VendorChangeDetailsReport_ITB 27-09_v2_Oct_9_26.pdf
PDF 2 KB Posted
- Attached to
- GCC Baseball & T-Ball Backstop Replacement
- Solicitation number
- ITB 27-09
- Issued by
- New London County, Connecticut
About this file
This is a Vendor Change Details Report for Invitation to Bid (ITB) 27-09 issued by the Town of Groton, Connecticut, for the replacement of baseball and T-ball backstops at the Groton Community Center. The project requires qualified fencing contractors to remove existing backstop and fencing components and furnish and install new commercial-grade galvanized chain-link backstop systems. The scope of work encompasses all labor, materials, equipment, concrete, hardware, removal, disposal, site cleanup, and incidental work necessary for complete installation. Bids are due on October 21, 2026, at 2:00 p.m. EDT, with the questions and answers period extending through October 14, 2026, at 2:00 p.m. EDT. The solicitation does not specify individual line items, estimated contract value, or contract term. All vendors are eligible to respond.
The report does not specify pricing terms, payment schedules, or set-asides applicable to this procurement. Delivery terms are Free On Board Destination, with payment terms to be specified by the selected vendor. No incumbent contractor information is provided in the file. The primary point of contact for this solicitation is Joseph Ciriello at the Town of Groton, located at 45 Fort Hill Road, Groton, Connecticut 06360, who can be reached at 860-441-1681, via facsimile at 860-449-7160, or by email at jciriello@groton-ct.gov.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Change Details Report Solicitation no.ITB 27-09
'GCC Baseball & T-Ball Backstop Replacement'
Header Information
There are no changes under this section.
Solicitation Fields
Solicitation Questionnaire
Documents Added
1. Document: '27-09 Walkthrough Addendum.pdf' was added.
Solicitation Group Changes
Report Created: Oct 09, 2026 11:08 AM EDT Page: 2
Solicitation ITB 27-09, GCC Baseball & T-Ball Backstop Replacement
Item Specifications and Quantities
File details come from the government source that posted it. Updated .