Attachment 12 - APOD Work Order Request (23 Jan 23).pdf
PDF 109 KB Posted
- Attached to
- JRTC- Mission Support Contract (Fort Polk) Federal contract opportunity
- Solicitation number
- W911S821R0017
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT #12 – APOD Work Order Requests as of 23 Jan 23
DEPARTMENT OF THE ARMY
JOINT READINESS TRAINING CENTER
AERIAL PORT OF DEBARKATION (APOD)
1101 WARRIOR AVE
ALEXANDRIA, LOUISIANA 71303
Control #____________ Date:____________
MEMORANDUM FOR Director of Operations, England Industrial Airpark, Alexandria, LA 71303
SUBJECT: Request for Repairs/Maintenance of Facilities
1. Request for Repairs/Maintenance for the JRTC-APOD area:
A. Building Number/Location:_______________
B. Repairs/Maintenance Description:__________________________________
2. Priority (clarification on back page): EMERGENCY URGENT ROUTINE
3. Impact of damage if not repaired:____________________________________
4. Request that repairs are completed NLT:_____
5. Pictures of Damage Y / N Pictures of Repair Y / N
6. Date work order is closed:________________________________
7. Work order inspected by:_______________________ (print name)
________________________ (signature)
8. Point of contact for this request is at (337) 653-2786 or FAX (337) 653-2709.
DISTRIBUTION:
England Authority
COR
File
Emergency: an unexpected and usually dangerous situation that calls for immediate action; situation where the health or lives of individuals are endangered or would result in further damage; will be completed within 24-48 hours from submittal (water pipe breaks, gas leak, etc.)
Urgent: no immediate threat to life or property but if the problem is not corrected in a timely manner it may become an emergency; will be completed within 3-5 working days from submittal (clogged sink/toilet, refrigerator not cooling, etc.)
Routine: not immediate in nature; will be completed within 10 working days from submittal (loose door knobs/screws/hinges, torn window screens, etc.)
File details come from the government source that posted it. Updated .