SOW-04052021.docx

DOCX document 49 KB Posted

Attached to
Z1DA--Project #502-19-102 Replace Roof and HVAC System for Building 3
Solicitation number
36C25621R0112
Issued by

About this file

This document outlines the scope of work for a federal construction contract to replace the roof and HVAC system in Building 3 at the Alexandria VA Health Care System in Pineville, Louisiana. The project includes demolishing the existing roof and HVAC equipment, installing a new roof, replacing all HVAC ductwork and equipment to accommodate new air handling units, upgrading controls to integrate with the facility's system, and replacing piping for chilled water, heating hot water, steam and condensate lines throughout the building. The work must be completed in phases over a two-year period following notice to proceed. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and have a construction cost range of $5-10 million. Interested vendors must be registered and verified in the Vendor Information Pages database. The solicitation is expected to be posted on beta.SAM.gov on or after June 15, 2021.

View the file

Other files

File Type Posted
36C25621R0112 0001.docx DOCX document
BLDG 3 Site Visit Information.pdf PDF
WDLA202110051 04302021.txt TXT text file
36C25621R0112.docx DOCX document
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
Vol 2-Specs.pdf PDF
ACM and LeadReports.pdf PDF
Drawings volume 2.pdf PDF
Drawings Volume 1.pdf PDF
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
EXHIBIT E SURETY FORM.docx DOCX document
J_A 502-19-102 (BC Signed) v1_Redacted.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
EXHIBIT G RETURNABLES.docx DOCX document
Vendor Request Form.xlsx XLSX spreadsheet
Vol 1-Specs v2.pdf PDF
Project Risk Assessment Replace Roof and HVAC building 3.pdf PDF
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
VA10091 FMS Vendor Request Form EFT.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev_02 Statement of Work

Project No. 502-19-102 Replace Roof and HVAC System in Bldg. 3 Alexandria VA Health Care System, Pineville, LA

Scope:

The primary scope of the project is to reroof this building and to replace the existing AHU with a new modern HVAC system. During this process, all ceilings, both ACT and suspended plaster ceilings above, will be removed to accommodate the installation of new HVAC. They will be replaced with new ACT ceiling with gypsum board soffits as needed for the new system. Most light fixtures will be reused as well as existing fixtures for speakers, fire alarm, smoke detectors and fire protection. Two chases will be cut in the floors from the attic to accommodate new HVAC work. New walls will be installed at that time around the chases. Existing walls and floors will be cut and patched as necessary to match existing construction. The existing roof will be removed in its entirety. Existing clay tile in good condition will be salvaged for reuse both from the roof and the sides of the dormers. Waterproof membrane with new copper flashing will be installed. The dormers will be reroofed and re-sided. Radiators will be removed in various locations. Revisions to electrical systems will be necessary as well as repairs to walls and floors. The gutters will be replaced, and four downspouts will be added connecting to the existing rainwater collection system. Salvaged half-round windows with new louvers will be installed at the dormers. All exterior woodwork at the exterior roof soffit and on the dormers will be replaced and repainted. The connector to building 2 will be reroofed. Both the connector to Building 4 and all levels of the connector to Building 2 will have a new heating system installed and a new water heater is planned for the building. The scope includes, in part, new architectural finishes, asbestos abatement, miscellaneous HVAC piping, new VAV boxes, new chilled water pumps, insulation work, new AHU’s, Siemens Controls & Electrical, and asbestos/lead abatement. Survey report provided by the AE will be included in the package. This includes information for asbestos, lead and PCB removal.

Building 3 is a multi-story reinforced concrete framed building constructed circa 1928. The building is constructed of reinforced concrete pan joists, slabs, beams and columns. Per the structural analysis, the existing concrete beams can support new loads. However, the existing joists and slab cannot. New steel framing will be required to span the new unit over the existing joint and slab. Partial existing slab demolition will be required to install new chases on multiple floors. New concrete equipment pad for ground supported temporary air handling unit, new steel framing for AHU’s in the attic, and new interior concrete equipment pads in basement will be required.

Architectural demolition will include all equipment, ductwork and piping with modifications to floors and ceilings as required. Electrical connections will be removed. New flooring/ceiling penetrations may be provided. Radiators will be removed in some cases including their piping. Demolition will be coordinated with the presence of hazardous materials. Demolition on the roof will take the existing roofing and flashing and underlayment off entirely. This is to include all flashings, dormer siding and trim, gutter flashing and trim. All damage to the roof deck or supporting structure to be repaired. All HVAC systems are to be replaced. Work will be phased floor by floor. Closure of unused original floor penetrations will be provided. New shaft wall or rated vertical enclosures are expected. Firestopping, dampening and other means of rated protection are expected. Some new windows and louvers will be installed as necessary to accommodate HVAC work.

Demolition of the existing sprinkler system will be necessary to allow for replacement of air handling ductwork. New mains, laterals and sprinklers shall be installed to restore the system to NFPA standards. The existing steam fired domestic hot water heater will be replaced with new electric water heater. The connection piping to be removed and capped downstream of the isolation valve. All associated condensate piping to be removed. Existing hot and cold-water piping to be reworked to be compatible with the new heater connections.

Removal of existing low-pressure steam system and the corresponding vacuum condensate return system in the crawl space is necessary as well as removal of existing induction units. A new general exhaust fan, new medium/low pressure ductwork, new hot water unit heaters, new attic and baseboard heaters, new hot water heat exchangers, pumps and associated piping will all be provided.

Electrical support for the new mechanical system will be provided. Electrical connections to existing AHU, chilled water pumps, and residual mechanical devices to be demolished. Existing ceiling mounted lighting and devices to be removed as required for ceiling replacement. Existing fire alarm duct mounted smoke detectors will be demolished leaving fire alarm circuit intact. New electrical panels will be provided in the crawl space and attic. Existing lighting will be temporarily supported and/or disconnected removed and reinstalled as required. Expansion of the existing lighting in the basement and attic will be provided. New duct mounted fire alarms will be provided where necessary.

The new HVAC system will include the following:

VAV air distribution thermal units for each zone, hot water heating converter heat exchangers, electric condensate pump, chilled water pumps and piping, digital control system that reports back to Siemens central energy management system, and ventilation of the crawl space.

Objective:

1. To ensure all requirements of contract drawings and specifications are met and completed by the completion date provided in contract documents.

2. To ensure that all construction activities are performed in such a manner as to ensure safe and correct operation and in compliance with applicable local, state and federal regulations and contract drawings and specifications.

Tasks:

Furnish all labor, tools, materials, equipment and supervision necessary for the work to replace the existing Alexandria VAHCS Roof and HVAC System in Building 3 as detailed in the Drawings and Specifications for this project.

The work for this project includes, but is not limited to the following improvements:

Contractor shall completely prepare site for operations, including demolition and removal of existing HVAC equipment and roofing, and furnish labor and materials and perform work to provide new HVAC equipment and roofing with related equipment (ductwork, controls, piping, etc.). Replacement of all existing HVAC ductwork as required for the proper functioning of the HVAC system and new AHU’s. Connection of the new HVAC controls to the AVAHCS controls network. Replacement of building 3 chilled water, heating hot water, steam and steam condensate loops and drain lines throughout the building.

Phasing:

Refer to volume 1 specifications 01 00 00 -5 on page 18 for phasing breakdown.

Special Condition:

Prior to mobilization and commencement of any construction, the contractor shall conduct a mandatory thorough survey and investigation of all the work sites for the Replace Roof and HVAC System in Bldg. 3 Project. This survey and investigation shall include verifying all utilities within the sites where VAV units and pipelines are to be installed, all tie-in connection points, the depth, size and material of all piping and any structures that may conflict with the proposed construction. The contractor shall be responsible for choosing the process He/She deems necessary to employ that will provide the most accurate data of the existing conditions at these sites. Once this information is obtained, the contractor shall prepare a report listing all discrepancies, conflicts and remedies to all conflicts. This report shall be submitted as Submittal #1. The Resident Engineer/COR will review for technical feasibility. Once approved, the Contracting Officer will request a formal proposal for the corrective work. Approval of this cost proposal will be required prior to the commencement of any corrective construction.

Delivery:

All personnel in the contractor’s services shall have certified or proper training on the tasks they perform.

The Project Engineer or COR shall be informed by the contractor of the following situations/events in writing:

· The anticipated start date of any contract work.

· As soon as it is known that the work will take longer than expected.

· As soon as it is known that a possible change order will have to happen.

· To provide a written plan for corrective action for any work that cannot be completely within contract specified time.

· Inform COR if contractor needs to stay outside of normal operating hours.

· Contractor Payment Application shall be provided at the beginning of each month for the previous month work that has been completed.

All work shall be completed in accordance with contract drawings and specifications.

All required contract works completed shall be approved and accepted by Project Engineer or COR prior to accepting and approving contractor application for payment.

Security and General Requirements:

All on-site work should be completed between the hours of 8am and 4:30pm CST, Monday through Friday excluding holidays unless otherwise listed in the tasks section or other working hours are approved by the COR.

Contractor shall obtain an access badge from the VA Police Departmentwhile performing work on-site for their self, their employees and all subcontractors under their authority.

Security and privacy requirements vary depending on the equipment to be serviced and the service being performed. Contractor personnel may be required to complete any or all of the following but not limited to:

· Online training.

· Read, sign, and comply with ‘Contractor Rules of Behavior’.

· Submit to finger printing and background investigation.

· Provide network security information as requested for any equipment used in the VA facilities.

· The extent of these requirements shall be determined by Project Engineer or COR using current facility Information Technology and Privacy rules in cooperation with experts in those departments.

Parking shall be limited to established concrete or improved rock parking lots, Project Engineer or COR will advise which parking lots to use. Contractors and personnel are not allowed on the grass area unless specifically authorized by the Project Engineer. U.S. District Court Violation Notices shall be issued for parking violations.

The contractor and all employees shall comply with all applicable Alexandria VA Health Care System fire, safety, and traffic regulations.

The contractor is to field verify existing conditions.

All work is to be performed within all ASME, OSHA, EPA, VA, and Federal, State and local codes and regulations.

Proper Lock-out/Tag-out procedures shall be used when appropriate.

No roadway, drainage ditch, pedestrian walkway, or any other service, utility, or access to any of the above is to be blocked or rendered unusable for any length of time during this project unless previously approved by the Project Engineer.

All work, materials, storage of materials and equipment, repair procedures and unforeseen problems or circumstances are to be coordinated with the Project Engineer.

Work on this project shall not begin until authorized by the Contracting Officer.

The title Project Engineer or COR shall refer to the Contracting Officer’s Representative.

Work to be conducted on a Fully Operational VA Hospital Campus, in and around Mental Health and Long Term Care facilities. Tools and equipment shall be kept under close watch to prevent patient injury.

Place of Performance:

· Work shall be performed, with issuance of Notice to Proceed, at the Alexandria VA Health Care System, Pineville, LA, or in the immediate vicinity as required by this Scope of Work.

· Equipment or Government property may be removed from the facilities with prior permission from Project Engineer or COR and the Department Director.

Period of Performance:

The construction portion of this project will consist of two separate periods, each of which must be preceded by a NTP issued by contracting.

1. Pre-construction period – 120 Days – Contractor to provide the following deliverables before the end of this period:

a. Submittal log of all submittals to be approved during the course of the project

b. Pre-tab report

c. Site survey of pre-existing conditions as described in paragraph titled “special conditions”.

d. All submittals which are to be approved by the AE and VA COR.

2. Construction period – All contractually required work and tests must be successfully completed within 365 calendar days of issuance of Notice to Proceed for construction.

ISO Requirements:

· The C&A requirements do not apply, therefore a Security Accreditation Package is not required.

COVID protocol

COVID screening: For those visiting the Medical Center for the first time, please be aware COVID screening at 2 entrances (North and Main) of the 3 at the facility is on-going. The south entrance has been closed since COVID screening began. The questions that will be asked at the entrance are shown on the VA COVID screening tool website www.va.gov/covid19screen. VA employees and contractors can use the screening tool before arriving in the morning to expedite the screening process. The employee or contractor will receive the following pop-up on their screen if they provide the appropriate answer to all COVID symptom questions:

This screen can be shown at the entrance checkpoint to reduce admittance waiting time. Everyone must have a mask upon entry to the facility and the mask must always be worn while on site. Social distancing and all other CDC guidelines are practiced here.

This is a tobacco free facility.

image1.jpeg

File details come from the government source that posted it. Updated .