Vol 2-Specs.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25621R0112
About this file
This federal contract synopsis announces a requirement for construction services to replace the roof and HVAC system for Building 3 at the Alexandria VA Health Care System in Pineville, Louisiana. The project number is 502-19-102 and has an estimated construction cost range of $5-10 million. The NAICS code for this opportunity is 236220. The solicitation will be issued on or around June 15, 2021 as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses using full and open competition procedures. Interested SDVOSBs must be registered in the Vendor Information Pages VIP database and System for Award Management SAM by the response date. The solicitation will be available for download on SAM.gov and amendments posted there. The point of contact is Jennings.Herbst@va.gov and awarding contracting officer is Gina.Roach@va.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25621R0112 0001.docx | DOCX document | |
| BLDG 3 Site Visit Information.pdf | ||
| WDLA202110051 04302021.txt | TXT text file | |
| 36C25621R0112.docx | DOCX document | |
| EXHIBIT F REQUEST FOR INFORMATION FORM.docx | DOCX document | |
| ACM and LeadReports.pdf | ||
| Drawings volume 2.pdf | ||
| Drawings Volume 1.pdf | ||
| EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx | DOCX document | |
| EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| EXHIBIT E SURETY FORM.docx | DOCX document | |
| J_A 502-19-102 (BC Signed) v1_Redacted.pdf | ||
| EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx | DOCX document | |
| EXHIBIT G RETURNABLES.docx | DOCX document | |
| Vendor Request Form.xlsx | XLSX spreadsheet | |
| Vol 1-Specs v2.pdf | ||
| Project Risk Assessment Replace Roof and HVAC building 3.pdf | ||
| EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx | DOCX document | |
| VA10091 FMS Vendor Request Form EFT.pdf | ||
| SOW-04052021.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 3 – Replace Roof and HVAC at the
Alexandria VA Medical Center Alexandria, Louisiana
Final Design Submittal Specifications - Vol. 2
12 February 2021 Project Number: 502-19-102
Building 3 – Replace Roof & HVAC, Project No. 502-19-102 12-01-20 Alexandria VAMC, Alexandria, LA
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 03-20 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 09-19 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 09-20 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 04-19
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 07-19
DIVISION 04 – MASONRY
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
00 01 10-2
07 01 50.19 Preparation for Re-Roofing 02-16 07 22 00 Roof and Deck Insulation 02-16 07 32 13 Clay Roof Tiles & Shingles 02-16 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16 07 60 00 Flashing and Sheet Metal 07-14 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 51 13 Aluminum Windows 02-16 08 71 00 Door Hardware 10-19 08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 23 00 Gypsum Plastering 10-15 09 24 00 Portland Cement Plastering 10-15 09 29 00 Gypsum Board 06-18 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16 09 65 19 Resilient Tile Flooring 05-18 09 68 00 Carpeting 10-15 09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components 01-14
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16
00 01 10-3
22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 11-19 22 13 00 Facility Sanitary and Vent Piping 09-15 22 33 00 Electric Domestic Water Heaters 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 08-17
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 08-17 23 21 23 Hydronic Pumps 08-17 23 22 13 Steam and Condensate Heating Piping 08-17 23 22 23 Steam Condensate Pumps 08-17 23 25 00 HVAC Water Treatment 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 37 00 Air Outlets and Inlets 02-15 23 40 00 HVAC Air Cleaning Devices 02-12 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 82 16 Air Coils 04-11
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 24 16 Panelboards 01-18 26 29 11 Motor Controllers 26 29 21 Enclosed Switches and Circuit Breakers 01-17
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
00 01 10-4
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
*** END ***
Building 3 – Replace Roof & HVAC, Project No. 502-19-102 08-01-16
09 51 00 - 1
SECTION 09 51 00
ACOUSTICAL CEILINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Acoustical units to match existing.
2. Metal ceiling suspension system for acoustical ceilings to match existing.
1.2 RELATED REQUIREMENTS
A. Color, pattern, and location of each type of acoustical unit: Section
09 06 00, SCHEDULE FOR FINISHES.
B. Access doors in adhesive applied tile: Section 08 31 13, ACCESS DOORS
AND FRAMES.
C. Ceiling Suspension System: Section 09 22 16, NON-STRUCTURAL METAL
FRAMING.
D. Lay in gypsum board ceiling panels: Section 09 29 00, GYPSUM BOARD.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. A641/A641M-09a(2014) - Zinc-coated (Galvanized) Carbon Steel Wire.
2. A653/A653M-15e1 - Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron
Alloy-coated (Galvannealed) by the Hot-Dip Process.
3. C423-09a - Sound Absorption and Sound Absorption Coefficients by the
Reverberation Room Method.
4. C634-13 - Terminology Relating to Environmental Acoustics.
5. C635/C635M-13a - Manufacture, Performance, and Testing of Metal
Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings.
6. C636/C636M-13 - Installation of Metal Ceiling Suspension Systems for
Acoustical Tile and Lay-in Panels.
7. D1779-98(2011) - Adhesive for Acoustical Materials.
8. E84-15b - Surface Burning Characteristics of Building Materials.
9. E119-16 - Fire Tests of Building Construction and Materials.
10. E413-16 - Classification for Rating Sound Insulation.
11. E580/E580M-14 - Installation of Ceiling Suspension Systems for
Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake
Ground Motions.
12. E1264-14 - Classification for Acoustical Ceiling Products.
C. International Organization for Standardization (ISO):
09 51 00 - 2
1. ISO 14644-1 - Classification of Air Cleanliness.
1.4 PREINSTALLATION MEETINGS
A. Conduct preinstallation meeting at project site minimum 30 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Architect/Engineer.
c. VA Interior Designer.
d. Contractor.
e. Installer.
f. Other installers responsible for adjacent and intersecting work, including fire protection, HVAC and lighting installers.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Installation schedule.
b. Installation sequence.
c. Preparatory work.
d. Protection before, during, and after installation.
e. Installation.
f. Terminations.
g. Transitions and connections to other work.
h. Inspecting and testing.
i. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.5 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Ceiling suspension system indicating manufacturer recommendation for each application.
3. Installation instructions.
4. Warranty.
D. Samples:
09 51 00 - 3
1. Acoustical units, 150 mm (6 inches) in size, each type, including units specified to match existing.
a. Submit quantity required to show full color and texture range.
2. Suspension system, trim and molding, 300 mm (12 inches) long.
3. Colored markers for access service.
4. Approved samples may be incorporated into work.
E. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
2. Biobased Content:
a. Show type and quantity for each product.
b. Show volatile organic compound types and quantities.
F. Certificates: Certify each product complies with specifications.
1. Acoustical units, each type.
G. Qualifications: Substantiate qualifications comply with specifications.
1. Manufacturer with project experience list.
H. Operation and Maintenance Data:
1. Care instructions for each exposed finish product.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Regularly manufactures specified products.
2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.
a. Project Experience List: Provide contact names and addresses for completed projects.
1.7 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.8 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight, conditioned facility.
B. Protect products from damage during handling and construction operations.
1.9 FIELD CONDITIONS
A. Environment:
09 51 00 - 4
1. Product Temperature: Minimum 21 degrees C (70 degrees F) for minimum
48 hours before installation.
2. Work Area Ambient Conditions: HVAC systems are complete, operational, and maintaining facility design operating conditions continuously, beginning 48 hours before installation until
Government occupancy.
3. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.
1.10 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 SYSTEM DESCRIPTION
A. Ceiling System: Acoustical ceilings units on exposed concealed grid suspension systems.
2.2 SYSTEM PERFORMANCE
A. Design product complying with specified performance:
1. Maximum Deflection: 1/360of span, maximum.
B. Fire Resistance: ASTM E119; as component of a rated floor-ceiling assembly.
C. Surface Burning Characteristics: When tested according to ASTM E84.
1. Flame Spread Rating: 25 maximum.
2. Smoke Developed Rating: 450 maximum.
2.3 PRODUCTS - GENERAL
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide acoustical units from one manufacturer.
1. Provide each product exposed to view from one production run.
C. Provide suspension system from same manufacturer to match existing.
1. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:
a. Non-flooring adhesives and sealants.
2.4 ACOUSTICAL UNITS
A. General:
1. Ceiling Panel and Tile: ASTM E1264, bio-based content according to
USDA Bio-Preferred Product requirements.
a. Mineral Fiber: 3.6 kg/sq. m (3/4 psf) weight, minimum.
09 51 00 - 5
2. Classification: Provide type and form as follows:
a. Type III Units - Mineral base with water-based painted finish maximum 10 g/l VOC; Form 2 - Water felted, minimum 16 mm
(5/8 inch) thick.
b. NRC (Noise Reduction Coefficient): ASTM C423, minimum 0.55.
c. CAC (Ceiling Attenuation Class): ASTM E413, 40-44 range.
d. LR (Light Reflectance): Minimum 0.75.
e. Humidity resistant
3. Lay-in panels: Sizes as indicated on Drawings, with edges to match existing.
a. Sizes:
1) Edge and Joint Detail: To match existing edges and joints as required to suit suspension and access system.
2.5 METAL SUSPENSION SYSTEM
A. General: ASTM C635, to match existing, except as otherwise specified.
1. Suspension System: Provide the following:
a. Galvanized cold-rolled steel, bonderized.
b. Extruded aluminum.
2. Main and Cross Runner: Use same construction Do not use lighter-duty sections for cross runners.
B. Exposed Grid Suspension System: Support of lay-in panels.
1. Grid Width: 22 mm (7/8 inch) minimum with8 mm (5/16 inch) minimum panel bearing surface.
2. Molding: Fabricate from the same material with same exposed width and finish.
3. Finish: Baked-on enamel flat texture finish.
a. Color: To match adjacent acoustical units unless specified otherwise in Section 09 06 00, SCHEDULE FOR FINISHES.
C. Concealed Grid Suspension System: Mineral base acoustical tile support.
1. Concealed grid upward access suspension system initial opening, 300 mm by 600 mm (12 by 24 inches).
2. Flange Width: 22 mm (7/8 inch) minimum except:
a. Access Hook and Angle: 11 mm (7/16 inch) minimum.
D. Anchors and Inserts: Provide anchors or inserts to support twice the loads imposed by hangers.
1. Hanger Inserts: Steel, zinc-coated (galvanized after fabrication).
a. Nailing type option for wood forms:
09 51 00 - 6
1) Upper portion designed for anchorage in concrete and positioning lower portion below surface of concrete approximately 25 mm (one inch).
2) Lower portion provided with minimum 8 mm (5/16 inch) hole to permit attachment of hangers.
b. Flush ceiling insert type:
1) Designed to provide a shell covered opening over a wire loop to permit attachment of hangers and keep concrete out of insert recess.
2) Insert opening inside shell approximately 16 mm (5/8 inch) wide by 9 mm (3/8 inch) high over top of wire.
3) Wire 5 mm (3/16 inch) diameter with length to provide positive hooked anchorage in concrete.
E. Clips: Galvanized steel, designed to secure framing member in place.
F. Tile Splines: ASTM C635.
G. Wire: ASTM A641.
1. Size:
a. Wire Hangers: Minimum diameter 2.68 mm (0.1055 inch).
b. Bracing Wires: Minimum diameter 3.43 mm (0.1350 inch).
2.6 ACCESSORIES
A. Adhesives: Low pollutant-emitting, water-based type recommended by adhered product manufacturer for each application.
B. Perimeter Seal: Vinyl, polyethylene or polyurethane open cell sponge material, density of 1.3 plus or minus 10 percent, compression set less than 10 percent with pressure sensitive adhesive coating on one side.
1. Thickness: As required to fill voids between back of wall molding and finish wall.
2. Size: Minimum 9 mm (3/8 inch) wide strip.
C. Access Identification Markers: Colored markers with pressure sensitive adhesive on one side, paper or plastic, 6 to 9 mm (1/4 to 3/8 inch) diameter.
1. Color Code: Provide the following color markers for service identification:
Color Service
Red Sprinkler System: Valves and Controls
Green Domestic Water: Valves and Controls
Yellow Chilled Water and Heating Water
09 51 00 - 7
Color Service
Orange Ductwork: Fire Dampers
Blue Ductwork: Dampers and Controls
Black Gas: Laboratory, Medical, Air and Vacuum
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Remove existing acoustical panels and suspension system to permit new installation.
1. Dispose of other removed materials.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
3.3 ACOUSTICAL UNIT INSTALLATION
A. Applications:
1. Cut acoustic units for perimeter borders and penetrations to fit tight against penetration for joint not concealed by molding.
B. Layout acoustical unit symmetrically, with minimum number of joints.
C. Installation:
1. Install acoustic tiles after wet finishes have been installed and solvents have cured.
2. Install lay-in acoustic panels in exposed grid with minimum 6 mm
(1/4 inch) bearing at edges on supports.
a. Install tile to lay level and in full contact with exposed grid.
b. Replace cracked, broken, stained, dirty, or tile.
3. Tile in concealed grid upward access suspension system:
a. Install acoustical tile with joints close, straight and true to line, and with exposed surfaces level and flush at joints.
b. Make corners and arises full, and without worn or broken places.
c. Locate acoustical units providing access to service systems.
4. Adhesive applied tile:
a. Condition of surface according to ASTM D1779, Note 1, Cleanliness of Surface, and Note 4, Rigidity of Base Surface.
09 51 00 - 8
b. Size or seal surface as recommended by manufacturer of adhesive and allow to dry before installing units.
5. Markers:
a. Install color coded markers to identify the various concealed piping, mechanical, and plumbing systems.
b. Attach colored markers to exposed grid on opposite sides of the units providing access.
c. Attach marker on exposed ceiling surface of upward access acoustical unit.
D. Touch up damaged factory finishes.
1. Repair painted surfaces with touch up primer.
3.4 CEILING SUSPENSION SYSTEM INSTALLATION
A. General: Install according to ASTM C636.
1. Use direct or indirect hung suspension system or combination of both.
2. Support a maximum area of 1.48 sq. m (16 sq. ft.) of ceiling per hanger.
3. Prevent deflection in excess of 1/360 of span of cross runner and main runner.
4. Provide additional hangers located at each corner of support components.
5. Provide minimum 100 mm (4 inch) clearance from the exposed face of the acoustical units to the underside of ducts, pipe, conduit, secondary suspension channels, concrete beams or joists; and steel beam or bar joist unless furred system is shown.
6. Provide main runners minimum 1200 mm (48 inches) in length.
7. Install hanger wires vertically. Angled wires are not acceptable except for seismic restraint bracing wires.
B. Direct Hung Suspension System: ASTM C635.
1. Support main runners by hanger wires attached directly to the structure overhead.
2. Maximum spacing of hangers, 1200 mm (4 feet) on centers unless interference occurs by mechanical systems. Use indirect hung suspension system where not possible to maintain hanger spacing.
C. Anchorage to Structure:
1. Concrete:
a. Install hanger inserts and wire loops required for support of hanger and bracing wire. Install hanger wires with looped ends
09 51 00 - 9 through steel deck when steel deck does not have attachment device.
b. Use eye pins or threaded studs with screw-on eyes in existing or already placed concrete structures to support hanger and bracing wire. Install in sides of concrete beams or joists at mid height.
2. Steel:
a. Install carrying channels for attachment of hanger wires.
1) Size and space carrying channels to support load within performance limit.
2) Attach hangers to steel carrying channels, spaced four feet on center, unless area supported, or deflection exceeds the amount specified.
b. Attach carrying channels to the bottom flange of steel beams spaced not 1200 mm (4 feet) on center before fireproofing is installed. Weld or use steel clips for beam attachment.
c. Attach hangers to bottom chord of bar joists or to carrying channels installed between the bar joists when hanger spacing prevents anchorage to joist. Rest carrying channels on top of the bottom chord of the bar joists, and securely wire tie or clip to joist.
D. Indirect Hung Suspension System: ASTM C635.
1. Space carrying channels for indirect hung suspension system maximum
1200 mm (4 feet) on center. Space hangers for carrying channels maximum 2400 mm (8 feet) on center or for carrying channels less than 1200 mm (4 feet) or center so as to ensure that specified requirements are not exceeded.
2. Support main runners by specially designed clips attached to carrying channels.
E. Seismic Ceiling Bracing System:
1. Install according to ASTM E580.
2. Connect bracing wires to structure above as specified for anchorage to structure and to main runner or carrying channels of suspended ceiling at bottom.
3.5 CEILING TREATMENT
A. Moldings:
1. Install metal wall molding at perimeter of room, column, or edge at vertical surfaces.
09 51 00 - 10
2. Install special shaped molding at changes in ceiling heights and at other breaks in ceiling construction to support acoustical units and to conceal their edges.
B. Perimeter Seal:
1. Install perimeter seal between vertical leg of wall molding and finish wall, partition, and other vertical surfaces.
2. Install perimeter seal to finish flush with exposed faces of horizontal legs of wall molding.
C. Existing ceiling:
1. Where extension of existing ceilings occurs, match existing.
2. Where acoustical units are salvaged and reinstalled or joined, use salvaged units within a space. Do not mix new and salvaged units within a space which results in contrast between old and new acoustic units.
3. Comply with specifications for new acoustical units for new units required to match appearance of existing units.
3.6 CLEANING
A. Clean exposed surfaces. Remove contaminants and stains.
- - - E N D - - -
Building 3 – Replace Roof & HVAC, Project No. 502-19-102 02-01-16
09 65 13 - 1
SECTION 09 65 13
RESILIENT BASE AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes the following to match existing finishes where new work occurs:
1. Resilient base (RB) adhered to interior walls and partitions.
2. Resilient stair treads (RST) adhered to interior stair treads.
3. Sheet rubber flooring (SRF) adhered to interior stair landings.
1.2 RELATED REQUIREMENTS
A. Rubber Tile Flooring at Landings: Section 09 65 19, RESILIENT TILE
FLOORING.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. F1344-15 - Rubber Floor Tile.
2. F1859-14 - Rubber Sheet Floor Covering without Backing.
3. F1860-14 - Rubber Sheet Floor Covering with Backing.
4. F1861-08(2012) e1 - Resilient Wall Base.
5. D4259-88(2012) - Abrading Concrete.
C. Federal Specifications (Fed. Spec.):
1. RR-T-650E - Treads, Metallic and Non-Metallic, Skid-Resistant.
D. International Concrete Repair Institute (ICRI):
1. 310.2R-13 - Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Adhesives and primers indicating manufacturer's recommendation for each application.
3. Installation instructions.
C. Samples:
1. Resilient Base: 150 mm (6 inches) long, each type and color.
2. Resilient Stair Treads: 150 mm (6 inches) long, each type and color.
3. Sheet Rubber Flooring: 300 mm (12 inches) square, each type and color.
09 65 13 - 2
D. Sustainable Construction Submittals:
1. Low Pollutant-Emitting Materials:
a. Stair Treads and Sheet Rubber Flooring: Submit FloorScore label.
b. Show volatile organic compound types and quantities.
E. Operation and Maintenance Data:
1. Care instructions for each exposed finish product.
1.5 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.6 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage when handling and during construction operations.
1.7 FIELD CONDITIONS
A. Environment:
1. Product Temperature: Minimum 21 degrees C (70 degrees F) for minimum
48 hours before installation.
2. Work Area Ambient Temperature Range: 21 to 27 degrees C (70 to
80 degrees F) continuously, beginning 48 hours before installation.
3. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.
1.8 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 PRODUCTS
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide each product from one manufacturer and from one production run.
C. Provide resilient stair treads and sheet rubber flooring from same manufacturer.
D. Sustainable Construction Requirements:
09 65 13 - 3
1. Sheet Rubber Flooring Recycled Content: 90 percent total recycled content, minimum.
2. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:
a. Flooring Adhesives and Sealants.
2.2 RESILIENT BASE
A. Resilient Base: To match existing. 3 mm (1/8 inch) thick, 100 mm
(4 inches) high.
1. Type: Rubber or vinyl; to match existing base.
2. ASTM F1861, Type TP thermoplastic rubber or Type TV thermoplastic vinyl, Group 2 - layered.
B. Applications:
1. Carpet Flooring Locations: Style A - Straight.
2. Other Locations: Style B - Cove.
2.3 RESILIENT STAIR TREADS
A. Resilient Stair Treads: To match existing. Rubber, skid-resistant abrasive strip nosing, 5 mm (3/16 inch) thick nosing wear surface tapered to 3 mm (1/8 inch) thick at riser.
1. Fed. Spec. RR-T-650, Composition A, Type 2.
2. Abrasive Strips: Design for access by visually impaired.
3. Nosing: Flexible, accommodating angle between tread and riser; shape suiting sub-tread.
4. Size: Single piece full stair tread width and depth.
2.4 SHEET RUBBER FLOORING
A. Sheet Rubber Flooring (SRF): To match existing. ASTM F1859 or
ASTM F1860; Rubber, 900 mm (36 inches) wide, 3 mm (1/8 inch) thick, smooth face; color and pattern matching resilient stair treads.
2.5 PRIMER (FOR CONCRETE FLOORS)
A. Primer: Type recommended by adhesive manufacturer.
2.6 LEVELING COMPOUND (FOR CONCRETE FLOORS)
A. Leveling Compound: Provide products mixed with latex or polyvinyl acetate resins.
2.7 ADHESIVES
A. Adhesives: Low pollutant-emitting, water-based type recommended by adhered product manufacturer for each application.
09 65 13 - 4
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Remove existing base, landing flooring as necessary to permit new installation.
1. Dispose of removed materials.
D. Correct substrate deficiencies.
1. Fill cracks, pits, and depressions with leveling compound.
2. Remove protrusions; grind high spots.
3. Apply leveling compound to achieve 3 mm (1/8 inch) in 3 m (10 feet) maximum surface variation.
E. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.
1. Mechanically clean concrete floor substrate according to ASTM D4259.
2. Surface Profile: ICRI Guideline No. 310.2R.
F. Allow substrate to dry and cure.
G. Perform flooring manufacturer’s recommended bond, substrate moisture content, and pH tests.
3.2 INSTALLATION GENERAL
A. Install products according to manufacturer's instructions.
1. When instructions deviate from specifications, submit proposed resolution for Contracting Officer consideration.
3.3 RESILIENT BASE INSTALLATION
A. Applications:
1. Install resilient base in rooms scheduled on Drawings to match existing conditions where repairs are being made.
2. Install resilient base on casework, and locker toe spaces, and other curb supported fixed equipment.
3. Extend resilient base into closets, alcoves, and cabinet knee spaces, and around columns within scheduled room.
B. Lay out resilient base with minimum number of joints.
1. Length: 600 mm (24 inches) minimum, each piece.
2. Locate joints 150 mm (6 inches) minimum from corners and intersection of adjacent materials.
C. Installation:
1. Apply adhesive uniformly for full contact between resilient base and substrate.
09 65 13 - 5
2. Set resilient base with hairline butted joints aligned along top edge.
D. Factory form corners and end stops.
1. V-groove back of outside corner.
2. V-groove face of inside corner and notch cove for miter joint.
E. Roll resilient base ensuring complete adhesion.
3.4 RESILIENT STAIR TREAD INSTALLATION
A. Install resilient stair treads without joints on each stair tread substrate.
1. Install full width resilient stair treads on each intermediate and floor landing.
B. Apply adhesive uniformly for full contact between resilient stair tread and substrate.
1. Roll resilient stair treads ensuring complete adhesion.
3.5 SHEET RUBBER FLOORING INSTALLATION
A. Applications:
1. To match existing. Install sheet rubber flooring on intermediate and floor landings where resilient stair treads are installed.
B. Lay out sheet rubber flooring symmetrically, with minimum number of joints.
1. Locate floor landing joints centered under doors.
C. Installation:
1. Apply adhesive uniformly for full contact between sheet rubber flooring and substrate.
2. Install sheet rubber flooring with 1 mm (0.04 inch) maximum width seams, perimeter joints, and joints with adjacent flooring.
a. Scribe sheet rubber flooring tight to interrupting surfaces.
3. Roll sheet rubber flooring ensuring complete adhesion.
3.6 CLEANING
A. Remove excess adhesive before adhesive sets.
B. Clean exposed resilient base, resilient stair treads, and sheet rubber flooring surfaces. Remove contaminants and stains.
1. Clean with mild detergent. Leave surfaces free of detergent residue.
C. Polish exposed resilient base to gloss sheen.
3.7 PROTECTION
A. Prohibit traffic on resilient stair treads and sheet rubber flooring 72 hours, minimum, after installation.
B. Protect products from construction traffic and operations.
09 65 13 - 6
1. Cover resilient stair treads and sheet rubber flooring with reinforced kraft paper, and plywood or hardboard.
2. Maintain protection until directed by Contracting Officer's
Representative.
C. Replace damaged products and re-clean.
1. Damaged Products include cut, gouged, scraped, torn, and unbonded products.
- - E N D - -
Building 3 – Replace Roof & HVAC, Project No. 502-19-102 12-01-15
09 65 19 - 1
SECTION 09 65 19
RESILIENT TILE FLOORING
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies the installation of solid vinyl tile flooring, luxury vinyl tile, vinyl composition tile, rubber tile, linoleum tile and accessories required for a complete installation to match existing resilient tile flooring.
1.2 RELATED WORK:
A. Sustainable Design Requirements: Section 01 81 13, SUSTAINABLE
CONSTRUCTION REQUIREMENTS.
B. Removal of Existing Construction Containing Asbestos:
Section 02 82 13.19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.
C. Color, Pattern and Texture for Resilient Tile Flooring and Accessories:
Section 09 06 00, SCHEDULE FOR FINISHES and Finish Schedule.
1.3 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Sustainable Design Submittals as described below:
1. Volatile organic compounds per volume as described in
PART 2 - PRODUCTS.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Resilient material manufacturer’s recommendations for adhesives, underlayment, primers, and polish.
3. Application, installation and maintenance instructions.
D. Samples:
1. Tile: Each type, color, thickness and finish.
2. Edge Strips: Each type, color, thickness and finish.
3. Feature Strips: Each type, color, thickness and finish.
E. Shop Drawings:
1. Layout of patterns as shown on the construction documents.
2. Edge strip locations showing types and detail cross sections.
F. Test Reports:
1. Abrasion resistance: Depth of wear for each tile type and color and volume loss of tile, certified by independent laboratory. Tested per
ASTM F510/F510M.
2. Moisture and pH test results as per Section 09 05 16, SUBSURFACE
PREPARATION FOR FLOOR FINISHES.
09 65 19 - 2
1.4 DELIVERY:
A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.
B. Materials from containers which have been distorted, damaged or opened prior to installation are not acceptable.
1.5 STORAGE:
A. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives, and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.
1.6 QUALITY ASSURANCE:
A. Installer Qualifications: A company specializing in installation with minimum three (3) years’ experience and employs experienced flooring installers who have retained, and currently hold, an INSTALL
Certification, or a certification from a comparable certification program.
1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:
a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.
b. Career long training.
c. Manufacturer endorsed training.
d. Fundamental journeyman skills certification.
B. Furnish product type materials from the same production run.
1.7 WARRANTY:
A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of
Construction”.
1.8 APPLICABLE PUBLICATIONS:
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. ASTM International (ASTM):
D2047-11................Test Method for Static Coefficient of Friction of Polish-Coated Flooring Surfaces as Measured by the James Machine
09 65 19 - 3
D2240-05(R2010).........Test Method for Rubber Property—Durometer
Hardness
D4078-02(R2008).........Water Emulsion Floor Finish
E648-14c................Critical Radiant Flux of Floor Covering Systems
Using a Radiant Energy Source
E662-14.................Specific Optical Density of Smoke Generated by
Solid Materials
E1155/E1155M-14.........Determining Floor Flatness and Floor Levelness
Numbers
F510/F510M-14...........Resistance to Abrasion of Resilient Floor
Coverings Using an Abrader with a Grit Feed
Method
F710-11.................Preparing Concrete Floors to Receive Resilient
Flooring
F925-13.................Test Method for Resistance to Chemicals of
Resilient Flooring
F1066-04(R2014).........Vinyl Composition Floor Tile
F1344-12(R2013).........Rubber Floor Tile
F1700-13a...............Solid Vinyl Floor Tile
F1869-11................Test Method for Measuring Moisture Vapor
Emission Rate of Concrete Subfloor Using
Anhydrous Calcium Chloride
F2170-11................Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in Situ Probes
F2195-13................Linoleum Floor Tile
C. Code of Federal Regulation (CFR):
40 CFR 59...............Determination of Volatile Matter Content, Water
Content, Density Volume Solids, and Weight
Solids of Surface Coating
D. International Standards and Training Alliance (INSTALL):
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS:
A. Provide adhesives, underlayment, primers, and polish recommended by resilient floor material manufacturer.
B. Critical Radiant Flux: 0.45 watts per sq. cm or more, Class I, per
ASTM E648.
C. Smoke Density: Less than 450 per ASTM E662.
D. Slip Resistance – Not less than 0.5 when tested with ASTM D2047.
09 65 19 - 4
2.2 RUBBER TILE:
A. Tile Standard: ASTM F1344, to match existing.
B. Hardness: Not less than 85 as required by ASTM F1344.
C. Wearing Surface: To match existing.
D. Thickness: To match existing.
E. Size: To match existing.
2.3 LINOLEUM TILE:
A. ASTM F2195.
B. Tile to consist of a homogeneous layer of a mixture of linoleum cement
(binder in linoleum consisting of a mixture of linseed oil, pine rosin, fossil, or other resins or rosins, or an equivalent oxidized oleoresinous binder), cork and/or wood flour, mineral fillers, and pigments bonded to a polyester backing.
2.4 VINYL COMPOSITION TILE:
A. Tile Standard: ASTM F1066, Class 2, through-pattern tile.
B. Wearing Surface: To match existing.
C. Thickness: To match existing.
D. Size: 305 x 305 mm (12 x 12 inches).
E. Slip Resistant.
2.5 SOLID VINYL-TILE:
A. Tile Standard: ASTM F1700.
1. Class: Class I, monolithic vinyl tile.
2. Type: To match existing.
B. Thickness: To match existing.
C. Size: To match existing.
2.6 LUXURY VINYL TILE:
A. ASTM F1700, Class III, Printed Film Vinyl Tile, Type A.
B. Thickness: 12 mil (1/8 inch).
C. Size: To match existing.
2.7 ADHESIVES:
A. Provide water resistant type adhesive for flooring, base and accessories as recommended by the manufacturer to suit substrate conditions. VOC content to be less than the 50 grams/L when calculated according to 40 CFR 59 (EPA Method 24). Submit manufacturer’s descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.
2.8 PRIMER FOR CONCRETE SUBFLOORS:
A. Provide in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR
FLOOR FINISHES.
09 65 19 - 5
2.9 LEVELING COMPOUND FOR CONCRETE FLOORS:
A. Provide cementitious products with latex or polyvinyl acetate resins in the mix in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR
FLOOR FINISHES.
2.10 POLISH AND CLEANERS:
A. Cleaners: As recommended in writing by floor tile manufacturer.
B. Polish: ASTM D4078.
2.11 MOULDING:
A. Provide tapered mouldings of materials and types to match existing for both edges and transitions of flooring materials. Provide vertical lip on moulding of maximum 6 mm (1/4 inch). Provide bevel change in level between 6 and 13 mm (1/4 and 1/2 inch) with a slope no greater than
1:2.
B. Fasteners for Aluminum Mouldings: Stainless steel of type required for substrate condition.
PART 3 - EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS:
A. Maintain flooring materials and areas to receive resilient flooring at a temperature above 20 degrees C (68 degrees F) for three (3) days before application, during application and two (2) days after application, unless otherwise directly by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 13 degrees C (55 degrees F) thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
B. Do not install flooring until building is permanently enclosed and wet construction in or near areas to receive tile materials is complete, dry and cured.
3.2 SUBFLOOR TESTING AND PREPARATION:
A. Prepare and test surfaces to receive resilient tile and adhesive as per manufacturer’s standards.
1. Remove existing resilient floor and existing adhesive ass required for new work.
B. Prepare concrete substrates in accordance with ASTM F710.
C. Perform work regarding removal of flooring and adhesive containing asbestos as specified in Section 02 82 13.19, ASBESTOS FLOOR TILE AND
MASTIC ABATEMENT.
09 65 19 - 6
3.3 INSTALLATION:
A. Install in accordance with manufacturer's instructions for application and installation unless specified otherwise.
B. Mix tile from at least two containers. An apparent line either of shades or pattern variance is not acceptable.
C. Tile Layout:
1. If layout is not shown on construction documents, lay tile symmetrically about center of room or space with joints aligned.
2. Vary edge width as necessary to maintain full size tiles in the field, no edge tile to be less than 1/2 the field tile size, except where irregular shaped rooms make it impossible.
3. Place tile pattern in the same direction; do not alternate tiles unless specifically indicated in the construction documents to the contrary.
D. Application:
1. Adhere floor tile to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.
2. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
3. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.
4. Roll tile floor with a minimum 45 kg (100 pound) roller.
E. Seal joints at pipes with sealants in accordance with Section 07 92 00, JOINT SEALANTS.
F. Installation of Edge Strips:
1. Locate edge strips under center line of doors unless otherwise shown on construction documents.
2. Set resilient edge strips in adhesive. Anchor metal edge strips with anchors and screws.
3. Where tile edge is exposed, butt edge strip to touch along tile edge.
4. Where thin set ceramic tile abuts resilient tile, set edge strip against floor file and against the ceramic tile edge.
09 65 19 - 7
3.4 CLEANING AND PROTECTION:
A. Clean adhesive marks on exposed surfaces during the application of resilient materials before the adhesive sets. Exposed adhesive is not acceptable.
B. Keep traffic off resilient material for a minimum 72 hours after installation.
C. Clean flooring as recommended in accordance with manufacturer’s printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and/or finish in accordance with manufacturer’s written instructions.
D. When construction traffic occurs over tile, cover resilient materials with reinforced kraft paper properly secured and maintained until removal is directed by COR. At entrances and where wheeled vehicles or carts are used, cover tile with plywood, hardboard, or particle board over paper, secured and maintained until removal is directed by COR.
E. When protective materials are removed and immediately prior to acceptance, replace damaged tile and mouldings, re-clean resilient materials.
3.5 LOCATION:
A. Unless otherwise indicated in construction documents, install tile flooring, under areas where casework, laboratory and pharmacy furniture and other equipment occur.
B. Extend tile flooring for room into adjacent closets and alcoves.
09 65 19 - 8
This Page is Blank.
Building 3 – Replace Roof & HVAC, Project No. 502-19-102 05-01-15
09 68 00 - 1
SECTION 09 68 00
CARPETING
A. Section specifies carpet, edge strips, adhesives, and other items required for complete installation to match existing that needs to be patched to complete the new construction.
1.2 RELATED WORK:
A. Sustainable Design Requirements: Section 01 81 13, SUSTAINABLE DESIGN
REQUIREMENTS.
B. Manufacturer, Color and Style of Carpet and Edge Strip:
Section 09 06 00, SCHEDULE FOR FINISHES and Finish Schedule.
C. Resilient Wall Base: Section 09 65 13, RESILIENT BASE AND ACCESSORIES.
D. Testing of Concrete Floors Before Installation: Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.
1.3 QUALITY ASSURANCE:
A. Installer Qualifications: A company specializing in carpet installation with a minimum three (3) years’ experience and employing experienced flooring installers who have retained, and currently hold, an INSTALL
Certification, or a certification from a comparable certification program, and a valid OSHA 10 certification.
1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:
a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.
b. Career long training.
c. Manufacturer endorsed training.
d. Fundamental journeyman skills certification.
1.4 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Sustainable Design Submittals as described below:
1. Volatile organic compounds per volume as specified in
PART 2 - PRODUCTS.
C. Product Data:
1. Manufacturer’s catalog data and printed documentation stating physical characteristics, durability, resistance to fading and flame
09 68 00 - 2 resistance characteristics for each type of carpet material and installation accessory.
2. Manufacturer’s printed installation instructions for the carpet, including preparation of installation substrate, seaming techniques and recommended adhesives and tapes.
D. Samples:
1. Carpet: "Production Quality" samples 305 x 305 mm (12 x 12 inches) of carpets, showing quality, pattern and color specified in
Section 09 06 00, SCHEDULE FOR FINISHES.
2. Floor Edge Strip (Molding): 152 mm (6 inches) long of each color and type specified.
3. Base Edge Strip (Molding): 152 mm (6 inches) long of each color specified.
E. Shop Drawings: Installers layout plan showing seams and cuts for sheet carpet and carpet module.
F. Maintenance Data: Carpet manufacturer’s maintenance instructions describing recommended type of cleaning equipment and material, spotting and cleaning methods and cleaning cycles.
G. Installer’s Qualifications.
H. Manufacturer’s warranty.
1.5 DELIVERY AND STORAGE:
A. Deliver carpet in manufacturer’s original wrappings and packages clearly labeled with manufacturer’s brand name, size, dye lot number and related information. Transport carpet to job site in a manner that prevents damage and distortion that might render it unusable. When bending or folding is unavoidable for delivery purposes, unfold carpet and lay flat immediately.
B. Deliver adhesives in containers clearly labeled with manufacturer’s brand name, number, installation instructions, safety instructions and flash points.
C. Store in a clean, dry, well-ventilated area, protected from damage and soiling. Before installation, acclimate carpet to the atmospheric conditions of the areas in which it will be installed for 2 days prior to installation
1.6 ENVIRONMENTAL REQUIREMENTS:
A. Maintain areas in which carpeting is to be installed at a temperature between 18 - 35 degrees C (65 - 95 degrees F) with a maximum relative
09 68 00 - 3 humidity of 65 percent for two (2) days before installation, during installation and for three (3) days after installation.
B. Minimum Substrate Surface Temperature: 18 degrees C (65 degrees F) at time of installation.
C. Three (3) days after installation, maintain minimum temperature of 10 degrees C (50 degrees F) for the duration of the contract.
1.7 WARRANTY:
A. Construction Warranty: Comply with FAR clause 52.246-21, "Warranty of
Construction".
B. Manufacturer Warranty: Manufacturer shall warranty their carpet for a minimum of ten (10) years from date of installation and final acceptance by the Government. Submit manufacturer warranty.
1.8 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.
B. American National Standards Institute (ANSI):
ANSI/NSF 140-10.........Sustainable Carpet Assessment Standard
C. American Association of Textile Chemists and Colorists (AATCC):
16-04...................Colorfastness to Light
134-11..................Electric Static Propensity of Carpets
165-08..................Colorfastness to Crocking: Textile Floor
Coverings-AATCC Crockmeter Method
174-11..................Antimicrobial Activity Assessment of New
Carpets
D. ASTM International (ASTM):
D1335-12................Tuft Bind of Pile Yarn Floor Coverings
D3278-96(R2011).........Flash Point of Liquids by Small Scale Closed-
Cup Apparatus
D5116-10................Determinations of Organic Emissions from Indoor
Materials/Products
D5252-11................Operation of the Hexapod Tumble Drum Tester
D5417-11................Operation of the Vettermann Drum Tester
E648-14c................Critical Radiant Flux of Floor-Covering Systems
Using a Radiant Heat Energy Source
E. Code of Federal Regulation (CFR):
09 68 00 - 4
40 CFR 59...............Determination of Volatile Matter Content, Water
Content, Density Volume Solids, and Weight
Solids of Surface Coating
F. The Carpet and Rug Institute (CRI):
CIS.....................Carpet Installation Standard
G. International Standards and Training Alliance (INSTALL)
H. International Organization for Standardization (ISO):
2551-81.................Machine-Made Textile Floor Coverings
I. U.S. Consumer Product and Safety Commission (CPSC):
16 CFR 1630.............Surface Flammability of Carpets and Rugs
2.1 CARPET:
A. Physical Characteristics:
1. Carpet free of visual blemishes, streaks, poorly dyed areas, fuzzing of pile yarn, spots or stains and other physical and manufacturing defects.
2. Type:
a. Carpet Construction: To match existing.
b. Carpet Type: To match existing.
c. Pile Type: To match existing. Pile type and thickness must conform to ADA requirements.
d. Pile Fiber: Commercial 100 percent branded (federally registered trademark), nylon continuous filament.
3. Static Control: Provide static control to permanently regulate static buildup to less than 2.0 kV when tested at 20 percent relative humidity and 21 degrees C (70 degrees F) in accordance with
AATCC 134.
4. Backing Materials: To match existing.
5. Flammability and Critical Radiant Flux Requirements:
a. Comply with 16 CFR 1630.
b. Test Carpet in accordance with ASTM E648.
c. Class I: Minimum critical radiant flux of 0.45 watts per square centimeter (2.9 watts per square inch).
e. Carpet in corridors, exits and Medical Facilities to be Class I.
6. Average Pile Yarn Density (APYD):
a. Corridors, lobbies, entrances, common areas or multipurpose rooms, open offices, waiting areas and dining areas: Minimum APYD
6000.
09 68 00 - 5
b. Other areas: Minimum APYD 4000.
7. VOC Limits: Use carpet that complies with the following limits for
VOC content when tested according to ASTM D5116:
a. Carpet, Total VOCs: 0.5 mg/sq.m x hr.
b. Carpet, 4-PC (4-Phenylcyclohexene): 0.05 mg/sq.m x hr.
c. Carpet, Formaldehyde: 0.05 mg/sq.m x hr.
d. Carpet, Styrene: 0.4 mg/sq.m x hr.
2.2 ADHESIVE AND CONCRETE PRIMER:
A. Provide water resistant, mildew resistant, nonflammable, and nonstaining adhesives and concrete primers for carpet installation.
Provide release adhesive for modular tile carpet as recommended by the carpet manufacturer. Provide adhesives flashpoint of minimum
60 degrees C (140 degrees F) in accordance with ASTM D3278. Materials are to have a VOC maximum of 50 g/L when calculated according to 40 CFR
59, (EPA Method 24).
2.3 SEAMING TAPE:
A. Provide tape for seams as recommended by the carpet manufacturer for the type of seam used in installation. Seam sealant is to have a maximum VOC content of 50 g/L when calculated according to 40 CFR 59, (EPA Method 24). Do not use sealants that contain 1,1,1-trichloroethane or toluene.
2.4 EDGE STRIPS (MOLDING):
A. Metal:
1. Hammered surface aluminum, pinless, clamp down type designed for the carpet being installed.
2. Floor flange not less than 38 mm (1-1/2…