETECTOR
R A
Y M
O N
D
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
M-002
02/24/2025
J. MCCAUSLAND
C. HANNING
K. THOMPSON
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
M E
C H
A N
IC
A
L A
B B
R E
V
IA
T
IO
N S
A N
D L
E G
E N
D S
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
Refrigerator
W
MECHANICAL DEMO SHEET NOTES:
1. THE SCOPE OF DEMOLITION AS DOCUMENTED IS
SCHEMATIC IN NATURE AND ANY ADDITIONAL
COORDINATION BETWEEN THIS SCOPE OF
DEMOLITION WORK AND THE EXISTING SYSTEMS IN
THE SPACE SHALL BE DETERMINED IN THE FIELD.
2. EXISTING EQUIPMENT, ASSOCIATED DUCTWORK,
AND PIPING SHOWN ON THE PLANS MAY NOT
EXACTLY MATCH WITH THE FIELD CONDITIONS.
EQUIPMENT, DUCTWORK, AND PIPING LOCATIONS
DEPICTED HERE ARE FOR PURPOSE OF
COORDINATION. CONTRACTOR SHALL VERIFY
EXISTING DUCTWORK ROUTING AND LOCATIONS.
3. CONTRACTOR WILL TAKE PRECAUTIONS NOT TO
DAMAGE, DESTROY, OR OTHERWISE ALTER ANY
BUILDING RELATED PERIPHERALS NOT IN THE
SCOPE OF WORK AND WILL BE RESPONSIBLE FOR
ASSOCIATED EXPENSES.
4. CONTRACTOR TO COORDINATE DEMOLITION OF
HVAC EQUIPMENT AND ALL OTHER RELATED
USEFUL PARTS WITH THE OWNER'S
REPRESENTATIVE PRIOR TO REMOVAL AND/OR
SALVAGE. THE OWNER RESERVES THE RIGHT TO
COLLECT ANY REMOVED EQUIPMENT.
EXIST. INFORMATION
SERVICES MANAGER
OPEN OFFICE
EXIST. INFORMATION
SERVICES MANAGER
EXIST. INFORMATION
SERVICES MANAGER
EXIST. OFFICE SUPPLIES
EXIST. PAPER SUPPLIES
EXIST. INFORMATION
SERVICES MANAGER
EXIST. LARGE
CONFERENCE ROOM
EXIST. STAFF ASSISTANT
EXIST. SMALL
CONFERENCE
EXIST. DIRECTOR
EXIST. TECHNICAL
DIRECTOR
SUPPLIES
EXIST. DIRECTOR
EXIST. ASSISTANT
DIRECTOR
EXIST. APPLICATIONS
DIRECTOR
122ELEVATOR EQUIPMENT
EXIST. ELEVATOR
EXIST. VESTIBULE
WOMEN
EXIST. PAPER SUPPLIES
MEN
UNISEX
107A
EXIST. EMPLOYEE
LOUNGE
KITCHEN
EXIST. CORRIDOR
CORRIDOR
EXIST. VOID
EXIST. OFFICE SUPPLIES
Room
JAN
CORRIDOR
3 3
(D) EF-5
(D) EF-3
(D) EF-4
(E )1
"Ø
(E )1
"Ø
6"Ø 12"Ø
EXISTING EF-6
TO REMAIN
EXISTING 54" X 10" PLENUM
WITH 30" X 10" EXHAUST UP
TO ROOF WITH EXISTING
FD AT FLOOR SLAB.
200 CFM
150 CFM
(E)8"Ø
8"Ø
R A
Y M
O N
D
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
MD-101
02/24/2025
J. MCCAUSLAND
C. HANNING
K. THOMPSON
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
M E
C H
A N
IC
A
L D
E M
O G
R O
U N
D F
L O
O R
P L A
N S
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
X MECHANICAL DEMO KEYNOTES
3/16" = 1'-0"A1
MECHANICAL DEMO GROUND FLOOR PLAN
DEMOLISH EXISTING SUPPLY AIR DEVICE AND
ASSOCIATED FLEX DUCT.
EXISTING DUCT TO REMAIN. PREP END OF
EXISTING DUCT FOR CONNECTION TO NEW
FLEX DUCT OR DUCT.
DEMOLISH EXISTING EXHAUST FAN AND ALL
ASSOCIATED APPERTENANCES.
EXISTING DUCT TO REMAIN. SEAL OPENINGS
AT POINT OF DEMOLITION TO BE AIR TIGHT.
EXISTING DUCT TO REMAIN.
TR
U E N
PLAN
NORTH
SCALE:
0 4' 8' 12'
3/16" = 1'-0"
MECHANICAL DEMO SHEET NOTES:
1. THE SCOPE OF DEMOLITION AS DOCUMENTED IS
SCHEMATIC IN NATURE AND ANY ADDITIONAL
COORDINATION BETWEEN THIS SCOPE OF
DEMOLITION WORK AND THE EXISTING SYSTEMS IN
THE SPACE SHALL BE DETERMINED IN THE FIELD.
2. EXISTING EQUIPMENT, ASSOCIATED DUCTWORK,
AND PIPING SHOWN ON THE PLANS MAY NOT
EXACTLY MATCH WITH THE FIELD CONDITIONS.
EQUIPMENT, DUCTWORK, AND PIPING LOCATIONS
DEPICTED HERE ARE FOR PURPOSE OF
COORDINATION. CONTRACTOR SHALL VERIFY
EXISTING DUCTWORK ROUTING AND LOCATIONS.
3. CONTRACTOR WILL TAKE PRECAUTIONS NOT TO
DAMAGE, DESTROY, OR OTHERWISE ALTER ANY
BUILDING RELATED PERIPHERALS NOT IN THE
SCOPE OF WORK AND WILL BE RESPONSIBLE FOR
ASSOCIATED EXPENSES.
4. CONTRACTOR TO COORDINATE DEMOLITION OF
HVAC EQUIPMENT AND ALL OTHER RELATED
USEFUL PARTS WITH THE OWNER'S
REPRESENTATIVE PRIOR TO REMOVAL AND/OR
SALVAGE. THE OWNER RESERVES THE RIGHT TO
COLLECT ANY REMOVED EQUIPMENT.
EXIST. OFFICE
EXIST. SUPPLIES
EXISTING WORK
STATIONS ROOM
STOR
CONFERENCE
WOMEN
MEN
STORAGE
EXISTING OFFICE
JAN
EXIST. ELECT
EXIST. MEDIA
MEDIA
EXISTING WORK ROOM
EXIST. OFFICE
ELEVATOR
102STAIR
EXIST. STORAGE
5 1
2 2
EXISTING 30" X 10"
EXHAUST DUCT UP TO
GOOSENECK ON ROOF
150 CFM
8"Ø 6"Ø
50 CFM
EXISTING
EF-1
R A
Y M
O N
D
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
MD-102
02/24/2025
J. MCCAUSLAND
C. HANNING
K. THOMPSON
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
M E
C H
A N
IC
A
L D
E M
O S
E C
O N
D F
L O
O R
P L A
N S
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
3/16" = 1'-0"A1
MECHANICAL DEMO SECOND FLOOR PLAN
X MECHANICAL DEMO KEYNOTES
DEMOLISH EXISTING SUPPLY AIR DEVICE AND
ASSOCIATED FLEX DUCT.
EXISTING DUCT TO REMAIN. PREP END OF
EXISTING DUCT FOR CONNECTION TO NEW
FLEX DUCT OR DUCT.
DEMOLISH EXISTING EXHAUST EXHAUST FAN
AND ALL ASSOCIATED APPERTENANCES.
EXISTING DUCT TO REMAIN.
EXISTING EXHAUST FAN TO REMAIN.
DEMOLISH EXISTING 6" DIA. DUCT UP TO
EXISTING ROOF CAP. EXISITING ROOF CAP TO
REMAIN. PREP ROOF AND ROOF CAP FOR
INSTALLATION OF NEW DUCT.
TR
U E N
PLAN
NORTH
SCALE:
0 4' 8' 12'
W
MECHANICAL SHEET NOTES:
1. REFER TO SHEET M-001 FOR MECHANICAL
GENERAL NOTES, DESIGN CRITERIA.
2. REFER TO SHEET M-002 FOR MECHANICAL
ABBREVIATIONS AND LEGENDS.
3. REBALANCE AIR DEVICES TO VALUES SHOWN.
EXIST. INFORMATION
SERVICES MANAGER
OPEN OFFICE
EXIST. INFORMATION
SERVICES MANAGER
EXIST. INFORMATION
SERVICES MANAGER
EXIST. OFFICE SUPPLIES
EXIST. PAPER SUPPLIES
EXIST. INFORMATION
SERVICES MANAGER
EXIST. LARGE
CONFERENCE ROOM
EXIST. STAFF ASSISTANT
EXIST. SMALL
CONFERENCE
EXIST. DIRECTOR
EXIST. TECHNICAL
DIRECTOR
SUPPLIES
EXIST. DIRECTOR
EXIST. ASSISTANT
DIRECTOR
EXIST. APPLICATIONS
DIRECTOR
122ELEVATOR EQUIPMENT
EXIST. ELEVATOR
102EXIST. VESTIBULE
WOMEN
EXIST. PAPER SUPPLIES
MEN
UNISEX
107A
EXIST. EMPLOYEE
LOUNGE
KITCHEN
EXIST. CORRIDOR
CORRIDOR
EXIST. VOID
EXIST. OFFICE SUPPLIES
Room
JAN
CORRIDOR
8"Ø
SD-1
150 CFM
(E)8"Ø
(E)16"x12"
8"Ø
8"Ø
SD-1
200 CFM
U
(E)30"x10"
(E)54"x10"
(E)14"Ø
(E)12"Ø
10"Ø 6"Ø
6"Ø
EF-4
EF-3
EF-5
EF-7
EXISTING EF-6
TO REMAIN
6"Ø
SD-1
150 CFM
6"Ø
SD-1
150 CFM
8"Ø
SD-1
150 CFM
CAP AND SEAL
EXISTING EXHAUST
DUCTS NOT USED
"Ø
FLEX DUCT SHALL BE LESS
THAN 5 FT IN LENGHT.
R A
Y M
O N
D
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
M-101
02/24/2025
J. MCCAUSLAND
C. HANNING
K. THOMPSON
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
M E
C H
A N
IC
A
L G
R O
U N
D F
L O
O R
P L A
N S
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
3/16" = 1'-0"A1
MECHANICAL NEW WORK GROUND FLOOR PLAN
X MECHANICAL KEYNOTES
1 UNDERCUT DOOR TO ALLOW MAKE UP AIR
INTO SPACE.
TR
U E N
PLAN
NORTH
SCALE:
0 4' 8' 12'
EXIST. OFFICE
EXIST. SUPPLIES
EXISTING WORK
STATIONS ROOM
CONFERENCE
WOMEN
MEN
STORAGE
EXISTING OFFICE
JAN
EXIST. ELECT
EXIST. MEDIA
MEDIA
EXISTING WORK ROOM
EXIST. OFFICE
ELEVATOR
102STAIR
EXIST. STORAGE
(E )2
"x
(E)EF-2
(E)30"x10"
EF-1
EF-8 (50 CFM)
8"Ø
SD-1
100 CFM
6"Ø
SD-1
50 CFM
"Ø
MECHANICAL SHEET NOTES:
1. REFER TO SHEET M-001 FOR MECHANICAL
GENERAL NOTES, DESIGN CRITERIA.
2. REFER TO SHEET M-002 FOR MECHANICAL
ABBREVIATIONS AND LEGENDS.
3. REBALANCE AIR DEVICES TO VALUES SHOWN.
LOAD RATED
FASTENERS
BAND OF
SAME SIZE
AS HANGER
STRAP
50" DIA &
UNDER
HANGER
RODS
OVER
50" DIA
BAND
HANGER STRAPS OR RODS
MAX DUCT
DIA
(in)
QUANTITY / SIZE (in)
MAX LOAD
(LBS)
MAX
SPACING
(in)
NOTE:
1. TABULATED DATA FROM SMACNA ALLOWS FOR DUCT
REINFORCING AND INSULATION, BUT NO EXTERNAL LOAD.
2. REFER TO CURRENT VERSION OF SMACNA HVAC DUCT
CONSTRUCTION STANDARDS - METAL AND FLEXIBLE.
ONE 1 x 22 GA STRAP
ONE 1 x 18 GA STRAP
ONE 1 x 16 GA STRAP
TWO 3/8 DIA RODS
TWO 1/2 DIA RODS
3 DISCONNECT SWITCH, FACTORY MOUNTED
NOTES
1 REFER TO ASHRAE VENTILATION SCHEDULE FOR SPACES SERVED BY EACH EXHAUST FAN.
2 VIBRATION ISOLATION
EF-7 107A - RESTROOM CEILING DIRECT 100 0.50 685 0.01 0.40 115/60/1 GREENHECK SP-LP0511-1 1-3, 6
EF-8 217 - JANITOR CEILING DIRECT 50 0.50 685 0.01 0.40 115/60/1 GREENHECK SP-LP0511-1 1-3, 6
EF-1 211 - MEN'S RESTROOM CEILING DIRECT 150 0.50 685 0.01 0.40 115/60/1 GREENHECK SP-LP0511-1 1-3, 5
EF-2 203 - WOMENS RESTROOM CEILING DIRECT 100 0.50 685 0.01 0.40 115/60/1 EXISTING 4, 5
EF-3 111 - MEN'S RESTROOM CEILING DIRECT 250 0.59 1,000 0.03 0.70 115/60/1 GREENHECK SP-1250 1-3, 5
EF-4 105 - WOMEN'S RESTROOM CEILING DIRECT 100 0.59 1,000 0.03 0.70 115/60/1 GREENHECK SP-1250 1-3, 5
EF-5 112 - JANITOR CEILING DIRECT 50 0.50 685 0.01 0.40 115/60/1 GREENHECK SP-LP0511-1 1-3, 5
EF-6 104 - ELEVATOR EQUIPMENT CEILING DIRECT 150 0.59 1,000 0.03 0.70 115/60/1 EXISTING 4, 5
EXHAUST FAN SCHEDULE
TAG AREA LOCATED IN MOUNTING DRIVE TYPE CFM ESP (in-wg) FAN RPM HP MCA V/C/P MAKE MODEL NOTES
EXISTING
EXISTING
4 EXISTING TO REMAIN
5 EXISTING FAN CONTROLS TO REMAIN.
6 TIE FAN INTO ROOM LIGHT SWITCH.
R A
Y M
O N
D
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
M-102
02/24/2025
J. MCCAUSLAND
C. HANNING
K. THOMPSON
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
M E
C H
A N
IC
A
L S
E C
O N
D F
L O
O R
P L A
N S
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
3/16" = 1'-0"A1
MECHANICAL NEW WORK SECOND FLOOR PLAN
X MECHANICAL KEYNOTES
1 UNDERCUT DOOR TO ALLOW MAKE UP AIR
INTO SPACE.
8" DIA. DUCT UP TO EXISTING ROOF CAP.
ENLARGE OPENING IN ROOF AS NECESSARY
TO INSTALL NEW DUCT.
N.T.SC6
ROUND DUCT HANGER
3 CONNECT TO EXISTING 30"x10" DUCT UP TO
EXISTING ROOF HOOD.
TR
U E N
PLAN
NORTH
SCALE:
0 4' 8' 12'
PLUMBING LEGEND
DIRECTION OF FLOW
PIPE TURNED DOWN
PIPE TURNED UP
RISE OR DROP
BRANCH BOTTOM CONNECTION
TEE OUTLET UP
TEE OUTLET DOWN
CAP ON END OF PIPE
SANITARY WASTE (NEW) -
ABOVE FLOOR OR GRADE
SANITARY WASTE (NEW) -
BELOW FLOOR OR GRADE
VENT PIPING (NEW)
POTABLE / DOMESTIC COLD
WATER PIPING (NEW)
POTABLE / DOMESTIC HOT
WATER SUPPLY PIPING (NEW)
THERMOMETER
TEMPERATURE & PRESSURE RELIEF VALVE
FLOW MEASURING / BALANCING / SHUT-
OFF VALVE
BALL VALVE
CHECK VALVE
GATE VALVE
STRAINER
UNION
HOSE BIBB
FLOOR DRAIN
PLUMBING ABBREVIATIONSPLUMBING GENERAL NOTES
1. PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE,
INTERNATIONAL PLUMBING CODE, AND INTERNATIONAL FUEL GAS CODE.
2. SLOPES AND INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER
TO MAINTAIN PROPER SLOPES. ANY DISCREPANCIES SHALL BE REPORTED TO CONTRACTING
OFFICER'S REPRESENTATIVE. ALL PIPING SHALL BE LOCATED AND DETERMINED WHEN TO BE
INSTALLED TO AVOID CONFLICT WITH OTHER TRADES.
3. PIPING SHALL BE CONCEALED UNLESS OTHERWISE NOTED.
4. KEEP ALL BURIED PIPING CLEAR OF FOOTINGS. COORDINATE WITH STRUCTURAL.
5. ALL WALL CLEANOUTS SHALL BE PROVIDED WITH WALL COVERS AND MOUNTED IN UNOBTRUSIVE LOCATIONS WHILE MAINTAINING ACCESSIBILITY. ALL FLOOR CLEANOUTS SHOWN SHALL BE SET FLUSH
WITH FLOOR AREAS OR FINISHED GRADE.
6. COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL AND ELECTRICAL EQUIPMENT.
NO PIPING SHALL BE INSTALLED ABOVE ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT OR
PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR EXACT LOCATION OF PLUMBING FIXTURES,
COMPLIANCE TO ADA CLEARANCES, AND FINISHES.
7. PROVIDE REQUIRED WATER, WASTE, AND VENT PIPING, FITTINGS, AND INSULATION, AND MAKE FINAL CONNECTIONS TO EQUIPMENT. THESE PLANS ARE SCHEMATIC AND DIAGRAMMATIC ONLY. THEY DO
NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS FITTINGS FOR A
COMPLETE INSTALLATION. ALL PIPING, EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN
ACCORDANCE WITH SPECIFICATIONS, LOCAL CODES AND ORDINANCES, AND MANUFACTURER'S
INSTRUCTIONS.
8. WASTE PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1%. WASTE PIPING 3" AND
SMALLER SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 2%.
9. DO NOT SCALE DRAWINGS. REFER TO ARCHITECTURE DRAWINGS FOR EXACT DIMENSIONS, FIXTURE
LOCATIONS, ROOM NAMES, AND NUMBERS.
10. PROVIDE EXTENSION OF EQUIPMENT DRAINS TO FLOOR DRAINS, FLOOR SINKS, AND OPEN SITE
DRAINS.
11. INSTALL SHUT-OFF VALVES AND EQUIPMENT REQUIRING MAINTENANCE, CLEANING AND ADJUSTMENT ABOVE ACCESSIBLE CEILINGS OR IN SERVICE AREAS SUCH AS JANITOR'S CLOSETS. IN OTHER
LOCATIONS, PROVIDE ACCESS PANELS IN INCONSPICUOUS LOCATIONS WITH FINISH TO MATCH
ARCHITECTURAL.
12. ALL HOSE BIBBS, WALL HYDRANTS, AND VALVES WITH THREADED HOSE CONNECTIONS SHALL BE
EQUIPPED WITH VACUUM BREAKER.
13. WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS, FLUID BEING HANDLED, AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING TO CODE AND AS SHOWN. NOTIFY GENERAL CONTRACTOR OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK OR EXTENSION OF CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR
OTHER WORK TO PROVIDE ACCESS TO THE CONCEALED UTILITY.
14. PROVIDE INSULATION, PIPE IDENTIFICATION, AND OTHER REQUIREMENTS AS LISTED IN
SPECIFICATIONS.
15. ALL PIPING ABOVE GRADE SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT
REST ON CEILING TILES OR BE SUPPORTED FROM CEILING TILES.
16. WATER PIPING ROUTED ABOVE CEILINGS AND IN EXTERIOR WALLS SHALL BE ROUTED ON HEATED SIDE (UNDERSIDE) OF CEILING INSULATION AND HEATED SIDE (INSIDE) OF WALL INSULATION.
17. TOPS OF ALL FLOOR DRAINS AND CLEANOUTS SHALL BE SET FLUSH WITH FINISHED FLOOR, UNLESS
NOTED OTHERWISE.
18. LOCATE ALL SECTIONAL OR MAIN CONTROL VALVES WITHIN 1'-0" FROM ACCESS PANELS, CEILING
TILES, OR OTHER POINT OF ACCESS.
19. PROVIDE WATER HAMMER ARRESTORS SIZED PER PLUMBING DRAINAGE INSTITUTE SPECIFICATIONS ON ALL DOMESTIC WATER LINES SERVING FLUSH VALVE FIXTURES, WASHING MACHINES SUPPLIES, PRV STATIONS, AND OTHER INSTALLATIONS WITH QUICK CLOSING VALVES.
20. PROVIDE A MANUFACTURED EXPANSION DEVICE OR FABRICATED EXPANSION LOOP ON ALL PIPING
SYSTEMS CROSSING BUILDING EXPANSION JOINTS.
21. COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL PLUMBING EQUIPMENT WITH THE ELECTRICAL DRAWINGS AND THE ELECTRICAL CONTRACTOR, AND FURNISH EQUIPMENT
WIRED FOR THE VOLTAGES SHOWN THEREIN.
22. ALL PLUMBING EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED FOR A MINIMUM PERIOD OF ONE
YEAR AFTER OWNER'S FINAL ACCEPTANCE.
23. ALL PIPE PENETRATIONS OF FIRE AND/OR SMOKE-RATED ASSEMBLIES SHALL BE FIRE-STOPPED AS REQUIRED TO RESTORE ASSEMBLY TO ORIGINAL INTEGRITY. FIRE BARRIER PRODUCTS SHALL BE AS MANUFACTURED BY 3M COMPANY, CP25 CAULK, CS195 COMPOSITE PANEL, FS195 WRAP/STRIP, OR PSS 7900 SERIES SYSTEMS AS RECOMMENDED BY MANUFACTURER FOR PARTICULAR APPLICATION, OR
EQUIVALENT SYSTEM AS APPROVED BY LOCAL CODE OFFICIALS.
24. ALL VENTS THROUGH ROOF SHALL BE LOCATED A MINIMUM OF 10'-0" FROM ANY OUTSIDE AIR INTAKE.
25. ALL COLD WATER, HOT WATER, AND DRAIN PIPING AT HANDICAPPED FIXTURES SHALL BE INSULATED
WITH HANDI-LAV GUARD MODELS 102 AND 105 OR APPROVED EQUAL INSULATION KITS.
26. NOT ALL PLUMBING ABBREVIATIONS SHOWN WILL BE USED FOR THIS PROJECT.
TRAP PRIMER
FLOOR CLEANOUT
WALL CLEANOUT
WATER HAMMER ARRESTOR
PLAN ELEV
TP
FCOFCO
WCO WCO
BRANCH TOP CONNECTION
POTABLE / DOMESTIC HOT
WATER RETURN PIPING (NEW)
PW
PP
SANITARY RISER DIAGRAM DESIGNATION
RISER DIAGRAM NUMBER
DOMESTIC WATER RISER DIAGRAM DESIGNATION
RISER DIAGRAM NUMBER
A/C ABOVE CEILING
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ARCH ARCHITECTURE, ARCHITECTURAL
BFP BACKFLOW PREVENTER
B/F BELOW FLOOR
B/G BELOW GRADE
BLDG BUILDING
BV BALL VALVE
CA COMPRESSED AIR
CD CONDENSATE DRAIN
CONT. CONTINUATION
CO CLEANOUT
CV CHECK VALVE
CONTR CONTRACTOR
CW COLD WATER (POTABLE / DOMESTIC)
DEG. DEGREES
DF DRINKING FOUNTAIN
DHWR DOMESTIC HOT WATER RETURN
DN DOWN
DSN DOWNSPOUT NOZZLE
DWGS DRAWINGS
(E) EXISTING
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EMEW EMERGENCY EYEWASH
EMSH EMERGENCY SHOWER
ESEW EMERGENCY SHOWER / EYEWASH
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
GC GENERAL CONTRACTOR
GPF GALLONS PER FLUSH
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GV GATE VALVE
GWH GAS WATER HEATER
HB HOSE BIBB
H/C HANDICAP
HW HOT WATER (POTABLE / DOMESTIC)
I.E. INVERT ELEVATION
IBC INTERNATIONAL BUILDING CODE
IFGC INTERNATIONAL FUEL GAS CODE
IMB ICE MAKER BOX
IPC INTERNATIONAL PLUMBING CODE
IW INDIRECT WASTE
KW KILOWATT
L LAUNDRY
LP LIQUID PETROLEUM
LV LAVATORY
MFG MANUFACTURER
MS MOP SINK
NFWH NON-FREEZE WALL HYDRANT
NG NATURAL GAS
NIC NOT IN CONTRACT
ORD OVERFLOW ROOF DRAIN
P, PLBG PLUMBING
PDI PLUMBING DRAINAGE INSTITUTE
PP PRESSURIZED PLUMBING
PS PLUMBING SUPPLY
PSI POUNDS PER SQUARE INCH
PW PLUMBING WASTE
RD ROOF DRAIN
RL RAIN LEADER
RPZ REDUCED PRESSURE ZONE
SAN, S SANITARY PIPING
SANS SANITARY SEWER
SH SHOWER
SK SINK
SOV SHUT-OFF VALVE
STR STRAINER
SS STAINLESS STEEL
TMV THERMOSTATIC MIXING VALVE
T&P TEMPERATURE AND PRESSURE RELIEF VALVE
TP TRAP PRIMER
TYP TYPICAL
UR URINAL
U/G UNDERGROUND
U/SAN UNDERGROUND SANITARY
V VENT PIPING
VTR VENT THROUGH ROOF
W WASTE PIPING
WB CLOTHES WASHER OUTLET BOX
WC WATER CLOSET
WCO WALL CLEANOUT
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
W/O WITHOUT
W/ WITH
YCO YARD CLEANOUT
DEMOLISHED
CONNECT TO EXISTING
DISCONNECT FROM EXISTING
R A
Y M
O N
D
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
P-001
02/24/2025
J. MCCAUSLAND
C. HANNING
C. SHEPPARD
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
P L U
M B
IN
G
G E
N E
R A
L N
O T
E S
A
B B
R E
V
A N
D L
E G
E N
D S
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
W
EXIST. INFORMATION
SERVICES MANAGER
OPEN OFFICE
EXIST. INFORMATION
SERVICES MANAGER
EXIST. INFORMATION
SERVICES MANAGER
EXIST. OFFICE SUPPLIES
EXIST. PAPER SUPPLIES
EXIST. INFORMATION
SERVICES MANAGER
EXIST. LARGE
CONFERENCE ROOM
EXIST. STAFF ASSISTANT
EXIST. SMALL
CONFERENCE
EXIST. DIRECTOR
EXIST. TECHNICAL
DIRECTOR
SUPPLIES
EXIST. DIRECTOR
EXIST. ASSISTANT
DIRECTOR
EXIST. APPLICATIONS
DIRECTOR
ELEVATOR EQUIPMENT
EXIST. ELEVATOR
EXIST. VESTIBULE
WOMEN
EXIST. PAPER SUPPLIES
MEN
UNISEX
107A
EXIST. EMPLOYEE
LOUNGE
115KITCHEN
EXIST. CORRIDOR
CORRIDOR
EXIST. VOID
EXIST. OFFICE SUPPLIES
CORRIDOR
8 4
LINE TO REMAIN
FCO
GCO
WCO
3/4"
4" S
1/2" CW
4"
3"
2" V
/2
C W
PLUMBING SHEET DEMO NOTES:
1. UNLESS NOTED OTHERWISE, ALL MATERIAL
& EQUIPMENT SHOWN OR SPECIFIED TO BE
DEMOLISHED SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND
SHALL BE REMOVED FROM THE SITE AND
DISPOSED OF. R
A Y
M O
N D
TR
U E N
PLAN
NORTH
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
PD-101
02/24/2025
J. MCCAUSLAND
C. HANNING
C. SHEPPARD
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
TG
R
O U
N D
F L O
O R
P L U
M B
IN
G
D E
M O
L
IT
IO
N
P L A
N
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
3/16" = 1'-0"A1
PLUMBING DEMO GROUND FLOOR PLAN
SCALE:
0 4' 8' 12'
3/16" = 1'-0"
SHEET KEY NOTES
REMOVE EXISTING ELECTRIC WATER HEATER AND ALL
APPERTENANCES.
EXISTING 4" SANTARY UP TO SECOND FLOOR.
CONNECTION OF SECOND FLOOR WATER PIPING TO FIRST
FLOOR WATER PIPING. SEE PD102 FOR CONT.
REMOVE EXISTING LAVATORY, TRIM AND STOP VALVES.
EXISTING ROUGH-IN TO BE REMOVED.
REMOVE EXISTING URINAL, TRIM, AND FLUSH VALVE.
EXISTING ROUGH-IN AND CARRIER TO BE REMOVED.
REMOVE EXISTING WATER CLOSET, TRIM AND STOP VALVE.
EXISTING ROUGH-IN TO BE REMOVED.
EXISTING FLOOR DRAIN TO BE REMOVED.
EXISTING VENT LINES SERVING FIRST FLOOR FIXTURES TO
BE REMOVED.
EXISTING 3" VENT TO SECOND FLOOR TO REMAIN.
EXISTING MOP SINK TO BE REMOVED AND ALL
APPERTENANCES.
EXISTING SINK, TRIM, AND STOP VALVES TO BE REMOVED.
ROUGH-IN TO BE ADJUSTED FOR NEW SINK. EXISTING DISH
WASHER AND TRIM TO BE REMOVED. SEE PW101 AND PP101
FOR NEW WORK.
EXISTING WATER COOLER TO REMAIN.
EXISTING 1-1/2" COLD WATER TO THE AREA. COORDINATE
EXACT LOCATION OF ISOLATION VALVE SHOWN WITH OWNER.
EXISTING 4" SANITARY PIPE TO REMAIN.
EXIST. OFFICE
EXIST. SUPPLIES
EXISTING WORK
STATIONS ROOM
CONFERENCE
WOMEN
STORAGE
EXISTING OFFICE
JAN
EXIST. ELECT
EXIST. MEDIA
MEDIA
EXISTING WORK ROOM
EXIST. OFFICE
ELEVATOR
102STAIR
EXIST. STORAGE
PLUMBING SHEET DEMO NOTES:
1. UNLESS NOTED OTHERWISE, ALL MATERIAL
& EQUIPMENT SHOWN OR SPECIFIED TO BE
DEMOLISHED SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND
SHALL BE REMOVED FROM THE SITE AND
DISPOSED OF. R
A Y
M O
N D
TR
U E N
PLAN
NORTH
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :0
P
M
J O
B
O R
L .0
PD-102
02/24/2025
J. MCCAUSLAND
C. HANNING
C. SHEPPARD
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
TG
R
O U
N D
F L O
O R
P L U
M B
IN
G
D E
M O
L
IT
IO
N
P L A
N
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
3/16" = 1'-0"A1
PLUMBING DEMO SECOND FLOOR PLAN
SCALE:
0 4' 8' 12'
3/16" = 1'-0"
SHEET KEY NOTES
REMOVE EXISTING LAVATORY, TRIM AND STOP VALVES.
EXISTING ROUGH-IN TO BE ADJUSTED FOR NEW FIXTURE.
EXISTING WATER PIPING SHOWN IS BELOW THE FLOOR.
REMOVE EXISTING URINAL, TRIM, AND FLUSH VALVE.
EXISTING ROUGH-IN AND CARRIER TO BE ADJUSTED FOR
NEW FIXTURE.
REMOVE EXISTING WATER CLOSET, TRIM AND STOP VALVE.
EXISTING ROUGH-IN TO BE ADJUSTED FOR NEW FIXTURE.
EXISTING FLOOR DRAIN TO REMAIN. REMOVE GRATE FOR
REPLACEMENT AND ADJUST FOR ANY NEW FLOOR.
EXISTING 4" SANITARY DOWN. SEE PD101 FOR CONT.
EXISTING WATER PIPES (SERVING SECOND FLOOR FIXTURES)
IN FIRST FLOOR CEILING CONNECTION TO OTHER EXISTING
WATER PIPES SERVING FIRST FLOOR FIXTURES. SEE PD101
FOR CONT.
EXISTING VENT LINES SERVING SECOND FLOOR FIXTURES TO
REMAIN. CONTRACTOR TO VERIFY INTEGRATY OF THE VENT
LINES COMPLETE TO EXISTING VTR'S TO THE SYSTEM.
EXISTING 3" VENT FROM FIRST FLOOR TO REMAIN.
EXISTING WASTE PIPING AND WATER PIPING IS BELOW THE
FLOOR AND BASED ON AS BUILT DOCUMENTS, PHOTOS, AND
SITE VISIT. THE CONTRACTOR IS TO FIELD VERIFY PIPING
BEFORE STARTING WORK.
REMOVE EXISTING WATER COOLER AND REINSTALL IN NEW
WORK. SEE PW102 AND PP102 FOR NEW LOCATION.
REMOVE EXISTING WATER CLOSET, TRIM AND STOP VALVES.
EXISTING ROUGH-IN TO BE REMOVED.
W
GENERAL PLUMBING SHEET NOTES:
1. REFER TO P-001 FOR PLUMBING GENERAL NOTES,
ABBREVIATIONS, AND LEGENDS.
EXIST. INFORMATION
SERVICES MANAGER
OPEN OFFICE
EXIST. INFORMATION
SERVICES MANAGER
EXIST. INFORMATION
SERVICES MANAGER
EXIST. OFFICE SUPPLIES
EXIST. PAPER SUPPLIES
EXIST. INFORMATION
SERVICES MANAGER
EXIST. LARGE
CONFERENCE ROOM
EXIST. STAFF ASSISTANT
EXIST. SMALL
CONFERENCE
EXIST. DIRECTOR
EXIST. TECHNICAL
DIRECTOR
SUPPLIES
EXIST. DIRECTOR
EXIST. ASSISTANT
DIRECTOR
EXIST. APPLICATIONS
DIRECTOR
ELEVATOR EQUIPMENT
EXIST. ELEVATOR
102EXIST. VESTIBULE
WOMEN
EXIST. PAPER SUPPLIES
MEN
UNISEX
107A
EXIST. EMPLOYEE
LOUNGE
KITCHEN
EXIST. CORRIDOR
CORRIDOR
EXIST. VOID
EXIST. OFFICE SUPPLIES
JAN
CORRIDOR
EWH-1
FOR CONTINUATION
SEE PP-102
/2
C
W
/2
H
W
1/2" HW
L-1L-1
L-1 L-1
L-2
WC-2
WC-1
MS-1
4"FD-A
UR-2
1/2" CW 1/2" HW
L-2
WC-2
4"FD-A
3/4" HW
9WC-1
9 8
4"FD-A
4"FD-A
UR-1
UR-2
L-2
WC-2 3/4" CW
R A
Y M
O N
D
TR
U E N
PLAN
NORTH
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :1
P
M
J O
B
O R
L .0
PP-101
02/24/2025
J. MCCAUSLAND
C. HANNING
C. SHEPPARD
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
P L U
M B
IN
G
N E
W W
O R
K S
U P
P L Y
G R
O U
N D
F L O
O R
P L A
N
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
3/16" = 1'-0"A1
PLUMBING NEW WORK SUPPLY GROUND FLOOR PLAN
SCALE:
0 4' 8' 12'
3/16" = 1'-0"
2. CONTRACTOR TO ADJUST SPRINKLERS TO NEW
FLOOR PLAN
SHEET KEY NOTES
INSTALL NEW LAVATORY L-2, CHAIR CARRIER, FAUCET, STOP
VALVES, AND SUPPLIES. PIPING BELOW THE LAVATORY TO BE
COVERED WITH PROTECTIVE COVERINGS FOR ADA
INSTALLATION.
INSTALL NEW LAVATORY L-1, FAUCET, STOP VALVES, AND
SUPPLIES.
INSTALL NEW WATER CLOSET WC-1 OR WC-2, STOP VALVE,
AND SUPPLY LINE.
INSTALL NEW URINAL UR-1 OR UR-2, CHAIR CARRIER AND
FLUSH VALVE.
INSTALL NEW KITCHEN SINK SK-1, STOP VALVES, FAUCET,
SUPPLIES, AND CONNECTION OF DISH WASHER. ADJUST
EXISTING ROUGH-INS AS NEEDED FOR NEW SINK.
INSTALL NEW MOP SINK MS-1, FAUCET, HOSE, HOSE RACK,
AND MOP RACK.
INSTALL NEW ELECTRIC WATER HEATER EWH-1. EXPANSION
TANK, ISOLATION VALVES, AND EXTEND DISCHARGE PIPING
FROM THE RELIEF VALVE TO THE FLOOR DRAIN IN THE ROOM.
INSTALL TRAP PRIMER TO NEAREST COLD WATER LINE WITH
AN ISOLATION VALVE AND 1/2" DISCHARGE LINE TO
CONNECTION ON FLOOR DRAIN.
ADJUST EXISTING SPRINKLER HEADS AS NEEDED PER NFPA
13 TO COVER FLOOR PLAN CHANGES.
EXISTING WATER COOLER TO REMAIN.
EXISTING ISOLATION VALVE.
GENERAL PLUMBING SHEET NOTES:
1. REFER TO P-001 FOR PLUMBING GENERAL NOTES,
ABBREVIATIONS, AND LEGENDS.
EXIST. OFFICE
EXIST. SUPPLIES
EXISTING WORK
STATIONS ROOM
STOR
CONFERENCE
WOMEN
MEN
STORAGE
EXISTING OFFICE
JAN
EXIST. ELECT
EXIST. MEDIA
MEDIA
EXISTING WORK ROOM
EXIST. OFFICE
ELEVATOR
102STAIR
EXIST. STORAGE
(E) 1/2" CW
(E) 1/2" HW
(E) 1" CW
(E) 1/2" HW
(E) 1/2" CW
(E) 3/4" CW
1/2" CW
WC-1
WC-2
L-2
L-1
L-1
L-2
WC-2
L-1
UR-1
UR-2
1/2" CW
1/2" HW
MS-1
1/2" CW
1/2" HW
FOR CONTINUATION
SEE PP-102
1/2" HW
R A
Y M
O N
D
TR
U E N
PLAN
NORTH
G
E
C
A
F
D
B
H
1 3 5 7 92 4 6 8 10 11
T H
E I
N F
O R
M A
T
IO
N C
O N
T A
IN
T H
IS
D
R A
W
IN
G I
S T
E L
L E
C T
U A
L A
N D
P H
Y S
IC
A
L
C O
P Y
R
IG
H T
P R
O P
E R
T Y
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A N
D M
A Y
N
D U
P L
IC
A
T E
D I
N P
A R
T O
R
O L
E I
N A
N Y
M A
N N
L U
D
IN
G I
M A
G
IN
G
E L
E C
T R
O N
IC
S
C A
N N
IN
G
A P
H
IC
R E
P R
O D
U C
T
IO
N
N D
T R
A N
S F
E R
E
W
IT
H O
E E
X P
R E
S S
W R
IT
T
R M
IS
S
IO
N
O F
T H
E A
U T
H O
R
R A
Y M
O N
D E
N G
IN
E
E R
IN
G
G E
O R
G
IA
I N
C
A L
L R
IG
H
S E
R V
E D
Y
E A
R A
S D
A T
E D
R A
Y M
O N
D P
R O
J E
C T
N O
C
O P
Y R
IG
H
T
G
R E
E N
S T
R E
E T
S E
S
U
IT
E A
C O
N Y
E R
S G
E O
R G
IA
-6
-2
R a ym o n d
E n g in ee ri n g
G eo rg ia
, I N
C
SHEET NO.:
OF
SHEETS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SUBMITTED BY:
ISSUE DATE:
P R
O J E
C T
T
IT
L E
P R
O J E
C T
A D
D R
E S
S
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
S T
A T
U S
S H
E E
T T
IT
L E
C O
N T
R A
C T
N O
R E
V
IS
IO
N
S
D E
S C
R
IP
T
IO
N D
A T
E R
E V
1234567
F ile
P a th
X
F
Y \1
\0
.C
A D
B
IM
\0 .0
.B
IM
P lo t D a te
/2
/2
:5 :1
P
M
J O
B
O R
L .0
PP-102
02/24/2025
J. MCCAUSLAND
C. HANNING
C. SHEPPARD
C. HANNING
R S
Q N o .2
-S
Q -1
L L
P R
O J N o P
C
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
P L U
M B
IN
G
N E
W W
O R
K S
U P
P L Y
S E
C O
N D
F L O
O R
P L A
N
W
E S
T I N
D
IA
N A
A V
E N
U E
D E
L A
N D
F
L
D E
L A
N D
I T
R E
S T
R O
O M
E N
E R
G Y
C O
N S
E R
V
M E
A S
U R
E S
B
ID
A N
D C
O N
S T
R U
C T
IO
N
S E
T
3/16" = 1'-0"A1
PLUMBING NEW WORK SUPPLY SECOND FLOOR PLAN
SCALE:
0 4' 8' 12'
3/16" = 1'-0"
2. CONTRACTOR TO ADJUST SPRINKLERS TO NEW
FLOOR PLAN
SHEET KEY NOTES
INSTALL NEW LAVATORY L-2, CHAIR CARRIER, FAUCET, STOP
VALVES, AND SUPPLIES. PIPING BELOW THE LAVATORY TO BE
COVERED WITH PROTECTIVE COVERINGS FOR ADA
INSTALLATION. ADJUST EXISTING ROUGH-IN AS NEEDED FOR
NEW FIXTURE.
INSTALL NEW LAVATORY L-1, FAUCET, STOP VALVES, AND
SUPPLIES. ADJUST EXISTING ROUGH-IN AS NEEDED FOR NEW
FIXTURE.
INSTALL NEW WATER CLOSET WC-1 OR WC-2, STOP VALVE,
AND SUPPLY LINE.
INSTALL NEW URINAL UR-1 OR UR-2, CHAIR CARRIER AND
FLUSH VALVE.
INSTALL NEW LAVATORY L-2, CHAIR CARRIER, FAUCET, STOP
VALVES, AND SUPPLIES. PIPING BELOW THE LAVATORY TO BE
COVERED WITH PROTECTIVE COVERINGS FOR ADA
INSTALLATION.
INSTALL NEW MOP SINK MS-1, FAUCET, HOSE, HOSE RACK,
AND MOP RACK.
INSTALL NEW WATER CLOSET WC-1 OR WC-2, STOP VALVE,
AND SUPPLY LINE. ADJUST EXISTING ROUGH-IN AS NEEDED.
INSTALL TRAP PRIMER TO NEAREST COLD WATER LINE WITH
AN ISOLATION VALVE AND 1/2" DISCHARGE LINE TO
CONNECTION ON EXISTING FLOOR DRAIN.
ADJUST EXISTING SPRINKLER HEADS AS NEEDED PER NFPA
13 TO COVER FLOOR PLAN CHANGES.
REINSTALL EXISTING WATER COOLER, NEW STOP VALVE, AND
NEW CHAIR CARRIER.
INSTALL NEW URINAL UR-2, CHAIR CARRIER AND FLUSH
VALVE. ADJUST EXISTING ROUGH-IN AS NEEDED.
W
EXIST. INFORMATION
SERVICES MANAGER
OPEN OFFICE
EXIST. INFORMATION
SERVICES MANAGER
EXIST. INFORMATION
SERVICES MANAGER
EXIST. OFFICE SUPPLIES
EXIST. PAPER SUPPLIES
EXIST. INFORMATION
SERVICES MANAGER
EXIST. LARGE
CONFERENCE ROOM
EXIST. STAFF ASSISTANT
EXIST. SMALL
CONFERENCE
EXIST. DIRECTOR
EXIST. TECHNICAL
DIRECTOR
SUPPLIES
EXIST. DIRECTOR
EXIST. ASSISTANT
DIRECTOR
EXIST. APPLICATIONS
DIRECTOR
ELEVATOR EQUIPMENT
EXIST. ELEVATOR
102EXIST. VESTIBULE
WOMEN
EXIST. PAPER SUPPLIES
MEN
UNISEX
107A
EXIST. EMPLOYEE
LOUNGE
KITCHEN
EXIST. CORRIDOR
CORRIDOR
EXIST. VOID
EXIST. OFFICE SUPPLIES
Room
JAN
CORRIDOR
FCO
4" S
S
S
4" S
2" V
2" S
2" S
2" S 2"V
4" S
FCO
S
S
2" S
S
4"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .