Text version
as of 23 January 2023
Instructions for Vignette I:
Standard Rotation
Request contractor provide a proposal with methodology and cost to accomplish a rotation from cradle to grave based on the following information:
Type: Standard (current model is a Decisive Action Training Environment (DATE))
The standard training exercise is scripted and typically based on any combination of offense, defense, and stability operations. Standard rotations take place in a generic region with scenarios and Opposing Forces (OPFOR) threats based on the contemporary operational environment
(COE). Rotational Training Unit (RTU) missions conducted during standard rotations are generally in direct alignment to the RTU’s standard Mission Essential Task List (METL) and training objectives.
Dates: T-Day (5 Jun 20xx) through Change of Mission (18 Jun 20xx)
Designed based on a 14 calendar day training period with 18 calendar days of Live Fires typically starting prior to Force on Force (FOF) and running concurrently during the 14 calendar training days.
Unit Size: For a standard Army Brigade Combat Team (6,500 PAX)
PAX size includes RTU, OPFOR and MSC personnel.
Scenario: Typically focus on training at brigade level and below; however, they may focus on division or higher level operations and training objectives. The variables of the Operational Environment (OE) serve as the Standard Rotational Exercise’s nucleus and concentrate on the conditions and characteristics of each variable that would significantly impact the military if deployed to that area of the world. The variables center on the political, military, economic, social, information, infrastructure, physical environment and time (PMESII-PT) components of an OE. In the current Standard Rotational Exercise, the variables are operationalized to the countries identified in the decisive action training and environment manual portrayed in the Caucasus region; however, they may include other regional areas as required by the Government.
Total hours available 70,242
Requirements (each requirement shall be costed separately):
a. Show number of general role players (excluding supervision) that can be supported (12 hours per day) within the 70,242 hours available after accounting for all other support staff.
b. Provide full description of support staff (including supervision not specifically addressed in
5.11) and work schedule. Support staff is fully inclusive of all labor categories and estimated hours to support role players in paragraph a.
c. Provide labor categories and hours used outside of the 14 calendar day exercise.
d. Provide estimate and breakout of any travel or non ODC requirements.
Considerations when costing number of general role players and support staff:
a. Contractor shall provide training, costumes and box transportation for a combined role play population estimated at 1,000 individuals. This includes all role play categories and military augmentees. (augmentees shall fill gap after deduction of role players)
b. Contractor shall provide five (5) skilled role players, type 1 and five (5) skilled role players, type 3 role players as identified in C.5.11.1.3.
DRAFT
as of 23 January 2023
c. Contractor shall support two Non-combatant Evacuation Operations (NEO) each consisting of twenty (20) general role player, type 1 role players and one hundred thirty (130) military augmentee role players as identified in C.5.11.1.3.2.
d. Contractor shall provide box transportation and 4 individuals to pick-up and re-locate live
(animal) props as dictated by rotational requirements as indicated in C.5.11.1.5.2
e. Contractor shall anticipate approximately 320 hours per month in the area of prop fabrication with surges for specific rotational requirements as identified in C.5.11.1.5.3.
f. Contractor shall set-up mock villages and special sites as identified in C.5.11.8.2.1.
g. Contractor is responsible for additional requirements that may include but not limited to:
a. Rental Vehicles – if required (cost of vehicles will be charged to ODC CLINs)
b. Costume Requirements
c. Augmentee Uniforms
d. Recruitment
e. Badge Requirements
f. Security Requirements